Safe, efficient and low-depletion recovery method for steeply-inclined, extremely-thin and medium-stable ore body
By adopting a one-shaped arrangement of gun holes in a very thin and medium-sized stable ore body with two mining and one filling method, the low blasting efficiency, high safety risks and ore depletion caused by conventional gun hole layout are solved, and the problems of low blasting efficiency, high safety risks and ore depletion caused by conventional gun hole layout are achieved. It has efficient, safe and low-poverty recovery effect.
Patent Information
- Application Number
- CN202411436971.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-10-15
AI Technical Summary
During the mining of extremely thin and medium-sized ore bodies with sharp inclination, conventional gun hole arrangement leads to problems such as low blasting efficiency, high safety risks and ore depletion.
The gun holes are arranged in a single shape on the side of the ore body close to the lower plate, and combined with the filling method of two mining and one filling, the surrounding rocks of the upper and lower plates are directly filled, and the mining parameters are optimized to achieve safe, efficient, and low-poverty and loss recovery.
Through the arrangement of one-shaped gun holes and two-tube and one-charge method, the blasting efficiency and safety are improved, the ore penetration rate is reduced, and the efficient, safe and low-poverty recovery of extremely thin, medium-sized ore bodies with acute inclination is achieved.
Smart Images

Figure CN118933784A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining a steeply inclined extremely thin ore body, and in particular to a safe, efficient and low-loss recovery method for a steeply inclined extremely thin medium-stable ore body. Background Art
[0002] Thin ore veins are one of the important distribution modes of mining resources, especially in the mining process of gold mines, where thin ore veins are more common. For the steeply inclined, extremely thin and medium-stable ore bodies in thin ore veins, the conventional mining methods are mainly shallow hole ore retention method, wall cutting and filling method, etc. However, most mines using the above methods face problems such as low mining efficiency, high impoverishment index, and poor operation safety.
[0003] To solve the above problems, the key lies in improving the mining method. In the prior art, the patent with publication number CN110952982A provides a medium-deep hole pre-splitting blasting mining method for steeply inclined thin veins to extremely thin veins. The patent excavates the bottom tunnel along the vein and the layered rock drilling tunnel in the vein along the strike in the ore body vein. Each time the ore is dropped and the rock is drilled, the pre-splitting blastholes in the upper plate ore-rock interface and the pre-splitting blastholes in the lower plate ore-rock interface along the upper plate ore-rock boundary line and the lower plate ore-rock boundary line are drilled in the bottom tunnel or the layered tunnel respectively. Although this method avoids the rock drilling and ore dropping on the blast pile under the suspended roof by the wall cutting and filling method or the shallow hole ore retention method, and improves the safety of the operators, it is necessary to arrange pre-splitting blastholes and medium-deep holes for ore dropping during blasting, which not only has a large amount of engineering, but also has a relatively high recovery amount of surrounding rock, which will cause ore depletion. In addition, the rock wall and the surrounding rock of the roof are prone to collapse due to blasting vibration and impact damage, which brings hidden dangers to safe production. In order to achieve safe, efficient and low-loss mining, the arrangement of blastholes and the corresponding mining parameters are crucial during the mining process.
[0004] At present, the arrangement of blastholes during blasting and mining is usually centered, symmetrical, or zigzag, but these conventional blasthole arrangement methods usually bring about problems such as low blasting efficiency, high safety risk, and high loss during the mining process of steeply inclined and extremely thin ore bodies. In the prior art, the patent with publication number CN117072164A provides a blasthole structure and blasting method for mechanized mining of steeply inclined and extremely thin ore veins. The patent arranges a central slot combination hole in the central position along the direction of the ore body on the blasting working face, and arranges the main blastholes on both sides of the central slot combination hole, so that it is arranged in two rows along the direction of the ore body. Each row of blastholes includes charging holes and empty holes. The charging holes are arranged in an alternating manner, and empty holes are provided between adjacent charging holes. During blasting, the central slot combination hole is blasted first, and the main blasthole is blasted in sections with a slight difference on both sides of the central slot space in sequence, and the blasting step length is 50~100m. Based on the blasthole structure and blasting method provided in this patent, it is easier to crush rocks than traditional zigzag blastholes, which is beneficial to reduce damage to the wall. However, this blasthole arrangement is more complicated, and the recovery rate of surrounding rock is high, which can easily cause ore depletion.
