Basement post-cast strip blind ditch diversion structure and construction method

By setting up a blind ditch diversion structure at the basement back pouring belt, using angle steel, rice stone layer, non-woven fabric and steel mesh to guide water to the water accumulation well, the leakage problem of rear pouring belt is solved, the construction is simplified, and the construction is reduced Cost and ensures dryness and stability of the basement.

CN118933137APending Publication Date: 2024-11-12WUHAN ZHONGXIN MUNICIPAL CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410417126.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-08
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The basement back pouring belt is difficult to clean and pour due to the large thickness and dense steel bars, which is even more serious in riverside or lakeside areas, resulting in uneven settlement and water leakage problems, affecting the stability and safety of the building.

Method used

The blind groove diversion structure and construction method of the rear pouring belt are adopted. Angle steel, rice stone layers, non-woven fabrics and steel mesh are set on both sides of the rear pouring belt of the bottom plate, and fine stone concrete floor layer is poured on it to form a guide The blind ditch is used to guide water to the accumulated well to ensure dry ground and to connect with the surrounding drainage ditch.

Benefits of technology

It effectively solves the problem of leakage of the post-pouring tape, reduces maintenance costs, simplifies construction processes, reduces costs and time, and ensures the dry state and structural stability of the basement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933137A_ABST
    Figure CN118933137A_ABST
Patent Text Reader

Abstract

The invention provides a basement post-cast strip blind ditch flow guide structure and a construction method, and belongs to the field of basement structures.The method comprises the steps that the two sides of the position of a bottom plate post-cast strip are expanded outwards by a preset distance for corresponding paying-off, so that the position of a flow guide blind ditch is determined; corresponding angle steel is placed on the two sides of the flow guide blind ditch, one side face is flush with the post-cast strip pavement, the other side face is perpendicular to the post-cast strip pavement, angle steel openings face the interior of the flow guide ditch, the outer sides of the flush faces are flush with the outer side edge of the flow guide blind ditch, and the angle steel is fixed according to preset intervals; a granite layer is laid between the inner sides of the angle steel, and a layer of non-woven fabric is laid on the granite layer; and steel bar meshes at corresponding positions are laid on the non-woven fabric, and fine aggregate concrete terrace layers are poured at the corresponding positions. According to the method, the dry state of the ground is ensured by conducting water seepage and flow guiding on the post-cast strip part, later-stage leakage of the post-cast strip can be effectively eradicated, the use function after delivery is ensured, and therefore the maintenance cost caused by the post-cast strip in the later stage is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of basement structures, and in particular to a blind ditch diversion structure of a basement post-cast zone and a construction method. Background Art

[0002] At present, large cities have high requirements for the layout of parking spaces when building new houses. Generally, people and vehicles are separated, and all vehicles are parked in the basement. Based on such requirements, when building new houses, the basement generally has two or more floors, and the depth of the basement pit is generally more than 10 meters. Due to the large area of ​​the basement, the settlement of the main building and the parking lot is different, which requires a circle of settlement post-casting belts to be set around the main building to solve this problem.

[0003] However, the post-casting strip can only be closed after the main building is capped, which means that the waiting time for this circle of post-casting strips is relatively long, and there is a risk of leakage. Especially the post-casting strip of the bottom plate, which is located at the bottom of the foundation pit. Although there are drainage measures, it is difficult to ensure that there is no leakage due to various reasons. First, the thickness of the post-casting strip of the bottom plate is relatively thick, generally up to 800mm. After a long time, a large amount of silt and garbage are stored at the bottom of the steel bars connected through it, and the installed water-stop steel plate is often prone to corrosion. Secondly, when pouring the concrete of the post-casting strip, it is difficult to clean it in place due to the dense steel bars. Thirdly, there is water leakage in the post-casting strip itself. After pouring concrete, the structural defects of these parts further lead to leakage in the basement. Among them, these situations are more obvious for basements close to rivers and lakes. Since the basement elevation is far lower than the water level of the nearby river or lake, after the completion of drainage, the groundwater head will find the weakest place to break through, and the post-casting strip of the bottom plate is the weakest position, and the risk of water seepage in the later stage is the greatest.

[0004] Therefore, there is an urgent need for a construction method or structure that is easy to construct, has low cost, and can compensate for the problem of water seepage in the post-cast zone to ensure the normal construction of other processes in the basement. Summary of the invention

[0005] In view of the problems existing in the prior art, the present invention provides a blind ditch diversion structure and a construction method for a basement post-cast zone.

