Concrete construction device for engineering construction and using method thereof
By using motor-driven jet mechanism and hydraulic slip pipes in concrete construction equipment, the uniform jetting and tilt height adjustment of concrete in nuclear engineering construction is achieved, which solves the problem of large concrete pouring area and separation in nuclear engineering, and improves construction efficiency and quality.
Patent Information
- Application Number
- CN202411329521.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN118933356A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field, in particular to a concrete construction device for engineering construction and a use method thereof. Background Art
[0002] Concrete construction equipment for construction projects is a kind of mechanical equipment used in the construction process of construction projects. In nuclear engineering construction, a large amount of concrete is usually required and the area to be poured is large. It requires a variety of equipment to cooperate with each other. It is used for concrete pouring and transportation. Common equipment includes concrete mixing equipment, concrete transportation equipment, concrete pouring equipment and maintenance equipment; When pouring concrete, first adjust the boom of the concrete pouring equipment so that the concrete can be accurately placed in an area, then put the same batch of concrete into the hopper, and transport it into the delivery pipe and hose through the pump truck, and then start the concrete pouring work; Due to the huge concrete pouring area of nuclear construction projects, it is necessary to pour concrete in layers and regions for many times to ensure that the poured concrete will not segregate and solidify quickly. Workers are required to control the pouring of hoses while using tools such as shovels to level the area, so as to facilitate orderly pouring operations in the entire area. Laying concrete for a long time consumes a lot of physical strength, which increases the difficulty of workers' work. In addition, workers cannot guarantee the laying quality of concrete when they are tired in the later stage. For this reason, we propose a concrete construction device for engineering construction and a method of using it. Summary of the invention
[0003] The object of the present invention is to provide a concrete construction device for engineering construction and a method of using the same to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a concrete construction device for engineering construction, comprising a boom and a delivery pipe for delivering concrete, a hose being provided at one end of the delivery pipe, and a spraying mechanism being provided at the end of the boom for controlling the hose to spray concrete uniformly, the hose having a certain length and flexibility, and being able to guide the pouring of concrete.
[0005] The spraying mechanism includes a first motor arranged on one side of the boom, the output shaft of the first motor is provided with a cross bar, one end of the cross bar is provided with a cylinder, the surface of the boom is rotatably connected with a round rod, one end of the round rod is provided with a vertical rod, one end of the vertical rod is provided with an arc plate, the arc plate is provided with an arc groove for mutual compression with the cylinder, and one side of the arc plate is provided with a reciprocating device for controlling the hose to linearly reciprocate and spray concrete.
[0006] Preferably, a limiting groove is provided on the surface of the cylinder for the cylinder to slide in the arc groove, the limiting groove is in an I-shape, and the arc groove is always in contact with the middle of the limiting groove, effectively preventing the cylinder from separating from the arc groove.
[0007] Preferably, the reciprocating device includes a fixed cavity arranged on one side of the arc plate, a second motor is arranged on the inner side of the fixed cavity, the output shaft of the second motor is provided with a first gear, the fixed cavity is rotatably connected to the second gear, a chain is arranged between the first gear and the second gear, and a conversion member is arranged on one side of the chain for driving the hose to make a linear motion in the fixed cavity.
[0008] Preferably, the first gear and the second gear are placed horizontally and symmetrically in the fixed cavity.
[0009] Preferably, the conversion member includes a slide groove arranged in the fixed cavity away from the side of the second motor, a slider is slidably connected in the slide groove, a groove is provided in the slider, a first short rod is slidably connected in the groove, a triangular plate is rotatably connected to one side of the first short rod, two second short rods are symmetrically provided on the side of the triangular plate away from the first short rod, and the second short rods are fixedly connected to one side of the chain.
[0010] Preferably, the slider is provided with a circular cavity for the hose to pass through to the outside, the circular cavity is a smooth ellipse, and the inner diameter of the circular cavity is larger than the inner diameter of the hose, which effectively prevents the hose from being squeezed and rubbed with the circular cavity during movement, causing the hose to fold in the circular cavity.
[0011] Preferably, a rectangular groove is provided on the inner side of the fixing cavity, a first fixing frame is slidably connected in the rectangular groove, and second fixing frames are rotatably connected to both sides of the lower end of the first fixing frame.
