Fabricated building prefabricated component and component assembling method
By using grouting pipe fittings, pipe heading mechanisms and connecting mechanisms in prefabricated components of prefabricated buildings, combined with the design of cone springs, wire mesh covers and ribs, the problem of low tensile strength at the connections of concrete components in the prior art is solved, and the problem of high tensile strength at the connections of concrete components is improved Seismic resistance and stability of the structure.
Patent Information
- Application Number
- CN202411398637.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-10-09
AI Technical Summary
When existing prefabricated concrete components face natural disasters such as earthquakes, the tensile strength at the joints is low, and the steel bars are prone to breaking, resulting in structural defects.
A prefabricated building prefabricated components were designed, using grouting pipe fittings, pipe heading mechanisms, connection mechanisms and connection mechanisms. The connecting strength of steel bars and cement bonding properties were enhanced through structures such as cone springs, wire mesh covers and ribs to ensure that the structure was in natural disasters. More impact resistance.
It significantly enhances the stability of the steel bar connection and the safety performance of the overall structure, improves tensile strength and seismic performance, and reduces the risk of connection failure.
Smart Images

Figure CN118933272A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering structures, and in particular to an assembled building prefabricated component and a component assembly method. Background Art
[0002] For example, the publication number is CN113216510A, and the name is a grouting sleeve connected with an ECC tube for prefabricated concrete components, which includes a prefabricated RC concrete component A, a prefabricated ECC tube, and a prefabricated RC concrete component B. The prefabricated RC concrete component A is a variable cross-section, and the plastic hinge end portion is an embedded tenon-type section adapted to the prefabricated ECC tube, and the embedded tenon is used to insert into the prefabricated ECC tube. The connection between the prefabricated RC concrete component A and the prefabricated RC concrete component B is achieved by a grouting sleeve pre-buried in the prefabricated ECC tube, and the prefabricated joints between the three are connected by grouting sleeves and joint materials such as high-strength structural adhesives, UHPC, and high-strength grouting materials. This invention can effectively improve the durability and seismic performance of prefabricated concrete components, and give full play to the excellent crack resistance and crack control capabilities of ECC materials. It is suitable for prefabricated concrete components of building structures, and also suitable for prefabricated concrete components such as prefabricated piers and tie beams in bridge structures.
[0003] In the process of prefabricated wall production, the joints of cement pouring cannot better resist the impact of external forces when facing natural disasters such as earthquakes, and the steel bar joints of the poured wall are easily broken without the support of the prefabricated building parts. In addition, the tensile strength of the prefabricated wall joints is low, and the structural defects caused by unstable connections. Therefore, the present application provides an assembled building prefabricated component and a component assembly method to meet the needs. Summary of the invention
[0004] The purpose of the present application is to provide a prefabricated building component and a component assembly method, which can effectively solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: an assembled building prefabricated component, comprising two grouting pipes, the upper ends of the two grouting pipes are both provided with a jacking mechanism, a through pipe is commonly provided between the two jacking mechanisms, a connecting mechanism is commonly provided at the lower ends of the two grouting pipes, a connecting mechanism for increasing the strength of the building is commonly provided between the two grouting pipes, a reinforcing mechanism for increasing the connection strength of the steel bars is provided inside the two grouting pipes, and a plugging mechanism is provided inside the two grouting pipes; The reinforcing mechanism comprises a supporting plate and a shaping ring, and a conical spring for increasing the casting strength of the steel bar connection is arranged between the supporting plate and the shaping ring.
[0006] Among them, the grouting pipe fittings include a first mounting pipe, the outer surface of the first mounting pipe is wound with spiral ribs, the upper part of the outer surface of the first mounting pipe is provided with a slurry outlet pipe, the lower part of the outer surface of the first mounting pipe is provided with a feed pipe and a slurry passage pipe, the spiral ribs are spiral in shape and the cross-section of the spiral ribs is in the shape of the letter "π".
[0007] Wherein, the jacking mechanism includes a cover, a second mounting tube is arranged inside the cover, a plurality of second through holes distributed in a circular array are opened on the outer surface of the second mounting tube, rib rings are arranged on the outer surface and inner wall of the cover, a connecting tube is arranged on the outer surface of the cover, a through tube is arranged inside the connecting tube, and the cover is installed on the upper end of the first mounting tube.
[0008] Wherein, the support sheet is installed inside the sealing cover, and the shaping ring is installed inside the first mounting tube.
