Construction method based on multi-arch tunnel underneath passing cavity and high-rising building disturbing area
By analyzing and dividing the interference level of the tunnel disturbance unit, a targeted construction plan was formulated, which solved the construction problems of the composite working conditions of hollows and towering structures in the continuous arch tunnel, achieved a safe and economical construction effect, and filled the existing construction Technology blank.
Patent Information
- Application Number
- CN202410872855.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology is difficult to safely and economically construct the composite working conditions of the continuous arch tunnels that pass through existing underground cavity and towering structures on the surface, resulting in high construction difficulties and high engineering investment.
By accurately analyzing the overlapping conditions of disturbed formations of existing towering structures, hollows and proposed tunnels, dividing the interference degree levels, and dividing tunnel disturbance units according to the levels, formulating corresponding construction plans, and using support full ring reinforcement and support Strengthen the construction of measures such as temporary support, automatic monitoring and backup plans.
On the premise of ensuring safety, the construction of complex working conditions underpass of the continuous arch tunnel has been completed in a relatively economical way, filling the construction problems of compound working conditions that have not been solved in the existing technology, and it is expected to save more than 30% of the project investment.
Smart Images

Figure CN118933795A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground engineering, and in particular relates to a construction method based on a multi-arch tunnel passing through a cavity and an area disturbed by tall structures. Background Art
[0002] With the acceleration of the construction of a strong transportation country, the focus will be on strengthening the construction of modern comprehensive transportation infrastructure. As an important part of transportation infrastructure, tunnel projects are being built in increasing numbers. In the planning process of highway, municipal and other transportation tunnel construction, arch tunnels are often set up from the perspective of line position corridors and construction land. Arch tunnels have a large horizontal span and are mainly shallowly buried in the longitudinal direction. They are large-span shallow buried tunnels and are difficult to construct. The section where the newly planned arch tunnel is located inevitably has some existing structures, such as underground cavities and tall structures on the surface. The difficulty of tunnel construction under the existing structures will increase. On the one hand, there is a problem of protecting the existing structures. On the other hand, the impact of the existing structures on the proposed tunnel cannot be ignored. In particular, if the arch tunnel simultaneously passes under the existing underground cavities and tall structures on the surface, the construction difficulty is extremely great, which is an extremely complex composite working condition. Existing technologies have solved some cases of single-hole, small-span tunnels passing through surrounding rock cavities or tall structures by significantly strengthening support parameters and adopting a large number of construction auxiliary measures. However, for complex cases of composite working conditions of passing through surrounding rock cavities and tall structures at the same time, no relevant literature and information have been found, and no relevant technology is available.
[0003] Considering the working condition that the proposed multi-arch tunnel will pass under the existing underground cavity and tall structures on the surface at the same time, how to carry out the construction and implementation safely and economically is a difficult problem that needs to be solved urgently. Summary of the invention
[0004] The purpose of the present invention is to solve the deficiencies of the prior art and provide a construction method based on a multi-arch tunnel passing through a void and a disturbance zone of a high-rise structure. The method accurately analyzes the range distribution and overlap of the disturbed strata of the existing high-rise structure foundation, the disturbed strata around the existing void, and the disturbed strata of the proposed multi-arch tunnel construction, and determines the interference level corresponding to each overlapping area, divides the tunnel in the overlapping area into disturbance zone units, and constructs each disturbance zone unit of the tunnel according to the construction plan corresponding to the interference level of the overlapping area, striving to achieve the construction of the multi-arch tunnel under the complex working conditions in a relatively economical way under the premise of ensuring safety.
[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0006] A construction method based on a multi-arch tunnel passing through a hollow cavity and an area disturbed by tall structures, comprising the following steps:
[0007] Step (1), collecting the topographical profile of the tunnel site of the proposed multi-arch tunnel and basic information of the proposed multi-arch tunnel, existing surface tall structures and underground cavities, and marking the specific relative position relationship of the multi-arch tunnel, surface tall structures and underground cavities in the stratum;
[0008] Step (2), analyzing the scope of the strata of concern for the foundation disturbance of the existing tall structures;
[0009] Step (3), analyzing the disturbed strata around the existing cavity;
[0010] Step (4), analyzing the scope of the strata disturbed by the proposed multi-arch tunnel;
[0011] Step (5), on the specific relative position relationship diagram marked in step (1), the disturbed stratum range of the existing high-rise structure foundation, the disturbed stratum range of the existing cavity and the disturbed stratum range of the proposed multi-arch tunnel are marked respectively to obtain the overlapping area of each range;
[0012] Step (6), determining the interference level corresponding to each overlapping area obtained in step (5);
[0013] Step (7), dividing the proposed multi-arch tunnel into disturbance zone units according to the overlapping area obtained in step (5); at the same time, according to the interference degree level of each overlapping area obtained in step (6), obtaining the construction plan of each disturbance zone unit of the tunnel corresponding to the overlapping area, and then carrying out construction according to the plan.