[0012] Preferably, the lower end of the hose is provided with a first slide pipe, the lower end of the second fixed frame is provided with a first slide pipe, the second slide pipe is slidably connected inside the first slide pipe, the third slide pipe is slidably connected inside the second slide pipe, and a group of hydraulic rods are symmetrically provided on the surface of the first slide pipe, and the output end of the hydraulic rod is fixedly connected to the surface of the third slide pipe.
[0013] Preferably, one end of the second slide pipe is rotatably connected to a third gear, a gear plate 1 is provided on the inner side of the first slide pipe, a gear plate 2 is provided on the surface of the third slide pipe, and both the gear plate 1 and the gear plate 2 are meshed with the third gear.
[0014] Preferably, the method comprises the following steps: S1. First, the concrete construction device pre-adjusts the position of the boom so that the hose is located directly above the construction position, and puts the same batch of concrete into the hopper and into the concrete construction device, and is sucked into the pump truck and transported into the delivery pipe and the hose; S2. The worker can manually operate the output power of the first motor to change its speed, so that the first motor drives the cross bar to move, so that the cylinder squeezes the arc groove when it makes a circular motion, and since the round bar rotates on one side of the boom, the arc plate and the vertical rod make a reciprocating swing motion on one side of the boom, and since the hose is arranged at one end of the vertical rod, the hose makes a reciprocating swing motion when laying concrete; S3. The output power of the second motor is controlled to change the speed of the first gear, so that the second motor drives the cross bar to move, so that the cylinder squeezes the arc groove when it makes a circular motion, and since the round rod rotates on one side of the boom, the arc plate and the vertical rod make a reciprocating swing motion on one side of the boom, and since the hose is arranged at one end of the vertical rod, the hose makes a reciprocating swing motion when laying concrete; S3. The first gear moves, and under the action of the second gear, the chain moves at a uniform speed. The sprockets on one side of the chain drive the first short rod on one side of the triangular plate to perform a quasi-circular motion, so that the first short rod squeezes the groove, driving the slider to perform reciprocating linear motion in the slide groove. Since the hose passes through the circular cavity in the slider, the hose can perform linear reciprocating motion in the fixed cavity; S4. Since the hose will perform cyclic and orderly spraying of concrete in this area, workers can pull the third chute in time according to the changes in the coarse aggregate diameter of the concrete and the construction position, so that the gear plate 2 on the surface of the third chute engages and drives the third gear to move. Similarly, the third gear slides on the surface of the gear plate 1, so that the second chute moves in the first chute, thereby changing the length of the first chute, so that the pouring height of the concrete can be effectively adjusted.
[0015] The present invention has at least the following beneficial effects: 1. The concrete construction device for engineering construction, through the manual control of the output speed of the first motor and the second motor by the worker, makes the first motor drive the horizontal bar and the cylinder to perform circular motion, the cylinder squeezes the arc groove, makes the arc plate and the vertical bar do reciprocating swing motion around the circular bar, so that the hose can spray concrete horizontally to the area, and the second motor drives the first gear, and through the action of the second gear, makes the chain move between the two gears, and a chain tooth on the chain drives the two second short rods to move the triangular plate, and the second short rod on the other side of the triangular plate can squeeze the groove to drive the slider to move linearly in the slide groove, so that the slider drives the hose to reciprocate in the fixed cavity and vertically spray concrete to the area, which is beneficial for workers to operate the pouring equipment to complete the uniform concrete spraying work in an area when pouring concrete.
[0016] 2. The concrete construction device for this project is that workers manually pull the third chute according to the coarse aggregate diameter of the concrete and the construction position of the concrete, so that the first chute can form a chute of a new length with the second chute and the third chute, thereby changing the pouring height of the concrete and reducing the occurrence of concrete segregation. This is beneficial for workers to carry out long-term concrete pouring work in large-scale nuclear construction projects and ensure that the quality of the concrete after pouring meets the quality requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the structure of the injection mechanism of the present invention; Figure 3 This is a schematic diagram of the fixed cavity structure of the present invention; Figure 4 It is a schematic diagram of the side cross-section structure of the fixed cavity of the present invention; Figure 5 It is a schematic diagram of the structure of the first fixing frame and the second fixing frame of the present invention; Figure 6 This is a schematic diagram of the first slide pipe structure of the present invention; Figure 7 It is a schematic diagram of the side sectional structure of the first slide pipe of the present invention.