[0009] Wherein, the connection mechanism includes a bottom tube and an inner tube, the outer surface of the bottom tube is provided with a plurality of T-pieces distributed in a circular array, the outer surface of the inner tube is provided with a plurality of first through holes distributed in a circular array, the outer surface of the inner tube is provided with a plurality of support bars distributed in a circular array, one end of each of the support bars is fixedly mounted on the inner wall of the bottom tube, and the bottom tube is fixedly mounted on the bottom of the first mounting tube.
[0010] Among them, the connecting mechanism includes a support tube, the outer surface of the support tube is provided with a plurality of slurry outlet holes distributed in a circular array, both sides of the outer surface of the support tube are sleeved with mounting ring frames, a plurality of ribs distributed in a circular array are arranged between the two mounting ring frames, a support frame is arranged on one side of the inner wall of the support tube, a through pipe is arranged inside the support frame, the two mounting ring frames are arranged inside with external sleeves, a wire mesh cover sleeved on the outer surface of the ribs is arranged between the two external sleeves, the outer surface of the wire mesh cover is provided with a plurality of circular holes distributed in a circular array, steel wire strips are arranged inside the plurality of circular holes, one end of the support tube is fixedly connected to the slurry through pipe, and the other end of the support tube is fixedly connected to the feed pipe.
[0011] Wherein, the blocking mechanism comprises a support ring, the inner wall of the support ring is provided with a plurality of sealing sheets distributed in a ring array, and the support ring is arranged inside the slurry passage pipe and the slurry outlet pipe.
[0012] Wherein, the blocking mechanism comprises a collar, the inner wall of which is provided with a plurality of arc sheets distributed in a ring array, and the collar is arranged inside the slurry passage pipe.
[0013] A component assembly method for prefabricated components of an assembled building, the specific assembly method is as follows: Step 1: During assembly, the connection mechanism is butted with the two grouting pipes, and then the steel bars of the prefabricated wall are inserted into the jacking mechanism so that the steel bars extend into the interior of the grouting pipes, and then the connection mechanism is installed at the bottom of the grouting pipes, and finally the jacking mechanism, grouting pipes, connection mechanism and connection mechanism are cast with cement using a mold; Step 2: The poured cement is only poured on the outer surfaces of the grouting pipe fittings, jacking pipe mechanisms, through pipes, connecting mechanisms and coupling mechanisms. In order to prevent the cement from entering the interior of the grouting pipe fittings, a sealing mechanism is used to seal the feed hole of a grouting pipe fitting buried inside the cement wall. Because the two grouting pipe fittings are located inside the wall when the wall is poured, but the slurry outlet pipe and feed pipe of one of the grouting pipe fittings extend to the outside of the wall, it is convenient for the prefabricated wall to pour cement into the grouting pipe fittings, coupling mechanisms and connecting mechanisms during the subsequent assembly process.
[0014] In summary, the technical effects and advantages of the present invention are as follows: 1. After the prefabricated wall is manufactured, when it is assembled on the foundation, the prefabricated wall casting steel bars protruding from the foundation need to be inserted into the inner tube of the prefabricated wall. The inner tube is a pre-buried pipe in the prefabricated wall, which is used to guide the steel bars into the correct connection position. As the steel bars are inserted, they will extend into the interior of the grouting pipe and eventually hit the cone spring. The cone spring is a special spring device. Its shape design is shown in the figure to generate a certain elastic force when the steel bars are inserted, thereby increasing the friction between the steel bars and the grouting pipe. The special shape and elastic design of the cone spring enable it to provide a radial extrusion force when the steel bars are inserted, which helps to increase the contact area and friction between the steel bars and the grouting pipe, thereby enhancing the stability of the steel bar connection. Through the action of the cone spring, the connection strength between the steel bars and the grouting pipe is significantly enhanced, reducing the risk of connection failure caused by sliding or moving the steel bars. The design of the cone spring increases the casting strength of the steel bar connection, improves the safety performance of the entire prefabricated building structure, especially when natural disasters such as earthquakes occur, it can better resist the impact of external forces.
