Anti-scale gas lift flowing device and equipment thereof

By setting up an inclined gas lifting and anti-scale agent channel in the gas well oil pipe, combined with the Rafale nozzle principle, efficient mixing of chemical agents and well fluids is achieved, solving the problem of gas well scale and improving the production stability of gas wells and efficiency reduces costs.

CN118933678APending Publication Date: 2024-11-12SICHUAN HAOYUN TONGXING OIL & GAS ENGINEERING TECHNOLOGY SERVICES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411084459.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Under high temperature and high pressure in the gas well, CO2 and H2S in water with high calcium and magnesium ion concentrations lead to column scaling. The existing technology, such as pickling and filling chemicals, has high cost and no obvious effect, resulting in unstable gas well production and increased cost. .

Method used

Design a anti-scaling gas lifting flow device. By setting up an inclined gas lifting and anti-scaling agent channel in the middle of the oil pipe, chemical agents are inclined into the well fluid by using high-pressure gas, and combining the principle of Rafale nozzle to realize the agent and Evenly mixing the well fluid reduces the liquid pressure gradient and improves the anti-scaling effect.

Benefits of technology

It improves the stability and efficiency of gas well production, reduces production costs, significantly reduces scale deposition, extends the validity period of acid-resolving plugging agents, reduces the amount of chemical agents, and improves the anti-scaling effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933678A_ABST
    Figure CN118933678A_ABST
Patent Text Reader

Abstract

The invention discloses an anti-scale gas lift flowing device and equipment thereof, and relates to the technical field of gas production processes, the anti-scale gas lift flowing device comprises a barrel connected in series in the middle of an oil pipe, and the two ends of the barrel are open and both communicated with the oil pipe; a plurality of gas lift gas injection channels are formed in the annular side wall of the cylinder body, and the two ends of each gas lift gas injection channel penetrate through the inner wall and the outer wall of the cylinder body respectively; in the direction from the outer end to the inner end of the gas lift gas injection channel, the gas lift gas injection channel is inclined towards the gas-liquid flowing direction; each gas lift gas injection channel further communicates with an anti-scaling agent channel formed in the first barrel. By the adoption of the scheme, gas well scaling is prevented while gas lift stability and gas lift efficiency are improved, production cost is reduced, and efficient development of gas wells is supported.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of gas production technology, and in particular to an anti-scaling gas lift flow device and equipment thereof. Background Art

[0002] The gas lift process is an artificial lifting process that injects high-pressure gas into the oil pipe through a high-pressure gas source to reduce the flow pressure gradient above the gas injection point, reduce the slip loss during the lifting process, discharge the bottom hole liquid, increase the production pressure difference, and restore or improve the production capacity of the gas well. Compared with other processes, the gas lift process has great advantages. It has a wide range of applications, a low failure rate, and a long maintenance-free period.

[0003] During the gas lift process, if the concentration of calcium and magnesium ions in the formation water is high, and the downhole fluid contains CO2 and H2S, the pipe string will be scaled with a high probability. The main reason is that the temperature rises and the pressure drops during gas lift, which breaks the ion balance of the solution and causes scaling precipitation. As shown in the following chemical formula:

[0004]

[0005] Pressure: Gas lift changes the CO2 and H2S content in the water, affecting the concentration of CO32- and HCO3-, and affecting the precipitation of CaCO3 crystals; Temperature: The higher the temperature, the lower the solubility of inorganic salts, the faster the scaling rate, and the more serious scaling in high-temperature wells. It is common sense in life that a container with water is easy to scale, while a low-temperature container rarely scales.

[0006] Poor downhole conditions are the primary cause of gas lift process failures. Due to the severe scaling and corrosion caused by the harsh downhole conditions of gas wells, gas lift valves, oil pipes, working barrels, etc. are often blocked by scaling.

