Construction treatment method for extra-large karst cave pile foundation

Through the construction treatment method of pile foundation of super-large caves, the limiting mechanism and conveying mechanism are used to cooperate with existing equipment, the stability and efficiency problems in pile foundation construction in karst areas are solved, efficient and stable pile foundation construction is achieved, and project costs are reduced .

CN118932989APending Publication Date: 2024-11-12THE THIRD ENG CO LTD OF CCCC SECOND HIGHWAY ENG BUREAU +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411054675.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During construction in karst areas, the stability of the pile foundation is affected by problems such as cave structure collapse, slurry leakage, necking, etc., resulting in high project cost and low construction efficiency. The existing temporary steel casing is complicated to insert and difficult to adjust, which affects the pile foundation. Stability.

Method used

The pile foundation construction treatment method of extra-large caves includes preparatory treatment, pile foundation treatment, grouting treatment and construction completion steps, and the limiting mechanism and conveying mechanism are used to cooperate with existing equipment for the insertion and grouting of temporary and permanent steel casings. Adjust the equipment position through a circular bubble level and a rotary limit thread rod to ensure that the steel casing is inserted vertically and slurry is injected to avoid leakage and soil mixing.

Benefits of technology

It improves the efficiency and stability of pile foundation construction, reduces the overall cost, avoids the mixing of slurry into the soil structure inside the cave, and ensures the stability and construction quality of pile foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932989A_ABST
    Figure CN118932989A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of pile foundation construction, in particular to an extra-large karst cave pile foundation construction treatment method which comprises the following steps: S1, pretreatment: firstly, filling a pile foundation selection position, then cleaning the pile foundation selection position, and placing an extra-large karst cave pile foundation construction treatment device at the cleaned pile foundation selection position to finish pretreatment; and S2, pile foundation treatment is conducted, specifically, inserting treatment of a temporary steel casing is conducted through cooperation of the extra-large karst cave pile foundation construction treatment device in the S1. According to the device, equipment can be stably placed at a pile foundation selection position through the bottom plate, then the supporting frame in the corresponding direction is rotationally adjusted by observing the condition of the round bubble level body, fixing the position of the supporting threaded rod, and under supporting of the top of the supporting frame, the top plate can be kept in the horizontal state; and under the driving of the rotating limiting threaded rod, the pressing ring can extrude and fit the corresponding second connecting plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pile foundation construction, and in particular relates to a construction and processing method for a super-large karst cave pile foundation. Background Art

[0002] A deep foundation consisting of a pile and a pile cap connected to the top of the pile, or a single pile foundation connected by a column and a pile foundation, is referred to as a pile foundation. If the pile body is completely buried in the soil and the bottom of the cap is in contact with the soil, it is called a low cap pile foundation; if the upper part of the pile body is exposed to the ground and the bottom of the cap is above the ground, it is called a high cap pile foundation.

[0003] However, in the prior art, when bored piles are constructed in karst areas, if the pile hole does not pass through the cave, as the pile foundation is built, the internal structure of the cave is easily collapsed, affecting the stability of the pile foundation. When the pile hole needs to pass through the cave, the pile hole is connected to the cave to form a connecting port, and a steel cage is sunk in the pile hole. The steel cage has a connecting section connected to the cave. During the bored pile forming process, it is very easy to leak slurry, shrink neck and collapse the hole. At the same time, after the slurry is fused with the soil inside the cave, it is easy to affect the overall quality of the pile foundation, and then it is necessary to improve the grouting composition, which is easy to lead to excessively high project costs. At the same time, the existing temporary steel casing needs to be adjusted in a vertical state to ensure the stable support of the pile foundation. However, due to the large actual specifications of the temporary steel casing, it is not convenient to adjust the vertical state during the insertion process. At the same time, the existing pile foundation construction equipment needs to be leveled at the construction position before use, so as to facilitate subsequent leveling treatment. The actual use is relatively complicated, resulting in low actual construction efficiency. Summary of the invention

[0004] The purpose of the present invention is to provide a method for pile foundation construction of a particularly large karst cave, which can complete the stable construction of pile foundations in karst caves, avoid excessively high construction costs, and efficiently carry out pile foundation construction.