[0015] 2. In the initial pouring process of the present invention, cement will first be adsorbed on the outer surface of the wire mesh cover and the steel wire strip. The wire mesh cover is made of microporous metal mesh. This design can effectively prevent a large amount of cement from directly entering the inside of the wire mesh cover, but allows the cement to form a layer of wrapping on the outer surface. The wire mesh cover is made of microporous metal mesh material, which can prevent a large amount of cement from entering the inside on the one hand, and can also provide additional support and enhance the adhesion of cement on the other hand. When the cement is poured into the first installation pipe, the cement will enter the inside of the support pipe through the slurry pipe, ensuring that the cement can be evenly distributed in the entire connection mechanism. The design of the through pipe is to increase the strength of the connection between the support pipe and the slurry pipe. After the cement enters the inside of the support pipe, it flows out through the slurry outlet and fills the inside of the wire mesh cover, which helps to ensure that the cement can be evenly distributed. At the same time, it increases the filling density inside the wire mesh cover, thereby enhancing the overall structural strength. The design purpose of the ribs is to support the shape of the wire mesh cover so that its cross section is wavy. This wavy design increases the structural strength after the cement is poured, because the wavy surface provides more contact area, thereby enhancing the adhesion between the cement and the structure.
[0016] 3. The present invention increases the structural strength after cement pouring through the design of the wire mesh cover, support pipe and ribs, making the connection more solid and durable. The microporous design of the wire mesh cover effectively prevents a large amount of cement from entering the interior, thereby avoiding cement waste, and also ensures that the cement forms a protective layer on the outer surface. The design of the through pipe enhances the strength of the connection between the support pipe and the slurry pipe, further improving the overall stability of the connection mechanism. The ribs make the cross-section of the wire mesh cover wavy, increasing the contact area between the cement and the structure, thereby enhancing the bonding performance of the cement and improving the tensile strength of the connection. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without paying any creative work.
[0018] Figure 1 It is a first-person perspective three-dimensional structural diagram of prefabricated components of an assembled building; Figure 2 It is a second-view stereoscopic structural diagram of prefabricated components of assembled buildings; Figure 3 It is a cross-sectional view of the three-dimensional connection structure of prefabricated components of an assembled building; Figure 4 It is a schematic diagram of the local three-dimensional connection structure of prefabricated components of assembled buildings; Figure 5 It is a schematic diagram of the three-dimensional connection structure of the pipe jacking mechanism; Figure 6 It is a cross-sectional view of the three-dimensional connection structure of the pipe jacking mechanism; Figure 7 It is a schematic diagram of the three-dimensional connection structure of the reinforcement mechanism and the jacking mechanism; Figure 8 A schematic diagram of the three-dimensional connection structure of the strengthening mechanism; Fig. 9 It is a schematic diagram of the three-dimensional connection structure of the grouting pipe fittings; Fig.10 It is a cross-sectional view of the three-dimensional connection structure of the grouting pipe fitting; Fig.11 Schematic diagram of the three-dimensional connection structure of the spiral rib; Fig.12 It is a schematic diagram of the three-dimensional connection structure of the support ring; Fig.13 It is a schematic diagram of the three-dimensional connection structure of the ring; Fig.14 It is a schematic diagram of the three-dimensional connection structure of the connection mechanism; Fig.15 It is a cross-sectional view of the three-dimensional connection structure of the connection mechanism; Fig.16 It is a schematic diagram of the three-dimensional connection structure of the inner tube and the support bar; Fig.17 is a schematic diagram of a three-dimensional connection structure of a connection mechanism; Fig.18 It is a sectional view of the three-dimensional connection structure of the connection mechanism; Fig.19 It is a schematic diagram of a local three-dimensional connection structure of a connection mechanism; Fig. 20 It is a schematic diagram of the three-dimensional connection structure of the support tube; Fig.21 It is a schematic diagram of the three-dimensional connection structure of the wire mesh cover and the steel wire strip.