[0014] Further, preferably, in step (1), the topographical overview is the topographical conditions of the tunnel site, including the ground line and the strata below the ground line;
[0015] Basic information includes function, geometric features, and specific location in the stratigraphy;
[0016] The relative position relationship is indicated graphically.
[0017] Further, preferably, in step (2):
[0018] The scope of the concerned strata for the foundations of existing tall structures includes the main scope of the concerned strata for the foundations of existing tall structures and the secondary scope of the concerned strata for the foundations of existing tall structures;
[0019] Among them, the main range of the disturbed strata of the existing high-rise structure foundation is the range enclosed by 0 to 0.3 times (greater than 0 times, including 0.3 times) of the foundation width on both sides of the foundation and 0 to 0.3 times (greater than 0 times, including 0.3 times) of the upper structure height below the base;
[0020] The level range of the disturbed area of the foundation of existing high-rise structures is the range enclosed by 0.3 to 0.6 times (excluding 0.3 times and including 0.6 times) of the foundation width on both sides of the foundation and 0.3 to 0.6 times (excluding 0.3 times and including 0.6 times) of the superstructure height below the base.
[0021] The strata outside the range of the disturbed strata of concern for the foundations of existing tall structures are the non-disturbed strata of concern for the foundations of existing tall structures.
[0022] Further, preferably, in step (3):
[0023] The range of disturbed strata around existing cavities includes the main range of disturbed strata around existing cavities and the layer range of disturbed strata around existing cavities;
[0024] Among them, the main range of disturbed strata around the existing cavities is the range around the cavities surrounded by 0 to 0.4 times (greater than 0 times, including 0.4 times) of the cavities’ top and both sides, and 0 to 0.5 times (greater than 0 times, including 0.5 times) of the cavities’ bottom.
[0025] The range of the disturbed areas around the existing cavities is the area around the cavities surrounded by 0.4 to 0.8 times (excluding 0.4 times and including 0.8 times) of the cavities top and both sides, and 0.5 to 1.0 times (excluding 0.5 times and including 1.0 times) of the cavities span at the bottom;
[0026] The strata outside the range of the disturbed strata of concern around the existing cavities are the non-disturbed strata of concern around the existing cavities.
[0027] Further, preferably, in step (4):
[0028] The range of disturbed strata for the proposed multi-arch tunnel includes the main range of disturbed strata for the proposed multi-arch tunnel and the lower range of disturbed strata for the proposed multi-arch tunnel;
[0029] Among them, the main range of disturbed strata for the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0 to 0.25 times (greater than 0 times, including 0.25 times) of the multi-arch tunnel top and both sides, and 0 to 0.1 times (greater than 0 times, including 0.1 times) of the multi-arch tunnel span at the bottom;
[0030] The range of disturbed ground levels for the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0.25 to 0.5 times (excluding 0.25 times and including 0.5 times) of the multi-arch tunnel span at the top and both sides of the multi-arch tunnel and 0.1 to 0.2 times (excluding 0.1 times and including 0.2 times) of the multi-arch tunnel span at the bottom.
[0031] Furthermore, preferably, in step (5), all overlapping areas of the main range and sub-range of the disturbed strata of concern for the foundation of existing high-rise structures, the disturbed strata of concern around existing cavities, and the disturbed strata of the proposed multi-arch tunnel are marked.
[0032] Further, preferably, the specific method of step (6) is:
[0033] (6.1) Determine whether the overlapping area belongs to the disturbed stratum range of the proposed multi-arch tunnel; if so, determine whether the disturbed stratum range of the proposed multi-arch tunnel belongs to the main range of the disturbed stratum of the proposed multi-arch tunnel or the disturbed stratum layer range of the proposed multi-arch tunnel, and then go to (6.2);
[0034] (6.2) Determine whether the existing high-rise structure foundation strata in the overlapping area belongs to the existing high-rise structure foundation disturbed strata concern range; if so, determine whether the existing high-rise structure foundation disturbed strata concern belongs to the main range of the existing high-rise structure foundation disturbed strata concern or to the secondary range of the existing high-rise structure foundation disturbed strata concern;
[0035] Determine whether the existing void surrounding strata in the overlapping area belongs to the existing void surrounding disturbed strata range. If so, determine whether the existing void surrounding disturbed strata range belongs to the main range of the existing void surrounding disturbed strata range or the sub-range of the existing void surrounding disturbed strata range; then go to (6.3);
[0036] (6.3) Based on the judgment results of (61) and (6.2), according to Table 1, the interference level corresponding to the overlapping area is obtained;
[0037] Table 1
[0038]
[0039] Furthermore, preferably, in step (7), the specific method for dividing the proposed multi-arch tunnel into tunnel disturbance zone units is as follows: each overlapping area is vertically projected downward to the bottom edge of the tunnel, and the corresponding tunnel portion is the disturbance zone unit; the interference degree level of each disturbance zone unit is the maximum level among all the corresponding overlapping areas of the projection.