[0005] The technical solution adopted by the present invention is as follows: a method for construction and treatment of a pile foundation of a super large karst cave, comprising the following steps: S1, preparatory treatment: firstly, filling the selected position of the pile foundation, then cleaning the selected position of the pile foundation, placing the super large karst cave pile foundation construction and treatment device at the cleaned selected position of the pile foundation, and completing the preparatory treatment;

[0006] S2, pile foundation treatment: The temporary steel casing is inserted and installed by cooperating with the extra-large karst cave pile foundation construction and treatment device in S1. After the temporary steel casing is inserted and installed, the extra-large karst cave pile foundation construction and treatment device is dismantled and transferred, and the permanent steel casing is inserted and installed by the existing pile foundation construction equipment to complete the preparatory work before grouting;

[0007] S3, grouting treatment: according to the size of the actual detected karst cave, in the process of inserting the temporary steel casing in S2, the karst cave grouting position around the temporary steel casing is selected, and the drilling treatment of the karst cave grouting position is completed. At the same time, according to the depth requirement of the pile foundation construction, if the pile foundation construction depth does not reach the karst cave position, grouting is first performed inside the karst cave, and after the slurry inside the karst cave is solidified, grouting is performed inside the permanent steel casing. If the pile foundation construction depth penetrates the karst cave, grouting inside the karst cave and grouting inside the permanent steel casing are performed simultaneously to complete the grouting treatment;

[0008] S4, construction completion: After completing the slurry filling inside the permanent steel casing in S3, insert the steel cage into the permanent steel casing. After the slurry inside the cave and the slurry inside the permanent steel casing solidify, remove the temporary steel casing to build the pile cap and complete the pile foundation construction.

[0009] A large cave pile foundation construction processing device, comprising:

[0010] The limiting mechanism comprises a bottom plate, a top plate and a limiting component, wherein the bottom plates are provided with two in total, and each of the outer surfaces of one side of the bottom plates is provided with two first connecting grooves, and the four first connecting grooves are divided into two groups, and a first connecting plate is inserted between the two first connecting grooves in each group, and the top of each first connecting plate is fixedly connected to a support frame, and a second connecting plate is slidably sleeved on the outer surface of each support frame. The top plates are provided with two in total, and the outer surface of each side of the top plates is provided with a second connecting groove, and the two top plates are clamped between the outer surfaces of the two second connecting plates through the second connecting grooves, and a top ring is inserted between the relative outer surfaces of the two top plates, and a butt ring is fixedly connected to the bottom of the top ring, and a plurality of card frames are equidistantly penetrated through the outer surface of the butt ring, and an extension frame is inserted in the interior of one of the card frames, and the limiting component is arranged on the two bottom plates; and

[0011] The conveying mechanism includes a moving tube, a protective tube and an extension tube. The moving tube is slidably sleeved on the outer surface of the extension frame, and the bottom of the moving tube slides through the interior of the extension frame. The protective tube is slidably inserted into the moving tube, and the extension tube is slidably inserted into the protective tube.

[0012] There are four groups of the limiting components, each group of which includes a supporting threaded rod and a supporting frame. The supporting threaded rod is rotatably connected to the top of the corresponding bottom plate, and the supporting frame is threadedly connected to the outer surface of the supporting threaded rod.

[0013] Wherein, a circular bubble level body is fixedly connected to the top of each top plate, and the top of each support frame fits the bottom of the corresponding top plate.

[0014] Among them, the top of each support frame slides through the bottom of the corresponding second connecting plate, and a limiting threaded rod is rotatably connected between the inner top surface and the inner bottom surface of each support frame. The outer surface of each limiting threaded rod is threadedly connected with a pressure ring, and the bottom of each pressure ring is fitted with the top of the corresponding second connecting plate.

