Construction method of cover-excavation falling type prefabricated beam plate assembled subway station
Through the construction method of prefabricated beams and slabs with the overall assembly of prefabricated components, the problems of long construction cycle and high cost of subway stations are solved, and the rapid, efficient, green and environmentally friendly construction results are achieved, reducing the impact on the environment.
Patent Information
- Application Number
- CN202411371611.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-12
AI Technical Summary
The existing subway station construction method has a long construction cycle, high cost, complex process, and the construction and demolition of the support structure will produce noise, vibration and environmental impact, affecting the surrounding residents and the environment.
The construction method of prefabricated beams and slabs is adopted to produce prefabricated subway stations through factory prefabricated production, including enclosing piles, column piles, block top plates, cross beams, block middle plates and block bottom plates, and drilling holes and cement are used for drilling rigs. The soil and mud guard wall positioning prefabricated components to form an integral permanent structure, reducing the use and removal of the support structure.
It improves construction speed and quality, reduces construction costs, simplifies processes, reduces the impact on the environment, achieves rapid, efficient, green and environmentally friendly construction results, and shortens the station construction time.
Smart Images

Figure CN118933075A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of subway station construction, and in particular to a construction method for a subway station assembled with cover-and-cut prefabricated beams and slabs. Background Art
[0002] Rail transit projects have become the leading force in the development of urban public transportation with their outstanding safety, comfort, speed, efficiency, energy saving and environmental protection. When excavating underground structures of subway stations, the road needs to be closed and occupied for a long time during the foundation pit excavation construction, which affects the smoothness and smoothness of the ground road; at the same time, the open-air construction of the foundation pit will produce certain dust pollution and noise, which will have an adverse impact on the environmental protection and nuisance to the surrounding areas of the city. The cover excavation method is to excavate from the ground to the depth of the top plate, close the top, restore the temporary road, and the rest of the lower project is constructed under the closed top cover, which can reduce the impact on ground traffic. This makes the cover excavation method widely used in the excavation process of underground structures such as subway stations.
[0003] However, most of the underground structures in the existing cover-and-cut construction methods are cast-in-place. For example, Chinese patent CN 102926403 A discloses a cover-and-cut top plate construction method, in which a cushion layer is first laid on the top plate, and then a cast-in-place concrete top plate is constructed. After the maintenance is completed, the formwork is removed and the top is backfilled with soil. The road occupancy time is long and the degree of standardization is low. Chinese patent CN 103741714 A discloses a full cover-and-cut reverse construction method for underground engineering, in which an underground continuous beam is first constructed as a retaining structure, and then a concrete structure top plate is cast. The construction period is long and the mud produced is not environmentally friendly.
[0004] Since the cover-and-cut method requires the construction and demolition of supporting structures, this will increase the construction period. The construction and demolition of supporting structures require additional time and human resources, which will extend the construction time. The construction and demolition process of the supporting structure may generate noise, vibration and other environmental impacts, which will cause certain interference and impacts on surrounding residents or the environment. How to quickly, efficiently, green and environmentally friendly realize the construction of subway stations and reduce the road occupation time of station construction is of great significance. Summary of the invention
[0005] The invention provides a construction method for assembling a subway station with a cover-and-dig-down type prefabricated beam and slab, which is used to solve the problems of a long construction period, high cost and complicated procedures in the existing subway station construction method.