[0018] In the figure: 1, arm; 2, conveying pipe; 3, hose; 4, injection mechanism; 40, first motor; 41, cross bar; 42, cylinder; 43, round bar; 44, vertical bar; 45, arc plate; 46, arc groove; 47, reciprocating device; 470, limit groove; 471, fixed cavity; 472, second motor; 473, first gear; 474, second gear; 475, chain; 476, conversion member; 4760, slide groove; 4761, slider; 4762, groove; 4763, first short rod; 4764, triangle plate; 4765, second short rod; 4766, round cavity; 48, rectangular groove; 49, first fixed frame; 410, second fixed frame; 5, first slide pipe; 50, second slide pipe; 51, third slide pipe; 52, hydraulic rod; 53, third gear; 54, gear plate one; 55, gear plate two. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] Embodiment 1 See also Figure 1-Figure 7 The present invention provides a technical solution: a concrete construction device for engineering construction, comprising a boom 1 and a delivery pipe 2 for delivering concrete. Workers can operate the boom 1 and adjust it to a suitable position, control the output ends of the delivery pipe 2 and the hose 3 above the construction position, deliver concrete into the delivery pipe 2 through a pump truck, and start the work of spraying concrete. A hose 3 is provided at one end of the delivery pipe 2. When the spraying mechanism 4 drives the hose 3 to spray concrete in an area, the hose 3 has a certain length and flexibility. One end of the hose 3 can follow the movement of the spraying mechanism 4 to complete the concrete spraying work in an area, and the hose 3 can guide the concrete The soil moves from the conveying pipe 2 to the construction position, and the end of the boom 1 is provided with a spraying mechanism 4 for controlling the hose 3 to evenly spray concrete. When pouring concrete for the nuclear construction project, since the area where concrete needs to be poured is large and the demand for concrete is large, the nuclear construction project will use a layered pouring method, and in order to prevent the concrete from solidifying during the pouring process, the same batch of concrete will be poured in the same area, and the spraying mechanism 4 will automatically spray the same batch of concrete entering the pump truck evenly in an area of the construction position, which is conducive to reducing the workers manually pulling the hose 3 for regional concrete pouring, and is convenient for large-scale concrete pouring in nuclear construction projects.
[0021] The spraying mechanism 4 includes a first motor 40 arranged on one side of the boom 1, which can rotate after being powered on, and the input power of the first motor 40 can be manually operated to change the output power of the first motor 40 to adjust the speed of the first motor 40, which is beneficial for workers to adjust the speed of pouring concrete in daily work. The output shaft of the first motor 40 is provided with a cross bar 41, one end of the cross bar 41 is fixedly connected to the output end of the first motor 40, and the other end makes a circular motion around the output shaft of the first motor 40, and drives the cylinder 42 to make a circular motion. A cylinder 42 is provided at one end of the cross bar 41. When the cylinder 42 makes a circular motion, it will squeeze the arc groove 46 to make the arc plate 45 move. The surface of the boom 1 is rotatably connected with a round rod 43. When the arc plate When the first motor 45 moves, the round rod 43 will rotate on one side of the arm 1. A vertical rod 44 is provided at one end of the round rod 43. An arc plate 45 is provided at one end of the vertical rod 44. One end of the arc plate 45 will make a reciprocating swing motion along the round rod 43 under the arm 1. An arc groove 46 is provided in the arc plate 45 for squeezing the cylinder 42. When the cylinder 42 follows the first motor 40 to make a circular motion, the cylinder 42 also moves in the arc groove 46. Since the arc groove 46 and the cylinder 42 are placed relative to the vertical plane, when the cylinder 42 rotates a quarter of a circle, the cylinder 42 squeezes the arc groove 46 and swings to one side by a certain angle. At this time, the cylinder 