[0015] Among them, three side blocks are equidistantly fixedly connected to the top of the top ring, a push rod is slidably penetrated through the outer surface of one side of each side block, a positioning bolt is threadedly connected to the top of each side block, and the bottom end of each positioning bolt fits with the top of the corresponding push rod.

[0016] Wherein, a retaining bolt is threadedly connected to the outer surface of one side of the moving tube, and one end of the retaining bolt is in contact with the outer surface of one side of the extension frame.

[0017] Among them, the top end of the extension tube is threadedly connected to a connecting seat, and the outer surface of the connecting seat is equidistantly provided with multiple extension grooves. The top of the connecting seat is slidably inserted into the limit bar, and the bottom end of each limit bar extends into the interior of the extension tube.

[0018] Among them, the outer surface of the extension tube is equidistantly provided with a plurality of connecting grooves, a resist bar is slidably inserted inside each of the connecting grooves, and a card slot is provided at the top and bottom of each of the resist bars, wherein a plurality of the card slots are fixedly connected with cards by bolts, one end of each of the cards extends to the corresponding extension groove, and each card is threadedly connected to the corresponding extension groove by bolts, and a plurality of the card slots are fixedly connected with rotating tubes by bolts.

[0019] Wherein, a plurality of discharge ports are equidistantly provided on the inner surface wall of the extension tube, and the interior of each discharge port is connected to the interior of the corresponding connection groove.

[0020] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0021] (1) In the present invention, the bottom plate enables the equipment to be stably placed at the pile foundation selection position, and then the position of the supporting threaded rod is fixed by observing the condition of the circular bubble level body, and then the supporting frame in the corresponding direction is rotated and adjusted, so that the top plate can maintain a horizontal state under the support of the top of the supporting frame, and then the limiting threaded rod is rotated, and the pressing ring can be pressed and fitted with the corresponding second connecting plate under the drive of the rotating limiting threaded rod, so that the second connecting plate can drive the top plate to be pressed and fitted with the top of the supporting frame, and then the horizontal use position of the top plate is fixed. At this time, according to the specifications of the temporary steel casing, the use position of the push rod is moved and adjusted, and the positioning bolt is rotated to fix the use position of the push rod, so that the temporary steel casing can fit between one end of the three push rods and pass through the top ring, and be vertically placed at the designated pile foundation selection position, so that the vertical insertion process of the temporary steel casing can be completed conveniently, so that the equipment can conveniently perform the insertion process of the temporary steel casing without the need for ground leveling, thereby improving the actual construction efficiency.

[0022] (2) In the present invention, the number of extension frames and conveying mechanisms is increased or decreased according to the actual detected cave location, and the use position of the mobile pipe is adjusted at the same time. At this time, the protective pipe can be vertically inserted into the surrounding of the pile foundation selection position along the direction of the mobile pipe, and then the extension pipe can be connected to the existing drilling equipment through the connecting seat, and then by increasing or decreasing the spliced ​​extension pipes, the existing drilling equipment can insert the extension pipe into the cave, and then connect it to the existing grouting equipment through the connecting seat. At this time, the limiting mechanism is dismantled, and the permanent steel casing is inserted in conjunction with the existing pile foundation construction equipment. When the permanent steel casing does not need to penetrate the cave, the bolts inside the extension groove are first released according to the actual depth of the cave, and then the spliced ​​support bar can be pulled out to a certain height along the connecting groove through the card, so that the discharge port located inside the cave can be connected to the inside of the cave. At this time, appropriate slurry is injected and filled to allow the slurry to pass through the discharge The material inlet and the extension pipe can be quickly injected into the cave, filling the inside of the cave, and then the conveying mechanism is withdrawn. After the slurry inside the cave solidifies, different slurries are injected into the permanent steel casing and the steel cage is settled. After the grouting inside the permanent steel casing solidifies, the pile cap is built to complete the pile foundation construction. When the permanent steel casing needs to pass through the cave, different slurries can be injected into the cave and the permanent steel casing at the same time, and the settlement of the steel cage inside the permanent steel casing is completed. At this time, under the barrier of the slurry inside the cave, the slurry inside the permanent steel casing is not easy to leak, thereby avoiding the mixing of the soil structure inside the cave into the slurry inside the permanent steel casing, ensuring the actual use quality of the slurry inside the permanent steel casing, and at the same time, the cave can be filled with slurries of different qualities to effectively reduce the overall construction cost, while ensuring the stability of the pile foundation and improving the actual pile foundation construction effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a first perspective stereogram of the present invention;