[0006] To achieve the above object, the present invention provides the following technical solutions: A construction method for a subway station assembled with a cover-and-dig type prefabricated beam and slab, comprising the following steps: Step 1: Factory prefabrication of prefabricated retaining piles, prefabricated column piles, prefabricated block top slabs, prefabricated cross beams, prefabricated block middle slabs and prefabricated block bottom slabs for subway stations; Step 2: At the corresponding location of the station construction site, the drilling rig drills into the hole to the designed depth, injects cement soil slurry to protect the wall, and positions the prefabricated retaining piles and prefabricated column piles at the designed position; Step 3: After the construction of prefabricated retaining piles is completed, water-stop curtains are constructed between the piles; Step 4: After excavating the foundation pit to the bottom elevation of the crown beam, hoist the prefabricated block top plate to the designed position, cast the crown beam, and form the overall structure of the station top plate; Step 5: Backfill the soil above the station roof and restore the ground road; Step 6: Continue to dig the foundation pit downwards, and remove the concrete protective layer of the prefabricated retaining piles and prefabricated column piles while excavating to expose the pre-buried reserved guide groove; Step 7: Install the prefabricated crossbeams at the reserved guide grooves of the prefabricated retaining piles and prefabricated column piles, tighten the limiter bolts to fix the prefabricated crossbeams, and also serve as lateral supports for foundation pit excavation; Step 8: After the foundation pit continues to be excavated downward to the middle plate position, the prefabricated crossbeam is lowered along the reserved guide groove to the middle plate position, and then the prefabricated block middle plate is hoisted to complete the construction of the station middle plate structure; Step 9: After the foundation pit is excavated downward to the bottom plate position, the bottom plate cushion layer is constructed, the prefabricated block bottom plate is installed, and then the reserved grooves at both ends of the prefabricated bottom plate and the station side wall are integrally cast; Step 10: Cast the reserved guide grooves, precast beams and spaces between the stoppers to form an overall permanent structure.
[0007] In a preferred implementation, anchor bars are reserved at both ends of the prefabricated block top plate in step 4, and the reserved anchor bars are connected to the crown beam reinforcement to transmit shear force and bending moment.
[0008] In a preferred implementation, a group of steel reserved guide grooves are pre-buried in the prefabricated retaining piles in step 6 inside the foundation pit; the reserved guide grooves are arranged axially along the prefabricated retaining piles; the reserved guide grooves are concave grooves, and bolt holes are reserved on both sides of the concave grooves.
[0009] In a preferred implementation, the prefabricated column piles in step 6 are pre-buried with four sets of steel reserved guide grooves around them; the reserved guide grooves are arranged along the axial direction of the column piles; the reserved guide grooves are concave grooves, and bolt holes are reserved on both sides of the concave grooves.
[0010] In a preferred implementation, the prefabricated crossbeam in step 7 is an inverted T-shaped structure, and both ends of the prefabricated crossbeam are convex structures, which are mortise and tenoned with the concave grooves of the reserved guide grooves and can slide up and down along the reserved guide grooves.
[0011] In a preferred implementation, a steel corbel structure is provided below both ends of the prefabricated beam, and the steel corbel structure includes a limiter, which can be fastened to the reserved bolt holes in the reserved guide groove by bolt connection, so as to position and control the position of the prefabricated beam on the reserved guide groove.
[0012] In a preferred implementation, after the prefabricated beam in step 8 is lowered along the reserved guide groove and positioned to the middle plate position, the limiters at both ends of the prefabricated beam are connected and fixed to the reserved bolt holes of the prefabricated retaining piles and prefabricated column piles by bolts, and then the prefabricated segmented middle plate is hoisted to the flange of the inverted T-shaped prefabricated beam to complete the middle plate structure splicing.
[0013] In a preferred implementation, anchor bars are reserved at both ends of the prefabricated block bottom plate in step 9, the reserved anchor bars are connected to the steel bars of the station side wall, and then the reserved grooves at both ends of the prefabricated block bottom plate and the station side wall concrete are poured in sequence from bottom to top.
[0014] In a preferred implementation, the prefabricated block floor in step 9 is overlapped along the axis of the station using tongue and groove, and an elastic rubber sealing strip is buried in the tongue and groove as a waterproof structure. After the floor structure is assembled, waterproof sealant is injected into the axial joint to supplement waterproofing.
[0015] In a preferred implementation, the elastic rubber sealing strip is made of water-swellable EPDM rubber.
[0016] The above structure has the following beneficial effects: 1. The overall structure of the subway station of the present invention is assembled with prefabricated components. The structural components are of fine size and reliable quality, which improves the industrialization level of underground engineering, overcomes the quality defects of bored pile retaining structure, such as pile foundation necking, hole expansion limit, honeycomb surface, etc., and avoids the problems of honeycomb surface, color difference, cracks, etc. that the cast-in-place concrete main structure is prone to.
