Active prevention and control method for rockburst disasters

By drilling and installing liquid injection holes in underground projects to inject lubricating fluid, slipping the weak structural surface, the problem of traditional passive prevention and control is difficult to completely solve the rock burst, and the construction safety and efficiency are improved. It is suitable for various underground projects, especially Deep rock engineering.

CN118933561APending Publication Date: 2024-11-12TSINGHUA UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411058373.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In underground engineering, traditional rock burst prevention and control technology is mainly passive, time-consuming and labor-intensive, and it is difficult to completely solve the rock burst problem, especially in areas where weak structural surfaces are distributed such as faults and joints, construction disturbances have a great impact on ground stress balance. , increasing the difficulty of rock burst prediction and prevention and control.

Method used

By determining the weak structural surface of the area to be constructed, drilling liquid injection holes and injecting lubricating fluid, the rock structure slips along the weak structural surface, releases stress, and reduces the chance of rock bursts. The lubricating liquid may include PEG, alkali metal saline aqueous solution, phosphatidylcholine aqueous solution and graphene, and the rock mass slip is regulated by the pressure and lubrication of the lubricating liquid.

Benefits of technology

The method of actively preventing and controlling rock bursts has been realized, which improves the safety of underground engineering construction, reduces economic losses, and effectively maintains the safety of construction personnel. By actively intervening in the ground stress state, the risk of rock bursts has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933561A_ABST
    Figure CN118933561A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of underground construction engineering, in particular to an active prevention and control method for rockburst disasters. Rock burst stress can be released in time before construction, and the probability of rock burst during construction is reduced. An active prevention and control method for rockburst disasters comprises the steps that a weak structural surface existing in a to-be-constructed area is determined, and the weak structural surface is a structural surface with the slippage risk; aiming at the weak structural surface, drilling a liquid injection hole in a tunnel face and / or an earth surface structure corresponding to the weak structural surface until reaching the weak structural surface; and lubricating liquid is injected into the liquid injection hole, so that the rock mass structure located on one side of the weak structural plane slides along the weak structural plane under the pressure and lubrication action of the lubricating liquid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of underground construction engineering, and in particular to a method for actively preventing and controlling rock burst disasters. Background Art

[0002] In underground engineering construction, with the continuous expansion of project scale and the continuous deepening of construction technology, rock burst problem has gradually become an important factor restricting the safe progress of underground engineering. Rock burst is a phenomenon in which rocks suddenly break in a high ground stress environment, accompanied by rapid release of energy. It usually occurs in hard and brittle rocks, such as granite and quartzite, and is particularly common in the construction of tunnels, deep foundation pits, mines and other projects. The occurrence of rock burst brings great safety hazards to the project, and in severe cases may cause casualties and equipment damage. Therefore, the research and application of rock burst prevention and control technology is particularly important.

[0003] In traditional rockburst prevention and control technologies, the measures usually adopted are mainly passive, that is, to deal with the rockburst after it occurs. These measures include anchoring, support, shotcrete reinforcement, reserved deformation space, etc. However, these passive prevention and control methods are not only time-consuming and labor-intensive, but also costly, and it is difficult to completely solve the rockburst problem. Especially in areas with weak structural surfaces such as faults and joints, the impact of underground engineering construction disturbance on the ground stress balance is more prominent, and the difficulty of rockburst prediction and prevention increases. Summary of the invention

[0004] Based on this, it is necessary to provide an active prevention and control method for rock burst disasters, which can release rock burst stress in time before construction and reduce the probability of rock burst during construction.

[0005] In a first aspect, a method for actively preventing and controlling rock burst disasters is provided, comprising:

[0006] Determine the weak structural surface existing in the area to be constructed, wherein the weak structural surface is a structural surface with a risk of slippage;

[0007] For the weak structural surface, drilling a liquid injection hole on the corresponding tunnel face and / or surface structure to the weak structural surface;

[0008] Lubricating liquid is injected into the injection hole, so that the rock structure located on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating liquid.

[0009] Optionally, the lubricating liquid comprises at least: a liquid lubricant main body material and a lamellar solid lubricant dispersed in the liquid lubricant main body material;

[0010] Wherein, the liquid lubricant main body material can produce a hydration effect on the weak structural surface.

[0011] Optionally, the lubricating liquid satisfies at least one of the following conditions:

[0012] (1) The main material of the liquid lubricant includes: one or more of PEG or its aqueous solution, alkali metal salt aqueous solution and phosphatidylcholine aqueous solution;

[0013] (2) The lamellar solid lubricant comprises at least one of graphene, graphene oxide and molybdenum dioxide;

[0014] (3) The lubricating liquid further comprises: a volatile alcohol solvent; optionally, the volatile alcohol solvent is selected from ethanol.

[0015] Optionally, the mass ratio of the lamellar solid lubricant to the liquid lubricant main material is 1:99-10:90.