42 is located in the middle of the arc groove 46. When it rotates two quarters of a circle, the arc groove 46 moves in the opposite direction to the initial position. At this time, the cylinder 42 is located at the other end of the arc groove 46. Similarly, when the cylinder 42 continues to rotate, the arc plate 45 and the arc groove 46 swing to the other side at a certain angle and return to the initial position, and the cylinder 42 moves from the middle of the arc groove 46 to the initial position of the arc groove 46, that is, the arc plate 45 drives one end of the hose 3 to swing back and forth to spray concrete, so that the section in the area can be evenly sprayed with concrete. A reciprocating device 47 for controlling the linear reciprocating spraying of the hose 3 is provided on one side of the arc plate 45, which can drive one end of the hose 3 to perform vertical displacement spraying of concrete. The two cooperate to complete the spraying of concrete in the area. The worker controls the first motor 40 to work, so that The horizontal bar 41 drives the cylinder 42 to start circular motion. At this time, the cylinder 42 starts to squeeze the arc groove 46. Since the vertical bar 44 and the round bar 43 on one side of the arc plate 45 can rotate freely on one side of the arm 1, the arc groove 46 drives the arc plate 45 to rotate on one side of the arm 1 following the round bar 43. Since the cylinder 42 makes a certain circular motion, the arc plate 45 swings left and right to realize the spraying of concrete at the lateral position in the area. At the same time, the reciprocating device 47 will drive the hose 3 to perform vertical displacement movement in the area to realize the spraying of concrete at the vertical position in the area, which is conducive to uniformly and quickly pouring the same batch of concrete in an area, effectively reducing the workload of workers in manually pouring concrete.
[0022] A limiting groove 470 is provided on the surface of the cylinder 42 for the cylinder 42 to slide in the arc groove 46. Since the cylinder 42 follows the output shaft of the first motor 40 to perform circular motion, the contact positions of the cylinder 42 and the arc groove 46 are different. The limiting groove 470 can prevent the cylinder 42 from separating from the arc groove 46, which is beneficial to improving the stability of the arc plate 45 when it swings, and is convenient for shortening the work progress of workers when they perform pouring work for a long time.
[0023] The reciprocating device 47 includes a fixed cavity 471 arranged on one side of the arc plate 45, which can fix the entire reciprocating device 47 on one side of the arc plate 45 and move with the arc plate 45. A second motor 472 is arranged on the inner side of the fixed cavity 471, and the output rate of the second motor 472 can be controlled under manual operation, thereby improving the use scenario of the device and facilitating workers to actively adjust the concrete pouring speed of the area according to actual conditions. The output shaft of the second motor 472 is provided with a first gear 473, which can be driven to rotate by the second motor 472 and drive the chain 475 to move through meshing, so that the second gear 474 meshed on the other side of the chain 475 rotates, and the first gear 473 and the second gear 474 are controlled to rotate simultaneously. The first gear 473 and the second gear 474 are symmetrically placed in the fixed cavity 471 in a horizontal direction. A chain 475 is provided between the first gear 473 and the second gear 474. When the chain 475 moves, it will drive the conversion member 476 to perform a quasi-circular motion on one side, so that the conversion member 476 performs a linear reciprocating motion, and the position of the hose 3 is adjusted, so as to perform vertical uniform concrete pouring in the area. A conversion member 476 is provided on one side of the chain 475 for driving the hose 3 to perform a linear motion in the fixed cavity 471, which can drive the hose 3 to perform a linear reciprocating motion in the fixed cavity 471, thereby realizing vertical uniform concrete pouring.