[0007] Scaling in gas wells seriously affects gas well production. The main solution is acid washing and replacement of tubing. MXX210 well has been in gas lift drainage production for less than a year since January 2022. The wellbore is frequently blocked. It is mainly unblocked by pumping inorganic acid + organic unblocking agent. So far, a total of 11 blockages have occurred (13 times of acid unblocking). A total of 25.2 cubic meters of organic unblocking agent, 40 cubic meters of hydrochloric acid, and 137 cubic meters of CT4-12B inorganic acid unblocking agent have been pumped. After acidification, the blockage can be removed and normal drainage production can be restored. However, the effective period of acid unblocking is shortening. The current unblocking frequency is once every 13 days to half a month, which is relatively high (usually once every six months or a year), resulting in a sharp increase in production and operation costs.

[0008] In addition, a separate filling pipeline can be set outside the oil pipe to add descaling agents, anti-scaling agents or scale inhibitors to prevent scale, but the construction of the filling channel is complicated and the one-time investment cost is high; or it can be added together with the high-pressure gas through the annulus of the oil casing. In this case, the filling effect is not obvious. The flow direction of the injected chemical agent forms a 90-degree angle with the flow direction of the liquid in the oil pipe. Most of it is brought to the ground with the well fluid. There are very few descaling agents and scale inhibitors acting on the wall of the oil pipe, resulting in a poor anti-scaling effect.

[0009] Replacing the tubing, pickling, or injecting chemicals through the pipeline all require high costs. During gas lift, the downward injection of gas is unstable and inefficient. Summary of the invention

[0010] The present invention aims to solve the deficiencies of the prior art and to provide an anti-scaling gas lift flow device and equipment thereof. By adopting this solution, the gas lift stability and efficiency can be improved while preventing gas well scaling, reducing production costs and supporting the efficient development of gas wells.

[0011] The present invention is achieved through the following technical solutions:

[0012] An anti-fouling gas lift flow device, comprising:

[0013] A cylinder connected in series in the middle of the oil pipe, with both ends of the cylinder open and connected to the oil pipe;

[0014] A plurality of gas lift and gas injection channels are provided on the circumferential side wall of the cylinder, and two ends of the gas lift and gas injection channels respectively penetrate the inner wall and the outer wall of the cylinder;

[0015] From the outer end to the inner end of the gas lift gas injection channel, the gas lift gas injection channel is inclined toward the direction of gas-liquid flow;

[0016] Each of the gas lift injection channels is also connected to an anti-scaling agent channel opened on the first cylinder.

[0017] Compared with the prior art, the flow direction of the injected chemical agents is at a 90-degree angle to the flow direction of the liquid in the oil pipe, and most of them are brought to the surface with the well fluid. Very few scale removers and scale inhibitors act on the wall of the oil pipe, resulting in an unclear anti-scaling effect. Replacing the tubing string, pickling, or injecting chemicals through the pipeline all require relatively high costs. During gas lift, the downward injection of gas leads to unstable production and low efficiency. The present invention provides an anti-scaling gas lift flow device and equipment thereof. By adopting this solution, gas lift stability and efficiency can be improved while preventing scaling of gas wells, reducing production costs and supporting efficient development of gas wells.

[0018] The specific scheme includes a cylinder connected in series in the middle of the oil pipe, the cylinder and the oil pipe are coaxially arranged, and both ends are connected to the oil pipe; an inclined gas lift injection channel is arranged on the side wall of the cylinder, and the gas lift injection channel is inclined in the direction of well fluid flow, so that an external high-pressure gas source can inject high-pressure gas into the interior through the gas lift injection channel, and the injection direction of the high-pressure gas is basically the same as the flow direction of the well fluid, so that the high-pressure gas can transfer kinetic energy to the liquid flowing at a low speed along the pipe wall, thereby reducing liquid slippage and improving gas lift efficiency. In addition, there are several anti-scaling agent channels on the side wall of the cylinder, through which chemical agents that play a role in scale inhibition or descaling can be easily input into several gas lift injection channels. The gas lift injection channel drives the chemical agents into the interior and mixes with the incoming liquid through the high-pressure gas source output by itself, and the entry direction of the chemical agents is also inclined toward the direction of well fluid flow. At this time, the flow velocity of the pipe wall is high, and it is easier to distribute the chemical agents to the pipe wall, so that part of the scale is separated from the pipe wall, playing a role in scale inhibition or descaling, and achieving the purpose of scale prevention and control. Of course, according to the scaling situation, two or three types of descaling agents, scale inhibitors or anti-scaling agents can also be added at the same time to achieve the purpose of joint scaling prevention and control. Before mixing, it is necessary to conduct a compatibility test of the agents and conduct a comprehensive performance evaluation.