[0040] Further, preferably, in step (7),
[0041] The disturbed area unit adopts the conventional construction plan, plus the corresponding construction plan in Table 2, and the other units in the non-disturbed area adopt the conventional construction plan;
[0042] Table 2
[0043]
[0044]
[0045] In the present invention, different categories are combined for the possible stratum ranges in the overlapping area (the main and secondary ranges of the disturbed stratum of the existing high-rise structure foundation and the disturbed stratum around the existing void, the non-disturbed stratum range of the existing high-rise structure foundation and the existing void, and the main and secondary ranges of the disturbed stratum of the proposed multi-arch tunnel, a total of 8 categories);
[0046] When the foundation of the existing high-rise structure and the strata around the existing void are both in the non-disturbance concern range, they are not affected by the proposed multi-arch tunnel, and the category combination analysis is not conducted for this situation; the strata outside the secondary disturbance range of the proposed multi-arch tunnel will not produce disturbance effects, and this situation is not analyzed either;
[0047] The strata around the foundation of the existing tall structures and the existing hollow holes are passive strata. First, the stratum range categories of the two are combined in no particular order to form 5 situations. Then, the 5 situations are combined with the main and secondary ranges of the stratum disturbed by the construction of the proposed multi-arch tunnel. A total of 10 different categories are combined. Different categories correspond to corresponding interference levels, as shown in Table 1.
[0048] In the present invention, the construction plan is an additional measure plan based on the conventional design and construction plan. The higher the interference level, the stronger the plan.
[0049] In the present invention, when there are multiple overlapping areas with different interference levels at different heights above the same interference zone unit, the construction plan of the tunnel interference zone unit is selected according to the principle of the highest interference level.
[0050] In the present invention, the full ring reinforcement of the support refers to a scheme for improving the strength of the full ring structure of the initial support of the tunnel, which is achieved by increasing the model of the initial support steel arch frame;
[0051] Support reinforcement refers to a scheme to increase the strength of the initial support structure of the tunnel corresponding to the subdivision, which is achieved by increasing the density of the longitudinal connecting steel bars of the initial support steel arch frame corresponding to the subdivision;
[0052] Temporary top support refers to the scheme of applying temporary counter-top support to the secondary lining structure of the tunnel corresponding to the section, which is achieved by applying steel frame vertical columns to support the surface of the secondary lining structure. After the tunnel construction passes through this section, the temporary top support is removed;
[0053] Automatic monitoring refers to monitoring the deformation of the initial support structure and secondary lining structure of the tunnel through automated monitoring and measurement methods;
[0054] The backup plan refers to a contingency plan that uses measures such as reinforcing the surrounding rock area after initial support and strengthening the temporary top support when the structural deformation measured by automatic monitoring is large and exceeds the design limit.
[0055] In the present invention, full-ring support reinforcement, support reinforcement, temporary top support, automatic monitoring and backup plans can all adopt existing technologies, and the specific implementation content is not limited as long as the above functions can be achieved.
[0056] The strata of the foundation of existing high-rise structures are divided into disturbed strata of concern and non-disturbed strata of concern, among which the disturbed strata of concern range is located below the bottom surface of the foundation; with 0.3 times and 0.6 times of the foundation width and the height of the upper structure of the foundation as the dividing values, the strata range of the foundation is divided into the main range of disturbed strata of concern, the secondary range of disturbed strata of concern and the non-disturbed strata range, specifically: the main range of the disturbed strata of the foundation of existing high-rise structures is 0 to 0.3 times (greater than 0 times, including 0.3 times) of the foundation width on both sides of the foundation, The range enclosed by 0 to 0.3 times (greater than 0 times, including 0.3 times) the height of the superstructure below the base; the range of the disturbed ground level of concern for foundations of existing tall structures is the range enclosed by 0.3 to 0.6 times (excluding 0.3 times, including 0.6 times) the foundation width on both sides of the foundation, and 0.3 to 0.6 times (excluding 0.3 times, including 0.6 times) the height of the superstructure below the base; the strata outside the range of the disturbed ground level of concern for foundations of existing tall structures are the non-disturbed ground levels of concern for foundations of existing tall structures.