[0016] Optionally, there are a plurality of injection holes, and the plurality of injection holes are respectively opened at different height positions of the tunnel face corresponding to the weak structural surface.

[0017] Optionally, before injecting the lubricating liquid into the injection hole, the method further comprises:

[0018] An anti-seepage casing is installed in the injection hole.

[0019] Optionally, the material of the anti-seepage casing includes: one or more of alloy steel, polyethylene and polyvinyl chloride.

[0020] Optionally, before injecting lubricating liquid into the injection hole so that the rock structure on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating liquid, the method further comprises:

[0021] Displacement meters and strain meters are installed around the tunnel face to record and analyze the displacement and stress conditions of the rock mass structure on one side of the weak structural surface during the sliding process.

[0022] Optionally, there are multiple displacement meters and multiple strain meters, and the displacement meters and strain meters are installed around the tunnel face, including:

[0023] A plurality of displacement meters and a plurality of strain meters are alternately installed on the surrounding rock around the tunnel face along a circumference of the tunnel face.

[0024] Optionally, injecting lubricating liquid into the injection hole so that the rock structure located on one side of the weak structural surface slides on the weak structural surface under the pressure and lubrication of the lubricating liquid includes:

[0025] Under the detection of the displacement meter and the strain meter, at least one of the pressure, volume and injection rate of the lubricating fluid injected is adjusted to control the speed at which the rock structure located on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating fluid.

[0026] Compared with the related art, the beneficial technical effects of this application are as follows:

[0027] By injecting lubricating liquid into the injection hole, a load can be applied to the rock structure on one side of the weak structural surface, and the weak structural surface can be lubricated to reduce the friction between the rock structure on one side of the weak structural surface and the weak structural surface, so that the rock structure on one side of the weak structural surface can slide along the weak structural surface, and then the stress of the rock with the weak structural surface can be actively released, reducing the probability of rock burst during construction. In this process, by actively intervening in the ground stress state before construction, regulating the stress distribution of the underground rock formation, and achieving the purpose of preventing and controlling rock burst, the safety of underground engineering construction can be improved, economic losses can be reduced, and the safety of construction personnel can be more effectively maintained. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A schematic diagram of a process for active rockburst prevention and control method provided in an embodiment of the present application;

[0029] Figure 2 A schematic diagram of using seismic exploration to determine the weak structural surface of the area to be constructed provided in an embodiment of the present application;

[0030] Figure 3 A schematic diagram of the structure of drilling holes in the surrounding rock around the tunnel face to arrange displacement meters and stress meters, and drilling injection holes, provided in an embodiment of the present application.

[0031] Description of reference numerals:

[0032] 1. Area to be constructed; 2. Weak structural surface; 3. Work face; 4. Injection hole; 5. Lubricating fluid; 6. Rock structure; 7. Underground structure; 8. Seismic detector; 9. Seismic source; 100. Instrument vehicle; 10. Displacement meter; 11. Strain meter. DETAILED DESCRIPTION

[0033] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application will be described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0034] Unless the context requires otherwise, throughout the specification and claims, the term "including" is to be interpreted as an open, inclusive meaning, that is, "including, but not limited to". In the description of the specification, the terms "one embodiment", "some embodiments", "exemplary embodiments", "exemplarily" or "some examples" and the like are intended to indicate that specific features, structures, materials or characteristics associated with the embodiment or example are included in at least one embodiment or example of the present disclosure. The schematic representation of the above terms does not necessarily refer to the same embodiment or example. In addition, the specific features, structures, materials or characteristics may be included in any one or more embodiments or examples in any appropriate manner.

[0035] Herein, unless otherwise specified, "one or more" means one or more than or equal to two.

[0036] In this document, "for example", "such as", "example", "for example", etc. are used for descriptive purposes, indicating that the previous and subsequent different technical solutions are related in terms of the content covered, but should not be understood as limiting the previous technical solution, nor can they be understood as limiting the scope of protection of this document. In this document, unless otherwise specified, A (such as B) means that B is a non-limiting example of A, and it can be understood that A is not limited to B.

[0037] In this article, "optionally", "optional", and "optional" mean optional, that is, any one of the two parallel options of "yes" or "no". If there are multiple "options" in a technical solution, unless otherwise specified and there is no contradiction or mutual restriction, each "option" is independent.

[0038] In this document, the terms "first", "second", etc. in "the first aspect", "the second aspect", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or quantity, nor can they be understood as implicitly indicating the importance or quantity of the indicated technical features.

[0039] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.

[0040] In this article, the technical features described in an open manner include closed technical solutions composed of the listed features, and also include open technical solutions containing the listed features.