[0024] Figure 2 It is a second viewing angle stereogram of the present invention;

[0025] Figure 3 It is a third perspective stereogram of the present invention;

[0026] Figure 4 It is a three-dimensional diagram of the limiting mechanism of the present invention;

[0027] Figure 5 It is a sectional and expanded stereoscopic diagram of the limiting mechanism of the present invention;

[0028] Figure 6 For the present invention Figure 5 Enlarged view of part A in the middle;

[0029] Figure 7 It is a three-dimensional diagram of the conveying mechanism of the present invention;

[0030] Figure 8 It is a cross-sectional and expanded stereoscopic view of the conveying mechanism of the present invention;

[0031] Fig. 9 For the present invention Figure 8 Enlarged view of part B;

[0032] Fig.10 For the present invention Figure 8 Enlarged view of part C in the middle;

[0033] Fig.11 For the present invention Figure 8 Enlarged view of part D in the middle.

[0034] Markings in the figure: 1. Limiting mechanism; 101. Bottom plate; 102. Support threaded rod; 103. Support frame; 104. First connecting plate; 105. Support frame; 106. Limiting threaded rod; 107. Pressing ring; 108. Second connecting plate; 109. Top plate; 110. Circular bubble level body; 111. Top ring; 112. Side block; 113. Retaining rod; 114. Retaining ring; 115. Card frame; 116. Extension frame; 2. Conveying mechanism; 201. Moving tube; 202. Protective tube; 203. Extension tube; 204. Retaining strip; 205. Connecting seat; 206. Limiting strip; 207. Card; 208. Rotating tube; 3. Temporary steel casing; 4. Permanent steel casing. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0036] Embodiment 1: A method for construction of a pile foundation of a large karst cave, comprising the following steps:

[0037] Step 1, preparatory treatment: first fill the selected position of the pile foundation, then clean the selected position of the pile foundation, provide a clean and reliable bottom support to facilitate the setting of the bottom plate 101, place the super-large karst cave pile foundation construction treatment device at the cleaned selected position of the pile foundation, and complete the preparatory treatment;

[0038] Step 2, pile foundation treatment: the temporary steel casing 3 is inserted and installed by the large cave pile foundation construction and processing device in step 1. After the temporary steel casing 3 is inserted and installed, the large cave pile foundation construction and processing device is dismantled and transferred, and the permanent steel casing 4 is inserted and installed by the existing pile foundation construction equipment to complete the preparatory work before grouting;

[0039] Step 3, grouting treatment: according to the size of the actual detected karst cave, in the process of inserting the temporary steel casing 3 in step 2, the karst cave grouting position around the temporary steel casing 3 is selected, and the drilling treatment of the karst cave grouting position is completed. At the same time, according to the pile foundation construction depth requirement, if the pile foundation construction depth does not reach the karst cave position, grouting is first performed inside the karst cave, and after the slurry inside the karst cave is solidified, grouting is performed inside the permanent steel casing 4. If the pile foundation construction depth penetrates the karst cave, grouting inside the karst cave and grouting inside the permanent steel casing 4 are performed simultaneously to complete the grouting treatment;

[0040] Step 4, end of construction: After completing the slurry filling inside the permanent steel casing 4 in step 3, insert the steel cage into the permanent steel casing 4. After the slurry inside the cave and the slurry inside the permanent steel casing 4 solidify, remove the temporary steel casing 3 to build the pile cap and complete the pile foundation construction.