[0057] The strata around the existing holes are divided into disturbed strata and non-disturbed strata. The top and both sides of the hole are divided by 0.4 and 0.8 times of the hole span, and the bottom is divided by 0.5 and 1.0 times of the hole span. The strata around the hole are divided into the main range of disturbed strata, the lower range of disturbed strata and the non-disturbed strata. Specifically, the main range of disturbed strata around the existing holes is 0 to 0.4 times (greater than 0, including 0.5 and 1.0 times) of the hole span. The surrounding area of the existing cavity is the area enclosed by 0.4 times and 0.5 times (greater than 0 times and including 0.5 times) of the cavity span at the top and both sides of the cavity and 0.5 times and 1.0 times (excluding 0.5 times and including 1.0 times) of the cavity span at the bottom; the strata outside the range of the disturbed strata of concern around the existing cavity are the non-disturbed strata of concern around the existing cavity.
[0058] The strata of the proposed multi-arch tunnel are divided into disturbed strata and non-disturbed strata, and only the disturbed strata are concerned; the top and both sides of the tunnel are divided into 0.25 times and 0.5 times of the tunnel span, and the bottom is divided into 0.1 times and 0.2 times of the tunnel span. The strata range around the tunnel is divided into the main range of disturbed strata, the sub-range of disturbed strata and the range of non-disturbed strata. Specifically: the main range of disturbed strata of the proposed multi-arch tunnel is 0 times and 0.5 times of the tunnel span on the top and both sides of the multi-arch tunnel. The tunnel surrounding area enclosed by 0.25 times (greater than 0 times, including 0.25 times) and 0 times to 0.1 times (greater than 0 times, including 0.1 times) of the span of the multi-arch tunnel at the bottom; the range of disturbed ground levels of the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0.25 times to 0.5 times (excluding 0.25 times, including 0.5 times) of the top and both sides of the multi-arch tunnel and 0.1 times to 0.2 times (excluding 0.1 times, including 0.2 times) of the span of the multi-arch tunnel at the bottom.
[0059] Compared with the prior art, the present invention has the following beneficial effects:
[0060] The present invention provides a construction method based on a multi-arch tunnel passing under a void and an area disturbed by tall structures, which can achieve the construction of a multi-arch tunnel under complex working conditions in a relatively economical manner while ensuring safety, thus filling the technical gap in the complex working conditions of a multi-arch tunnel passing under a surrounding rock void and a tall structure at the same time.
[0061] Under the existing technology, when a single-hole tunnel passes through a cavity and other complex working conditions, the general measures are to strengthen the tunnel support in the whole section, apply a variety of temporary supports, and reinforce the strata from a large range of grouting inside the tunnel or on the surface. The project investment is large, the main range of disturbance under the complex working conditions is not analyzed, and targeted engineering plans and construction plans are not implemented for the main range. It is difficult for the existing technology to solve the construction problems of complex complex working conditions such as arch tunnels passing through cavities and tall structures.
[0062] By comparing with the existing engineering technology, the construction method of the present invention based on the multi-arch tunnel passing through the empty space and the disturbed area of high-rise structures can better solve the construction problem of the multi-arch tunnel passing through the complex and composite working conditions, and is expected to save more than 30% of the project investment.
[0063] The invention also provides a construction method based on a multi-arch tunnel passing through a hollow cavity and a disturbed area of a tall structure, which has strong practicality and promotion significance. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0065] Figure 1 Elevation drawing of the relationship between the proposed multi-arch tunnel and the existing underground cavities and tall structures on the surface;
[0066] Figure 2 Provide elevation drawings of the strata range of concern for the foundation disturbance of existing tall structures on the ground;
[0067] Figure 3 Pay attention to the elevation drawings of the main and secondary ranges of the strata for the foundations of existing tall structures on the surface that are disturbed;
[0068] Figure 4 Provide an elevation view of the disturbed strata around the existing cavity;
[0069] Figure 5 Provide elevation drawings of the main and secondary ranges of the disturbed strata around the existing voids;
[0070] Figure 6 Elevation drawing of the disturbed strata for the proposed multi-arch tunnel;
[0071] Figure 7 Elevation drawings of the main and secondary ranges of the disturbed strata for the proposed multi-arch tunnel;
[0072] Figure 8 It is an overview elevation of the overlapping area and tunnel disturbance area unit;
[0073] Fig. 9 It is the elevation diagram of each overlapping area and the specific corresponding tunnel disturbance area unit;
[0074] Fig.10 It is a large sample map of each overlapping area;
[0075] Fig.11 This is a large-scale drawing of each disturbed area unit of the proposed multi-arch tunnel.
