Iron pouring notch operation method
By setting up temporary retaining walls and gun mud-burning measures in the iron reversing port operation, the problem of sludge coating in the new iron reversing port is solved, ensuring the depth of the iron reversing port, achieving long-term stable production and safety of the blast furnace, and bringing about Significant economic benefits.
Patent Information
- Application Number
- CN202411264077.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-12
AI Technical Summary
The existing method of inverting the iron mouth has caused the mud pack in the new iron mouth to be washed away, and the depth of the iron mouth is shallow, making it easy to cause problems such as coke stuck, furnace conditions fluctuations, large flow and coke waste, resulting in production losses and safety hazards.
Set up a temporary retaining wall before the new iron mouth is put into use, and open the new iron mouth when the iron mouth on the same side is about to be out of the iron, and perform a short period of time to make the mud and stay in the gun mud to ensure that the mud is formed and dried and ensure that the iron mouth is ensured. Deeply meet the iron discharge conditions, extend the residence time of the cannon mud in the iron mouth passage, and avoid slag iron erosion.
The stability of the iron mouth depth is achieved, the fluctuations in the jam and furnace conditions are reduced, the production stability and safety are improved, and the production increase and cost reduction benefits are brought about.
Abstract
Description
Technical Field
[0001] The invention relates to the field of steel production, in particular to a method for operating a tapping hole. Background Art
[0002] There are multiple tapholes in front of the blast furnace. During normal production, two tapholes are used and two are reserved according to the principle of taphole facing each other. For example, there are four sets of tapholes. During normal tapping of tapholes 1 and 3, tapholes 2 and 4 are used for the preparation work such as dismantling the old tapholes for pouring the main ditch and slag ditch, and maintenance and inspection of the equipment in front of the furnace, and vice versa. Taphole switching operation is to switch the two tapholes that normally tap iron to the two spare tapholes that tap iron in turn.
[0003] The normal method of changing the iron mouth is to change the iron mouth when the iron flow through the iron mouth for normal iron tapping reaches the specified iron flow or the main groove is eroded to the point where it cannot meet the requirements for safe iron tapping. Generally, after one iron mouth is successfully changed, it will be changed to another one the next day.
[0004] The original method of tapping the taphole was to open a spare taphole to tap iron after the taphole to be switched had tapped the last batch of iron. The operation was simple and clear, but there were many disadvantages.
[0005] There were two tapholes that had not produced iron for about a month. Due to the lack of new taphole mud replenishment, the taphole mud in the taphole channel was gradually eroded and washed away, resulting in a shallow taphole when it was opened for the next tapping. This made it easy for large flow and coke jamming to occur, and the incomplete discharge of slag and iron caused fluctuations in the furnace condition and the need to reduce wind to prevent accidents.
[0006] For example, since the spare iron mouth has not produced iron for about 35 days, the mud bags in the iron mouth have been basically washed away by the slag and iron in the furnace. There are many disadvantages in directly opening the spare iron mouth to produce iron during the iron mouth pouring process. At the same time, there are requirements for the wind and oxygen control of blast furnace operations. Before opening a new iron mouth, it is required to reduce the wind by about 1000m3 / min and stop oxygen operation.
[0007] To sum up, there are mainly the following deficiencies: 1. The mud bags in the new taphole have been washed away, and the depth of the taphole is shallow. In the process of the first batch of iron coming out of the new taphole, coke is prone to get stuck frequently. After the coke is stuck, the taphole must be poked with an opening machine, resulting in a waste of drill rods and drill bits. In addition, due to the high temperature above the main groove, frequent poking of the taphole can easily cause the opening machine to malfunction.
[0008] 2. When preparing to pour the iron mouth, the air flow is reduced and the oxygen operation is stopped, which leads to unstable airflow, easily causing fluctuations in the furnace condition, affecting the operation in the furnace, and easily causing furnace heat, etc.
[0009] 3. During the iron-discharging process, coke frequently gets stuck at the tap hole, which results in poor discharge of slag and iron, causing furnace blockage and increased pressure difference. Sometimes, the furnace is forced to reduce the air volume more significantly, and even worse, causing large fluctuations in furnace conditions.
[0010] 4. It is easy for a large amount of iron to escape from the iron mouth, causing safety accidents such as molten iron falling to the ground, posing a threat to personal and equipment safety.
[0011] 5. Coke escapes during the iron-popping process, and a large amount of coke enters the slag handling system along with the slag, causing the slag handling belt to burn out and coke to be wasted.