[0017] 2. The covered-excavation subway station of the present invention adopts a combination of descending prefabricated cross beams, prefabricated block middle plates, and prefabricated block bottom plates to form a beam-slab structure, thereby realizing the overall prefabrication and assembly of the main structure of the station, avoiding the waiting time for cast-in-place structure maintenance, accelerating the construction speed, and overcoming the problems of long-term road closure and occupation during the construction period of the station foundation pit using the open-cut method, and dust and noise generated during open-air construction.
[0018] 3. The dropped design of the prefabricated crossbeams of the present invention avoids the generation of construction waste by chiseling away concrete supports, can save the process and cost of crossbeam removal, greatly reduces construction costs, makes construction green and environmentally friendly, simplifies the construction process, improves construction efficiency, maintains the integrity of the underground structure, reduces the impact and damage to the structure, makes the construction process more coherent, improves construction effects and quality, and promotes the green and sustainable development of underground projects.
[0019] 4. During the downward excavation of the foundation pit, the reserved guide grooves of the prefabricated retaining piles and column piles of the present invention are chiseled out while excavating. The concrete protective layer can protect the reserved guide grooves from being impacted and damaged by soil, stones and other debris. By chiseling out the concrete protective layer and installing prefabricated beams, the prefabricated beams can be effectively fixed and prefabricated.
[0020] 5. The present invention integrally casts the reserved grooves at both ends of the prefabricated block bottom plate and the station side walls, as well as the reserved casting guide grooves, prefabricated beams, and the gaps between the limiters to form an overall permanent structure, which can enhance the integrity of the structure: improve construction efficiency, make the construction process more continuous and efficient, ensure that the various parts of the structure are tightly connected, and reduce the risk of water seepage and leakage. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present application and do not constitute an improper limitation of the present invention. In the drawings: Figure 1 The schematic diagram of the structure of the subway station with cover-excavation and landing prefabricated beam-slab assembly in this application is drawn; Figure 2 A schematic diagram showing the prefabricated retaining piles and prefabricated column piles of the present application placed in the underground design position is drawn; Figure 3 A schematic structural diagram of a subway station after the prefabricated block top plate is installed in the present application is depicted; Figure 4 A schematic diagram of the structure of the subway station after the upper side of the prefabricated block top plate of the present application is restored to the ground road is drawn; Figure 5 A schematic diagram of the subway station structure after the prefabricated beams and stoppers are installed in this application is drawn; Figure 6 A schematic diagram of the structure of the subway station after the prefabricated beams of the present application are lowered is drawn; Figure 7 A schematic diagram of the structure of the subway station after the prefabricated block floor is installed in this application is drawn; Figure 8 A schematic diagram of the structure of the subway station after pouring the station side wall in this application is drawn; Fig. 9 This application is shown Figure 8 Schematic diagram of the cross section of AA; Fig.10 This application is shown Fig. 9 A magnified schematic diagram of part B; Fig.11 This application is shown Fig. 9 A magnified schematic diagram of part C; Fig.12A schematic structural diagram of the limiter of the present application is shown.
[0022] Description of labels: 1- Prefabricated retaining piles; 2- Prefabricated column piles; 3- Prefabricated block top plate; 4- Crown beam; 5- Ground road; 6- Prefabricated cross beam; 7- Limiter; 8- Bottom surface of foundation pit excavation; 9- Prefabricated block bottom plate; 10- Pad layer; 11- Station side wall; 12- High-pressure jet grouting piles; 13- Prefabricated block middle plate; 14- Stiffening ribs; 15- Reserved guide groove; 16- Bolts. DETAILED DESCRIPTION
[0023] In the following, only some exemplary embodiments are briefly described. As those skilled in the art will appreciate, the described embodiments may be modified in various ways without departing from the spirit and scope of the present invention. Therefore, the drawings and descriptions are considered to be exemplary and non-restrictive in nature.
[0024] The present invention will be described below in conjunction with the accompanying drawings.