[0076] In each figure:
[0077] 1. Strata;
[0078] 11. Outside the disturbance range of the multi-arch tunnel, the foundation of the towering structure and the non-disturbed strata around the hole
[0079] 12. The scope of the strata that are of concern when the foundations of existing tall structures are disturbed;
[0080] 121. The main area of the stratum where the foundation of an existing tall structure is disturbed;
[0081] 122. The scope of the level of concern for the disturbance of the foundations of existing tall structures;
[0082] 13. The disturbed strata around the existing cavities;
[0083] 131. The main area of the strata around the existing cavities that are disturbed;
[0084] 132. The range of the level of the disturbed areas around the existing holes;
[0085] 14. The scope of strata disturbed by the proposed multi-arch tunnel;
[0086] 141. The main area of strata disturbed by the proposed multi-arch tunnel;
[0087] 142. The scope of the ground disturbance caused by the proposed multi-arch tunnel;
[0088] 15. The overlapping areas of disturbed strata of concern at the foundation of high-rise structures, disturbed strata of concern around hollows, and disturbed strata of arch tunnels;
[0089] 151, first overlapping region;
[0090] 152, second overlapping region;
[0091] 153, the third overlapping area;
[0092] 154, fourth overlapping area;
[0093] 155, fifth overlapping area;
[0094] 2. Existing tall structures;
[0095] 2a. Existing high-rise building foundations;
[0096] 2b. The superstructure of existing tall buildings;
[0097] 3. There are both voids;
[0098] 4. It is planned to build a multi-arch tunnel;
[0099] 41. Corresponding double-arch tunnel disturbance zone units in overlapping areas
[0100] 411. The first disturbance zone unit of the double-arch tunnel in the overlapping area;
[0101] 412. The second disturbance zone unit of the double-arch tunnel in the overlapping area;
[0102] 413. The third disturbance zone unit of the double-arch tunnel in the overlapping area;
[0103] 414, the fourth disturbance zone unit of the double-arch tunnel in the overlapping area;
[0104] 42. The disturbance zone unit of the double-arch tunnel outside the overlapping area. DETAILED DESCRIPTION
[0105] The present invention is further described in detail below in conjunction with embodiments.
[0106] Those skilled in the art will appreciate that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.
[0107] Example 1
[0108] A construction method based on a multi-arch tunnel passing through a hollow cavity and an area disturbed by tall structures, comprising the following steps:
[0109] Step (1), collecting the topographical profile of the tunnel site of the proposed multi-arch tunnel and basic information of the proposed multi-arch tunnel, existing surface tall structures and underground cavities, and marking the specific relative position relationship of the multi-arch tunnel, surface tall structures and underground cavities in the stratum;
[0110] Step (2), analyzing the scope of the strata of concern for the foundation disturbance of the existing tall structures;
[0111] Step (3), analyzing the disturbed strata around the existing cavity;
[0112] Step (4), analyzing the scope of the strata disturbed by the proposed multi-arch tunnel;
[0113] Step (5), on the specific relative position relationship diagram marked in step (1), the disturbed stratum range of the existing high-rise structure foundation, the disturbed stratum range of the existing cavity and the disturbed stratum range of the proposed multi-arch tunnel are marked respectively to obtain the overlapping area of each range;
[0114] Step (6), determining the interference level corresponding to each overlapping area obtained in step (5);
[0115] Step (7), dividing the proposed multi-arch tunnel into disturbance zone units according to the overlapping area obtained in step (5); at the same time, according to the interference degree level of each overlapping area obtained in step (6), obtaining the construction plan of each disturbance zone unit of the tunnel corresponding to the overlapping area, and then carrying out construction according to the plan.
[0116] Example 2
[0117] A construction method based on a multi-arch tunnel passing through a hollow cavity and an area disturbed by tall structures, characterized in that it comprises the following steps:
[0118] Step (1), collecting the topographical profile of the tunnel site of the proposed multi-arch tunnel and basic information of the proposed multi-arch tunnel, existing surface tall structures and underground cavities, and marking the specific relative position relationship of the multi-arch tunnel, surface tall structures and underground cavities in the stratum;
[0119] Step (2), analyzing the scope of the strata of concern for the foundation disturbance of the existing tall structures;
[0120] Step (3), analyzing the disturbed strata around the existing cavity;
[0121] Step (4), analyzing the scope of the strata disturbed by the proposed multi-arch tunnel;
[0122] Step (5), on the specific relative position relationship diagram marked in step (1), the disturbed stratum range of the existing high-rise structure foundation, the disturbed stratum range of the existing cavity and the disturbed stratum range of the proposed multi-arch tunnel are marked respectively to obtain the overlapping area of each range;
[0123] Step (6), determining the interference level corresponding to each overlapping area obtained in step (5);
[0124] Step (7), dividing the proposed multi-arch tunnel into disturbance zone units according to the overlapping area obtained in step (5); at the same time, according to the interference degree level of each overlapping area obtained in step (6), obtaining the construction plan of each disturbance zone unit of the tunnel corresponding to the overlapping area, and then carrying out construction according to the plan.
[0125] In step (1), the topographical overview refers to the topographical conditions of the tunnel site, including the ground line and the strata below the ground line;
[0126] Basic information includes function, geometric features, and specific location in the stratigraphy;
[0127] The relative position relationship is indicated graphically.