[0019] In order to make the chemical agent and the well fluid mix more evenly and use the pressure to automatically absorb the chemical agent to improve the anti-scaling effect, the gas lift injection channel includes a Rafael pipe section along its length; the anti-scaling agent channel is connected to the roar channel in the middle of the Rafael pipe section. In this solution, the gas lift injection channel includes a Rafael pipe section, using the Rafael nozzle principle, and its outlet pressure is only related to the external transmission pressure; Figure 5 As shown in the figure, it is a schematic diagram of the Lafarge principle device, which consists of a high-pressure air inlet end ① (the junction of ① and ② can be regarded as a nozzle), ② is a roar channel, ③ is a diffusion section, and ④ is a low-pressure end (i.e., the suction end of the chemical agent). The high-pressure gas flows at a high speed, and the chemical agent is sucked in from the low-pressure end, and the chemical agent is gathered and mixed in the roar channel ②, and mixed more evenly in the diffusion section ③, and then mixed with the well fluid through the outlet of ③, that is, the high-speed kinetic energy of the high-pressure gas is partially converted into the potential energy of the well fluid. At the same time, due to the mixing of the high-pressure gas and the liquid, the pressure gradient of the liquid is also reduced. In addition, the inhaled chemical agent contacts with the well wall to play a role in scale inhibition or descaling. Of course, the anti-scaling agent can also be inhaled, thereby achieving the purpose of scale prevention and control.

[0020] The gas in its flow channel is in a non-critical flow state. Due to the need to absorb chemicals, its flow channels should be at least more than 36, and its roar channel should be determined according to the dosage of the injected chemical, the injection pressure at the location of the device, the injection volume and temperature; the number of its inhaled chemical ends is determined by the continuous injection amount and the type of chemical. Usually, the gas lift design of 4mm aperture is equivalent to 16 special Rafael nozzles, 5mm aperture is equivalent to 25 special Rafael nozzles, 6mm aperture is equivalent to 36 special Rafael nozzles, 7mm aperture is equivalent to 49 special Rafael nozzles, and 8mm aperture is equivalent to 64 special Rafael nozzles. The diameter of each nozzle is usually 1-1.2mm, which needs to be determined according to the dosage of chemical agents. If the design size is too large, the daily consumption of chemical agents will be large. If it is too small, the anti-scaling and scaling effects will be poor. Of course, it is closely related to the performance of descaling agents, scale inhibitors or scale inhibitors. Good performance means less dosage, and of course the nozzle diameter is small. If necessary, some nozzles can be blind-plugged with low-pressure chemical suction end.

[0021] In order to evenly provide corresponding chemical agents to each anti-scaling agent channel, the outer wall of the cylinder is provided with an anti-scaling agent pipeline and a plurality of annular pipelines arranged in an annular direction, and the plurality of annular pipelines are sequentially spaced along the axial direction of the cylinder; the anti-scaling agent pipeline sequentially passes through each of the annular pipelines and is connected to the inside of each annular pipeline; each of the anti-scaling agent channels is connected to the annular pipelines at their respective positions. In this scheme, the anti-scaling agent pipeline is fixed on the outer wall of the cylinder, one end of the pipeline of the anti-scaling agent pipeline is connected to a plurality of annular pipelines, and the other end is extended to a position near the packer, and the pipeline is fixed to the oil pipe by a binding band or a wire tie; in this way, through the collection of multiple air injection holes, the chemical agent suction end is assembled into a separate liquid suction pipeline at the lower end of the anti-scaling gas lift flow device, and on the anti-scaling gas lift flow device, all the suction ports are also integrated into a channel through annular pipelines and connected to the lower end suction chemical pipeline.