[0041] Herein, when it comes to a numerical interval (i.e., a numerical range), unless otherwise specified, the distribution of the optional numerical values ​​within the numerical interval is considered to be continuous and includes the two numerical endpoints (i.e., the minimum and maximum values) of the numerical interval, and each numerical value between the two numerical endpoints. Unless otherwise specified, when a numerical interval only refers to integers within the numerical interval, including the two endpoint integers of the numerical range, and each integer between the two endpoints, is equivalent to directly listing each integer. When multiple numerical ranges are provided to describe features or characteristics, these numerical ranges can be combined. In other words, unless otherwise specified, the numerical ranges disclosed herein should be understood to include any and all sub-ranges included therein. The "numerical value" in the numerical interval can be any quantitative value, such as a number, a percentage, a ratio, etc. "Numerical interval" allows broadly including numerical interval types such as percentage intervals, ratio intervals, and ratio intervals.

[0042] Different rock masses are often encountered in engineering construction, and these rock masses can be regarded as composed of structural bodies and structural surfaces. The structural body refers to a single rock block produced by the cutting of the structural surface in the rock mass. The structural surface refers to the geological structural interface of various causes and characteristics existing in the rock mass, such as bedding, joints, cleavage, faults, etc. The structural surface with lower strength is called weak structural surface. The structural surface has a very adverse effect on the strength and other engineering properties of the rock mass. In particular, the existence of weak structural surfaces will significantly reduce the strength of the rock mass. In the construction of tunnels, deep foundation pits, mines and other projects, there is a high ground stress in the rock mass, which exceeds the strength of the rock mass itself. Once the balance of the rock mass is destroyed during the construction process, the strong energy destroys the rock and throws out the broken rock, causing rock bursts, which in turn affects the safety and stability of the engineering structure.

[0043] Based on the above technical problems, some embodiments of the present application provide a method for actively preventing and controlling rock burst disasters, such as Figure 1 As shown, the method includes:

[0044] S11), determining a weak structural surface 2 existing in the area to be constructed 1, the weak structural surface being a structural surface with a slip risk;

[0045] S12), with respect to the weak structural surface 2, drilling a liquid injection hole 4 on the corresponding tunnel face 3 and / or the surface structure to the weak structural surface 2;

[0046] S13), injecting lubricating liquid 5 into the injection hole 4, so that the rock structure 6 located on one side of the weak structural surface 2 slides along the weak structural surface 2 under the pressure and lubrication of the lubricating liquid 5.

[0047] Among them, since the weak structural surface 2 is a structural surface with a risk of slipping, the weak structural surface 2 may include, for example, a fault surface and a crack.

[0048] For example, the weak structural surface 2 includes a fault surface, and the two structures (also called rock structures) on both sides of the fault surface may include broken rock blocks, mud, mylonite or fault breccia. The rocks near the fault in the structural surface are often accompanied by joints due to tectonic action. If the joints are not filled with minerals, they can be used as lubricating fluid channels. The filled joints may also be opened again after the main fault is activated, and the opened space can also be used as lubricating fluid channels.

[0049] The two structures on both sides of the fault plane can also be called the hanging plate and the footplate. The hanging plate is located above the fault plane, and the footplate is located below the fault plane.

[0050] According to the characteristics of the relative displacement between the two plates, the fault with a relatively lowered upper plate is a normal fault, and the fault with a relatively higher upper plate is a reverse fault.

[0051] In the following embodiments, the fault will be described as a normal fault. Those skilled in the art will understand that the method provided in the present application is also applicable to reverse faults. The only difference is that the upper plate of the normal fault drops relative to the lower plate, and the lower plate of the reverse fault drops relative to the upper plate.

[0052] like Figure 1 As shown, it is shown that the fault is a normal fault.

[0053] The face of a tunnel, also known as the face of a tunnel, is a term used in tunnel construction. It refers to the working face that is constantly advancing in tunnel excavation (coal mining, mining or tunnel engineering).

[0054] By drilling injection holes on the tunnel face or surface structure to the above-mentioned weak structural surface, lubricating liquid can be injected into the upper plate of the fault near the weak structural surface, thereby facilitating the upper plate to slide along the weak structural surface under the pressure and lubrication of the lubricating liquid.

[0055] It should be noted that, in the case where the fault is a reverse fault, by drilling injection holes on the face or surface structure to the above-mentioned weak structural surface, lubricating liquid can be injected into the lower plate of the fault near the weak structural surface, thereby facilitating the lower plate to slip along the weak structural surface under the pressure and lubricating effect of the lubricating liquid.

[0056] Among them, in the above-mentioned embodiment, compared with drilling the injection holes 4 on the tunnel face 3, drilling the injection holes on the surface structure is more suitable for tunnels that are shallower than the surface.

[0057] As the name suggests, lubricating fluid is a liquid that can lubricate weak structural surfaces, reduce friction, and induce slip of the rock structure on one side of the weak structural surface, thereby achieving energy release.