[0005] In view of this, it is necessary to design an improved safe, efficient and low-loss mining method for steeply inclined, extremely thin and moderately stable ore bodies to solve the above problems. Summary of the invention
[0006] In view of the technical problems existing in the background technology, the present application provides a safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies. The blast holes are arranged in a straight line on one side of the ore body close to the lower plate, and the optimal recovery parameters are designed according to the characteristics of the ore body. At the same time, the filling method of two mining and one filling is combined, and the large blocks of surrounding rock obtained by clearing the upper and lower plates are directly filled, thereby achieving safe, efficient and low-loss recovery of steeply inclined, extremely thin and medium-stable ore bodies with a simple blast hole arrangement.
[0007] The present application provides a safe, efficient and low-loss recovery method for a steeply inclined, extremely thin and medium-stable ore body, comprising the following steps: Divide the stope field according to the ore body structure, and construct a rock drilling operation space and a ore chute connected to the rock drilling operation space at the bottom of the stope field; Performing rock drilling on the ore body in the rock drilling operation space to form a plurality of blast holes arranged in a straight line; the blast holes are all arranged on one side of the ore body close to the lower wall, the blast holes are arranged obliquely and are parallel to the lower wall; Charge is loaded in the blasthole, and detonated row by row from the free surface side, and after the ore falling is completed, the collapsed ore is unloaded through the ore chute to complete the recovery operation; Perform risk elimination operations on the surrounding rocks of the upper and lower walls; the surrounding rocks collected by the risk elimination operations are placed in the waste rock storage area reserved in the mining area; The mining area is filled in accordance with the two-mining-one-filling method.
[0008] In the technical solution of the embodiment of the present application, the arrangement of the blastholes is different from the conventional symmetrical arrangement or the central arrangement. Instead, the blastholes are arranged side by side in a straight line on one side of the ore body close to the lower plate. In this way, after detonation, the energy of the explosive explosion will be released to the side of the weak space as much as possible, so that most of the energy acts on the rock between the blasthole and the upper plate. The energy toward the lower plate will also be partially rebounded at the moment of explosion and act on the rock between the upper and lower plates, so that the ore body has a better crushing effect and improves the blasting efficiency. In addition, based on this arrangement of blastholes, although cracks will appear in the damaged part of the lower plate, most of them will not fall off immediately, and can be attached to the rock wall by their own weight, which is convenient for risk removal when leaving the mine to ensure the safety of the mining site operation. Since the upper plate is far away from the blasthole, the blasting energy has been severely attenuated when it reaches the upper plate, and the degree of damage to the upper plate is relatively small, thereby effectively improving the safety of the working environment while reducing depletion.
[0009] In some embodiments, the inclination angle of the ore body is ≥70°, and the thickness of the ore body is ≤0.8 m.
[0010] In some embodiments, the mining width of the mining field is 0.8~1.0m.
[0011] In some embodiments, the distance between the blasthole and the lower wall is 0.15~0.25m.
[0012] In some embodiments, the row spacing of the blast holes is 0.5~0.7m; the diameter of each blast hole is 35~45mm, the depth is 2.1~2.5m, and the inclination angle is 35~45°.
[0013] In some embodiments, the surrounding rocks of the upper wall and the lower wall are layered structures.
[0014] In some embodiments, the rock drilling operation comprises: first installing a first drill rod on the rock drill to perform preliminary drilling; then replacing a second drill rod to complete the blasthole drilling; the length of the first drill rod is less than the length of the second drill rod.