[0006] The present invention provides a construction method for a blind ditch diversion structure of a basement post-cast strip, comprising: correspondingly laying out lines along both sides of a post-cast strip position of a bottom plate at a preset distance to determine the position of the diversion blind ditch; placing corresponding angle steels on both sides of the diversion blind ditch position, with one side surface flush with the post-cast strip pavement and the other side surface perpendicular to the post-cast strip pavement, with the angle steel opening facing the inside of the diversion ditch and the outside of the flush surface aligned with the outer edge of the diversion blind ditch, and fixing the angle steels at preset intervals; laying a layer of stone between the inner sides of the angle steels, and laying a layer of non-woven fabric on the stone layer; laying a steel mesh at a corresponding position on the non-woven fabric, and pouring a fine stone concrete floor layer at the corresponding position.

[0007] According to a construction method for a blind ditch diversion structure of a basement post-cast zone provided by the present invention, the preset distance is greater than or equal to 10 cm.

[0008] According to a construction method for a blind ditch diversion structure of a basement post-cast zone provided by the present invention, the width of the flush surface of the angle steel is greater than the preset distance.

[0009] According to a construction method of a blind ditch diversion structure of a basement post-cast zone provided by the present invention, the size of the steel mesh includes 150 mm×150 mm×4 mm.

[0010] According to a construction method of a blind ditch diversion structure of a basement post-cast zone provided by the present invention, the size of the angle steel includes 30 cm×30 cm×2 cm.

[0011] According to a construction method of a blind ditch diversion structure of a basement post-cast zone provided by the present invention, all the backflow blind ditches of the post-cast zone are connected with the surrounding drainage ditches.

[0012] The present invention also provides a blind ditch diversion structure for a basement post-cast strip, comprising: angle steel, a stone layer, a non-woven fabric layer, a steel mesh and a fine stone concrete floor layer; two of the angle steels are respectively arranged on the junction of new and old concrete on both sides of the post-cast strip, and the angle steel openings face the inside of the diversion ditch, and the distance between the outer edges of the two angle steels is greater than the width of the post-cast strip; the stone layer, the non-woven fabric layer, the steel mesh and the fine stone concrete floor layer are distributed in the area between the angle steel openings from bottom to top.

[0013] According to a blind ditch diversion structure of a basement post-cast zone provided by the present invention, each of the blind ditch diversion structures is connected with the surrounding drainage ditch.

[0014] According to a blind ditch diversion structure for a basement post-cast zone provided by the present invention, the width of the flush surface of the angle steel is greater than the preset distance.

[0015] According to a blind ditch diversion structure for a basement post-cast zone provided by the present invention, the preset distance is greater than or equal to 10 cm, the size of the angle steel includes 30 cm×30 cm×2 cm, and the size of the steel mesh includes 150 mm×150 mm×4 mm.

[0016] The blind ditch diversion structure and construction method of the post-casting belt of the basement provided by the present invention can ensure the dry state of the ground by diverting the seepage water at the post-casting belt, such as diverting it to a water well. In addition, it has the characteristics of small one-time construction investment, simple process, and short construction time, which can effectively prevent the late leakage of the post-casting belt, add an extra insurance for the leakage of the post-casting belt, ensure the use function after delivery, and thus reduce the maintenance cost caused by the post-casting belt in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 It is a schematic diagram of the process of the construction method of the blind ditch diversion structure of the basement post-cast zone provided by the present invention; Figure 2 It is a plan view schematic diagram of the blind ditch diversion principle provided by the present invention; Figure 3 yes Figure 2 AA section view; In the figure: 1- angle steel; 2- post-cast strip; 3- drainage ditch; 4- meter stone layer; 5- non-woven fabric layer; 6- steel mesh; 7- fine stone concrete floor layer. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] Combine the following Figure 1-Figure 3 The invention describes a blind ditch diversion structure and a construction method for a basement post-cast zone. Figure 1 It is a schematic diagram of the process of the construction method of the blind ditch diversion structure of the basement post-cast zone provided by the present invention, such as Figure 1 As shown, the present invention provides a construction method for a blind ditch diversion structure of a basement post-cast zone, comprising: 101. Expand the preset distance on both sides of the post-cast strip of the bottom slab and lay out the corresponding lines to determine the location of the diversion blind ditch.

[0021] The preset distance is expanded on both sides of the post-casting strip along the bottom plate, such as a preset distance of 10cm. If the post-casting strip is 80cm wide, after expanding 10cm on both sides, a blind ditch with a width of 100cm is set. Clean the bottom plate at this part first and then lay out the lines.