[0025] The specific plans adopted are: like Figure 1-12 As shown, the present invention provides a construction method for assembling a subway station with a cover-and-cut type prefabricated beam slab. In order to make the purpose, technical scheme and effect of the present invention clearer and more specific, the present invention is further described in detail below. The present invention, through the innovation of the prefabricated beam and slab structure and the innovation of the construction method of the subway station, firstly prefabricates the prefabricated retaining piles 1, prefabricated column piles 2, prefabricated block top plates 3, prefabricated cross beams 6, prefabricated block middle plates 13 and prefabricated block bottom plates 9 of the station, and then performs a descending movement and positioning of the prefabricated cross beam 6 structure, and then performs combined assembly of the prefabricated block middle plates 13 and the prefabricated block bottom plates 9, thereby realizing the overall assembly of the main structure of the station, accelerating the construction speed, effectively reducing the road occupation time of the station construction, achieving excellent quality of structural components, and green and environmentally friendly construction technology, thereby improving the industrialization level of underground engineering.
[0026] The invention proposes a construction method for assembling a subway station with a cover-and-cut type prefabricated beam and slab, and the specific steps are as follows: Step 1: Factory prefabrication of subway station prefabricated retaining piles 1, prefabricated column piles 2, prefabricated block top plates 3, prefabricated cross beams 6, prefabricated block middle plates 13 and prefabricated block bottom plates 9; Step 2: At the corresponding position of the station construction site, the drilling rig drills into the hole to the designed depth, injects cement soil slurry to protect the wall, and positions the prefabricated retaining pile 1 and the prefabricated column pile 2 at the designed position; Step 3: After the construction of prefabricated retaining piles 1 is completed, a water-stop curtain is constructed between the piles; Step 4: After excavating the foundation pit to the bottom elevation of the crown beam 4, hoist the prefabricated block top plate 3 to the designed position, cast the crown beam 4, and form the overall structure of the station top plate; Step 5: Backfill the soil above the station roof to restore the ground road 5; Step 6: The foundation pit is further excavated downwards, and the concrete protective layer of the prefabricated retaining piles 1 and the prefabricated column piles 2 is removed while excavating to expose the pre-buried reserved guide grooves 15; Step 7: Install the prefabricated cross beam 6 at the reserved guide groove 15 of the prefabricated retaining pile 1 and the prefabricated column pile 2, and tighten the bolts 16 of the stopper 7 to fix the prefabricated cross beam 6, which also serves as a lateral support for the foundation pit excavation; Step 8: After the foundation pit continues to be excavated downward to the middle plate position, the prefabricated cross beam 6 is lowered along the reserved guide groove 15 to the middle plate position, and then the prefabricated block middle plate 13 is hoisted to complete the construction of the station middle plate structure; Step 9: After the excavation bottom surface 8 of the foundation pit is further excavated downward to the bottom plate position, the bottom plate cushion layer 10 is applied, the prefabricated block bottom plate 9 is installed, and then the reserved grooves at both ends of the prefabricated block bottom plate 9 and the station side wall 11 are integrally cast; Step 10: Cast the reserved guide groove 15, the prefabricated beam 6, and the gap between the limiter 7 to form an overall permanent structure. The prefabricated retaining piles 1, prefabricated column piles 2, prefabricated block top plates 3, prefabricated cross beams 6, prefabricated block middle plates 13, and prefabricated block bottom plates 9 in step 1 are prefabricated in a factory and formed using special steel molds. The hydraulic system and positioning system are used to achieve standard structural dimensions and accurate reserved and embedded positions.
[0027] The prefabricated retaining piles 1 in step 1 are prefabricated square piles, and the prefabricated column piles 2 are prefabricated square piles.
[0028] See also Fig. 9 The inter-pile water-stop curtain in step 3 is constructed by triple-tube high-pressure rotary jet piles. The high-pressure rotary jet piles 12 and the prefabricated retaining piles 1 are engaged with each other to form a continuous water-stop structure, and precipitation measures are used to ensure that the foundation pit excavation is above the groundwater level.
[0029] In step 4, when the foundation pit is excavated to the bottom elevation of the crown beam 4, steel mesh and shotcrete slope protection are simultaneously applied.