[0019] In the figure: 1, grouting pipe; 11, grout outlet pipe; 12, first installation pipe; 13, feed pipe; 14, spiral rib; 15, grout pipe; 2, connection mechanism; 21, bottom pipe; 22, T-piece; 23, inner pipe; 24, first through hole; 25, support bar; 3, connection mechanism; 30, external sleeve; 31, wire mesh cover; 32, through pipe; 33, steel wire; 34, support pipe; 35, rib; 36. Slurry outlet hole; 37. Mounting ring frame; 38. Support frame; 39. Round hole; 4. Through pipe; 5. Pipe jacking mechanism; 51. Second mounting pipe; 52. Second through hole; 53. Sealing cover; 54. Connecting pipe; 55. Rib ring; 6. Reinforcing mechanism; 61. Conical spring; 62. Support plate; 63. Shaping ring; 7. Sealing mechanism; 81. Support ring; 82. Sealing plate; 91. Sleeve ring; 92. Arc plate. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] Example 1, Reference Figures 1 to 21 An assembled building prefabricated component shown includes two grouting pipes 1, each of which is provided with a jacking mechanism 5 at its upper end, a through pipe 4 is provided between the two jacking mechanisms 5, each of which is provided with a connecting mechanism 2 at its lower end, a connecting mechanism 3 for increasing the building strength is provided between the two grouting pipes 1, a reinforcing mechanism 6 for increasing the connection strength of the steel bars is provided inside the two grouting pipes 1, and a blocking mechanism 7 is provided inside the two grouting pipes 1; It is worth noting that during assembly, the connection mechanism 3 is butt-jointed with the two grouting pipe fittings 1, and then the steel bars of the prefabricated wall are inserted into the jacking mechanism 5 so that the steel bars extend into the interior of the grouting pipe fitting 1, and then the connection mechanism 2 is installed at the bottom of the grouting pipe fitting 1, and finally the jacking mechanism 5, the grouting pipe fitting 1, the connection mechanism 2 and the connection mechanism 3 are cast with cement using a mold; The poured cement is only poured on the outer surfaces of the grouting pipe 1, the jacking mechanism 5, the through pipe 4, the connecting mechanism 3 and the connecting mechanism 2. In order to prevent the cement from entering the interior of the grouting pipe 1, a sealing mechanism 7 is used to seal the feed hole of a grouting pipe 1 buried inside the cement wall. Because the two grouting pipes 1 are located inside the wall when the wall is poured, but the slurry outlet pipe 11 and the feed pipe 13 of one of the grouting pipes 1 extend to the outside of the wall, it is convenient for the prefabricated wall to pour cement into the grouting pipe 1, the connecting mechanism 2 and the connecting mechanism 3 during the subsequent assembly process.
[0022] Among them, the connection mechanism 3 and the grouting pipe 1 are connected to ensure that the prefabricated components can be accurately connected during the final assembly to form a solid whole. The steel bars in the prefabricated wall are inserted into the jacking mechanism 5 so that the steel bars can pass through the entire grouting pipe 1, thereby enhancing the structural strength of the connection part of the prefabricated wall.
[0023] Embodiment 2: Based on the pipe jacking mechanism 5, grouting pipe fitting 1, reinforcement mechanism 6 and connection mechanism 2 proposed in Embodiment 1, this embodiment provides a further technical solution for the pipe jacking mechanism 5, grouting pipe fitting 1, reinforcement mechanism 6 and connection mechanism 2.
[0024] The jacking mechanism 5 includes a cover 53, a second mounting tube 51 is arranged inside the cover 53, a plurality of second through holes 52 distributed in a circular array are opened on the outer surface of the second mounting tube 51, rib rings 55 are arranged on the outer surface and inner wall of the cover 53, a connecting tube 54 is arranged on the outer surface of the cover 53, a through tube 4 is arranged inside the connecting tube 54, and the cover 53 is installed on the upper end of the first mounting tube 12.
[0025] It is worth mentioning that when in use, the second mounting tube 51 is inserted into the broken end of the steel bar made of the prefabricated wall. As the steel bar extends out and enters the grouting pipe 1, one end of the extended steel bar hits the reinforcing mechanism 6 and stops pushing the grouting pipe 1. When the prefabricated wall is poured, the poured concrete will cover the surface of the cover 53 and the rib ring 55. Part of the concrete will enter the second mounting tube 51 through the second through hole 52 to fix the steel bar in the second mounting tube 51. The design of the rib ring 55 can make the cover 53 more firmly adsorbed in the prefabricated wall, and the design of the rib ring 55 can enhance the cement strength at the joint of the prefabricated wall.
[0026] Among them, the second mounting tube 51 is inserted into the broken end of the prefabricated wall steel bar. In order to allow the steel bar to be accurately positioned in the grouting pipe 1 and ensure the correct connection between the steel bar and the grouting pipe 1, one end of the steel bar extends into the grouting pipe 1 until it contacts the reinforcing mechanism 6. The function of the reinforcing mechanism 6 is to provide additional support and fixing functions. When the prefabricated wall is poured with concrete, the concrete will cover the surface of the cover 53 and the rib ring 55, and the cover 53 and the rib ring 55 will be firmly fixed inside the prefabricated wall.
[0027] Part of the concrete will enter the tube through the second through hole 52 on the second mounting tube 51. The main purpose of this is to enhance the bonding force between the steel bars and the second mounting tube 51 to ensure that the steel bars will not easily fall out of the tube. The design of the rib ring 55 can not only help the cover 53 to be more firmly "adsorbed" in the prefabricated wall, but also increase the cement strength at the joint of the prefabricated wall by increasing the contact area. The presence of the rib ring provides more friction.