[0024] The conversion member 476 includes a slide groove 4760 arranged in the fixed cavity 471 away from the second motor 472, which can limit the slider 4761 to only perform linear reciprocating motion along the slide groove 4760. The slide groove 4760 is slidably connected with the slider 4761, which can simultaneously drive one end of the hose 3 to perform linear reciprocating motion in the fixed cavity 471. The slider 4761 is provided with a groove 4762, and the groove 4762 has a certain length, which can enable the first short rod 4763 to move up and down in the groove 4762. The first short rod 4763 is slidably connected in the groove 4762. When the triangular plate 4764 follows the chain 475 to perform a quasi-circular motion, the triangular plate 4764 will drive The first short rod 4763 moves. When the triangular plate 4764 rotates, the first short rod 4763 and the triangular plate 4764 rotate relative to each other, so that the first short rod 4763 stably moves up and down in the groove 4762 and pushes the groove 4762 to make the slider 4761 move linearly in the slide groove 4760. One side of the first short rod 4763 is rotatably connected with the triangular plate 4764. The two second short rods 4765 of the triangular plate 4764 are fixedly connected to one side of a sprocket of the chain 475. When the sprocket engages and rotates with the first gear 473, the two second short rods 4765 synchronously drive the triangular plate 4764 to rotate. At this time, the triangular plate 4764 drives the first short rod 4763 in the groove. The slider 4761 is provided with a circular cavity 4766 for the hose 3 to pass through to the outside, and the hose 3 for conveying concrete will pass through the circular cavity 4766. When the slider 4761 moves in the slide groove 4760, it will synchronously drive one end of the hose 3 to move, which is beneficial to control the hose 3 to guide the concrete to be poured in the appropriate position. By starting the second motor 472, the first gear 473 will be driven to rotate, and the second gear 474 will rotate synchronously through the chain 475, and the chain 47 A chain tooth on 5 drives two second short rods 4765, so that the triangular plate 4764 has a certain stability when following the movement of the chain 475, and the first short rod 4763 on the other side of the triangular plate 4764 pushes the groove 4762, so that the slider 4761 moves linearly along the slide groove 4760. When the triangular plate 4764 starts to rotate, the first short rod 4763 on one side of the triangular plate 4764 slides up and down in the groove 4762, thereby changing the movement direction of the slider 4761 to continue to move in the slide groove 4760, which is beneficial for the slider 4761 to drive one end of the hose 3 to vertically and evenly pour concrete in the area, thereby improving the work progress of the workers in pouring concrete.
[0025] A rectangular groove 48 is provided on the inner side of the fixed cavity 471, and the first fixed frame 49 can slide freely in the rectangular groove 48. The first fixed frame 49 moves with one end of the hose 3, and the second fixed frame 410 can rotate freely on both sides of the first fixed frame 49 under the action of gravity, keeping one side of the second fixed frame 410 perpendicular to the ground, which is conducive to guiding the concrete in the hose 3 to accurately fall on the construction position, and when the hose 3 reciprocates under the drive of the injection mechanism 4, the output end of the hose 3 is tilted, which easily causes the concrete to be injected to an area outside the target area, causing a waste of concrete and being unfavorable for the uniform injection of concrete in the area. The first fixed frame 49 is slidably connected in the rectangular groove 48, and the second fixed frame 410 is rotatably connected on both sides of the lower end of the first fixed frame 49, which is conducive to keeping the output end of the hose 3 always perpendicular to the ground, and is conducive to accurately injecting the concrete to the appropriate position.
[0026] Embodiment 2 When the diameter of the coarse aggregate of concrete is greater than or equal to 25mm, the height of its free fall should not exceed 3 meters, and when the diameter of the coarse aggregate is less than 25mm, the height of its free fall should not exceed 6 meters. When the concrete is poured to a certain height, the lower end of the hose 3 is provided with a second fixed frame 410, and the lower end is provided with a first slide pipe 5, which can guide the concrete in the hose 3. When the pouring height is incorrect, it is easy to cause the concrete to segregate quickly after pouring, thereby causing the concrete after pouring to be unqualified, reducing the concrete from falling from a high place, causing concrete segregation, and the first slide pipe 5 is slidably connected to the second slide pipe 50, and the second slide pipe 50 is slidably connected to the third slide pipe 51. The slide pipe can slow down the height of concrete pouring, and is often used as a tool to reduce the pouring height of concrete in the hose 3 in construction projects such as construction sites. The first slide pipe 5, the second slide pipe 50 and the third slide pipe 51 can be freely extended and retracted to adjust the concrete pouring height. The hydraulic rod 52 can support the position of the third slide pipe 51 in the second slide pipe 50, and the output end of the hydraulic rod 52 is connected to the The surface of the third slide pipe 51 is fixedly connected, and one end of the second slide pipe 50 is rotatably connected to the third gear 53. A gear plate 1 54 is provided on the inner side of the first slide pipe 5, and a gear plate 2 55 is provided on the surface of the third slide pipe 51. The gear plate 1 54 and the gear plate 2 55 are both meshed with the third gear 53. When the worker needs to adjust the pouring height of the concrete, that is, manually adjust the length of the slide pipe, he can manually pull one end of the third slide pipe 51. At this time, the gear plate 2 55 at one end of the third slide pipe 51 is meshed to drive the third gear 53 to rotate. At the same time, the third gear 53 slides on the surface of the gear plate 1 54 in the first slide pipe 5. At this time, the second slide pipe 50 will move in the same direction as the third slide pipe 51, and when the third gear 53 moves to one end of the gear plate 1 54, the adjustment of the length of the slide pipe is completed. This is beneficial for workers to effectively and quickly adjust the length of the slide pipe according to the coarse aggregate diameter of the concrete and the construction position of the concrete in daily work, reduce the occurrence of concrete segregation, and facilitate workers to carry out long-term concrete pouring work in large-scale nuclear construction projects.