[0015] In some embodiments, the steps of the risk elimination operation include: prying the loose surrounding rocks off one by one from one side close to the safety zone to the other side.
[0016] In some embodiments, after the mine is dropped, the mining area needs to be supported.
[0017] In some embodiments, after the filling operation is completed, an operating height of at least 1.8 m is reserved above the filling area as a drilling operation space for the next round of recovery.
[0018] The beneficial effects of this application are: The safe, efficient, and low-loss recovery method for steeply inclined, extremely thin, and medium-stable ore bodies provided in this application changes the conventional blasthole arrangement method, arranges the blastholes in a straight line on the side of the ore body close to the lower plate, and designs the optimal recovery parameters according to the characteristics of the ore body, and performs efficient recovery through shallow hole blasting. In the process of clearing danger, the large blocks of surrounding rock obtained are directly filled, which effectively reduces the loss of ore while ensuring safety, and realizes the efficient, safe, and low-loss recovery of steeply inclined, extremely thin, and medium-stable ore bodies. In addition, the blasthole structure provided in this application is simple, and the overall recovery method is simple and easy to implement. It is possible to obtain a safe, efficient, and low-loss recovery method for steeply inclined, extremely thin, and medium-stable ore bodies at a low cost and with simple steps, and has a high practical application value. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the technical solution of the present application, the following is a brief introduction to the drawings used in the present application. Obviously, the drawings described below are only some embodiments of the present application, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0020] Figure 1 This is a schematic diagram of the arrangement structure of blastholes in a stope at a first viewing angle in an embodiment of the present application; Figure 2 This is a schematic diagram of the arrangement structure of blastholes in a stope at a second viewing angle in an embodiment of the present application; Figure 3 This is a schematic diagram of the arrangement structure of blastholes in a stope at a third viewing angle in an embodiment of the present application; Figure 4 This is a schematic diagram of the stope structure during rock drilling operations in an embodiment of the present application; Figure 5 This is a schematic diagram of the structure of the division of various areas within the stope in the embodiment of the present application.
[0021] Explanation of the accompanying reference numerals: 1. Ore body; 2. Surrounding rock; 3. Upper wall; 4. Lower wall; 5. Blast hole; 6. Drilling operation space; 7. Hydraulic support; 8. Filled area; 9. Mining area; 10. Waste rock storage area. DETAILED DESCRIPTION
[0022] The following embodiments of the technical solution of the present application will be described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.
[0023] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.
[0024] In the description of the embodiments of the present application, the technical terms "first", "second", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.
[0025] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0026] In the description of the embodiments of the present application, the orientation or position relationship indicated by technical terms such as "length", "thickness", "up", "down", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the accompanying drawings. They are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the embodiments of the present application.
[0027] In the prior art, when mining a steeply inclined, extremely thin, and medium-stable ore body 1, the conventional arrangement of blastholes 5 for blasting mining not only poses a safety hazard, but also leads to ore depletion. In order to solve the above-mentioned existing technical problems, the present application provides a safe, efficient, and low-depletion mining method for a steeply inclined, extremely thin, and medium-stable ore body 1, by arranging the blastholes 5 in a straight line on one side of the ore body 1 close to the lower plate 4, and designing the optimal mining parameters according to the characteristics of the ore body 1, and combining the two-mining and one-filling filling method, the large blocks of surrounding rock 2 obtained by clearing the upper and lower plates 4 are directly filled, thereby achieving safe, efficient, and low-depletion mining of the steeply inclined, extremely thin, and medium-stable ore body 1 with a simple blasthole 5 arrangement.