[0012] 6. Coke frequently leaks and gets stuck at the new taphole, which easily causes smoke and makes it difficult to maintain the taphole, affecting environmental protection. Directly opening the spare taphole has many of the above problems, and the blast furnace loses thousands of tons of output every time the taphole is changed. Sometimes there will be large fluctuations in furnace conditions. The taphole is changed every 40 days or so, resulting in a large loss in a year. Summary of the invention
[0013] In order to solve the problems of the old method, a team headed by the furnace technician, the duty room foreman and the furnace foreman was established for a specific blast furnace to study solutions to the problems. The focus of each discussion was on how to solve the problem of the iron mouth depth of the new iron mouth, without causing the blast furnace to reduce air and oxygen.
[0014] The technical solution adopted by the present invention is as follows: The present invention is a method for operating a tapping hole, comprising the following steps: Step 1: Before the new iron mouth is put into use, a temporary retaining wall is built in the new main trench; Step 2: When the amount of iron discharged from the last iron hole on the same side is consistent with the theoretical output in the furnace, that is, when the iron hole is about to be fully discharged, the new iron hole to be replaced is opened first, and the iron hole is immediately blocked after it is completely drilled through, and mud is beaten for a period of time to ensure the depth of the iron hole and the formation of mud bags in the furnace; Step 3: Wait for 28-32 minutes for the tap hole on the other side to be opened and the tap hole to be plugged before opening the new tap hole to be replaced, that is, tapping the first batch of iron; Step 4: If the tapping time of the tapping site on the other side is shorter, then continue to tap the iron in one furnace to ensure that the clay driven into the new tapping site to be replaced stays in the tapping channel for more than two hours, and that the clay in the tapping channel is formed and dried before tapping from the new tapping site. When the new tapping site meets the tapping conditions, tapping will be carried out according to normal operations.
[0015] Furthermore, the purpose of designing the temporary retaining wall in step 1 is to prevent slag from rushing into the slag skimmer and blocking the molten iron channel.
[0016] Furthermore, the mud making time in step 2 is 25-35 seconds.
[0017] Preferably, the idea of this design is to feed enough new taphole mud into the taphole channel before the new taphole is officially tapped, and ensure that the taphole mud can stay in the taphole channel for a long enough time to dry and form, so that the taphole can reach a normal depth when the taphole is officially tapped; The beneficial effects achieved by the present invention using the above structure are as follows: 1. Based on the annual iron output of 3.3 million tons of blast furnace, the iron flow rate of each main iron channel is 120,000 tons, and the blast furnace tapping is performed once a month, a total of 24 tapping times per year. Compared with the old tapping method, the new method brings a monthly benefit of 2.2 million yuan.
[0018] 2. By pre-beating the blasthole mud in advance, the strength of the iron mouth channel is improved to reduce splashing. The iron mouth is shallow, which is prone to large flow, coke jamming, and incomplete slag and iron discharge causing furnace condition fluctuations. The wind is reduced to prevent accidents, thus achieving long-term stability of the blast furnace.
[0019] 3. After a long period of exploration, the blast furnace boldly explored and steadily verified a new method for tapping the iron hole. The new method not only solved many drawbacks of the original method, but also brought direct economic benefits such as increased production and reduced costs, and the indirect benefits are immeasurable. DETAILED DESCRIPTION
[0020] The invention relates to a tapping operation method. Example 1
[0021] The tapping operation method comprises the following steps: Step 1: Before the new taphole is put into use, a temporary retaining wall is built in the new main trench to prevent slag from rushing into the slag skimmer and blocking the molten iron channel; Step 2: When the tapping amount of the last iron from the taphole on the same side is consistent with the theoretical output in the furnace, that is, when the taphole is about to finish tapping, first open the new taphole to be replaced, and immediately plug the taphole again after it is completely drilled through. The mud-making time is 25 seconds to ensure the depth of the taphole and the formation of mud bags in the furnace; Step 3: Wait for 28 minutes for the tap hole on the other side to be completely unloaded and then open the new tap hole to be replaced, that is, to unload the first batch of iron; Step 4: If the tapping time of the tapping site on the other side is shorter, then continue to tap the iron in one furnace to ensure that the clay driven into the new tapping site to be replaced stays in the tapping channel for more than two hours, and that the clay in the tapping channel is formed and dried before tapping from the new tapping site. When the new tapping site meets the tapping conditions, tapping will be carried out according to normal operations. Example 3