[0128] In step (2):
[0129] The scope of the concerned strata for the foundations of existing tall structures includes the main scope of the concerned strata for the foundations of existing tall structures and the secondary scope of the concerned strata for the foundations of existing tall structures;
[0130] Among them, the main range of the disturbed strata of the existing high-rise structure foundation is the range enclosed by 0 to 0.3 times the foundation width on both sides of the foundation and 0 to 0.3 times the height of the upper structure below the base;
[0131] The range of the disturbed area of the foundation of existing high-rise structures is the range enclosed by 0.3 to 0.6 times the width of the foundation on both sides of the foundation and 0.3 to 0.6 times the height of the upper structure below the base;
[0132] The strata outside the range of the disturbed strata of concern for the foundations of existing tall structures are the non-disturbed strata of concern for the foundations of existing tall structures.
[0133] In step (3):
[0134] The range of disturbed strata around existing cavities includes the main range of disturbed strata around existing cavities and the layer range of disturbed strata around existing cavities;
[0135] Among them, the main range of disturbed strata around the existing cavities is the area around the cavities surrounded by 0 to 0.4 times the cavities’ top and sides, and 0 to 0.5 times the cavities’ bottom span.
[0136] The range of the disturbed areas around the existing cavities is the area around the cavities surrounded by 0.4 to 0.8 times the cavities’ top and sides, and 0.5 to 1.0 times the cavities’ bottom span.
[0137] The strata outside the range of the disturbed strata of concern around the existing cavities are the non-disturbed strata of concern around the existing cavities.
[0138] In step (4):
[0139] The range of disturbed strata for the proposed multi-arch tunnel includes the main range of disturbed strata for the proposed multi-arch tunnel and the lower range of disturbed strata for the proposed multi-arch tunnel;
[0140] Among them, the main range of disturbed strata for the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0 to 0.25 times the span of the multi-arch tunnel at the top and both sides, and 0 to 0.1 times the span of the multi-arch tunnel at the bottom;
[0141] The range of disturbed ground levels for the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0.25 to 0.5 times the span of the multi-arch tunnel at the top and sides, and 0.1 to 0.2 times the span of the multi-arch tunnel at the bottom.
[0142] In step (5), all overlapping areas of the main range and sub-range of the disturbed strata of the foundation of the existing high-rise structure, the disturbed strata around the existing cavity, and the disturbed strata of the proposed multi-arch tunnel are marked.
[0143] The specific method of step (6) is:
[0144] (6.1) Determine whether the overlapping area belongs to the disturbed stratum range of the proposed multi-arch tunnel; if so, determine whether the disturbed stratum range of the proposed multi-arch tunnel belongs to the main range of the disturbed stratum of the proposed multi-arch tunnel or the disturbed stratum layer range of the proposed multi-arch tunnel, and then go to (6.2);
[0145] (6.2) Determine whether the existing high-rise structure foundation strata in the overlapping area belongs to the existing high-rise structure foundation disturbed strata concern range; if so, determine whether the existing high-rise structure foundation disturbed strata concern belongs to the main range of the existing high-rise structure foundation disturbed strata concern or to the secondary range of the existing high-rise structure foundation disturbed strata concern;
[0146] Determine whether the existing void surrounding strata in the overlapping area belongs to the existing void surrounding disturbed strata range. If so, determine whether the existing void surrounding disturbed strata range belongs to the main range of the existing void surrounding disturbed strata range or the sub-range of the existing void surrounding disturbed strata range; then go to (6.3);
[0147] (6.3) Based on the judgment results of (61) and (6.2), according to Table 3, the interference level corresponding to the overlapping area is obtained;
[0148] Table 3
[0149]
[0150] In step (7), the specific method for dividing the proposed multi-arch tunnel into tunnel disturbance zone units is as follows: each overlapping area is vertically projected downward to the bottom edge of the tunnel, and the corresponding tunnel part is the disturbance zone unit; the interference level of each disturbance zone unit is the maximum level among all the overlapping areas corresponding to the projection.
[0151] In step (7),
[0152] The disturbed area unit adopts the conventional construction plan and adds the corresponding construction plan in Table 4, and the other units in the non-disturbed area adopt the conventional construction plan;
[0153] Table 4
[0154] .