[0028] Specifically, the embodiment of the present application provides a safe, efficient and low-loss recovery method for a steeply inclined, extremely thin and medium-stable ore body 1, comprising the following steps: Divide the stope field according to the structure of the ore body 1, and construct a rock drilling operation space 6 and a ore chute connected to the rock drilling operation space 6 at the bottom of the stope field; The ore body 1 is drilled in the rock drilling operation space 6 to form a plurality of blast holes 5 arranged in a straight line; the blast holes 5 are all arranged on one side of the ore body 1 close to the lower wall 4, and the blast holes 5 are arranged obliquely and parallel to the lower wall 4; Charge is loaded in the blasthole 5, and detonated row by row from the free surface side, and after the ore falling is completed, the collapsed ore is unloaded through the ore chute to complete the recovery operation; Perform risk elimination operations on the surrounding rocks 2 of the upper plate 3 and the lower plate 4; the surrounding rocks 2 collected by the risk elimination operations are placed in the waste rock storage area 10 reserved in the mining area 9; The ore-falling area 9 is filled in accordance with the two-mining-one-filling method.
[0029] See also Figures 1 to 3 In the technical solution of the embodiment of the present application, the arrangement of the blastholes 5 is different from the conventional symmetrical arrangement or the central arrangement, but the blastholes 5 are all arranged side by side in a straight line on one side of the ore body 1 close to the lower plate 4. Based on the arrangement of the blastholes 5 in the embodiment of the present application, after the blastholes 5 are loaded and detonated, the energy of the explosive explosion will be released to the side of the weak space as much as possible, so that most of the energy acts on the rock between the blastholes 5 and the upper plate 3, and the energy toward the lower plate 4 will also partially rebound at the moment of explosion and act on the rock between the upper and lower plates 4, so that the ore body 1 has a better crushing effect and improves the blasting efficiency.
[0030] Moreover, based on the arrangement of the blastholes 5 in the embodiment of the present application, for the lower plate 4, although some cracks will appear after it is damaged, most of them will not fall off immediately, but can be attached to the rock wall by their own weight, which is convenient for risk removal when mining, so as to ensure the safety of the mining site operation; for the upper plate 3, since the blastholes 5 are arranged in a position close to the lower plate 4, the blasting energy has been severely attenuated when it reaches the upper plate 3, and the degree of damage to the upper plate 3 is relatively small. Even if the delamination phenomenon occurs due to vibration, it will not fall off directly and mix with the ore, and can be processed through risk removal operations. On this basis, the surrounding rock 2 obtained after the upper plate 3 and the lower plate 4 are removed from the mine together with the ore, but will be directly left in the mining site for filling, which can not only reduce the amount of waste rock out of the pit, reduce the labor intensity of workers, and improve the mining efficiency, but also avoid the waste rock from mixing into the ore to cause ore depletion, effectively reducing depletion losses.
[0031] In addition to the arrangement of the blastholes 5, the setting of the mining parameters is also crucial to the effect of the mining during the mining process. Specifically, in some embodiments of the present application, the inclination angle β of the ore body 1 is ≥70°, the thickness L1 of the ore body 1 is ≤0.8m, and the surrounding rocks 2 of the upper plate 3 and the lower plate 4 are both layered structures. When dividing the mining area based on the ore body 1, the preferred mining width L is 0.8~1.0m. In this way, while ensuring that the ore body 1 is fully mined, only a small amount of surrounding rock 2 is included in the mining area. In addition, through the special arrangement of the blastholes 5 in the present application, it is possible to effectively avoid the surrounding rock 2 between the upper plate 3 and the lower plate 4 from falling off after blasting, and prevent the surrounding rock 2 from mixing with the ore to reduce the depletion rate of the ore. In addition, for the layered structure of the surrounding rock 2, although it will loosen and delaminate after being vibrated, it will not fall off, which reduces the depletion rate of the ore, and the delaminated surrounding rock 2 can also act as a protective layer, ensuring the integrity of the next layer of surrounding rock 2. During the hazard removal operation, by prying the loosened surrounding rock 2 off one by one from one side close to the safety zone to the other side, the safety of the hazard removal process can be guaranteed. After the hazard removal is completed, the next layer of intact surrounding rock 2 will be presented, which can effectively improve the safety of mining in the mine.