[0022] The tapping operation method comprises the following steps: Step 1: Before the new taphole is put into use, a temporary retaining wall is built in the new main trench to prevent slag from rushing into the slag skimmer and blocking the molten iron channel; Step 2: When the amount of iron discharged from the last iron hole on the same side is consistent with the theoretical output in the furnace, that is, when the iron hole is about to be exhausted, the new iron hole to be replaced is opened first, and the iron hole is immediately blocked after it is completely drilled through. The mud-making time is 30 seconds to ensure the depth of the iron hole and the formation of mud bags in the furnace; Step 3: Wait for 30 minutes for the tap hole on the other side to be completely unloaded and then open the new tap hole to be replaced, that is, to unload the first batch of iron; Step 4: If the tapping time of the tapping site on the other side is shorter, then continue to tap the iron in one furnace to ensure that the clay driven into the new tapping site to be replaced stays in the tapping channel for more than two hours, and that the clay in the tapping channel is formed and dried before tapping from the new tapping site. When the new tapping site meets the tapping conditions, tapping will be carried out according to normal operations. Example 4
[0023] The tapping operation method comprises the following steps:
[0024] Step 1: Before the new taphole is put into use, a temporary retaining wall is built in the new main trench to prevent slag from rushing into the slag skimmer and blocking the molten iron channel; Step 2: When the tapping amount of the last iron from the taphole on the same side is consistent with the theoretical output in the furnace, that is, when the taphole is about to finish tapping, first open the new taphole to be replaced, and immediately plug the taphole again after it is completely drilled through. The mud-making time is 35 seconds to ensure the depth of the taphole and the formation of mud bags in the furnace; Step 3: Wait for 32 minutes for the tap hole on the other side to finish tapping the iron and then open the new tap hole to be replaced, that is, tap the first batch of iron; Step 4: If the tapping time of the tapping site on the other side is shorter, then continue to tap the iron in one furnace to ensure that the clay driven into the new tapping site to be replaced stays in the tapping channel for more than two hours, and that the clay in the tapping channel is formed and dried before tapping from the new tapping site. When the new tapping site meets the tapping conditions, tapping will be carried out according to normal operations.
[0025] Estimated economic benefits achieved
[0026] Based on the calculation that the annual iron output of the blast furnace is 3.3 million tons, and the iron flow rate of each main iron channel is 120,000 tons, the blast furnace tapping is performed once a month, and the tapping is performed 24 times a year in total. Compared with the old tapping method, the benefits brought by the new method are calculated as follows: 1. Direct economic benefits 1.1 Increased production benefits The new method of tapping the iron mouth achieves zero fluctuation in furnace conditions and does not require air reduction and oxygen stop operations. Each tapping of the iron mouth increases production by about 1,000 tons, and the annual increase in production is about 1,000 (tons / time) × 24 (times) = 24,000 tons. Calculated based on a fixed cost of 90 yuan / ton of iron, the economic benefit is 24,000*90=216 (million yuan).
[0027] 1.2 Save drill rods and drill bits The new method of tapping the tap hole will not cause coke to get stuck in the tap hole. There is no need to waste drill rods and drill bits to poke the tap hole in front of the furnace. Each tapping saves 5 drill rods and 5 drill bits. The drill rod costs 400 yuan each and the drill bit costs 50 yuan each. Annual savings: 5 (pieces / time) × (400 yuan + 50 yuan) × 24 (times) = 54,000 yuan 1.3 Save coke The new tapping method will not cause coke to leak. Based on the calculation that 1 ton of coke leaks each time the tapping is done and each ton of coke costs 1,800 yuan, the annual savings are: 1 (ton / time) × 1800 (yuan / ton) × 24 (times) = 43,200 (10,000 yuan) In summary, the direct economic benefits brought by the new method total: 216+5.4+4.32=225.72 (10,000 yuan) It should be understood that although this specification is described according to implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. The method for operating the tapping hole is characterized in that: The steps include: Step 1: Before the new iron mouth is put into use, a temporary retaining wall is built in the new main trench; Step 2: When the amount of iron discharged from the last iron hole on the same side is consistent with the theoretical output in the furnace, that is, when the iron hole is about to be fully discharged, the new iron hole to be replaced is opened first, and the iron hole is immediately blocked after it is completely drilled through, and mud is beaten for a period of time to ensure the depth of the iron hole and the formation of mud bags in the furnace; Step 3: Wait for 28-32 minutes for the tap hole on the other side to be opened and the tap hole to be plugged before opening the new tap hole to be replaced, that is, tapping the first batch of iron; Step 4: If the tapping time of the tapping site on the other side is shorter, then continue to tap the iron in one furnace to ensure that the clay driven into the new tapping site to be replaced stays in the tapping channel for more than two hours, and that the clay in the tapping channel is formed and dried before tapping from the new tapping site. When the new tapping site meets the tapping conditions, tapping will be carried out according to normal operations.
2. The method for operating the tapping hole according to claim 1, characterized in that: The purpose of designing the temporary retaining wall in the step 1 is to prevent slag iron from rushing into the slag skimmer and blocking the molten iron channel.