[0156] Application Examples
[0157] For a proposed multi-arch tunnel, it will pass through an existing underground cavity and an existing high-rise structure on the surface. Figure 1 After preliminary analysis, the arch tunnel has a large span and a small buried depth. In order to implement the arch tunnel safely and economically, the present invention provides a construction method based on the arch tunnel passing through the empty cavity and the high-rise structure disturbance area, which is specifically implemented in the following steps:
[0158] (1) Collect the topographical profile of the proposed multi-arch tunnel site and basic information of the proposed multi-arch tunnel, existing tall structures on the surface and underground cavities, and indicate the specific relative positions of the multi-arch tunnel, tall structures on the surface and underground cavities in the strata;
[0159] After checking, the detailed terrain conditions of the tunnel site were drawn. Below the ground line is stratum 1; the proposed multi-arch tunnel 4 is a traffic tunnel with a horizontal span of 26m and a height of 10.5m, and a relatively small burial depth (the minimum position is only 17m). The existing surface tall structure 2 is a high-voltage line tower. The foundation 2a of the existing tall structure is a concrete foundation of 6.0m long × 8.0m wide × 1.2m high. The bottom of the foundation is 21.2m vertically away from the top of the tunnel, and the side of the foundation is 3.2m horizontally away from the side of the tunnel. The tower height, that is, the upper structure 2b of the existing tall structure, is 20m high. The existing cavity 3 is a mine cave, 3.6m wide and 5.2m high, located 4.5m above the tunnel. The basic information of the proposed multi-arch tunnel 4, the existing surface tall structure 2 and the existing cavity 3 are detailed in the figure, as shown in the figure. Figure 1 shown.
[0160] (2) Analyze the scope of the strata that are disturbed by the foundations of existing tall structures;
[0161] The existing high-rise structure foundation is disturbed and the stratum scope of concern is 12 such as Figure 2 As shown, it includes two parts: the main range of concerned strata for disturbed foundations of existing high-rise structures and the concerned ground level range for disturbed foundations of existing high-rise structures: the main range 121 of concerned strata for disturbed foundations of existing high-rise structures is the range of 0 to 0.3 times (greater than 0 times, including 0.3 times) foundation width on both sides of the foundation, and 0 to 0.3 times (greater than 0 times, including 0.3 times) superstructure height below the base; the concerned ground level range 122 of concerned foundations of existing high-rise structures is the range of 0.3 to 0.6 times (excluding 0.3 times, including 0.6 times) foundation width on both sides of the foundation, and 0.3 to 0.6 times (excluding 0.3 times, including 0.6 times) superstructure height below the base. As shown Figure 3 shown.
[0162] (3) Analyze the scope of disturbed strata around existing cavities;
[0163] The disturbed strata around the existing cavities are as follows: Figure 4 As shown, it includes two parts: the main range of disturbed strata of concern around existing holes and the layered range of disturbed strata of concern around existing holes: the main range 131 of disturbed strata of concern around existing holes is the range around the hole surrounded by 0 to 0.4 times (greater than 0 times, including 0.4 times) of the hole span at the top and both sides of the hole, and 0 to 0.5 times (greater than 0 times, including 0.5 times) of the hole span at the bottom; the layered range 132 of disturbed strata of concern around existing holes is the range around the hole surrounded by 0.4 to 0.8 times (excluding 0.4 times, including 0.8 times) of the hole span at the top and both sides of the hole, and 0.5 to 1.0 times (excluding 0.5 times, including 1.0 times) of the hole span at the bottom. As shown Figure 5 shown.
[0164] (4) Analyze the scope of the strata disturbed by the proposed multi-arch tunnel;
[0165] The proposed multi-arch tunnel will disturb the strata 14 Figure 4 As shown, it includes two parts: the main range of disturbed strata for the proposed multi-arch tunnel and the range of disturbed strata for the proposed multi-arch tunnel: the main range of disturbed strata for the proposed multi-arch tunnel 141 is the tunnel surrounding range enclosed by 0 to 0.25 times (greater than 0 times, including 0.25 times) of the top and both sides of the multi-arch tunnel and 0 to 0.1 times (greater than 0 times, including 0.1 times) of the span of the multi-arch tunnel at the bottom; the range of disturbed strata for the proposed multi-arch tunnel 142 is the tunnel surrounding range enclosed by 0.25 to 0.5 times (excluding 0.25 times, including 0.5 times) of the top and both sides of the multi-arch tunnel and 0.1 to 0.2 times (excluding 0.1 times, including 0.2 times) of the span of the multi-arch tunnel at the bottom. Figure 7 shown.
[0166] (5) On the specific relative position relationship diagram marked in step (1), the disturbed strata range of the existing high-rise structure foundation, the disturbed strata range of the existing void hole periphery, and the disturbed strata range of the proposed multi-arch tunnel are marked respectively to obtain the overlapping area of each range;
[0167] The main range of the disturbed strata of the existing high-rise structure foundation 121, the disturbed strata of the existing high-rise structure foundation 122, the main range of the disturbed strata of the existing voids 131, the disturbed strata of the existing voids 132, the main range of the disturbed strata of the proposed multi-arch tunnel 141, the disturbed strata of the proposed multi-arch tunnel 142 are marked on Figure 1 In the figure, the overlapping areas of the disturbed strata of the foundation of the towering structure, the disturbed strata around the cavity and the disturbed strata of the arch tunnel are marked 15, as shown in Figure 8 shown.
[0168] (6) determining the interference level corresponding to each overlapping area obtained in step (5);
[0169] Specific differentiation is performed on each overlapping area, such as Fig. 9 shown.
