Construction method of continuous beam rigid frame bridge cantilever pouring linear section
By pouring the cantilever straight section of the continuous beams segment by section by section, the problems of high construction costs, long cycles and poor terrain in the existing technology are solved, and the effects of high construction efficiency, safety and cost saving are achieved. .
Patent Information
- Application Number
- CN202411298527.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-12
AI Technical Summary
The existing construction method for cantilever casting linear sections of continuous beams has problems such as large consumption of formwork brackets, long construction periods, and poor applicability in complex terrain, resulting in high construction costs, long cycles and low safety.
The cantilever linear section is constructed using a hanging basket, and the temporary support structure and steel strands are reinforced, and the temporary support system is poured section by section and steel pipes and transverse partitions are used to form a temporary support system to avoid joint diseases and simplify the construction process.
It achieves simple structure, convenient construction, high efficiency, short cycle, cost saving, and improves construction safety, which is suitable for complex terrain environments.
Smart Images

Figure CN118932877A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a construction method for cantilever casting a straight section of a continuous beam rigid frame bridge. Background Art
[0002] In the past, the construction method for cantilever casting of straight sections of continuous beams was usually the support method, which involves setting up a support under the bridge and then casting the beam body on site on the support. After the concrete reaches a certain strength, the formwork and support are removed. Although this method can reduce equipment costs to a certain extent, it still has certain shortcomings and limitations during the construction process. These include: 1. The formwork and scaffolding consumption is large, which indirectly increases the material cost of construction; 2. The construction period is long. The time to build and dismantle a large number of scaffolding, as well as the time to wait for the concrete to reach sufficient strength, may lead to the extension of the entire construction period; 3. Terrain restrictions. For mountain bridges and high pier bridges, the applicability of the scaffolding method is limited due to the complex terrain and height issues. Summary of the invention
[0003] The purpose of the present invention is to provide a construction method for cantilever casting straight section of a continuous beam rigid frame bridge which has a simple structure, convenient construction, ensures the quality of the continuous beam, and makes the casting process of the continuous beam in the cantilever straight section convenient and fast, has high construction efficiency, short cycle and saves costs.
[0004] The present invention is achieved by the following measures: A construction method for cantilever casting of a continuous beam rigid frame bridge straight section, the construction method comprising the following steps: S1. Beam section construction: First, use the hanging basket to carry out symmetrical construction of the middle span beam section and the side span beam section. When the hanging basket on one side of the pier reaches the location of the middle span closure section and the hanging basket on the other side reaches the location of the side span section, the middle span closure section is constructed first; S2. Construction of the side span closing section: Build a temporary support structure under the last section of the side span beam section, and cast the cantilever straight section of the side span closing section in nodes. During the construction process, each node and the side span beam section will be tensioned and reinforced by steel strands.
[0005] S3. Later construction: After the side span closure section is cast, the steel strands are tensioned crosswise and step by step, and temporary support structures are constructed to form a complete bridge system.
[0006] The specific features of the present invention also include: The temporary support structure includes a lower foundation and an embedded part anchoring structure arranged below the outer side position of the bottom plate of the last segment of the side span beam section. After the steel pipe is connected to the lower embedded part, it is connected to the corresponding position of the side span beam section beam body to form a support.
[0007] The last section of the side span beam is pre-embedded with high-strength tooth blocks, and high-strength tooth blocks are cast on the surface of each node of the side span closing section. The high-strength tooth blocks at each node of the side span closure section are connected to the high-strength tooth blocks of the side span beam section through steel strands, and are tensioned and anchored using jacks to form temporary cables for tensioning.
[0008] The connection between the lower part of the steel pipe and the lower foundation is achieved by welding embedded parts and stiffening ribs, and the upper part is in contact with the beam body by welding a steel pad, thereby ensuring the stability of the steel pipe support.
[0009] A transverse diaphragm is cast in the beam box corresponding to the center position of the steel pipe, and the transverse diaphragm and the steel pipe together form a temporary support system.