[0058] In the active prevention and control method of rock burst disasters provided in the embodiment of the present application, by injecting lubricating liquid 5 into the injection hole 4, a load can be applied to the rock structure 6 located on one side of the weak structural surface 2, and the weak structural surface 2 can be lubricated to reduce the friction between the rock structure 6 located on one side of the weak structural surface 2 and the weak structural surface 2, so that the rock structure 6 located on one side of the weak structural surface 2 can slide along the weak structural surface 2, and then the active stress release of the rock mass with the weak structural surface 2 can be achieved, reducing the probability of rock burst during construction. In this process, by actively intervening in the ground stress state before construction, regulating the stress distribution of the underground rock formation, and achieving the purpose of preventing and controlling rock burst, the safety of underground engineering construction can be improved, economic losses can be reduced, and the safety of construction personnel can be more effectively maintained.

[0059] In some embodiments, S11), determine the weak structural surface 2 existing in the area to be constructed 1, such as Figure 1 and Figure 2 As shown, this may include:

[0060] The seismic exploration method is used to obtain the stratigraphic structural characteristics of the area to be constructed in order to determine the weak structural surface existing in the area to be constructed2.

[0061] Among them, using the seismic exploration method to obtain the stratigraphic structural characteristics of the area to be constructed to determine the weak structural surface existing in the area to be constructed can include: using the reflection seismic method to detect the underground structure 7, and analyzing the detected underground structure 7 to determine the weak structural surface 2 existing in the area to be constructed.

[0062] Specifically, multiple grid-shaped or cross-shaped survey lines can be set up in the area to be constructed to conduct 3D seismic exploration, and the underground structure of the area to be constructed can be three-dimensionally mapped, so as to determine the stratigraphic structural characteristics of the area to be constructed, such as faults, layered structures, rock characteristics, etc., and then the weak structural surface 2 existing in the area to be constructed and the characteristics of the weak structural surface 2 can be determined.

[0063] Exemplarily, detecting underground structures by using reflection seismic method and analyzing the detected underground structures to determine the weak structural surface in the area to be constructed may include:

[0064] The seismic detectors 8 are evenly arranged on multiple survey lines at certain intervals, and seismic waves are excited by the seismic source 9. After being reflected by the underground structure 2, the seismic waves are recorded by the seismic detectors 8, and the three-dimensional mapping data of the underground structure in the construction area is collected. By processing and analyzing the collected data, the weak structural surface in the construction area and the characteristics of the weak structural surface can be determined.

[0065] In the process of seismic exploration, many instruments are used, and an instrument vehicle 100 may be arranged on the ground to carry the instruments.

[0066] The collected data may be raw data, and data processing of the collected data may include: performing signal enhancement processing on the raw data, removing interference waves and noise in the raw data, and correcting time delays caused by velocity changes and surface irregularities encountered by seismic waves.

[0067] The interference wave may include a direct wave, a ground roll wave, etc., and the noise may be a random noise, which may be removed after superposition processing of the seismic wave velocity.

[0068] The analysis of the collected data may include: analyzing the data by professionals based on relevant knowledge and experience to determine the underground structural characteristics, or using software-assisted analysis to determine the underground structural characteristics, so as to identify and locate potential weak structural surfaces in the area to be constructed, such as faults, joints, fissures, etc., as well as the position, direction, dip, extension, etc. of faults, joints and fissures. Among them, the use of software-assisted analysis may include analysis methods such as seismic attribute analysis, stratigraphic modeling and reverse time migration imaging.

[0069] Furthermore, in order to ensure the accuracy of the above-mentioned collected data, before the seismic exploration, the above-mentioned seismic exploration activities can also be planned based on the available geological and topographic data and surface conditions.

[0070] Specifically, available geological data, such as strata, structures, historical seismic activity and data from previous earthquakes and drilling operations, can be collected, topographic maps of the area to be constructed can be obtained, surface conditions can be assessed, satellite images and aerial photographs can be obtained, and geological surveys can be carried out at the same time, ground observations and rock sample data can be collected, and environmental impact assessments can be conducted to understand the possible impacts of seismic exploration activities on the local ecosystem and plan mitigation measures, such as avoiding sensitive areas and adopting means to minimize damage.

[0071] In seismic exploration, terrain conditions may have some impact on the design of equipment and laterals, which can be adjusted in combination with the above planning and preparation. For example, seismic detectors need to be firmly placed on the ground to ensure that they can accurately record seismic waves.

[0072] In addition, if Figure 2As shown, the above-mentioned source 9 can be a vibrator vehicle or explosives. The vibrator vehicle is relatively environmentally friendly and suitable for sensitive areas or places subject to environmental supervision. The frequency, duration and intensity of the vibration signal can be adjusted according to the geological conditions. Its source signal is easier to repeat, which is helpful for the above-mentioned data processing. However, the vibrator vehicle requires a flat surface with strong weighing capacity to operate, while in areas with rugged terrain, explosives can be selected as the source. The selection of the above-mentioned source also needs to be considered in combination with the above-mentioned collected geological and topographic data, local regulations and environmental protection requirements, which can reduce the adverse risks brought by seismic exploration.

