Digitized hydraulic self-propelled steel-concrete composite beam support device and using method

Through the digital hydraulic self-propelled steel-mixed beam bracket device, the mobile components and cable wind rope technology are used to solve the problems of high construction costs and long construction periods in the existing technology, and the flexible movement and standardized construction of the bracket are realized, reducing construction Cost and construction period adapt to the obstacle problem at the construction site.

CN118932867AInactive Publication Date: 2024-11-12CHINA MCC17 GRP CO LTD
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202411119421.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the construction of existing highway steel box beams and steel concrete bonded beams, the prefabricated construction method of the bracket method leads to high construction costs and long construction periods. Multiple groups of temporary brackets are required to be set up at each segmented bridge span, and it is difficult to deal with the construction site. obstacle.

Method used

Using digital hydraulic self-propelled steel-mixed beam bracket device, the temporary bracket assembly is driven to move along the customized rail through the moving components, and connected to the third base through cable wind rope, combining high-strength bolts and embedded flange to realize segmented bridge Support constraints across the cross-section save materials and construction time.

Benefits of technology

It reduces construction costs and construction periods, realizes flexible movement and standardized construction of temporary brackets, avoids the removal of obstacles, and improves the cleanliness and efficiency of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932867A_ABST
    Figure CN118932867A_ABST
Patent Text Reader

Abstract

The invention discloses a digital hydraulic self-propelled steel-concrete composite beam support device and a using method, and belongs to the technical field of bridge construction. The digital hydraulic self-propelled steel-concrete composite beam support device comprises bridge piers and further comprises a temporary support assembly, the temporary support assembly is located between the two bridge piers, the temporary support assembly comprises a main stand column, a connecting lacing bar, I-shaped steel, a top sealing steel plate and a fixing block, and a moving assembly is arranged below the main stand column. In order to solve the problems of high construction cost and long construction period of fabricated construction depending on a bracket method during transporting and hoisting fabricated construction of a steel-concrete composite beam, a temporary bracket assembly is driven by a moving assembly to move to a segmented bridge span along a customized steel rail body, and then a supporting plate is connected with a pre-embedded flange plate through a high-strength bolt; and meanwhile, the cable rope is connected with the third base, so that supporting and restraining at the subsection bridge span are achieved, a large amount of material cost and mounting and dismounting cost are saved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction, and in particular to a digital hydraulic self-propelled steel-concrete combined beam support device and a use method thereof. Background Art

[0002] In recent years, steel-concrete composite beams have been increasingly widely used in urban overpasses and building structures in my country, and are developing towards large spans. The application practice of steel-concrete composite beams in my country shows that it has the advantages of both steel structures and concrete structures, has significant technical, economic and social benefits, is suitable for the national conditions of my country's basic construction, and is one of the main development directions of future structural systems. Compared with reinforced concrete beams, steel-concrete composite beams can reduce the deadweight of the structure, reduce seismic effects, reduce cross-sectional dimensions, increase effective use space, save formwork processes and templates, shorten construction periods, and increase beam ductility. Compared with steel beams, they can reduce the amount of steel used, increase stiffness, increase stability and integrity, and enhance structural fire resistance and durability.

[0003] The existing highway steel box girder and steel-concrete composite beam relocation, hoisting and assembly construction mainly relies on the scaffolding assembly construction method. However, this method requires setting up multiple sets of temporary scaffolds at each segmented bridge span. The temporary scaffolds are removed after the construction of the steel box girder and the steel-concrete composite beam is completed, which has the problems of high construction cost and long construction period. Therefore, it does not meet the existing needs. In this regard, the present application proposes a digital hydraulic self-propelled steel-concrete composite beam scaffold device and a method of use. Summary of the invention

[0004] The purpose of the present invention is to provide a digital hydraulic self-propelled steel-concrete combined beam support device and a method of use, which drives the temporary support assembly to move along the customized rail body to the segmented bridge span through the moving assembly, and then connects the support plate and the embedded flange through high-strength bolts, and at the same time connects the cable wind rope to the third base to achieve support constraints at the segmented bridge span here, which can solve the problems in the prior art.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a digital hydraulic self-propelled steel-concrete combined beam support device, including a bridge pier and a temporary support assembly, wherein the temporary support assembly is located between two bridge piers, and the temporary support assembly includes a main column, a connecting tie bar, an I-beam, a capping steel plate and a fixed block. A moving assembly is arranged below the main column, and a cable is arranged on the side of the main column. One end of the cable is installed on the fixed block, and the other end of the cable is arranged with a third base. A customized track assembly is arranged below the moving assembly, and flange tightening assemblies are arranged on both sides of the moving assembly.