[0041] See also Figure 1-Figure 3 A large cave pile foundation construction processing device is composed of a limiting mechanism 1 and a conveying mechanism 2.

[0042] The details are as follows:

[0043] See also Figure 4-Figure 6The limiting mechanism 1 includes a bottom plate 101, a top plate 109 and a limiting component. There are two bottom plates 101 in total. Two first connecting grooves are provided on the outer surface of one side of each bottom plate 101. The four first connecting grooves are divided into two groups. A first connecting plate 104 is inserted between the two first connecting grooves in each group. A support frame 105 is fixedly connected to the top of each first connecting plate 104. A second connecting plate 108 is slidably sleeved on the outer surface of each support frame 105. There are two top plates 109 in total. A second connecting groove is provided on the outer surface of one side of each top plate 109. The two top plates 109 are clamped between the outer surfaces of the two second connecting plates 108 through the second connecting groove. A top ring 111 is inserted between the relative outer surfaces of the two top plates 109. The bottom of the top ring 111 is fixed A collar 114 is fixedly connected, and a plurality of card frames 115 are equidistantly penetrated on the outer surface of the collar 114, wherein an extension frame 116 is inserted inside one of the card frames 115, and a limiting component is arranged on the two bottom plates 101, and a total of four groups of limiting components are arranged, and each group of limiting components includes a supporting threaded rod 102 and a supporting frame 103, and the supporting threaded rod 102 is rotatably connected to the top of the corresponding bottom plate 101, and the supporting frame 103 is threadedly connected to the outer surface of the supporting threaded rod 102, and a circular bubble level body 110 is fixedly connected to the top of each top plate 109, and the top of each support frame 103 is fitted with the bottom of the corresponding top plate 109, and the top of each support frame 105 slides through the bottom of the corresponding second connecting plate 108, and there is a gap between the inner top surface and the inner bottom surface of each support frame 105. The limited threaded rod 106 is rotatably connected, and each limited threaded rod 106 is threadedly connected to a pressure ring 107 on the outer surface, and the bottom of each pressure ring 107 is fitted with the top of the corresponding second connecting plate 108. The top of the top ring 111 is equidistantly fixedly connected with three side blocks 112, and the outer surface of one side of each side block 112 is slidably penetrated by a push rod 113, and the top of each side block 112 is threadedly connected with a positioning bolt, and the bottom end of each positioning bolt is fitted with the top of the corresponding push rod 113. The first connecting plate 104 and the second connecting plate 108 are used to facilitate the splicing of the bottom plate 101 and the top plate 109. At the same time, under the position restriction of the support frame 105, the top plate 109 can be stably placed on the top of the support frame 103, and then according to the state of the circular bubble level body 110, it can be intuitively Observe the horizontal condition of the top plate 109, and then adjust the use height of the support frame 103 by rotating, so that the horizontal state of the top plate 109 can be conveniently adjusted. At the same time, the pressing ring 107 can squeeze the second connecting plate 108 by rotating the limiting threaded rod 106, so that the top plate 109 can be closely attached to the top of the support frame 103, and the position of the top plate 109 is fixed. At the same time, the position of the support rod 113 is moved and adjusted according to the specifications of the temporary steel casing 3, so that one end of the support rod 113 can be attached to the outer surface of the temporary steel casing 3, so that the temporary steel casing 3 can be inserted to keep it in a vertical state at all times, and then the insertion process of the temporary steel casing 3 can be conveniently carried out. At the same time, according to the actual size of the cave, the extension frame 116 can be added or removed to facilitate the setting of multiple conveying mechanisms 2;