[0073] Wherein, in S12), when drilling the injection hole 4 on the tunnel face 3 and / or the surface structure corresponding to the weak structural surface 2, the drilling may be performed by means of rotary impact drilling.

[0074] Rotary impact drilling is a drilling technology that combines the two mechanisms of rotary drilling and impact drilling. Through the combination of rotation and impact, the drill bit interacts with the rock to effectively break the rock. Rotation provides continuous shearing and crushing power, while impact provides periodic impact energy. The combined effect of the two can effectively improve the penetration speed and efficiency of drilling.

[0075] At present, common drilling methods include vertical drilling and inclined drilling. Vertical drilling is suitable for shallow tunnels, while inclined drilling can cover a wider underground area. Especially when it is necessary to operate on specific inclined or tilted strata, the selection of drilling style needs to be combined with the actual geological conditions. The diameter of the injection hole depends on the fluidity of the lubricant and the construction equipment, and it is necessary to ensure that the lubricant can be injected smoothly during the injection process.

[0076] In some embodiments, Figure 3 As shown, there are multiple injection holes 4, and the multiple injection holes 4 are respectively opened at different height positions of the tunnel face 3 corresponding to the weak structural surface 2.

[0077] In these embodiments, a plurality of injection holes 4 may be arranged along the inclined direction of the weak structural surface 2, so that the lubricating liquid 5 can cover a larger area of ​​the weak structural surface 2 as possible, thereby facilitating the occurrence of the above-mentioned slippage.

[0078] In some embodiments, the hole spacing of the plurality of injection holes 4 can be comprehensively determined based on the diffusion range of the lubricating liquid 5, geological conditions, and improvement effects.

[0079] The multiple injection holes 4 may be arranged in a regular grid pattern, or may be arranged irregularly according to geological conditions and engineering requirements.

[0080] In some embodiments, the specific depths of the plurality of injection holes 4 can be determined according to the geological structure layer and the liquid propagation range.

[0081] In some embodiments, before injecting the lubricating liquid 5 into the injection hole 4, the method may further include: installing an impermeable casing in the injection hole 4. This can protect the injection hole wall and reduce the loss of the lubricating liquid during the injection process.

[0082] In some embodiments, the impermeable casing may include: high pressure resistant and corrosion resistant materials.

[0083] The high pressure resistant and corrosion resistant material may include one or more materials such as alloy steel, polyethylene (HDPE) and polyvinyl chloride (PVC), etc. The high pressure resistant and corrosion resistant performance of the anti-seepage casing can be effectively improved, and damage caused by excessive pressure can be avoided while ensuring the injection flow rate. At the same time, the reliability of the anti-seepage casing can also be improved.

[0084] Among them, the specific composition of the above-mentioned lubricating liquid 5 is not limited, and all possible liquids that can lubricate the weak structural surface in this application and cause the rock structure located on one side of the weak structural surface to slide along the weak structural surface are within the protection scope of this application.

[0085] In some embodiments, the lubricating liquid 5 at least includes: a liquid lubricant main material and a lamellar solid lubricant dispersed in the liquid lubricant main material.

[0086] The lamellar solid lubricant refers to a solid material that has a lamellar structure and can undergo lamellar sliding to play a lubricating role.

[0087] In these embodiments, the lubricating fluid combines the different lubrication mechanisms of the liquid lubricant main material and the lamellar solid lubricant, and can more effectively lubricate the weak structural surface, thereby facilitating the rock structure located on one side of the weak structural surface to slide along the weak structural surface more effectively.

[0088] The liquid lubricant main material can also disperse the lamellar solid lubricant and carry it to the weak structural surface.

[0089] The main material of the liquid lubricant may be any liquid lubricant that can lubricate the rock structure surfaces on both sides of the weak structural surface and / or the surfaces of weak and broken rock blocks at the weak structural surface, and is not specifically limited here.

[0090] In some embodiments, the liquid lubricant main body material may include: one or more of PEG or its aqueous solution, an alkali metal salt aqueous solution, and a phosphatidylcholine aqueous solution;

[0091] In these embodiments, these materials can be attached to the rock structure surfaces on both sides of the weak structural surface and / or the weak broken rock block surfaces at the weak structural surface, so that the rock structure on one side of the weak structural surface can slide along the weak structural surface under the lubrication of the lubricating liquid. In addition, these liquid lubricating main materials can be compatible with underground rock materials and give full play to the lubrication effect, and can maintain their performance in underground high pressure and different chemical environments, and ensure that it will not pollute the environment during the lubrication process.