[0030] Anchor bars are reserved at both ends of the prefabricated block top plate 3 in step 4, and the reserved anchor bars are connected to the steel bars of the crown beam 4 to transmit shear force and bending moment.
[0031] In step 5, cement mortar is backfilled above the station roof and compacted layer by layer. Municipal roads are constructed according to design requirements and ground traffic is restored.
[0032] See also Fig.10In step 6, a set of steel reserved guide grooves 15 are pre-buried inside the foundation pit of the prefabricated retaining pile 1; the reserved guide grooves 15 are arranged axially along the prefabricated retaining pile 1; the reserved guide grooves 15 are concave grooves, and bolt holes are reserved on both sides of the concave grooves.
[0033] See also Fig.11 The prefabricated column pile 2 in step 6 is pre-buried with four sets of steel reserved guide grooves 15 around it; the reserved guide grooves 15 are arranged axially along the prefabricated column pile 2; the reserved guide grooves 15 are concave grooves, and bolt holes are reserved on both sides of the concave grooves.
[0034] See also Fig. 9 , Fig.10 and Fig.11 The prefabricated beam 6 in step 7 is an inverted T-shaped structure, and the two ends of the prefabricated beam 6 are convex structures, which are mortise and tenoned with the concave grooves of the reserved guide grooves 15 and can slide up and down along the reserved guide grooves 15; a steel bracket structure is provided below the two ends of the prefabricated beam 6.
[0035] For further information, see Fig.11 , Fig.12 The steel bracket structure includes a limiter 7, which is provided with a stiffening rib 14 to improve the rigidity and bearing capacity of the limiter. The limiter 7 can be connected and fastened with the reserved bolt holes in the reserved guide groove 15 through bolts 16 to position and control the position of the prefabricated beam 6 on the reserved guide groove 15.
[0036] Furthermore, the prefabricated cross beam 6 can slide up and down in the reserved guide groove 15 and can be lifted and lowered by an electric hoist device. The electric hoist device transmits force in the form of a chain, and the lifting control is stable. In step 8, after the prefabricated cross beam 6 is lowered and positioned to the height position of the middle plate along the reserved guide groove 15, the limiters 7 at both ends of the prefabricated cross beam 6 are connected and fixed with the reserved bolt holes of the prefabricated retaining piles 1 and the prefabricated column piles 2 by bolts, and then the prefabricated block middle plate 13 is hoisted to the flange of the inverted T-shaped prefabricated cross beam 6 to complete the splicing of the middle plate structure.
[0037] See also Figure 7 and Figure 8 In step 9, anchor bars are reserved at both ends of the prefabricated block bottom plate 9, and the reserved anchor bars are connected to the steel bars of the station side wall 11. Then, the reserved grooves at both ends of the prefabricated block bottom plate 9 and the concrete of the station side wall 11 are poured in sequence from bottom to top. The prefabricated block bottom plate 9 in step 9 is overlapped along the axis of the station by tongue and groove, and an elastic rubber sealing strip is buried in the tongue and groove as a waterproof structure. After the prefabricated bottom plate 9 structure is assembled, waterproof sealant is injected into the axial joint to supplement waterproofing.
[0038] Furthermore, the cast-in-place concrete adopts concrete of the same strength grade as the prefabricated block top plate 3, the prefabricated block middle plate 13, and the prefabricated block bottom plate 9; Furthermore, the elastic rubber sealing strip adopts water-expandable EPDM rubber.
[0039] Anything not described in the present invention can be achieved by adopting or drawing on existing technologies.