[0044] See also Figure 7-Figure 11 The conveying mechanism 2 includes a moving tube 201, a protective tube 202 and an extension tube 203. The moving tube 201 is slidably sleeved on the outer surface of the extension frame 116, and the bottom of the moving tube 201 slides through the interior of the extension frame 116. The protective tube 202 is slidably inserted into the moving tube 201. The extension tube 203 is slidably inserted into the protective tube 202. A retaining bolt is threadedly connected to the outer surface of one side of the moving tube 201. One end of the retaining bolt is in contact with the outer surface of one side of the extension frame 116. The top of the extension tube 203 is threadedly connected to The connecting seat 205 has a plurality of extension grooves equidistantly formed on the outer surface of the connecting seat 205. The top of the connecting seat 205 is slidably inserted into the limit strip 206. The bottom end of each limit strip 206 extends into the extension tube 203. The outer surface of the extension tube 203 has a plurality of connecting grooves equidistantly formed. A support strip 204 is slidably inserted into each connecting groove. A card slot is formed at the top and bottom of each support strip 204. A card slot 207 is fixedly connected to the multiple card slots by bolts. One end of each card slot extends To the inside of the corresponding extension groove, and each card 207 is threadedly connected to the corresponding extension groove by bolts, and a rotating pipe 208 is fixedly connected between the insides of multiple card slots by bolts. A plurality of discharge ports are equidistantly provided on the inner wall of the extension pipe 203, and the inside of each discharge port is connected to the inside of the corresponding connecting groove. The use position of the mobile pipe 201 can be fixed by the retaining bolt, and then the protective pipe 202 can be vertically inserted into the construction position under the position restriction of the mobile pipe 201, and then the extension pipe 203 can be vertically drilled along the protective pipe 202, thereby improving the construction efficiency. At the same time, according to the actual depth of the cave, the extension pipe 203 can be increased or decreased, so that one end of the extension pipe 203 can be effectively inserted into the cave, and then connected to the existing grouting equipment through the connecting seat 205, and at the same time, the use position of the anti-strip 204 in the connecting groove is moved, so that the discharge port located inside the cave can connect the inside of the extension pipe 203 with the inside of the cave, thereby accelerating the grouting speed into the cave, thereby effectively improving the actual construction efficiency.

[0045] When in use, the device can be stably placed at the selected position of the pile foundation through the bottom plate 101, and then the position of the supporting threaded rod 102 is fixed by observing the condition of the circular bubble level body 110, and then the supporting frame 103 is rotated to adjust the corresponding direction. Under the support of the top of the supporting frame 103, the top plate 109 can maintain a horizontal state, and then the limiting threaded rod 106 is rotated. Under the drive of the rotating limiting threaded rod 106, the pressing ring 107 can be pressed and fitted with the corresponding second connecting plate 108, so that the second connecting plate 108 can drive the top plate 109 The top of the support frame 103 is squeezed and fitted, and the top plate 109 is fixed in a horizontal position. At this time, according to the specifications of the temporary steel casing 3, the position of the support rod 113 is adjusted and moved, and the positioning bolt is rotated to fix the position of the support rod 113, so that the temporary steel casing 3 can fit between the ends of the three support rods 113 and pass through the top ring 111, and be placed vertically at the designated pile foundation selection position, so that the vertical insertion of the temporary steel casing 3 can be completed conveniently, so that the equipment can conveniently perform the insertion and installation of the temporary steel casing 3, without the need for ground leveling, thereby improving the actual construction efficiency;