[0027] The specific steps include: S1. First, the concrete construction device will pre-adjust the position of the boom 1 so that the hose 3 is located directly above the construction position, and the same batch of concrete is put into the hopper and enters the concrete construction device, and is sucked into the pump truck and transported into the delivery pipe 2 and the hose 3; S2, and the worker can manually operate the output power of the first motor 40 to change its speed, so that the first motor 40 drives the cross bar 41 to move, so that the cylinder 42 squeezes the arc groove 46 when making a circular motion, and because the round rod 43 rotates on one side of the boom 1, the arc plate 45 and the vertical rod 44 make a reciprocating swing motion on one side of the boom 1, and because the hose 3 is arranged at one end of the vertical rod 44, the hose 3 makes a reciprocating swing motion when laying concrete; S3, and operate and control the output power of the second motor 472 to change the speed of the first gear 473, so that the second motor 472 drives the first gear 473 to move, and under the action of the second gear 474, the chain 475 moves at a uniform speed, and the sprockets on one side of the chain 475 drive the first short rod 4763 on one side of the triangular plate 4764 to perform a quasi-circular motion, so that the first short rod 4763 squeezes the groove 4762, and drives the slider 4761 to perform a reciprocating linear motion in the slide groove 4760. Since the hose 3 passes through the circular cavity 4766 in the slider 4761, the hose 3 can perform a linear reciprocating motion in the fixed cavity 471; S4. Since the hose 3 will perform the work of spraying concrete in a cyclic and orderly manner in the area, the worker can pull the third chute 51 in time according to the changes in the coarse aggregate diameter of the concrete and the construction position, so that the gear plate 2 55 on the surface of the third chute 51 engages and drives the third gear 53 to move. Similarly, the third gear 53 slides on the surface of the gear plate 1 54, so that the second chute 50 moves in the first chute 5, thereby changing the length of the first chute 5, so that the pouring height of the concrete can be effectively adjusted.
[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A concrete construction device for engineering construction, comprising a boom (1) and a delivery pipe (2) for delivering concrete, characterized in that: A hose (3) is provided at one end of the delivery pipe (2), and a spraying mechanism (4) for controlling the hose (3) to spray concrete evenly is provided at the end of the arm (1); The spraying mechanism (4) comprises a first motor (40) arranged at one side of the boom (1); the output shaft of the first motor (40) is provided with a crossbar (41); one end of the crossbar (41) is provided with a cylinder (42); a round rod (43) is rotatably connected to the surface of the boom (1); one end of the round rod (43) is provided with a vertical rod (44); one end of the vertical rod (44) is provided with an arc plate (45); an arc groove (46) is provided in the arc plate (45) for mutually squeezing the cylinder (42); and a reciprocating device (47) is provided on one side of the arc plate (45) for controlling the hose (3) to linearly reciprocate and spray concrete.
2. The concrete construction device for engineering construction according to claim 1, characterized in that: The surface of the cylinder (42) is provided with a limiting groove (470) for the cylinder (42) to slide in the arc groove (46).
3. The concrete construction device for engineering construction according to claim 1, characterized in that: The reciprocating device (47) comprises a fixed cavity (471) arranged on one side of the arc-shaped plate (45); a second motor (472) is arranged on the inner side of the fixed cavity (471); an output shaft of the second motor (472) is provided with a first gear (473); the fixed cavity (471) is rotatably connected to a second gear (474); a chain (475) is arranged between the first gear (473) and the second gear (474); a conversion member (476) for driving the hose (3) to perform linear motion in the fixed cavity (471) is arranged on one side of the chain (475).