[0006] Preferably, the main column is a steel pipe structure, the main column is located below the capping steel plate, the capping steel plate is located below the I-beam, and at least two I-beams are arranged inside a single temporary support assembly. The two I-beams are placed side by side, and the connecting strip is located between the two main columns.

[0007] Preferably, the moving assembly includes a moving trolley, a hydraulic lifting rod, a support plate and a positioning ring, the upper end of the hydraulic lifting rod is connected to the support plate, the lower end of the hydraulic lifting rod is connected to the moving trolley, and the main column and the positioning ring are both located above the support plate.

[0008] Preferably, the customized rail assembly includes a customized rail body and a second base, the customized rail body is installed on the second base, the customized rail body includes a transverse rail and a longitudinal rail, the transverse rail is connected to the longitudinal rail, the transverse rail is located between the two piers, and the longitudinal rail is located on one side of the pier.

[0009] Preferably, the flange tightening assembly comprises a first base, a positioning column and an embedded flange, wherein the first base is located below the embedded flange, and the positioning column is located above the embedded flange.

[0010] A method for using a digital hydraulic self-propelled steel-concrete composite beam support is implemented based on a digital hydraulic self-propelled steel-concrete composite beam support device, comprising the following steps:

[0011] Step 1: Locate the temporary support assembly and lay the custom track assembly;

[0012] Step 2: Install the flange tightening assembly;

[0013] Step 3: Assemble the mobile assembly and temporary bracket assembly;

[0014] Step 4: First install the mobile assembly on the customized rail body, then install the temporary bracket assembly on the mobile assembly, and finally connect the support plate and the embedded flange with high-strength bolts and cover them with C20 concrete;

[0015] Step 5: Connect the two ends of the guy rope to the fixed block and the third base respectively, and encapsulate the concrete footing to complete the temporary support constraint of the first segmented span;

[0016] Step 6. Remove the high-strength bolts and disconnect the connection between the wind rope and the third base. The mobile assembly drives the temporary support assembly to move along the customized rail body to the next segmented bridge span, and the support plate and the embedded flange are connected again with high-strength bolts. The wind rope is connected to the third base again, and the concrete foot guard is encapsulated to complete the temporary support constraint of this segmented bridge span.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1. The present invention drives the temporary support assembly to move along the customized rail body at each segmented bridge span through a mobile assembly. When the temporary support assembly moves to the segmented bridge span to be supported and constrained, the support plate is connected to the embedded flange by high-strength bolts, and the cable wind rope is connected to the third base at the same time, so as to achieve support and constraint at the segmented bridge span here. Compared with the traditional method of setting multiple groups of fixed temporary supports at each segmented bridge span, a large amount of material costs and installation costs are saved, and the construction cost is reduced.

[0019] 2. The temporary support assembly in the present invention can move along the customized rail body. When encountering obstacles, the customized rail body laying path can bypass the obstacles, so that the obstacles can be operated normally without being removed, which greatly shortens the construction time and reduces the construction cost. At the same time, the temporary support assembly can only move along a fixed route, realizing the standardization of the construction site and ensuring the cleanliness of the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is an overall schematic diagram of the present invention;

[0021] Figure 2 It is a partial schematic diagram of a temporary support assembly of the present invention;

[0022] Figure 3 It is a partial schematic diagram of the flange tightening assembly of the present invention;

[0023] Figure 4 It is a partial schematic diagram of the moving component of the present invention.