[0022] 102. Place corresponding angle steels on both sides of the diversion blind ditch, with one side flush with the post-casting road surface and the other side perpendicular to the post-casting road surface. The mouth of the angle steel should face the inside of the diversion ditch and the outer side of the flush surface should be aligned with the outer edge of the diversion blind ditch, and the angle steel should be fixed at preset intervals.

[0023] like Figure 2 and Figure 3 As shown, an angle steel is placed on each side of the diversion blind ditch, such as an angle steel with a size of 30 cm×30 cm×2 cm. One side of the angle steel is placed parallel to the road surface, and the other side is perpendicular to the road surface. The openings of the angle steels are all facing the inside of the diversion ditch, and at the same time, the outermost side of the side of the angle steel parallel to the road surface (the inner side is close to the center of the diversion blind ditch) is aligned with the position of the line. Among them, the preset interval can be two meters, that is, the angle steel is fixed at an interval of two meters. The angle steel fixing method includes driving the angle steel into the concrete with a steel bar with a bent hook to fix the angle steel.

[0024] 103. Lay a layer of rice stone between the inner sides of the angle steels, and lay a layer of non-woven fabric on the rice stone layer.

[0025] A layer of rice stone is sprinkled on both sides of the angle steel for infiltration and drainage, and a layer of non-woven fabric is laid on the rice stone layer to separate the seepage of the basement floor from the poured floor concrete above.

[0026] 104. Lay steel mesh at corresponding positions on the non-woven fabric, and pour fine stone concrete floor layer at corresponding positions.

[0027] In order to ensure that the floor concrete is not hollow, a steel mesh is set on the non-woven fabric, and the size of the steel mesh can be 50mm×150mm×4mm. Finally, pour the floor concrete on the top layer, that is, the fine stone concrete floor layer.

[0028] The blind ditch diversion structure construction method of the post-casting belt of the basement of the present invention ensures the dry state of the ground by diverting the seepage water at the post-casting belt, such as diverting it to a water well. In addition, it has the characteristics of small one-time construction investment, simple process, and short construction time. It can effectively prevent the late leakage of the post-casting belt, add an extra insurance for the leakage of the post-casting belt, ensure the use function after delivery, and thus reduce the maintenance cost caused by the post-casting belt in the later stage.

[0029] In one embodiment, the preset distance is greater than or equal to 10 cm, that is, the diversion part is expanded outward by a distance greater than or equal to 10 cm beyond the post-casting strip implemented on site, ensuring that the blind ditch diversion structure can effectively cover the seepage part of the post-casting strip and improve the seepage diversion effect.

[0030] In one embodiment, the width of the flush surface of the angle steel is greater than the preset distance. Figure 2 As shown, the flat surface of the angle steel, that is, the side that fits the post-casting belt, has a width greater than the preset distance of the outward expansion, such as 10 cm above, so that the horizontally placed side can effectively block underground water seepage, reduce the pressure of water seepage on the stone layer, non-woven fabric and floor layer, avoid damaging the blind ditch diversion structure above the angle steel, and at the same time reduce the water flow of the seepage, ensure that the seepage water is discharged in time through the drainage ditch that intersects with the blind ditch diversion structure, and ensure that the floor layer on the post-casting belt is leak-free.

[0031] In one embodiment, the size of the steel mesh includes 150 mm×150 mm×4 mm. Specifically, the steel mesh of this size structure used in the embodiment of the present invention can effectively avoid the hollowing problem while reducing the amount of steel used.

[0032] In one embodiment, the preset distance is 10 cm, and the angle steel size includes 30 cm×30 cm×2 cm. In combination with the above embodiment, the outward expansion distance is 10 cm, which can ensure the diversion effect while controlling the construction cost and labor cost. On this basis, in order to achieve the most ideal diversion effect without increasing the material cost, an angle steel of 30 cm×30 cm×2 cm is used.

[0033] In one embodiment, all the backflow blind ditches of the post-casting strips are connected with the surrounding drainage ditches 3. Figure 2 As shown in the figure, it is a schematic diagram of two post-cast strips connected with the drainage ditch, and finally the basement is drained into the collection well through the drainage ditch.

[0034] The following is a description of the blind ditch diversion structure of the basement post-cast strip provided by the present invention. The blind ditch diversion structure of the basement post-cast strip described below and the construction method of the blind ditch diversion structure of the basement post-cast strip described above can be referred to each other.