[0092] In some embodiments, the lamellar solid lubricant includes at least one of graphene, graphene oxide, and molybdenum dioxide.

[0093] In these embodiments, the lamellar solid lubricant contained in the lubricating fluid is compatible with underground rock materials and can fully exert its lubricating effect, and can maintain its performance in underground high pressure and different chemical environments, and ensure that it does not pollute the environment during the lubrication process.

[0094] In some embodiments, the mass ratio of the lamellar solid lubricant to the liquid lubricant main material is 1:99 to 10:90.

[0095] In these embodiments, the lamellar solid lubricant can be evenly dispersed in the liquid lubricant main material, so that the lamellar solid lubricant and the liquid lubricant main material can be evenly attached to the rock structure surface on both sides of the weak structural surface and / or the surface of the weak broken rock blocks at the weak structural surface, further improving the lubrication effect.

[0096] In some embodiments, when the liquid lubricant main material includes PEG, the number average molecular weight of the PEG is 180 to 620. In these embodiments, by selecting PEG with an appropriate molecular weight, the lubrication effect can be more effectively improved and the viscosity of the lubricating liquid can be reduced.

[0097] In some embodiments, the lubricating fluid further comprises: a volatile alcohol solvent; optionally, the alcohol solvent is selected from ethanol.

[0098] In these embodiments, by adding a volatile alcohol solvent, the prepared lubricating liquid is transported to a designated location, the volatile alcohol solvent evaporates, and the remaining lubricating liquid can continue to play its role, further improving the lubrication effect.

[0099] In some embodiments, the volatile alcohol solvent accounts for 50% to 80% by weight of the lubricating fluid.

[0100] In these embodiments, by controlling the mass proportion of the volatile alcohol solvent in the lubricating liquid to be 50% to 80%, on the one hand, it is convenient for the volatile alcohol solvent to disperse the lamellar solid lubricant and the liquid lubricant main material, thereby improving the dispersion uniformity of the lamellar solid lubricant and the liquid lubricant main material; on the other hand, after the volatile alcohol solvent evaporates, it is convenient for the lamellar solid lubricant and the liquid lubricant main material to form a gel-like lubricating layer attached to the rock structure surface on both sides of the weak structural surface and / or the surface of the weak broken rock block at the weak structural surface, which can further improve the lubrication effect and facilitate the induction of rock burst.

[0101] In some embodiments, before the injection, a step of preparing the lubricating liquid may be further included, specifically including:

[0102] According to the above ratio, weigh the lubricating material such as PEG in the main material of the liquid lubricant into the stirrer, add an appropriate amount of distilled water or deionized water and start the stirrer. Slow heating can promote the dissolution of PEG;

[0103] According to the above ratio, weigh the molybdenum disulfide suspension and slowly add it to the mixed solution of PEG and glycerol, and stir it thoroughly to disperse the molybdenum disulfide in the solution.

[0104] During this process, the agglomeration of molybdenum disulfide can be avoided by controlling the stirring speed.

[0105] In some embodiments, the step of preparing the lubricating liquid may further include: filtering the mixed lubricating liquid through a fine-pore filter to remove undispersed large particles and agglomerates, adding ethanol to the filtered lubricating liquid and transferring it to a sealed container for storage.

[0106] In other embodiments, after the above-mentioned lubricating fluid is prepared, the rocks taken out from the drilling holes can be used to carry out indoor rock direct shear and unloading experiments to simulate the lubrication effect of the rock along the fracture surface to observe the influence of the lubricating fluid on the friction coefficient of the fracture surface of the weak structural surface.

[0107] Specifically, the rock taken out from the drilling hole can be processed into cubic specimens, with the weak structural surface located in the middle of the specimen and the specimen divided into an upper and lower part. Lubricating fluid is applied to the weak structural surface for direct shear tests, the rock sample is immersed in the lubricating fluid for direct shear tests, and after applying confining pressure to the specimen, lubricating fluid is injected into the weak structural surface to observe whether the specimen is unstable. The influence of the lubricating fluid on the friction coefficient of the weak structural surface is observed through simulation experiments.

[0108] Studies have found that the above-mentioned lubricating fluid can effectively reduce the friction coefficient of soft structural surfaces.

[0109] In some embodiments, before the lubricating liquid 5 is injected into the injection hole 4 so that the rock structure 6 located on one side of the weak structural surface 2 slides along the weak structural surface 2 under the pressure and lubrication of the lubricating liquid 5, the method further includes:

[0110] like Figure 3 As shown, displacement meters 10 and stress meters 11 are installed around the tunnel face 3 to record and analyze the displacement and stress conditions of the rock mass structure located on one side of the weak structural surface during the sliding process.