[0032] Furthermore, in some embodiments of the present application, the distance B1 between the blasthole 5 and the lower wall 4 is preferably 0.15-0.25 m, more preferably 0.2 m. Based on this distance setting, most of the energy can be applied to the ore body 1 during blasting, while protecting the upper wall 3 without causing serious damage to the lower wall 4, and the best blasting effect can be achieved.
[0033] Further, in some embodiments of the present application, when arranging the blastholes 5, the blastholes 5 are arranged in a row and multiple rows, and the row spacing B2 of the blastholes 5 is set to 0.5~0.7m; the diameter of each blasthole 5 is preferably 35~45mm, the depth of the blasthole 5 is preferably 2.1~2.5m, and the inclination angle α of the blasthole 5 is preferably 35~45°, and the ore drop height H formed on this basis is about 1.5m. Such an arrangement can effectively control the blasting range based on shallow hole blasting, reduce the recovery of the surrounding rock 2 and excessive impact damage to the rock wall and roof, and greatly improve the safety of the working environment while reducing depletion. More specifically, the number of rows of blastholes 5 can be arranged according to the ore supply requirements of the mining site, generally arranged as 15 rows, the ore drop length is about 10m, and the ore drop amount is about 35t, so as to meet the conventional ore supply requirements.
[0034] Furthermore, in some embodiments of the present application, the steps of the rock drilling operation include: first installing a first drill rod on the rock drill to perform preliminary drilling; then replacing the second drill rod to complete the drilling of the blasthole 5; the length of the first drill rod is less than the length of the second drill rod. With such a configuration, it is convenient to operate accurately when using the first drill rod with a shorter length for preliminary drilling, and the end of the blasthole 5 is prevented from drilling into the lower plate 4 while accurately controlling the inclination of the blasthole 5; after the preliminary drilling, replacing the second drill rod with a longer length can effectively prevent gravel or pumice from falling and injuring the operator during the drilling process, thereby improving the safety of the rock drilling operation.
[0035] Furthermore, in some embodiments of the present application, after the ore dropping is completed, the stope is supported to keep the surrounding rock 2 at the upper plate 3 and the lower plate 4 stable. Specifically, in some embodiments of the present application, logs and / or hydraulic props 7 are preferably used to support the stope.
[0036] Furthermore, in some embodiments of the present application, a two-mining-one-filling method is used for filling, that is, filling is performed once after every two mining operations. During the filling process, the filling height needs to be controlled to avoid filling too high and affecting the next cycle of rock drilling operations, and to avoid filling too low and causing the next cycle of empty top height to be too high, which increases safety hazards. It is preferred to reserve an operating height of at least 1.8m above the filling area. After completing the mining of this layer, the reserved operating height above the filling area can be used as the rock drilling operating space 6 for the next round of mining.
[0037] A specific embodiment is listed below. It should be noted that the embodiment described below is exemplary and is only used to explain the present application, and should not be understood as a limitation to the present application.
[0038] Example 1 Please refer to Figure 1-5 This embodiment provides a safe, efficient and low-loss mining method for a steeply inclined, extremely thin and medium-stable ore body 1, wherein the thickness L1 of the ore body 1 targeted by this embodiment is about 0.5m, the inclination angle β of the ore body 1 is about 75°, the ore body 1 is a medium-stable ore body 1, and the surrounding rock 2 is a layered structure.
[0039] Based on the above ore body 1, the mining method used in this embodiment includes the following steps: S1. The mining width L of the stope is controlled to 0.8m, and a rock drilling operation space 6 and a chute are constructed at the bottom of the stope. The operation height h1 of the rock drilling operation space 6 is 1.8m, and the chute is connected to the rock drilling operation space 6, and one is arranged every 15m, so that ore can be discharged from both sides at the same time, thereby improving the efficiency of ore discharge.