[0028] By combining the steel bar with the second mounting tube 51 and solidifying the concrete, the stability of the connection can be significantly improved to prevent the prefabricated components from loosening during use. The design of the reinforcing mechanism 6 and the rib ring 55 enhances the reliability of the connection, ensures a firm connection between the steel bar and the prefabricated components, and reduces possible structural problems in the future.
[0029] The connection mechanism 2 includes a bottom tube 21 and an inner tube 23. The outer surface of the bottom tube 21 is provided with a plurality of T-pieces 22 distributed in a circular array. The outer surface of the inner tube 23 is provided with a plurality of first through holes 24 distributed in a circular array. The outer surface of the inner tube 23 is provided with a plurality of support bars 25 distributed in a circular array. One ends of the plurality of support bars 25 are fixedly mounted on the inner wall of the bottom tube 21. The bottom tube 21 is fixedly mounted on the bottom of the first mounting tube 12.
[0030] The reinforcing mechanism 6 comprises a supporting plate 62 and a shaping ring 63 , between which a conical spring 61 for increasing the casting strength of the steel bar connection is provided.
[0031] The support sheet 62 is installed inside the sealing cover 53 , and the shaping ring 63 is installed inside the first mounting tube 12 .
[0032] It is worth noting that when the prefabricated wall is completed and needs to be assembled, the prefabricated wall casting steel bars protruding from the foundation are inserted into the inner tube 23 until the steel bars extend to the inside of the grouting pipe 1 and abut against the cone spring 61, and the cone spring 61 is arranged in a Figure 8 As shown in the shape, the steel bars extending into the grouting pipe 1 through the second mounting tube 51 and the steel bars extending into the grouting pipe 1 through the inner tube 23 are both in contact with the conical spring 61 , thereby increasing the casting strength of the steel bar connection through the conical spring 61 .
[0033] When the prefabricated wall is completed and assembled on the foundation, the prefabricated wall casting steel bars protruding from the foundation need to be inserted into the inner tube 23 in the prefabricated wall. The inner tube 23 is a pre-buried pipe in the prefabricated wall, which is used to guide the steel bars into the correct connection position. As the steel bars are inserted, they extend into the interior of the grouting pipe 1 and eventually hit the cone spring 61. The cone spring 61 is a special spring device, and its shape is designed as follows: Figure 8 The purpose is to generate a certain elastic force when the steel bar is inserted, thereby increasing the friction between the steel bar and the grouting pipe.
[0034] The steel bars extending into the grouting pipe 1 through the second mounting tube 51 and the steel bars extending into the grouting pipe 1 through the inner tube 23 will contact the conical spring 61, which means that whether it is the steel bars in the prefabricated wall or the steel bars on the foundation, they will be supported by the conical spring 61 after entering the grouting pipe.
[0035] The special shape and elastic design of the conical spring 61 enable it to provide a radial extrusion force when the steel bar is inserted, which helps to increase the contact area and friction between the steel bar and the grouting pipe, thereby enhancing the stability of the steel bar connection.
[0036] Through the action of the conical spring 61, the connection strength between the steel bars and the grouting pipe fittings is significantly enhanced, reducing the risk of connection failure due to sliding or movement of the steel bars. The design of the conical spring 61 increases the casting strength of the steel bar connection and improves the safety performance of the entire prefabricated building structure, especially when natural disasters such as earthquakes occur, it can better resist the impact of external forces.
[0037] The grouting pipe fitting 1 includes a first mounting pipe 12, the outer surface of which is wound with a spiral rib 14, the upper portion of the outer surface of the first mounting pipe 12 is provided with a slurry outlet pipe 11, the lower portion of the outer surface of the first mounting pipe 12 is provided with a feed pipe 13 and a slurry passage pipe 15, the spiral rib 14 is in a spiral shape and the cross-section of the spiral rib 14 is in the shape of the letter "π", which can increase the overall strength of the prefabricated wall when cement is poured.