[0022] In order to provide a longer action distance for the chemical agent, the plurality of gas lift injection channels are spirally distributed in the axial direction of the cylinder. In this solution, the plurality of gas lift injection channels are spirally distributed in the axial direction, and the staggered spiral divisions help the absorbed chemical agent to act on a longer distance, thereby preventing the formation or reduction of scale in the scaling section, and also saving chemical agents, thereby reducing costs.

[0023] In order to realize the selection of the length of the cylinder and the rapid splicing, the cylinder comprises a plurality of collars, and the plurality of collars are coaxially spliced ​​in sequence.

[0024] In order to provide an outlet end face for the injected high-pressure gas and allow the high-pressure gas to enter along the flow direction of the well fluid, the inner side of the collar includes a large-diameter section and a small-diameter section connected to each other, and the end face between the large-diameter section and the small-diameter section is a spiral end face arranged along the axial direction of the collar, and the inner end of each of the gas lift injection channels on the collar passes through the spiral end face.

[0025] As a splicing method between several sleeves, the large diameter section and the small diameter section are respectively located at the outlet and inlet ends of the sleeve, and the outer side of the inlet end of the sleeve is provided with a reduced diameter section, and the outer diameter of the reduced diameter section is adapted to the inner diameter of the outlet end; the adjacent sleeves, and the sleeves and the oil pipes are connected with the outlet end through the reduced diameter section for socket connection or thread connection. Of course, in order to make the connection node more stable, other fixed connection methods such as welding can also be used.

[0026] Further solutions:

[0027] The present invention also provides an anti-scaling gas lift device, comprising an oil pipe extending deep into the well, and an anti-scaling gas lift flow device connected in series on the oil pipe, wherein the anti-scaling gas lift flow device is located above a completion packer, and an anti-scaling agent injection device is provided between the completion packer and the anti-scaling gas lift flow device;

[0028] The anti-scaling gas lift flow device is provided with an anti-scaling agent pipeline connected to a plurality of anti-scaling agent channels, and the anti-scaling agent pipeline is connected to the anti-scaling agent filling device; and the end of the anti-scaling agent pipeline is provided with a filtering device. It also includes a gas injection device, and the gas injection device is used to provide high-pressure gas to each of the gas lift gas injection channels. In this scheme, intermittent injection of chemicals is adopted on the ground, but the chemicals are evenly and continuously sucked into the tubing string as the gas lift high-pressure gas is injected, so as to prevent and control the scale in the tubing string. The volume between the anti-scaling gas lift flow device and the packer will be the filling space for the chemicals. The chemical agent suction end of the anti-scaling gas lift flow device is usually lowered to 1 to 2 oil pipes on the packer, and then the amount of chemicals and the filling frequency are designed. On the side of the packer port, there is a filtering device at the end of the pipeline to prevent dirt from entering and blocking the pipeline. Therefore, in the present invention, by introducing high-pressure gas through the Rafale pipe sections in the gas lift injection channels, the chemicals can be automatically sucked into the Rafale pipe sections at the low-pressure end, and the chemicals can be sprayed into the well fluid through a similar nozzle, thereby achieving sufficient mixing of the chemicals, gas and well fluid to improve the anti-scaling efficiency.

[0029] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0030] 1. The present invention provides an anti-scaling gas lift flow device and its equipment. The high-pressure gas flow direction is almost consistent with the flow direction of the fluid in the wellbore. The high-pressure gas transfers kinetic energy to the liquid flowing along the pipe wall at a low speed, thereby reducing liquid slippage and improving gas lift efficiency. Improvements have been made in anti-erosion. Usually, the flow center speed is fast and the flow velocity along the pipe wall is low. However, the present invention makes the flow velocity of the pipe wall high, which can significantly reduce the deposition of scale for high-temperature wells prone to scaling. At the same time, the fast flow rate can also make some scales detach from the pipe wall.