[0040] S2. According to the set arrangement of blastholes 5, rock drilling is performed on the ore body 1 in the rock drilling operation space 6 to form the required blastholes 5. The set arrangement of blastholes 5 is as follows: all blastholes 5 are arranged on the side of the ore body 1 close to the lower plate 4, and each blasthole 5 is arranged in a straight line, and the distance B1 between each blasthole 5 and the lower plate 4 is 0.2m, the row spacing B2 between adjacent blastholes 5 is 0.6m, the diameter of each blasthole 5 is 38mm, the inclination angle α of the blasthole 5 is 40°, the depth of the blasthole 5 is 2.2m, and the formed ore drop height H is about 1.5m.
[0041] During the rock drilling operation, a YT-28 air-leg rock drill was used, first with a 1.5m long hollow hexagonal drill rod and a 38mm diameter cylindrical drill bit, and the drill was aligned with the set blasthole 5 position for preliminary drilling. When the drill bit was drilling stably, the machine head must be supported, and the blasthole 5 was advanced in a direction parallel to the surface of the lower plate 4 while ensuring that the inclination angle α of the blasthole 5 was 40°, so as to prevent the end of the blasthole 5 from drilling into the lower plate 4. After drilling 0.3m, the drill rod was replaced with a 2.5m long hollow hexagonal drill rod, and drilling was continued in the same way to prevent gravel or pumice from falling and injuring the operator during the drilling process.
[0042] S3. After drilling the blasthole 5, emulsion explosives with a diameter of 32 mm are loaded into the blasthole 5. Each pack of emulsion explosives is 300 mm long and weighs 300 g. Five packs of emulsion explosives are loaded into each blasthole 5, so that the charge amount of a single hole is 1.5 kg. Then, the hole mouth is blocked with blasthole mud, and the blocking length is about 300 mm. After the charge is completed, the blasting is started row by row from the free surface side. After the ore falling is completed, it is found that the roof is flat and smooth, with less floating stones, which is convenient for danger removal, and the block size is uniform, so no secondary crushing is required when the ore is discharged.
[0043] Among them, the method of clearing the danger is to pry off the loose surrounding rocks 2 one by one from one side close to the safety zone to the other side. The pried-off surrounding rocks 2 are not discharged from the mine together with the ore through the chutes on both sides, but a waste rock storage area 10 is reserved in the mining area 9. The surrounding rocks 2 pried off during the danger clearing are placed in the waste rock storage area 10 and directly used for filling, which effectively reduces the amount of waste rock discharged from the mine, while reducing the depletion rate of the ore and improving the mining efficiency.
[0044] In addition, since the empty roof height h of the mining area after the ore falls reaches 3.3 m, in order to ensure the stability of the surrounding rock 2 of the upper plate 3 and the lower plate 4, hydraulic props 7 are also provided in this embodiment to support the mining area.
[0045] S4. The ore-dropping area 9 is filled in accordance with the two-mining-one-filling method, and after the filling is completed, the filled area 8 is formed. During the filling process, the filling height needs to be controlled to ensure that a working height of 1.8 m is retained between the filled area 8 and the upper roof, so that it can be used as a rock drilling working space 6 in the next cycle of mining.
[0046] Through the above method, this embodiment can achieve safe, efficient and low-depletion recovery of the steeply inclined, extremely thin and medium-stable ore body 1. Compared with the method of arranging the blasthole 5 in the center of the ore body 1, it can reduce the depletion rate by about 30% and significantly improve the mining efficiency.