[0046] According to the actual detected cave position, the number of extension frames 116 and conveying mechanisms 2 is increased or decreased, and the use position of the mobile tube 201 is moved and adjusted at the same time. At this time, the protective tube 202 can be vertically inserted around the selected position of the pile foundation along the direction of the mobile tube 201, and then the extension tube 203 can be connected to the existing drilling equipment through the connecting seat 205, and then by increasing or decreasing the spliced ​​extension tube 203, the existing drilling equipment can penetrate the extension tube 203 into the cave, and then connect it to the existing grouting equipment through the connecting seat 205. At this time, the limiting mechanism 1 is dismantled, and the permanent steel casing 4 is inserted in conjunction with the existing pile foundation construction equipment. When the permanent steel casing 4 does not need to penetrate the cave, the bolts inside the extension groove are first released according to the actual depth of the cave, and then the spliced ​​resistance strip 204 can be pulled out to a certain height along the connecting groove through the card 207, so that the discharge port located inside the cave can be connected to the inside of the cave, and then the appropriate slurry is injected to fill The slurry is injected into the cave through the discharge port and the extension pipe 203 to fill the inside of the cave, and then the conveying mechanism 2 is withdrawn. After the slurry inside the cave solidifies, different slurries are injected into the permanent steel casing 4 and the steel cage is settled. After the grouting inside the permanent steel casing 4 solidifies, the pile cap is built to complete the pile foundation construction. When the permanent steel casing 4 needs to pass through the cave, different slurries can be injected into the cave and the permanent steel casing 4 at the same time, and the settlement of the steel cage inside the permanent steel casing 4 is completed. At this time, under the obstruction of the slurry inside the cave, the slurry inside the permanent steel casing 4 is not easy to leak, thereby avoiding the mixing of the soil structure inside the cave into the slurry inside the permanent steel casing 4, ensuring the actual use quality of the slurry inside the permanent steel casing 4, and at the same time, the cave can be filled with slurries of different qualities to effectively reduce the overall construction cost, while ensuring the stability of the pile foundation and improving the actual pile foundation construction effect.

[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for construction and treatment of pile foundation in extra-large karst caves. It is characterized in that The following steps are involved: S1, preparatory treatment: first fill the selected position of the pile foundation, then clean the selected position of the pile foundation, place the super-large karst cave pile foundation construction treatment device at the cleaned selected position of the pile foundation, and complete the preparatory treatment; S2, pile foundation treatment: the temporary steel casing (3) is inserted and installed by the large karst cave pile foundation construction and processing device in S1. After the temporary steel casing (3) is inserted and installed, the large karst cave pile foundation construction and processing device is dismantled and transferred, and the permanent steel casing (4) is inserted and installed by the existing pile foundation construction equipment, thereby completing the preparatory work before grouting; S3, grouting treatment: according to the size of the actual detected karst cave, in the process of inserting the temporary steel casing (3) in S2, the karst cave grouting position around the temporary steel casing (3) is selected, and the drilling treatment of the karst cave grouting position is completed. At the same time, according to the pile foundation construction depth requirement, if the pile foundation construction depth does not reach the karst cave position, grouting is first performed inside the karst cave, and after the slurry inside the karst cave is solidified, grouting is then performed inside the permanent steel casing (4). If the pile foundation construction depth penetrates the karst cave, grouting inside the karst cave and grouting inside the permanent steel casing (4) are then performed simultaneously to complete the grouting treatment; S4, completion of construction: After the slurry filling inside the permanent steel casing (4) in S3 is completed, a steel cage is inserted into the permanent steel casing (4). After the slurry inside the cave and the slurry inside the permanent steel casing (4) solidify, the temporary steel casing (3) is removed to construct the pile cap, thereby completing the pile foundation construction.