[0031] 2. The present invention provides an anti-scaling gas lift flow device and equipment thereof. By introducing high-pressure gas through the Rafale pipe sections in a plurality of gas lift injection channels, chemicals can be automatically sucked into the Rafale pipe sections at the low-pressure end, and the chemicals can be sprayed into the well fluid through a similar nozzle, thereby achieving sufficient mixing of the chemicals, gas and well fluid to improve the anti-scaling efficiency.

[0032] 3. The present invention provides an anti-fouling gas lift flow device and equipment thereof, wherein a plurality of gas lift injection channels are spirally distributed in the axial direction, and the staggered spiral divisions help the absorbed chemicals to act over a longer distance, thereby preventing the formation or reduction of scale in the scaling section, saving chemicals, and reducing costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:

[0034] Figure 1 A schematic diagram of the structure of the anti-fouling gas lift flow device provided by the present invention;

[0035] Figure 2 A cross-sectional view of the anti-fouling gas lift flow device provided by the present invention;

[0036] Figure 3 A cross-sectional view of a single sleeve provided by the present invention;

[0037] Figure 4 A side view of a single sleeve provided for the present invention;

[0038] Figure 5 This is a schematic structural diagram of the gas lift gas injection channel provided by the present invention.

[0039] Marks and corresponding parts names in the attached drawings:

[0040] 1-cylinder, 101-throwing ring, 2-gas lift injection channel, 201-Rafael pipe section, 3-scaling agent channel, 4-scaling agent pipeline, 5-annular pipeline. DETAILED DESCRIPTION

[0041] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0042] Embodiment 1:

[0043] This embodiment 1 provides an anti-fouling gas lift flow device, such as Figure 1-Figure 5 As shown, including:

[0044] A cylinder 1 connected in series in the middle of the oil pipe, with both ends of the cylinder 1 open and connected to the oil pipe;

[0045] A plurality of gas lift and gas injection channels 2 are provided on the circumferential side wall of the cylinder 1, and two ends of the gas lift and gas injection channels 2 respectively penetrate the inner wall and the outer wall of the cylinder 1;

[0046] From the outer end to the inner end of the gas lift gas injection channel 2, the gas lift gas injection channel 2 is inclined toward the direction of gas-liquid flow;

[0047] Each of the gas lift injection channels 2 is also connected to an anti-scaling agent channel 3 opened on the first cylinder 1 .

[0048] Compared with the prior art, the flow direction of the injected chemical agents is at a 90-degree angle to the flow direction of the liquid in the oil pipe, and most of them are brought to the surface with the well fluid. Very few scale removers and scale inhibitors act on the wall of the oil pipe, resulting in an unclear anti-scaling effect. Replacing the tubing string, pickling, or injecting chemicals through the pipeline all require relatively high costs. During gas lift, the downward injection of gas leads to unstable production and low efficiency. The present invention provides an anti-scaling gas lift flow device and equipment thereof. By adopting this solution, gas lift stability and efficiency can be improved while preventing scaling of gas wells, reducing production costs and supporting efficient development of gas wells.