[0010] A transverse diaphragm is cast in the beam box corresponding to the center position of the steel pipe. The transverse diaphragm and the steel pipe together form a temporary support system. When the deadweight of the beam is too large, the influence of the steel pipe on the bottom web of the beam is dispersed to the transverse diaphragm to prevent cracks from forming at the bottom plate of the beam and affecting the quality of the beam. At the same time, a manhole is reserved during the casting of the transverse diaphragm to ensure the subsequent related construction.
[0011] Preferably, the last section of the side span beam section is M blocks, and each node of the side span closing section is N1, N2...Nn blocks. After each section is cast, the beam body of the section is connected to the M blocks separately. The connection method is to use steel strands to connect through high-strength tooth blocks cast on the surface of the top plate of the beam body to form a temporary cable knot to resist the deadweight of the beam body and the bending moment generated by the hanging basket, and prevent the newly cast section beam body from generating downward deflection, which affects the quality of the continuous beam body. Preferably, a tower frame may be installed on the side span beam section to temporarily tie the steel strands to the casting blocks such as N1.
[0012] This construction method uses a hanging basket to cast the cantilever straight section. Specifically, a hanging basket is set on the M block and gradually moves to the N block, so that the continuous beam falls to the cap beam above the side pier. Compared with the traditional support casting method, it can effectively avoid the continuous beam joint disease, with high construction efficiency, short cycle, cost savings and high safety.
[0013] The beneficial effects of the present invention are: simple structure, convenient construction, guaranteed quality of the continuous beam, and at the same time, convenient and quick casting process of the continuous beam in the cantilever straight section, high construction efficiency, short cycle and cost saving. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic structural diagram of an embodiment of the present invention.
[0015] Figure 2 It is a schematic diagram of the structure of the casting block tie in an embodiment of the present invention.
[0016] Figure 3 It is a schematic structural diagram of a temporary support in an embodiment of the present invention.
[0017] Figure 4 It is a schematic diagram of the structure of using a tower frame to tie the casting blocks together in an embodiment of the present invention.
[0018] Among them, the figure markings are: 1. middle span beam section; 2. side span beam section; 3. steel pipe; 4. lower foundation; 5. embedded parts; 6. hanging basket; 7. steel strand; 8. cantilever straight section; 9. cross partition; 10. steel pad; 11. tooth block; 12. side pier; 14. cap beam; 15. stiffening rib; 16. tower. DETAILED DESCRIPTION
[0019] In order to clearly illustrate the technical features of this solution, this solution is described below through a specific implementation method.
[0020] See also Figure 1-4 A construction method for cantilever casting of a continuous beam rigid frame bridge straight section, the construction method comprising the following steps: S1, beam section construction: first use the hanging basket 6 to perform symmetrical continuous beam construction on the middle span beam section 1 and the side span beam section 2. When the hanging basket 6 on one side of the pier reaches the location of the middle span closure section and the hanging basket 6 on the other side reaches the location of the side span section, the middle span closure section is constructed first; S2. Construction of the side span closing section: Build a temporary support structure under the last section of the side span beam section 2, and cast the cantilever straight section 8 of the side span closing section in nodes. During the construction process, each node and the side span beam section 2 are tensioned and reinforced by steel strands 7.
[0021] S3. Later construction: After the side span closure section is cast, the steel strands 7 are tensioned in a cross and step-by-step manner, and a temporary support structure is provided to form a bridge system.
[0022] The temporary support structure includes a lower foundation 4 and an embedded part 5 anchoring structure arranged below the outer side position of the bottom plate of the last segment of the side span beam section 2. After the steel pipe 3 is connected to the lower embedded part 5, it is connected to the corresponding position of the beam body of the side span beam section 2 to form a support.
[0023] The last section of the side span beam section 2 is pre-embedded with a high-strength tooth block 11, and the high-strength tooth block 11 is cast on the surface of each node of the side span closing section. The high-strength tooth blocks 11 of each node of the side span closure section are respectively connected to the high-strength tooth blocks 11 of the side span beam section 2 through steel strands 7, and are tensioned and anchored by jacks to form temporary cables for tensioning.
[0024] The connection between the lower part of the steel pipe 3 and the lower foundation 4 is achieved by welding the embedded parts 5 and the stiffening ribs 15, and the upper part is in contact with the beam body by welding the steel pad 10, thereby ensuring the stability of the support of the steel pipe 3.