[0038] It is worth noting that during pouring, cement is poured into the first installation tube 12 through the feed pipe 13. The cement is first poured into the bottom tube 21, and then poured into the inner tube 23. The inner tube 23 is used to guide the steel bars. The support bar 25 is provided to increase the strength of the wall joint. The poured cement will then pass through the grouting pipe 15 into the interior of the connecting mechanism 3, and then pass through the connecting mechanism 3 into another first installation tube 12 buried in the wall. The through-tube 4 is provided to allow gas to be discharged through the through-tube 4 during the grouting process, ensuring that there are no bubbles in the grouting cement. The cement entering the first installation tube 12 will contact with the cone spring 61 and fill up the interior of the first installation tube 12, thereby increasing the strength of the cement and making the cement joint more secure. When the cement fills the first installation pipe 12, the cement will enter the cover 53 and then flow through the through pipe 4. The setting of the rib ring 55 makes the cement more firmly adsorbed in the cover 53. When the interiors of the two covers 53 are filled with cement, the excess cement will be discharged through the slurry outlet pipe 11.
[0039] Embodiment 3: Based on the connection mechanism 3 proposed in Embodiment 1, this embodiment provides a further technical solution of the connection mechanism 3.
[0040] The connecting mechanism 3 includes a support tube 34, the outer surface of which is provided with a plurality of pulp outlet holes 36 distributed in a circular array, mounting ring frames 37 are sleeved on both sides of the outer surface of the support tube 34, a plurality of ribs 35 distributed in a circular array are arranged between the two mounting ring frames 37, a support frame 38 is arranged on one side of the inner wall of the support tube 34, a through pipe 32 is arranged inside the support frame 38, an external sleeve 30 is arranged inside the two mounting ring frames 37, a wire mesh cover 31 sleeved on the outer surface of the rib 35 is arranged between the two external sleeves 30, a plurality of circular holes 39 distributed in a circular array are arranged on the outer surface of the wire mesh cover 31, steel wire strips 33 are arranged inside the plurality of circular holes 39, one end of the support tube 34 is fixedly connected to the pulp through pipe 15, and the other end of the support tube 34 is fixedly connected to the feed pipe 13.
[0041] It is worth mentioning that when the prefabricated wall is first poured, cement is first adsorbed on the outer surface of the wire mesh cover 31 and the steel wire strip 33, and the wire mesh cover 31 is made of a microporous metal mesh, which can prevent a large amount of cement from being poured into the interior of the wire mesh cover 31. After cement is poured into the first installation tube 12, the cement will enter the interior of the support tube 34 through the slurry pipe 15, and the through pipe 32 increases the strength of the connection between the support tube 34 and the slurry pipe 15. After the cement enters the interior of the support tube 34, the cement will flow out through the slurry outlet hole 36 to fill the interior of the wire mesh cover 31, and the ribs 35 are provided to support the shape of the wire mesh cover 31, so that the cross-section of the wire mesh cover 31 is wavy, thereby increasing the strength of cement pouring.
[0042] Among them, in the initial pouring process, cement will first be adsorbed on the outer surface of the wire mesh cover 31 and the steel wire strip 33. The wire mesh cover 31 is made of a microporous metal mesh. This design can effectively prevent a large amount of cement from directly entering the interior of the wire mesh cover, but instead allows the cement to form a layer of wrapping on the outer surface. The wire mesh cover 31 is made of a microporous metal mesh material, which can prevent a large amount of cement from entering the interior on the one hand, and on the other hand, it can also provide additional support and enhance the adhesion of the cement.
[0043] When cement is poured into the first mounting tube 12, the cement will enter the support tube 34 through the slurry pipe 15, ensuring that the cement can be evenly distributed in the entire connection mechanism. The design of the through pipe 32 is intended to increase the strength of the connection between the support tube 34 and the slurry pipe 15. After the cement enters the support tube 34, it flows out through the slurry outlet hole 36 and fills the inside of the wire mesh cover 31, which helps to ensure that the cement can be evenly distributed, while increasing the filling density inside the wire mesh cover 31, thereby enhancing the overall structural strength.
[0044] The ribs 35 are designed to support the shape of the wire mesh cover 31 so that its cross section is wavy. This wavy design increases the structural strength after cement pouring because the wavy surface provides more contact area, thereby enhancing the bonding force between the cement and the structure.
[0045] The design of the wire mesh cover 31, support tube 34 and ribs 35 increases the structural strength after cement pouring, making the joints more sturdy and durable. The microporous design of the wire mesh cover 31 effectively prevents a large amount of cement from entering the interior, thereby avoiding cement waste, and also ensures that the cement forms a protective layer on the outer surface.