[0049] The specific scheme includes a cylinder 1 connected in series in the middle of the oil pipe, the cylinder 1 and the oil pipe are coaxially arranged, and both ends are connected to the oil pipe; an inclined gas lift injection channel 2 is arranged on the side wall of the cylinder 1, and the gas lift injection channel 2 is inclined in the direction of well fluid flow, so that an external high-pressure gas source can inject high-pressure gas into the interior through the gas lift injection channel 2, and the injection direction of the high-pressure gas is basically the same as the flow direction of the well fluid, so that the high-pressure gas can transfer kinetic energy to the liquid flowing at a low speed along the pipe wall, thereby reducing liquid slippage and improving gas lift efficiency. In addition, there are several anti-scaling agent channels 3 on the side wall of the cylinder 1. Through the several anti-scaling agent channels 3, it is convenient to input chemical agents that play a role in scale inhibition or descaling into the several gas lift injection channels 2. The gas lift injection channels 2 drive the chemical agents to enter the interior and mix with the incoming liquid through the high-pressure gas source output by themselves, and the entry direction of the chemical agents is also inclined in the direction of the well fluid flow. At this time, the pipe wall flow velocity is high, and it is easier to distribute the chemical agents to the pipe wall, so that part of the scale is separated from the pipe wall, playing a role in scale inhibition or descaling, and achieving the purpose of scale prevention and control. Of course, according to the scaling situation, two or three types of descaling agents, scale inhibitors or anti-scaling agents can also be added at the same time to achieve the purpose of joint scaling prevention and control. Before mixing, it is necessary to conduct a compatibility test of the agents and conduct a comprehensive performance evaluation.

[0050] In order to make the chemical agent and the well fluid mix more evenly and automatically absorb the chemical agent by pressure to improve the anti-scaling effect, the gas lift injection channel 2 includes a Rafael pipe section 201 along its length; the anti-scaling agent channel 3 is connected to the roar channel in the middle of the Rafael pipe section 201. In this solution, the gas lift injection channel 2 includes a Rafael pipe section 201, and uses the Rafael nozzle principle, and its outlet pressure is only related to the external transmission pressure; Figure 5 As shown in the figure, it is a schematic diagram of the Lafarge principle device, which consists of a high-pressure air inlet end ① (the junction of ① and ② can be regarded as a nozzle), ② is a roar channel, ③ is a diffusion section, and ④ is a low-pressure end (i.e., the suction end of the chemical agent). The high-pressure gas flows at a high speed, and the chemical agent is sucked in from the low-pressure end, and the chemical agent is gathered and mixed in the roar channel ②, and mixed more evenly in the diffusion section ③, and then mixed with the well fluid through the outlet of ③, that is, the high-speed kinetic energy of the high-pressure gas is partially converted into the potential energy of the well fluid. At the same time, due to the mixing of the high-pressure gas and the liquid, the pressure gradient of the liquid is also reduced. In addition, the inhaled chemical agent contacts with the well wall to play a role in scale inhibition or descaling. Of course, the anti-scaling agent can also be inhaled, thereby achieving the purpose of scale prevention and control.

[0051] The gas in its flow channel is in a non-critical flow state. Due to the need to absorb chemicals, its flow channels should be at least more than 36, and its roar channel should be determined according to the dosage of the injected chemical, the injection pressure at the location of the device, the injection volume and temperature; the number of its inhaled chemical ends is determined by the continuous injection amount and the type of chemical. Usually, the gas lift design of 4mm aperture is equivalent to 16 special Rafael nozzles, 5mm aperture is equivalent to 25 special Rafael nozzles, 6mm aperture is equivalent to 36 special Rafael nozzles, 7mm aperture is equivalent to 49 special Rafael nozzles, and 8mm aperture is equivalent to 64 special Rafael nozzles. The diameter of each nozzle is usually 1-1.2mm, which needs to be determined according to the dosage of chemical agents. If the design size is too large, the daily consumption of chemical agents will be large. If it is too small, the anti-scaling and scaling effects will be poor. Of course, it is closely related to the performance of descaling agents, scale inhibitors or scale inhibitors. Good performance means less dosage, and of course the nozzle diameter is small. If necessary, some nozzles can be blind-plugged with low-pressure chemical suction end.