2. A large cave pile foundation construction treatment device, It is characterized in that The method for construction and treatment of a pile foundation of a super-large karst cave as described in claim 1 comprises: A limiting mechanism (1), the limiting mechanism (1) comprising a bottom plate (101), a top plate (109) and a limiting component, wherein two bottom plates (101) are provided, and each bottom plate (101) is provided with two first connection grooves on one side of the outer surface, and the four first connection grooves are divided into two groups, and a first connection plate (104) is inserted between the two first connection grooves in each group, and each first connection plate (104) is fixedly connected to a support frame (105) on the top, and each support frame (105) is provided with a second connection plate (108) slidably sleeved on the outer surface, and the top plate (109) There are two of them in total, each of the top plates (109) is provided with a second connecting groove on one side of the outer surface, the two top plates (109) are clamped between the outer surfaces of the two second connecting plates (108) through the second connecting groove, a top ring (111) is inserted between the opposite outer surfaces of the two top plates (109), a butt ring (114) is fixedly connected to the bottom of the top ring (111), a plurality of card frames (115) are equidistantly passed through the outer surface of the butt ring (114), an extension frame (116) is inserted inside one of the card frames (115), and the limiting component is arranged on the two bottom plates (101); and A conveying mechanism (2), the conveying mechanism (2) comprising a moving tube (201), a protective tube (202) and an extension tube (203), the moving tube (201) being slidably sleeved on the outer surface of an extension frame (116), and the bottom of the moving tube (201) slidingly passing through the interior of the extension frame (116), the protective tube (202) being slidably inserted into the interior of the moving tube (201), and the extension tube (203) being slidably inserted into the interior of the protective tube (202).

3. A large cave pile foundation construction and processing device as claimed in claim 2, Features: There are four groups of the limiting components in total, and each group of the limiting components comprises a supporting threaded rod (102) and a supporting frame (103), wherein the supporting threaded rod (102) is rotatably connected to the top of the corresponding bottom plate (101), and the supporting frame (103) is threadedly connected to the outer surface of the supporting threaded rod (102).

4. A super large cave pile foundation construction processing device as claimed in claim 3, Features: The top of each top plate (109) is fixedly connected to a circular bubble level body (110), and the top of each support frame (103) fits the bottom of the corresponding top plate (109).

5. A super large cave pile foundation construction and processing device as claimed in claim 4, Features: The top of each support frame (105) slides through the bottom of the corresponding second connecting plate (108), and a limiting threaded rod (106) is rotatably connected between the inner top surface and the inner bottom surface of each support frame (105). The outer surface of each limiting threaded rod (106) is threadedly connected with a pressing ring (107), and the bottom of each pressing ring (107) fits with the top of the corresponding second connecting plate (108).

6. A super large cave pile foundation construction processing device as claimed in claim 5, Features: The top of the top ring (111) is equidistantly and fixedly connected with three side blocks (112); a push rod (113) is slidably penetrated through the outer surface of one side of each side block (112); a positioning bolt is threadedly connected to the top of each side block (112); and the bottom end of each positioning bolt fits with the top of the corresponding push rod (113).

7. A super large cave pile foundation construction and processing device as claimed in claim 6, Features: A retaining bolt is threadedly connected to the outer surface of one side of the moving tube (201), and one end of the retaining bolt is in contact with the outer surface of one side of the extension frame (116).

8. A super large cave pile foundation construction and processing device as claimed in claim 7, Features: The top of the extension tube (203) is threadedly connected to a connection seat (205), and a plurality of extension grooves are equidistantly provided on the outer surface of the connection seat (205). The top of the connection seat (205) is slidably inserted into a limit bar (206), and the bottom end of each limit bar (206) extends into the interior of the extension tube (203).

9. A super large cave pile foundation construction and processing device as claimed in claim 8, Features: The outer surface of the extension tube (203) is provided with a plurality of connection grooves at equal intervals, a push bar (204) is slidably inserted inside each of the connection grooves, and a card slot is provided at the top and bottom of each of the push bars (204), wherein a plurality of the card slots are fixedly connected with a card (207) by bolts, one end of each of the card (207) extends to the inside of the corresponding extension groove, and each of the card (207) is threadedly connected to the corresponding extension groove by bolts, and a plurality of the card slots are fixedly connected with a rotating tube (208) by bolts.

10. A super large cave pile foundation construction and processing device as claimed in claim 9, Features: The inner surface wall of the extension tube (203) is provided with a plurality of discharge openings at equal intervals, and the interior of each discharge opening is connected to the interior of the corresponding connection groove.