4. The concrete construction device for engineering construction according to claim 3 is characterized in that: The first gear (473) and the second gear (474) are placed horizontally and symmetrically in the fixed cavity (471).
5. The concrete construction device for engineering construction according to claim 3, characterized in that: The conversion member (476) comprises a slide groove (4760) provided in the fixed cavity (471) on a side away from the second motor (472); a slider (4761) is slidably connected in the slide groove (4760); a groove (4762) is provided in the slider (4761); a first short rod (4763) is slidably connected in the groove (4762); a triangular plate (4764) is rotatably connected to one side of the first short rod (4763); two second short rods (4765) are symmetrically provided on a side of the triangular plate (4764) away from the first short rod (4763); and the second short rods (4765) are fixedly connected to one side of the chain (475).
6. The concrete construction device for engineering construction according to claim 5, characterized in that: The slider (4761) is provided with a circular cavity (4766) for the hose (3) to pass through to the outside.
7. The concrete construction device for engineering construction according to claim 3, characterized in that: A rectangular groove (48) is provided inside the fixing cavity (471), a first fixing frame (49) is slidably connected inside the rectangular groove (48), and second fixing frames (410) are rotatably connected to both sides of the lower end of the first fixing frame (49).
8. The concrete construction device for engineering construction according to claim 7, characterized in that: The lower end of the hose (3) is provided with a second fixing frame (410), and the lower end of the hose (3) is provided with a first slide pipe (5), the first slide pipe (55) is slidably connected to the inside of the second slide pipe (50), the second slide pipe (50) is slidably connected to the inside of the third slide pipe (51), and a group of hydraulic rods (52) are symmetrically provided on the surface of the first slide pipe (5), and the output ends of the hydraulic rods (52) are fixedly connected to the surface of the third slide pipe (51).
9. The construction concrete construction device according to claim 8, characterized in that: One end of the second slide pipe (50) is rotatably connected to a third gear (53); a gear plate 1 (54) is provided on the inner side of the first slide pipe (5); a gear plate 2 (55) is provided on the surface of the third slide pipe (51); and the gear plate 1 (54) and the gear plate 2 (55) are both meshed with the third gear (53).
10. A method for using a concrete construction device for engineering construction, using the concrete construction device for engineering construction according to any one of claims 1 to 9, characterized in that: The specific steps include: S1. First, the concrete construction device will pre-adjust the position of the boom (1) so that the hose (3) is located directly above the construction position, and the same batch of concrete is put into the hopper and enters the concrete construction device, and is sucked into the pump truck and transported into the delivery pipe (2) and the hose (3); S2, and the worker can manually operate the output power of the first motor (40) to change its rotation speed, so that the first motor (40) drives the crossbar (41) to move, so that the cylinder (42) squeezes the arc groove (46) when performing a circular motion, and because the round rod (43) rotates on one side of the arm (1), the arc plate (45) and the vertical rod (44) perform a reciprocating swinging motion on one side of the arm (1), and because the hose (3) is arranged at one end of the vertical rod (44), the hose (3) performs a reciprocating swinging motion when laying concrete; S3, and operating and controlling the output power of the second motor (472) to change the rotation speed of the first gear (473), so that the second motor (472) drives the first gear (473) to move, and under the action of the second gear (474), the chain (475) moves at a uniform speed, and the sprockets on one side of the chain (475) drive the first short rod (4763) on one side of the triangular plate (4764) to perform a quasi-circular motion, so that the first short rod (4763) squeezes the groove (4762), driving the slider (4761) to perform reciprocating linear motion in the slide groove (4760), and because the hose (3) passes through the circular cavity (4766) in the slider (4761), the hose (3) can perform linear reciprocating motion in the fixed cavity (471); S4. Since the hose (3) can perform the work of spraying concrete in a cyclic and orderly manner in the area, the worker can timely pull the third chute (51) according to the changes in the diameter of the coarse aggregate of the concrete and the construction position, so that the gear plate 2 (55) on the surface of the third chute (51) is meshed to drive the third gear (53) to move. Similarly, the third gear (53) slides on the surface of the gear plate 1 (54), so that the second chute (50) moves in the first chute (5), thereby changing the length of the first chute (5), so that the pouring height of the concrete can be effectively adjusted.