[0111] In these embodiments, by installing displacement meters 10 and stress meters 11 around the tunnel face 3, the displacement and stress conditions of the rock structure on one side of the weak structural surface 2 during the sliding process can be recorded and analyzed, thereby providing more research data for this and future active prevention and control of rock bursts.

[0112] The displacement meter 10 can be exemplarily a resistance strain gauge, which is a sensor for measuring the deformation degree or strain of an object. The resistance strain gauge can be a slender filament or sheet element made of a resistance material. Its working principle is: when an object is deformed by an external force, the resistance material in the strain gauge will also deform accordingly. The deformation of the resistance material will cause its length, cross-sectional area or resistivity to change, thereby causing a change in the resistance value. The deformation amount of the resistance material can be inferred based on the change in the resistance value, and then the displacement of the rock structure located on one side of the weak structural surface during the sliding process can be monitored.

[0113] Among them, the resistance strain gauge can be fixed on the surrounding rock to ensure that it is affected by force changes together with the rock mass as a whole. For example, the resistance strain gauge can have a smaller deformation amount at the initial position, indicating a state of no deformation as much as possible. When all possible deformations in the sliding process of the rock structure located on one side of the weak structural surface can drive the resistance strain gauge to deform, it is affected by force changes together with the rock mass as a whole, so that the displacement of the rock structure located on one side of the weak structural surface during the sliding process can be monitored more accurately.

[0114] The resistance strain gauge can be fixed on the surrounding rock by adhesives such as high-strength glue or epoxy resin, which can achieve effective fixation and also enable the resistance strain gauge to adapt to different rock shapes and surfaces.

[0115] The strain gauge 11 can be a sensor for measuring the internal stress of an object, and its working principle is based on the relationship between the resistivity of a material and the stress it is subjected to. The strain gauge can also be composed of a resistance wire or a resistance sheet, and these resistance materials are usually slender wires or sheets with high resistivity. When the resistance wire or the resistance sheet is subjected to external stress, their length, cross-sectional area or resistivity will change, resulting in a change in resistance value. By measuring the change in resistance value, the stress on the object can be monitored.

[0116] Similar to the above-mentioned resistance strain gauge, the stress gauge can also be installed on the surrounding rock by pasting to ensure that it is affected by force changes together with the rock mass as a whole and adapts to the shape and surface of different rock masses, so that the stress gauge is subjected to smaller stress at the initial position and indicates a state of no stress as much as possible. When all possible stresses in the process of sliding of the rock structure located on one side of the weak structural surface can drive the resistance strain gauge to deform, it is affected by force changes together with the rock mass as a whole, so that the stress conditions of the rock structure located on one side of the weak structural surface during the sliding process can be monitored more accurately.

[0117] In some embodiments, Figure 3 As shown, there are multiple displacement meters 10 and stress meters 11, and the displacement meters 10 and stress meters 11 are installed around the tunnel face 3, which may include:

[0118] A plurality of displacement meters 10 and a plurality of stress meters 11 are alternately installed on the surrounding rock around the tunnel face 3 along a circumference of the tunnel face 3 .

[0119] In these embodiments, multiple displacement meters 10 and multiple pressure gauges 11 can be covered on the rock structure on one side of the weak structural surface as much as possible, and by alternately installing multiple displacement meters 10 and multiple stress gauges 11 on the surrounding rock around the tunnel face 3 along a circle of the tunnel face 3, the displacement and stress conditions of the rock structure on one side of the weak structural surface can be more effectively monitored at multiple points, thereby further improving the monitoring accuracy.

[0120] Among them, Figure 3 , which is a schematic diagram showing a plurality of boreholes 12 opened in the surrounding rock around the tunnel face 3 for installing a plurality of displacement meters 10 and a plurality of stress meters 11 .

[0121] In some embodiments, injecting lubricating fluid into the injection hole so that the rock structure on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating fluid includes:

[0122] Under the detection of the displacement meter and the strain meter, at least one of the pressure, volume and injection rate of the injected lubricating fluid is adjusted to control the speed at which the rock structure located on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating fluid.

[0123] In these embodiments, by real-time monitoring of the changes in ground stress and displacement of the rock structure located on one side of the weak structural surface, and adjusting at least one of the pressure, volume and injection rate of the lubricating fluid based on the monitoring data, the rock structure located on one side of the weak structural surface can be made to slide smoothly instead of suddenly becoming unstable as much as possible.

[0124] For example, under the monitoring of the displacement meter and the strain meter, the lubricant can be slowly injected in the initial stage, and as the injection amount of the lubricant increases, the injection speed, pressure and volume of the lubricant can be adjusted according to the displacement and force conditions monitored by the displacement meter and the strain meter, so that the rock structure on one side of the weak structural surface slowly slides along the weak structural surface, and / or, as Figure 1 As shown, the rock structure 6 located on one side of the weak structural surface 2 collapses slowly, reducing the environmental damage caused by active prevention and control.