[0040] The above are only specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of various changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A construction method for assembling a subway station with prefabricated beams and slabs in a cover-and-dig-down manner, characterized in that: The following steps are involved: Step 1: Factory prefabrication of prefabricated retaining piles, prefabricated column piles, prefabricated block top slabs, prefabricated cross beams, prefabricated block middle slabs and prefabricated block bottom slabs for subway stations; Step 2: At the corresponding location of the station construction site, the drilling rig drills into the hole to the designed depth, injects cement soil slurry to protect the wall, and positions the prefabricated retaining piles and prefabricated column piles at the designed position; Step 3: After the construction of prefabricated retaining piles is completed, water-stop curtains are constructed between the piles; Step 4: After excavating the foundation pit to the bottom elevation of the crown beam, hoist the prefabricated block top plate to the designed position, cast the crown beam, and form the overall structure of the station top plate; Step 5: Backfill the soil above the station roof and restore the ground road; Step 6: Continue to dig the foundation pit downwards, and remove the concrete protective layer of the prefabricated retaining piles and prefabricated column piles while excavating to expose the pre-buried reserved guide groove; Step 7: Install the prefabricated crossbeams at the reserved guide grooves of the prefabricated retaining piles and prefabricated column piles, tighten the limiter bolts to fix the prefabricated crossbeams, and also serve as lateral supports for foundation pit excavation; Step 8: After the foundation pit continues to be excavated downward to the middle plate position, the prefabricated crossbeam is lowered along the reserved guide groove to the middle plate position, and then the prefabricated block middle plate is hoisted to complete the construction of the station middle plate structure; Step 9: After the foundation pit is excavated downward to the bottom plate position, the bottom plate cushion layer is constructed, the prefabricated block bottom plate is installed, and then the reserved grooves at both ends of the prefabricated bottom plate and the station side wall are integrally cast; Step 10: Cast the reserved guide grooves, precast beams and spaces between the stoppers to form an overall permanent structure.
2. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 1 is characterized in that: Anchor bars are reserved at both ends of the prefabricated block top plate in step 4, and the reserved anchor bars are connected to the crown beam steel bars to transmit shear force and bending moment.
3. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 1 is characterized in that: The prefabricated retaining piles in step 6 are pre-buried with a set of steel reserved guide grooves inside the foundation pit; the reserved guide grooves are arranged axially along the prefabricated retaining piles; the reserved guide grooves are concave grooves, and bolt holes are reserved on both sides of the concave grooves.
4. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 3 is characterized in that: The prefabricated column pile in step 6 is pre-buried with four sets of steel reserved guide grooves around it; the reserved guide grooves are arranged along the axial direction of the column pile; the reserved guide grooves are concave grooves, and bolt holes are reserved on both sides of the concave grooves.
5. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 4 is characterized in that: The prefabricated crossbeam in step 7 is an inverted T-shaped structure, and both ends of the prefabricated crossbeam are convex structures, which are mortise and tenoned with the concave grooves of the reserved guide grooves and can slide up and down along the reserved guide grooves.
6. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 5 is characterized in that: A steel bracket structure is provided below both ends of the prefabricated crossbeam, and the steel bracket structure includes a limiter. The limiter can be fastened to the reserved bolt hole in the reserved guide groove by bolt connection, so as to position and control the position of the prefabricated crossbeam on the reserved guide groove.
7. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 5 is characterized in that: In step 8, after the prefabricated beam is lowered along the reserved guide groove and positioned to the middle plate position, the limiters at both ends of the prefabricated beam are connected and fixed with the reserved bolt holes of the prefabricated retaining piles and prefabricated column piles by bolts, and then the prefabricated block middle plate is hoisted to the flange of the inverted T-shaped prefabricated beam to complete the middle plate structure splicing.
8. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 1 is characterized in that: In step 9, anchor bars are reserved at both ends of the prefabricated block bottom plate, and the reserved anchor bars are connected to the steel bars of the station side wall. Then, the reserved grooves at both ends of the prefabricated block bottom plate and the station side wall concrete are poured in sequence from bottom to top.
9. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 1 is characterized in that: The prefabricated block bottom plate in step 9 is overlapped along the axis of the station by tongue and groove, and elastic rubber sealing strips are buried in the tongue and groove as a waterproof structure. After the bottom plate structure is assembled, waterproof sealant is injected into the axial joint to supplement waterproofing.
10. The construction method of a subway station assembled with prefabricated beams and slabs of cover and excavation type according to claim 9, characterized in that: The elastic rubber sealing strip is made of EPDM rubber that expands when exposed to water.