[0025] A transverse diaphragm 9 is cast in the beam box room corresponding to the center position of the steel pipe 3, and the transverse diaphragm 9 and the steel pipe 3 together form a temporary support system.
[0026] A transverse diaphragm 9 is cast in the beam box corresponding to the center position of the steel pipe 3. The transverse diaphragm 9 and the steel pipe 3 together form a temporary support system. The transverse diaphragm 9 is arranged in the beam box at the upper center of the steel pipe 3 so that when the dead weight of the beam is too large, the influence of the steel pipe 3 on the bottom web position of the beam can be dispersed to the transverse diaphragm 9, thereby preventing cracks from occurring at the bottom plate of the beam and affecting the quality of the beam. At the same time, a manhole is reserved during the casting of the transverse diaphragm 9 to ensure the subsequent related construction.
[0027] Preferably, the last section of the side span beam section 2 is M blocks, and each node of the side span closing section is N1, N2...Nn blocks. After each section is cast, the beam body of the section is connected to the M blocks separately. The connection method is to use steel strands 7 to connect through high-strength tooth blocks 11 cast on the surface of the top plate of the beam body to form a temporary cable knot to resist the bending moment generated by the deadweight of the beam body and the hanging basket 6, and prevent the newly cast section beam body from generating downward deflection, which affects the quality of the continuous beam body. Preferably, a tower 16 may be installed on the side span beam section 2 to temporarily tie the steel strands 7 to the casting blocks such as N1.
[0028] This construction method utilizes the hanging basket 6 to move to cast the cantilever straight section 8. Specifically, the hanging basket 6 is set on the M block and gradually moves to the N block, so that the continuous beam falls to the cap beam 14 above the side pier 12. Compared with the traditional support casting method, it can effectively avoid the continuous beam joint disease, with high construction efficiency, short cycle, cost saving and high safety.
[0029] Technical features not described in the present invention can be achieved through or by adopting existing technologies and will not be described in detail here. Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention should also fall within the scope of protection of the present invention.
Claims
1. A construction method for cantilever casting of a continuous beam rigid frame bridge straight section, characterized in that: The construction method includes the following steps: S1. Beam section construction: First, use the hanging basket to carry out symmetrical construction of the middle span beam section and the side span beam section. When the hanging basket on one side of the pier reaches the location of the middle span closure section and the hanging basket on the other side reaches the location of the side span section, the middle span closure section is constructed first; S2. Construction of the side span closing section: Build a temporary support structure under the last section of the side span beam section, and cast the cantilever straight section of the side span closing section in nodes. During the construction process, each node and the side span beam section will be tensioned and reinforced by steel strands. S3. Later construction: After the side span closure section is cast, the steel strands are tensioned crosswise and step by step, and temporary support structures are constructed to form a complete bridge system.
2. The construction method for cantilever casting of a continuous beam rigid frame bridge straight section according to claim 1 is characterized in that: The temporary support structure includes a lower foundation and an embedded part anchoring structure arranged below the outer side position of the bottom plate of the last segment of the side span beam section. After the steel pipe is connected to the lower embedded part, it is connected to the corresponding position of the side span beam section beam body to form a support.
3. The construction method for cantilever casting of a continuous beam rigid frame bridge straight section according to claim 1 is characterized in that: The last section of the side span beam is pre-embedded with high-strength tooth blocks, and high-strength tooth blocks are cast on the surface of each node of the side span closing section. The high-strength tooth blocks at each node of the side span closure section are connected to the high-strength tooth blocks of the side span beam section through steel strands, and are tensioned and anchored using jacks to form temporary cables for tensioning.
4. The construction method for cantilever casting of a continuous beam rigid frame bridge straight section according to claim 1 is characterized in that: The connection between the lower part of the steel pipe and the lower foundation is achieved by welding embedded parts and stiffening ribs, and the upper part is in contact with the beam body by welding a steel pad.
5. The construction method for cantilever casting of a continuous beam rigid frame bridge straight section according to claim 1, characterized in that: A transverse diaphragm is cast in the beam box room corresponding to the center position of the steel pipe, and the transverse diaphragm and the steel pipe together form a temporary support system.