[0046] The design of the through pipe 32 enhances the strength of the connection between the support pipe 34 and the slurry through pipe 15, further improving the overall stability of the connection mechanism. The ribs 35 make the cross-section of the wire mesh cover 31 wavy, increasing the contact area between the cement and the structure, thereby enhancing the bonding properties of the cement and improving the tensile strength of the connection.
[0047] The sealing mechanism 7 comprises a support ring 81 , the inner wall of which is provided with a plurality of sealing pieces 82 distributed in a ring array. The support ring 81 is arranged inside the slurry passage pipe 15 and the slurry outlet pipe 11 .
[0048] It is worth noting that when a single grouting pipe 1 is needed to cast a prefabricated wall, the support ring 81 can be installed inside the grouting pipe 15, and the sealing piece 82 can prevent external cement from entering the grouting pipe 15; When two grouting pipes 1 are spliced and used, in order to prevent cement from being poured into the grouting pipe 11 inside the prefabricated wall, the support ring 81 is installed on the inner sealing piece 82 of the grouting pipe 11 to prevent external cement from entering the grouting pipe 11 .
[0049] The plugging mechanism 7 comprises a collar 91 , the inner wall of which is provided with a plurality of arc pieces 92 distributed in a ring array. The collar 91 is arranged inside the slurry passage pipe 15 .
[0050] Among them, when two grouting pipes 1 are spliced and used, a ring 91 can be placed at the connection between the grouting pipe 15 and the support pipe 34. The arc piece 92 set will not prevent cement from being poured into the through pipe 32. The setting of the arc piece 92 can increase the connection strength between the grouting pipe 15 and the support pipe 34.
[0051] The present invention also provides a component assembly method of prefabricated building components, and the specific assembly method is as follows: Step 1: During assembly, the connection mechanism 3 is butted with the two grouting pipe fittings 1, and then the steel bars of the prefabricated wall are inserted into the jacking mechanism 5 so that the steel bars extend into the interior of the grouting pipe fitting 1, and then the connection mechanism 2 is installed at the bottom of the grouting pipe fitting 1, and finally the jacking mechanism 5, the grouting pipe fitting 1, the connection mechanism 2 and the connection mechanism 3 are cast with cement using a mold; Step 2: The poured cement is only poured on the outer surfaces of the grouting pipe fittings 1, the jacking mechanism 5, the through pipe 4, the connecting mechanism 3 and the connecting mechanism 2. In order to prevent the cement from entering the interior of the grouting pipe fittings 1, a sealing mechanism 7 is used to seal the feed hole of a grouting pipe fitting 1 buried inside the cement wall. Because the two grouting pipe fittings 1 are located inside the wall when the wall is poured, but the slurry outlet pipe 11 and the feed pipe 13 of one of the grouting pipe fittings 1 extend to the outside of the wall, it is convenient for the prefabricated wall to pour cement into the grouting pipe fittings 1, the connecting mechanism 2 and the connecting mechanism 3 during the subsequent assembly process.
[0052] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled building prefabricated component, characterized in that: Comprising two grouting pipes (1), the upper ends of the two grouting pipes (1) are each provided with a jacking mechanism (5), a through pipe (4) is commonly provided between the two jacking mechanisms (5), the lower ends of the two grouting pipes (1) are each provided with a connection mechanism (2), a connecting mechanism (3) for increasing the strength of the building is commonly provided between the two grouting pipes (1), a reinforcing mechanism (6) for increasing the strength of the steel bar connection is provided inside the two grouting pipes (1), and a blocking mechanism (7) is provided inside the two grouting pipes (1); The reinforcing mechanism (6) comprises a supporting plate (62) and a shaping ring (63), and a conical spring (61) for increasing the casting strength of the steel bar connection is provided between the supporting plate (62) and the shaping ring (63).
2. The prefabricated building component according to claim 1, characterized in that: The grouting pipe fitting (1) comprises a first mounting pipe (12), the outer surface of the first mounting pipe (12) being wound with a spiral rib (14), the upper portion of the outer surface of the first mounting pipe (12) being provided with a slurry outlet pipe (11), the lower portion of the outer surface of the first mounting pipe (12) being provided with a feed pipe (13) and a slurry passage pipe (15), the spiral rib (14) being in a spiral shape, and the cross section of the spiral rib (14) being in the shape of the letter "π".
3. The prefabricated building component according to claim 1, characterized in that: The pipe jacking mechanism (5) comprises a cover (53), a second mounting tube (51) is arranged inside the cover (53), a plurality of second through holes (52) distributed in a ring array are provided on the outer surface of the second mounting tube (51), rib rings (55) are provided on the outer surface and inner wall of the cover (53), a connecting tube (54) is provided on the outer surface of the cover (53), a through tube (4) is provided inside the connecting tube (54), and the cover (53) is mounted on the upper end of the first mounting tube (12).