[0024] In the figure: 1. Bridge pier; 2. Temporary support assembly; 201. Main column; 202. Connecting tie bar; 203. I-beam; 204. Capping steel plate; 205. Fixed block; 3. Moving assembly; 301. Moving trolley; 302. Hydraulic lifting rod; 303. Support plate; 304. Positioning ring; 4. Flange tightening assembly; 401. First base; 402. Positioning column; 403. Embedded flange; 5. Customized track assembly; 501. Customized rail body; 502. Second base; 6. Cable guy rope; 601. Third base. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] In order to solve the problem of high construction cost and long construction period when the steel-concrete composite beam is moved, hoisted and assembled, the assembly construction relies on the bracket method. Figure 1-4 , this embodiment provides the following technical solutions:

[0027] A digital hydraulic self-propelled steel-concrete combined beam support device includes a bridge pier 1 and a temporary support assembly 2. The temporary support assembly 2 is located between two bridge piers 1. The temporary support assembly 2 includes a main column 201, a connecting tie bar 202, an I-beam 203, a capping steel plate 204 and a fixed block 205. A moving assembly 3 is arranged below the main column 201, and a cable wind rope 6 is arranged on the side of the main column 201. One end of the cable wind rope 6 is installed on the fixed block 205, and the other end of the cable wind rope 6 is arranged with a third base 601. The third base 601 is a reinforced concrete structure. A customized track assembly 5 is arranged below the moving assembly 3, and flange tightening assemblies 4 are arranged on both sides of the moving assembly 3.

[0028] Specifically, the structure of the cable wind rope 6 is a three-way steel wind rope, and the angle between the cable wind rope 6 and the side of the main column 201 is between 45° and 60°. One end of the cable wind rope 6 is always connected to the fixed block 205, and the other end of the cable wind rope 6 is anchored to the third base 601 using a precast concrete foundation. When the cable wind rope 6 moves with the temporary support assembly 2, the other end of the cable wind rope 6 needs to be installed with a hand winch or a rope tightener to straighten the cable wind rope 6 to further ensure the stability of the temporary support assembly 2.

[0029] The main column 201 is a steel pipe structure. The main column 201 is located below the capping steel plate 204. The capping steel plate 204 is located below the I-beam 203. At least two I-beams 203 are arranged inside a single temporary support assembly 2. The two I-beams 203 are placed side by side, and the connecting bar 202 is located between the two main columns 201.

[0030] Specifically, the main column 201 adopts a steel pipe with a specification of Φ273×8, the connecting bar 202 adopts an equilateral angle steel with a specification of L100×8, the I-beam 203 adopts a specification of 40a, and the adjusting short column adopts a square tube with a specification of 150*100*8. The temporary support assembly 2 is modularly designed. After the temporary support assembly 2 is assembled, it can be moved arbitrarily on the customized track assembly 5 through the moving assembly 3, so that after the temporary support assembly 2 is used in this segmented bridge span, it can continue to be used in the next segmented bridge span. Compared with the traditional method of setting multiple groups of fixed temporary supports in each segmented bridge span, it saves a lot of material costs and installation costs, and further reduces the construction cost.

[0031] The moving assembly 3 includes a moving trolley 301, a hydraulic lifting rod 302, a support plate 303 and a positioning ring 304. The upper end of the hydraulic lifting rod 302 is connected to the support plate 303, and the lower end of the hydraulic lifting rod 302 is connected to the moving trolley 301. The main column 201 and the positioning ring 304 are both located above the support plate 303.

[0032] Specifically, the mobile trolley 301 is an electric vehicle, and the mobile trolley 301 is modularly designed. After the mobile component 3 is assembled, the temporary support component 2 is installed on the mobile component 3, and the mobile trolley 301 is installed on the customized rail body 501 in the customized rail component 5, so that the mobile trolley 301 can drive the temporary support component 2 to move along the customized rail body 501, realizing the standardization of the construction site and further ensuring the cleanliness of the construction site.

[0033] The customized rail assembly 5 includes a customized rail body 501 and a second base 502. The second base 502 is a reinforced concrete structure. The customized rail body 501 is installed on the second base 502. The customized rail body 501 includes a transverse rail and a longitudinal rail. The transverse rail is connected to the longitudinal rail. The transverse rail is located between the two bridge piers 1, and the longitudinal rail is located on one side of the bridge pier 1.