[0125] In some embodiments, high-pressure injection technology can be used to inject lubricating liquid into the injection hole.

[0126] High-pressure injection technology is a process technology widely used in underground engineering and geotechnical engineering. Its main instruments and equipment include high-pressure injection pumps, stirring tanks, flow meters, pressure gauges and permeameters. Among them, the high-pressure injection pump is used to inject high-pressure lubricating liquid into the injection hole, and the stirring tank is used to store the above-configured lubricating liquid; the flow meter is used to monitor the flow rate and injection rate during the injection process, and the pressure gauge is used to monitor the pressure during the injection process; the permeameter is used to monitor the penetration of the lubricating liquid during the injection process. The monitoring data can evaluate the lubrication and penetration of weak structural surfaces, providing more research data for future research on active prevention and control of rock bursts.

[0127] In summary, the embodiments of the present application provide a method for active prevention and control of rock bursts, which can significantly improve the construction safety of underground projects and is expected to reduce casualties and economic losses caused by rock bursts. Through real-time monitoring and intelligent regulation, the present application also brings the possibility of adaptive adjustment, bringing rock burst management into a new stage of high intelligence. It has the following advantages:

[0128] (1) Active prevention: Actively releasing ground stress by inducing slip, thus avoiding the limitations of passive prevention.

[0129] (2) Safety and efficiency: It reduces the risk of rock burst during construction and improves the safety and efficiency of construction.

[0130] (3) Wide application: Applicable to various underground projects, especially deep rock projects.

[0131] (4) Environmentally friendly: The lubricating fluid used has little impact on the environment and is easy to control and manage.

[0132] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0133] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims, and the description may be used to interpret the scope of the claims.

Claims

1. A method for active prevention and control of rock burst disasters, It is characterized in that include: Determine the weak structural surface existing in the area to be constructed, wherein the weak structural surface is a structural surface with a risk of slippage; For the weak structural surface, drilling a liquid injection hole on the corresponding tunnel face and / or surface structure to the weak structural surface; Lubricating liquid is injected into the injection hole, so that the rock structure located on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating liquid.

2. The active prevention and control method for rock burst disasters according to claim 1, It is characterized in that The lubricating liquid at least comprises: a liquid lubricant main body material and a lamellar solid lubricant dispersed in the liquid lubricant main body material.

3. The active prevention and control method for rock burst disasters according to claim 2, It is characterized in that The lubricating fluid satisfies at least one of the following conditions: (1) The main material of the liquid lubricant includes: one or more of PEG or its aqueous solution, alkali metal salt aqueous solution and phosphatidylcholine aqueous solution; (2) The lamellar solid lubricant comprises at least one of graphene, graphene oxide and molybdenum dioxide; (3) The lubricating liquid further comprises: a volatile alcohol solvent; optionally, the volatile alcohol solvent is selected from ethanol.

4. The active prevention and control method for rock burst disaster according to claim 2, It is characterized in that The mass ratio of the lamellar solid lubricant to the liquid lubricant main material is 1:99-10:

90.

5. The active prevention and control method for rock burst disaster according to claim 1, It is characterized in that There are a plurality of injection holes, and the plurality of injection holes are respectively opened at different height positions of the tunnel face corresponding to the weak structural surface.

6. The active prevention and control method for rock burst disaster according to claim 1, It is characterized in that Before injecting the lubricating liquid into the injection hole, the method further comprises: An anti-seepage casing is installed in the injection hole.

7. The active prevention and control method for rock burst disaster according to claim 6, It is characterized in that The material of the anti-seepage casing includes: one or more of alloy steel, polyethylene and polyvinyl chloride.

8. The active prevention and control method for rock burst disasters according to any one of claims 1 to 7, It is characterized in that Before injecting lubricating liquid into the injection hole so that the rock structure on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating liquid, the method further comprises: Displacement meters and strain meters are installed around the tunnel face to record and analyze the displacement and stress conditions of the rock mass structure on one side of the weak structural surface during the sliding process.

9. The active rockburst prevention and control method according to claim 8, It is characterized in that There are multiple displacement meters and strain meters, and the displacement meters and strain meters are installed around the tunnel face, including: A plurality of displacement meters and a plurality of strain meters are alternately installed on the surrounding rock around the tunnel face along a circumference of the tunnel face.

10. The active prevention and control method for rock burst disasters according to claim 8, It is characterized in that The step of injecting lubricating liquid into the injection hole so that the rock mass structure located on one side of the weak structural surface slides on the weak structural surface under the pressure and lubrication of the lubricating liquid comprises: Under the detection of the displacement meter and the strain gauge, at least one of the pressure, volume and injection rate of the lubricating fluid injected is adjusted to control the speed at which the rock structure located on one side of the weak structural surface slides along the weak structural surface under the pressure and lubrication of the lubricating fluid.