4. The prefabricated building component according to claim 1, characterized in that: The support sheet (62) is installed inside the sealing cover (53), and the shaping ring (63) is installed inside the first installation tube (12).
5. The prefabricated building component according to claim 1, characterized in that: The connection mechanism (2) comprises a bottom tube (21) and an inner tube (23); the outer surface of the bottom tube (21) is provided with a plurality of T-pieces (22) distributed in a ring array; the outer surface of the inner tube (23) is provided with a plurality of first through holes (24) distributed in a ring array; the outer surface of the inner tube (23) is provided with a plurality of support bars (25) distributed in a ring array; one end of each of the plurality of support bars (25) is fixedly mounted on the inner wall of the bottom tube (21); and the bottom tube (21) is fixedly mounted on the bottom of the first mounting tube (12).
6. The prefabricated building component according to claim 1, characterized in that: The connecting mechanism (3) comprises a support tube (34), the outer surface of the support tube (34) being provided with a plurality of slurry outlet holes (36) distributed in a circular array, both sides of the outer surface of the support tube (34) being sleeved with mounting ring frames (37), a plurality of ribs (35) distributed in a circular array being provided between the two mounting ring frames (37), a support frame (38) being provided on one side of the inner wall of the support tube (34), a through pipe (32) being provided inside the support frame (38), and the two mounting ring frames (37) being provided with a plurality of ribs (35) distributed in a circular array. An external sleeve (30) is provided inside each frame (37), a wire mesh cover (31) sleeved on the outer surface of the rib (35) is provided between the two external sleeves (30), the outer surface of the wire mesh cover (31) is provided with a plurality of circular holes (39) distributed in a ring array, and a steel wire (33) is provided inside each of the circular holes (39), one end of the support tube (34) is fixedly connected to the pulp passage tube (15), and the other end of the support tube (34) is fixedly connected to the feed tube (13).
7. The prefabricated building component according to claim 1, characterized in that: The sealing mechanism (7) comprises a support ring (81), the inner wall of the support ring (81) being provided with a plurality of sealing sheets (82) distributed in a ring array, and the support ring (81) being arranged inside the slurry passage pipe (15) and the slurry outlet pipe (11).
8. The prefabricated building component according to claim 1, characterized in that: The plugging mechanism (7) comprises a collar (91), the inner wall of the collar (91) being provided with a plurality of arc pieces (92) distributed in a ring array, and the collar (91) being arranged inside the slurry passage pipe (15).
9. A method for assembling prefabricated building components according to any one of claims 1 to 8, characterized in that: The specific assembly method is as follows: Step 1: During assembly, the connection mechanism (3) is butt-jointed with the two grouting pipe fittings (1), and then the steel bars of the prefabricated wall are inserted into the jacking mechanism (5) so that the steel bars extend into the interior of the grouting pipe fittings (1), and then the connection mechanism (2) is installed at the bottom of the grouting pipe fittings (1), and finally a mold is used to cast cement on the jacking mechanism (5), the grouting pipe fittings (1), the connection mechanism (2) and the connection mechanism (3); Step 2: The poured cement is poured only on the outer surfaces of the grouting pipe (1), the jacking mechanism (5), the through pipe (4), the connecting mechanism (3) and the connecting mechanism (2). In order to prevent the cement from entering the interior of the grouting pipe (1), a sealing mechanism (7) is used to seal the feed hole of a grouting pipe (1) buried inside the cement wall. Since both grouting pipes (1) are located inside the wall during the pouring of the wall, the grouting pipe (11) and the feed pipe (13) of one of the grouting pipes (1) extend to the outside of the wall, thereby facilitating the pouring of cement into the grouting pipe (1), the connecting mechanism (2) and the connecting mechanism (3) during the subsequent assembly process of the prefabricated wall.
Citation Information
Patent Citations
Device for detecting anchoring length of reinforcing steel of semi-grout sleeve
CN109579679A
Sleeve, prefabricated part connector, prefabricated part and prefabricated part assembly
CN110485647A
Quantitative-type grouting device of sleeve of PC component and with reinforcement positioning and sealing functions
CN111270814A
Double-row grouting sleeve structure and assembly type prefabricated part
CN113565266A
Lightning protection grout sleeve and prefabricated component connection structure
CN205653987U