[0034] Specifically, a rail pressure plate is provided on the side of the customized rail body 501. The customized rail body 501 and the mobile trolley 301 are customized as a set. The customized rail body 501 is 43# specification. The customized rail bodies 501 are connected by fishtail plates. When encountering obstacles, the customized rail body 501 can lay a path to bypass the obstacles, so that the obstacles can work normally without being removed, which greatly shortens the construction time and further reduces the construction cost.

[0035] The flange tightening assembly 4 includes a first base 401 , a positioning column 402 and a pre-embedded flange 403 . The first base 401 is located below the pre-embedded flange 403 , and the positioning column 402 is located above the pre-embedded flange 403 .

[0036] Specifically, the first base 401 is a reinforced concrete structure, and the lower end of the positioning column 402 extends to the interior of the first base 401. After the positioning column 402 passes through the through hole on the support plate 303, the embedded flange 403 is connected to the support plate 303 by high-strength bolts. After the embedded flange 403 is connected to the support plate 303, a layer of C20 concrete needs to be wrapped on the outside, so that the support plate 303, the positioning column 402, the embedded flange 403 and the first base 401 are completely integrated, further improving the stability of the temporary bracket assembly 2 during use.

[0037] A method for using a digital hydraulic self-propelled steel-concrete composite beam support is implemented based on a digital hydraulic self-propelled steel-concrete composite beam support device, and is characterized in that it includes the following steps:

[0038] Step 1: After cleaning and leveling the ground at the segmented bridge span on site, measure and locate the position of the temporary support assembly 2, and at the same time construct the rail foundation and lay the custom track assembly 5. Further construction needs to be strengthened at the turning point of the custom track assembly 5 to ensure the stability of the temporary support assembly 2 during movement;

[0039] Step 2: Install the flange tightening assembly 4 at the segmented bridge span. The flange tightening assembly 4 is required on both sides of each main column 201, and the flange tightening assembly 4 is symmetrically arranged;

[0040] Step 3: Assemble the mobile assembly 3 and the temporary support assembly 2 at the segmented bridge span;

[0041] Step 4: first install the mobile component 3 on the customized rail body 501, then install the temporary support component 2 on the mobile component 3, and finally connect the support plate 303 and the embedded flange 403 with high-strength bolts and cover them with C20 concrete;

[0042] Step 5: Connect the two ends of the cable wind rope 6 to the fixed block 205 and the third base 601 respectively, and encapsulate the C20 concrete footing to complete the temporary support constraint at the first segmented span;

[0043] Step 6. After completing the assembly construction of the steel structure of the first span of the steel-concrete composite beam, release the temporary support constraints, that is, remove the high-strength bolts and disconnect the cable wind rope 6 from the third base 601. The mobile component 3 drives the temporary support component 2 to move along the customized rail body 501 to the next segmented bridge span. During the movement, it is necessary to stabilize the cable wind rope 6, and connect the support plate 303 and the embedded flange 403 again with high-strength bolts. The cable wind rope 6 is connected to the third base 601 again, and the C20 concrete foot guard is encapsulated at the same time to complete the temporary support constraints of this segmented bridge span.

[0044] Working principle: After completing the assembly construction of the first span of the steel-concrete composite beam steel structure, the mobile component 3 drives the temporary support component 2 to move along the customized rail body 501 to the next segmented bridge span, and then the support plate 303 and the embedded flange 403 are connected by high-strength bolts and outsourced with C20 concrete. At the same time, the cable wind rope 6 is connected to the third base 601 and enclosed with C20 concrete footing to achieve support and constraint at this segmented bridge span, thereby saving a lot of material costs and installation costs, and reducing construction costs.

[0045] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0046] While the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that many changes, modifications, substitutions and variations can be made to the embodiments without departing from the principles and spirit of the invention.