[0047] In summary, the present application provides a safe, efficient and low-loss recovery method for a steeply inclined, extremely thin and medium-stable ore body 1, which belongs to the technical field of mining steeply inclined, extremely thin ore bodies 1. The recovery method includes: constructing a rock drilling operation space 6 and a chute at the bottom of the mining field; performing rock drilling operations on the ore body 1 in the rock drilling operation space 6 to form a number of blast holes 5 arranged in a straight line; the blast holes 5 are all arranged on one side of the ore body 1 close to the lower plate 4, and the blast holes 5 are inclined and parallel to the lower plate 4; charging the blast holes 5, and detonating them row by row from the free surface side, and after the ore falling is completed, the collapsed ore is unloaded through the chute to complete the recovery operation; performing risk removal operations on the surrounding rocks 2 of the upper plate 3 and the lower plate 4, placing the collected surrounding rocks 2 in the waste rock storage area 10 reserved in the ore falling area 9, and then performing filling operations on the ore falling area 9. Through the above-mentioned method, the present application can effectively reduce ore loss while ensuring safety, and realize efficient, safe and low-loss recovery of the steeply inclined, extremely thin and medium-stable ore body 1.
[0048] It should be noted that the present application is not limited to the above-mentioned embodiments. The above-mentioned embodiments are only examples, and the embodiments having the same structure as the technical idea and exerting the same effect within the scope of the technical solution of the present application are all included in the technical scope of the present application. In addition, without departing from the scope of the main purpose of the present application, various modifications that can be thought of by those skilled in the art to the embodiments and other methods of combining some of the constituent elements in the embodiments are also included in the scope of the present application.
Claims
1. A safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies, characterized in that: The steps include: Divide the stope field according to the ore body structure, and construct a rock drilling operation space and a ore chute connected to the rock drilling operation space at the bottom of the stope field; Performing rock drilling on the ore body in the rock drilling operation space to form a plurality of blast holes arranged in a straight line; the blast holes are all arranged on one side of the ore body close to the lower wall, the blast holes are arranged obliquely and are parallel to the lower wall; Charge is loaded in the blasthole, and detonated row by row from the free surface side, and after the ore falling is completed, the collapsed ore is unloaded through the ore chute to complete the recovery operation; Perform risk elimination operations on the surrounding rocks of the upper and lower walls; the surrounding rocks collected by the risk elimination operations are placed in the waste rock storage area reserved in the mining area; The mining area is filled in accordance with the two-mining-one-filling method.
2. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The inclination angle of the ore body is ≥70°, and the thickness of the ore body is ≤0.8m.
3. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The mining width of the stope is 0.8~1.0m.
4. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The distance between the blasthole and the lower wall is 0.15-0.25 m.
5. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The row spacing of the blast holes is 0.5-0.7 m; the diameter of each blast hole is 35-45 mm, the depth is 2.1-2.5 m, and the inclination angle is 35-45°.
6. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The surrounding rocks of the upper plate and the lower plate are layered structures.
7. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The rock drilling operation comprises the following steps: firstly installing a first drill rod on the rock drill to perform preliminary drilling; then replacing a second drill rod to complete the blasthole drilling; the length of the first drill rod is less than the length of the second drill rod.
8. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: The steps of the risk elimination operation include: prying the loose surrounding rocks off one by one from one side close to the safety zone to the other side.
9. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: After the mine is dropped, the mining area must be supported.
10. The safe, efficient and low-loss recovery method for steeply inclined, extremely thin and medium-stable ore bodies according to claim 1 is characterized in that: After the filling operation is completed, an operating height of at least 1.8 m is reserved above the filling area as a rock drilling operation space for the next round of recovery.
Citation Information
Patent Citations
Method for united mining of deep subsequent stoping chamber and layered stoping jamb
CN105041314A
Vertical medium-length hole retreating type ore breaking dry filling mining method based on steeply inclined ore body
CN110080774A
Wall-cutting mining method for steeply-inclined thin broken vein
CN117823158A
Deep hole loosening shaped charge blasting subsequent filling mining method for steeply inclined broken ore body
CN118030071A
progressive longwall expansion
DE2310077A1
Cited By
Self-sliding filling method for underground extremely-thin steeply inclined mine stoping and application of self-sliding filling method
CN121576073A