[0035] like Figure 3As shown, the blind ditch diversion structure of the basement post-cast strip includes: angle steel 1, stone layer 4, non-woven fabric layer 5, steel mesh 6 and fine stone concrete floor layer 7; two angle steels 1 are respectively arranged on the interface between the new and old concrete on both sides of the post-cast strip 2, one side is flush with the post-cast strip pavement, and the other side is perpendicular to the post-cast strip pavement, and the angle steel mouth faces the inside of the diversion ditch, and the outer edges of the flush surfaces of the two angle steels are both expanded relative to the post-cast strip by a preset distance; the stone layer, non-woven fabric layer, steel mesh and fine stone concrete floor layer are distributed in the area between the angle steel mouths from bottom to top.

[0036] In one embodiment, each blind ditch diversion structure is connected to the surrounding drainage ditch 3 .

[0037] In one embodiment, the width of the flush surface of the angle steel is greater than the preset distance.

[0038] In one embodiment, the preset distance is greater than or equal to 10 cm. In one embodiment, the angle steel dimensions include 30 cm×30 cm×2 cm. In one embodiment, the steel mesh dimensions include 150 mm×150 mm×4 mm.

[0039] The device embodiment provided in the embodiment of the present invention is implemented through the above method embodiment. Please refer to the above method embodiment for the specific process and detailed content, which will not be repeated here.

[0040] The implementation principle and technical effects of the blind ditch diversion structure for the basement post-cast strip provided in the embodiment of the present invention are the same as those of the aforementioned embodiment of the construction method of the blind ditch diversion structure for the basement post-cast strip. For the sake of brief description, for matters not mentioned in the embodiment of the blind ditch diversion structure for the basement post-cast strip, reference may be made to the corresponding contents in the aforementioned embodiment of the construction method of the blind ditch diversion structure for the basement post-cast strip.

[0041] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A construction method for a blind ditch diversion structure of a basement post-cast zone, characterized in that: include: Expand the preset distance on both sides of the bottom slab post-casting strip to lay out the corresponding lines to determine the location of the diversion blind ditch; Place corresponding angle steels on both sides of the diversion blind ditch, with one side flush with the post-casting road surface and the other side perpendicular to the post-casting road surface. The angle steel mouth faces the inside of the diversion ditch and the outer side of the flush surface is aligned with the outer edge of the diversion blind ditch. Fix the angle steel at preset intervals. Lay a layer of rice stone between the inner sides of the angle steels, and lay a layer of non-woven fabric on the rice stone layer; Lay steel mesh at corresponding positions on the non-woven fabric, and pour fine stone concrete floor layer at corresponding positions.

2. The construction method of the blind ditch diversion structure of the basement post-cast zone according to claim 1 is characterized in that: The preset distance is greater than or equal to 10 cm.

3. The construction method of the blind ditch diversion structure of the basement post-cast zone according to claim 1 is characterized in that: The width of the flush surface of the angle steel is greater than the preset distance.

4. The construction method of the blind ditch diversion structure of the basement post-cast zone according to claim 1 is characterized in that: The dimensions of the steel mesh include 150 mm×150 mm×4 mm.

5. The construction method of the blind ditch diversion structure of the basement post-cast zone according to claim 2 is characterized in that: The preset distance is 10 cm, and the angle steel dimensions include 30 cm×30 cm×2 cm.

6. The construction method of the blind ditch diversion structure of the basement post-cast zone according to claim 1 is characterized in that: The backflow blind ditch of all post-cast joints is connected with the surrounding drainage ditch.

7. A blind ditch diversion structure for post-cast belts in a basement, characterized in that: include: Angle steel, rice stone layer, non-woven fabric layer, steel mesh and fine stone concrete floor layer; The two angle steels are respectively arranged on the junction of the new and old concrete on both sides of the post-cast strip, one side is flush with the post-cast strip road surface, and the other side is perpendicular to the post-cast strip road surface, and the angle steel mouth faces the inside of the guide ditch, and the outer edges of the flush surfaces of the two angle steels are both extended by a preset distance relative to the post-cast strip; The rice stone layer, the non-woven fabric layer, the steel mesh and the fine stone concrete floor layer are sequentially distributed in the area between the angle steel openings from bottom to top.

8. The blind ditch diversion structure of the basement post-cast zone according to claim 7 is characterized in that: Each of the blind ditch diversion structures is connected with the surrounding drainage ditches.

9. The blind ditch diversion structure of the basement post-cast zone according to claim 7 is characterized in that: The width of the flush surface of the angle steel is greater than the preset distance.

10. The blind ditch diversion structure of the basement post-cast zone according to claim 7, characterized in that: The preset distance is greater than or equal to 10 cm, the size of the angle steel includes 30 cm×30 cm×2 cm, and the size of the steel mesh includes 150 mm×150 mm×4 mm.