[0052] In order to evenly provide corresponding chemical agents to each anti-scaling agent channel 3, the outer wall of the cylinder 1 is provided with an anti-scaling agent pipeline 4 and a plurality of annular pipelines 5 arranged in an annular direction, and the plurality of annular pipelines 5 are sequentially spaced and distributed along the axial direction of the cylinder 1; the anti-scaling agent pipeline 4 sequentially passes through each annular pipeline 5 and is connected to the inside of each annular pipeline 5; each anti-scaling agent channel 3 is connected to the annular pipeline 5 at its respective position. In this scheme, the anti-scaling agent pipeline 4 is fixed on the outer wall of the cylinder 1, one end of the pipeline of the anti-scaling agent pipeline 4 is connected to a plurality of annular pipelines 5, and the other end is extended to a position near the packer, and the pipeline is fixed to the oil pipe by a binding band or a wire tie; in this way, through the collection of multiple gas injection holes, the chemical agent suction end is assembled into a separate liquid suction pipeline at the lower end of the anti-scaling gas lift flow device, and on the anti-scaling gas lift flow device, all the suction ports are also integrated into a channel through an annular pipeline and connected to the lower end suction chemical pipeline.

[0053] In order to provide a longer action distance for the chemical agent, the plurality of gas lift injection channels 2 are spirally distributed in the axial direction of the cylinder 1. In this solution, the plurality of gas lift injection channels 2 are spirally distributed in the axial direction, and the staggered spiral divisions help the absorbed chemical agent to act on a longer distance, thereby preventing the formation or reduction of scale in the scaling section, and also saving chemical agents, thereby reducing costs.

[0054] In order to achieve the length selection of the cylinder 1 and quick splicing, the cylinder 1 includes a plurality of collars 101, and the plurality of collars 101 are coaxially spliced ​​in sequence.

[0055] In order to provide an outlet end face for the injected high-pressure gas and allow the high-pressure gas to enter along the flow direction of the well fluid, the inner side of the collar 101 includes a large-diameter section and a small-diameter section connected to each other, and the end face between the large-diameter section and the small-diameter section is a spiral end face arranged along the axial direction of the collar 101, and the inner end of each of the gas lift injection channels 2 on the collar 101 passes through the spiral end face.

[0056] As a splicing method between several collars 101, the large diameter section and the small diameter section are respectively located at the outlet and inlet ends of the collar 101, and the outer side of the inlet end of the collar 101 is provided with a reduced diameter section, and the outer diameter of the reduced diameter section is adapted to the inner diameter of the outlet end; the adjacent collars 101, and the collar 101 and the oil pipe are connected with the outlet end through the reduced diameter section for socket connection or thread connection. Of course, in order to make the connection node more stable, other fixed connection methods such as welding can also be used.

[0057] Embodiment 2:

[0058] This embodiment 2 is further defined on the basis of embodiment 1, and also provides an anti-scaling gas lift equipment, including an oil pipe deep into the well, and an anti-scaling gas lift flow device connected in series on the oil pipe, the anti-scaling gas lift flow device is located above the completion packer, and an anti-scaling agent injection device is provided between the completion packer and the anti-scaling gas lift flow device;

[0059] The anti-scaling gas lift flow device is provided with an anti-scaling agent pipeline 4 connected to a plurality of anti-scaling agent channels 3, and the anti-scaling agent pipeline 4 is connected to the anti-scaling agent filling device; and the end of the anti-scaling agent pipeline 4 is provided with a filtering device. It also includes a gas injection device, which is used to provide high-pressure gas for each of the gas lift gas injection channels 2. In this scheme, intermittent chemical injection is adopted on the ground, but the chemical agent is uniformly and continuously sucked into the tubing string when the gas lift high-pressure gas is injected, so as to prevent and control the scale in the tubing string. The volume between the anti-scaling gas lift flow device and the packer will be the filling space for the chemical agent. The chemical agent suction end of the anti-scaling gas lift flow device is usually lowered to 1 to 2 oil pipes on the packer, and then the amount of chemical agent and the filling frequency are designed. On the side of the packer port, there is a filtering device at the end of the pipeline to prevent dirt from entering and blocking the pipeline. Therefore, in the present invention, by passing high-pressure gas through the Rafale pipe sections 201 in the gas lift injection channels 2, the chemicals can be automatically sucked into the Rafale pipe sections 201 at the low-pressure end, and the chemicals can be sprayed into the well fluid through a similar nozzle, thereby achieving sufficient mixing of the chemicals, gas and well fluid to improve the anti-scaling efficiency.