Claims

1. A digital hydraulic self-propelled steel-concrete composite beam support device, comprising a bridge pier (1), It is characterized by: The invention also comprises a temporary support assembly (2), wherein the temporary support assembly (2) is located between two bridge piers (1), and the temporary support assembly (2) comprises a main column (201), a connecting tie bar (202), an I-beam (203), a capping steel plate (204) and a fixing block (205). A moving assembly (3) is arranged below the main column (201), a cable wind rope (6) is arranged on the side of the main column (201), one end of the cable wind rope (6) is installed on the fixing block (205), and a third base (601) is arranged at the other end of the cable wind rope (6), a customized track assembly (5) is arranged below the moving assembly (3), and flange tightening assemblies (4) are arranged on both sides of the moving assembly (3).

2. According to claim 1, a digital hydraulic self-propelled steel-concrete composite beam support device, Features: The main column (201) is a steel pipe structure. The main column (201) is located below the capping steel plate (204). The capping steel plate (204) is located below the I-beam (203). At least two I-beams (203) are arranged inside a single temporary support assembly (2). The two I-beams (203) are placed side by side, and the connecting tie bar (202) is located between the two main columns (201).

3. According to claim 1, a digital hydraulic self-propelled steel-concrete composite beam support device, Features: The moving assembly (3) comprises a moving trolley (301), a hydraulic lifting rod (302), a support plate (303) and a positioning ring (304); the upper end of the hydraulic lifting rod (302) is connected to the support plate (303); the lower end of the hydraulic lifting rod (302) is connected to the moving trolley (301); and the main column (201) and the positioning ring (304) are both located above the support plate (303).

4. According to claim 1, a digital hydraulic self-propelled steel-concrete composite beam support device, Features: The customized rail assembly (5) comprises a customized rail body (501) and a second base (502), wherein the customized rail body (501) is installed on the second base (502), and the customized rail body (501) comprises a transverse rail and a longitudinal rail, wherein the transverse rail is connected to the longitudinal rail, the transverse rail is located between the two bridge piers (1), and the longitudinal rail is located on one side of the bridge pier (1).

5. According to claim 1, a digital hydraulic self-propelled steel-concrete composite beam support device, Features: The flange tightening assembly (4) comprises a first base (401), a positioning column (402) and a pre-embedded flange (403), wherein the first base (401) is located below the pre-embedded flange (403), and the positioning column (402) is located above the pre-embedded flange (403).

6. A method for using a digital hydraulic self-propelled steel-concrete composite beam support, which is implemented based on a digital hydraulic self-propelled steel-concrete composite beam support device according to any one of claims 1 to 5. It is characterized in that The following steps are involved: Step 1: locate the temporary support assembly (2) and lay the custom track assembly (5); Step 2: Install the flange tightening assembly (4); Step 3, assembling the mobile assembly (3) and the temporary support assembly (2); Step 4: first install the moving assembly (3) on the customized rail body (501), then install the temporary support assembly (2) on the moving assembly (3), and finally connect the support plate (303) and the embedded flange (403) with high-strength bolts and cover them with C20 concrete; Step 5: Connect the two ends of the guy rope (6) to the fixed block (205) and the third base (601) respectively, and encapsulate the concrete footing to complete the temporary support constraint at the first segmented bridge span; Step 6: Remove the high-strength bolts and disconnect the connection between the wind rope (6) and the third base (601). The mobile assembly (3) drives the temporary support assembly (2) to move along the customized rail body (501) to the next segmented bridge span, and the support plate (303) and the embedded flange (403) are connected again through high-strength bolts. The wind rope (6) is connected to the third base (601) again, and the concrete foot guard is encapsulated at the same time to complete the temporary support constraint of this segmented bridge span.

Citation Information

Patent Citations

  • Construction process for integrally moving ring lock full support

    CN111364741A

  • Splicing type lifting platform for narrow space and construction method

    CN117166722A

  • Fabricated slidable support structure for super-large-span steel box bent cap construction

    CN117344649A

  • Assembly type movable and adjustable overpass existing line construction supporting frame and installation method thereof

    CN117703045A

  • Construction platform capable of rapidly switching states and used for constructional engineering

    CN118422856A