[0060] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. An anti-fouling gas lift flow device, characterized in that: include: A cylinder (1) connected in series in the middle of the oil pipe, wherein both ends of the cylinder (1) are open and both are connected to the oil pipe; A plurality of gas lift and gas injection channels (2) are provided on the circumferential side wall of the cylinder (1), and two ends of the gas lift and gas injection channels (2) respectively penetrate the inner wall and the outer wall of the cylinder (1); From the outer end to the inner end of the gas lift gas injection channel (2), the gas lift gas injection channel (2) is inclined in the direction of gas-liquid flow; Each of the gas lift injection channels (2) is also connected to an anti-scaling agent channel (3) opened on the first cylinder (1).

2. The anti-fouling gas lift flow device according to claim 1, characterized in that: Along its length direction, the gas lift injection channel (2) includes a Rafale pipe section (201); the anti-scaling agent channel (3) is connected to the roar channel in the middle of the Rafale pipe section (201).

3. The anti-fouling gas lift flow device according to claim 1, characterized in that: The outer wall of the cylinder (1) is provided with an anti-scaling agent pipeline (4) and a plurality of annular pipelines (5) arranged in an annular direction, wherein the plurality of annular pipelines (5) are sequentially spaced and distributed along the axial direction of the cylinder (1); the anti-scaling agent pipeline (4) sequentially passes through each of the annular pipelines (5) and is in communication with the interior of each of the annular pipelines (5); Each of the anti-scaling agent channels (3) is communicated with the annular pipe (5) at a respective position.

4. The anti-fouling gas lift flow device according to claim 1, characterized in that: The plurality of gas lift and gas injection channels (2) are distributed in a spiral manner in the axial direction of the cylinder (1).

5. The anti-fouling gas lift flow device according to claim 1, characterized in that: The cylinder (1) comprises a plurality of collars (101), and the plurality of collars (101) are coaxially spliced ​​in sequence.

6. The anti-fouling gas lift flow device according to claim 5, characterized in that: The inner side of the collar (101) comprises a large diameter section and a small diameter section connected to each other, the end face between the large diameter section and the small diameter section is a spiral end face arranged along the axial direction of the collar (101), and the inner end of each of the gas lift and gas injection channels (2) on the collar (101) passes through the spiral end face.

7. The anti-fouling gas lift flow device according to claim 6, characterized in that: The large diameter section and the small diameter section are respectively located at the outlet end and the inlet end of the collar (101); the outer side of the inlet end of the collar (101) is provided with a reduced diameter section, and the outer diameter of the reduced diameter section is matched with the inner diameter of the outlet end.

8. The anti-fouling gas lift flow device according to claim 7, characterized in that: Adjacent collars (101) and collars and the oil pipe are connected with the outlet end by socket or thread connection via the reduced diameter section.

9. An anti-scaling gas lift device, characterized in that: It comprises an oil pipe extending deep into the well, and an anti-scaling gas lift flow device connected in series on the oil pipe, wherein the anti-scaling gas lift flow device is located above a completion packer, and an anti-scaling agent injection device is provided between the completion packer and the anti-scaling gas lift flow device; The anti-scaling gas lift flow device is provided with an anti-scaling agent pipeline (4) connected to a plurality of anti-scaling agent channels (3), the anti-scaling agent pipeline (4) is connected to the anti-scaling agent filling device; and the end of the anti-scaling agent pipeline (4) is provided with a filtering device; The anti-fouling gas lift flow device is the anti-fouling gas lift flow device according to any one of claims 1 to 8.

10. The anti-fouling gas lift equipment according to claim 9, characterized in that: It also comprises a gas injection device, which is used to provide high-pressure gas to each of the gas lift gas injection channels (2).