[0170] The first overlapping area 151: the overlapping of the disturbed sub-stratum range 122 of the foundation of the existing high-rise structure and the disturbed sub-stratum range 142 of the proposed multi-arch tunnel; the interference degree level is level one.
[0171] The strata included in the second overlapping area 152 are overlapped by the disturbed strata range 132 around the existing cavity and the disturbed strata range 142 of the proposed multi-arch tunnel; the interference level is level one.
[0172] The strata included in the third overlapping area 153 are overlapped by the main range 131 of disturbed strata around the existing cavity and the range 142 of disturbed strata to be built by the proposed multi-arch tunnel; the interference degree is level two.
[0173] The fourth overlapping area 154 includes the following strata: the main range 131 of disturbed strata around the existing cavity and the main range 141 of disturbed strata to be built by the proposed multi-arch tunnel; the interference degree is level seven.
[0174] The fifth overlapping area 155 includes the following strata: the strata range 132 of disturbed strata around the existing cavity overlapped with the main strata range 141 of disturbed strata to be built by the proposed multi-arch tunnel; the interference degree is level six.
[0175] (7) According to the overlapping area obtained in step (5), the proposed multi-arch tunnel is divided into tunnel disturbance zone units; at the same time, according to the interference degree level corresponding to each overlapping area of the overlapping area obtained in step (6), the construction plan of each disturbance zone unit of the corresponding overlapping area tunnel is obtained, and then the construction is carried out according to the engineering plan.
[0176] For the proposed multi-arch tunnel 4, the overlapping area 15 corresponding to the disturbed stratum of the foundation of the towering structure, the disturbed stratum of the hole around the tunnel and the disturbed stratum of the multi-arch tunnel is divided into the corresponding multi-arch tunnel disturbance zone unit 41 in the overlapping area, and the multi-arch tunnel disturbance zone unit 42 outside the overlapping area is marked, such as Figure 8 The specific tunnel disturbance zone units corresponding to each overlapping area are shown as follows Fig. 9 As shown, the overlapping areas are as follows Fig.10 As shown in the figure, the detailed drawings of the various sections of the proposed multi-arch tunnel are as follows Fig.11 shown.
[0177] Analyze the interference zone units, interference levels and construction plans of the overlapping areas corresponding to the double-arch tunnels:
[0178] The first overlapping area 151 corresponds to the first disturbance zone unit 411 of the double-arch tunnel in the overlapping area, the interference level is level one, and the construction plan is automatic monitoring.
[0179] The two sides of the fifth overlapping area 155 are located below part of the second overlapping area 152, and are correspondingly divided into the second disturbance zone unit 412 of the double-arch tunnel in the overlapping area and the fourth disturbance zone unit 414 of the double-arch tunnel in the overlapping area. The interference degree level and the engineering plan are selected according to the principle of the highest interference degree. The interference degree level is level six, and the construction plan is support reinforcement + automatic monitoring.
[0180] The middle part of the fifth overlapping area 155 is located below the fourth overlapping area 154, and the fourth overlapping area 154 is located below the third overlapping area 153 and part of the second overlapping area 152, corresponding to the third disturbance zone unit 413 of the arch tunnel in the overlapping area. The interference degree level and the engineering plan are selected according to the principle of the highest interference degree. The interference degree level is level seven, and the construction plan is support reinforcement + temporary top support + automatic monitoring + backup plan.
[0181] The overlapping area outer arch tunnel disturbance zone unit 42 is designed and constructed according to the conventional scheme, and there is no need to add corresponding construction schemes.
[0182] Each disturbed area unit of the proposed multi-arch tunnel 4 shall be constructed according to the corresponding construction plan.
[0183] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A construction method based on a multi-arch tunnel passing through empty holes and high-rise structure disturbance areas, It is characterized in that The steps include: Step (1), collecting the topographical profile of the tunnel site of the proposed multi-arch tunnel and basic information of the proposed multi-arch tunnel, existing surface tall structures and underground cavities, and marking the specific relative position relationship of the multi-arch tunnel, surface tall structures and underground cavities in the stratum; Step (2), analyzing the scope of the strata of concern for the foundation disturbance of the existing tall structures; Step (3), analyzing the disturbed strata around the existing cavity; Step (4), analyzing the scope of the strata disturbed by the proposed multi-arch tunnel; Step (5), on the specific relative position relationship diagram marked in step (1), the disturbed stratum range of the existing high-rise structure foundation, the disturbed stratum range of the existing cavity and the disturbed stratum range of the proposed multi-arch tunnel are marked respectively to obtain the overlapping area of each range; Step (6), determining the interference level corresponding to each overlapping area obtained in step (5); Step (7), dividing the proposed multi-arch tunnel into disturbance zone units according to the overlapping area obtained in step (5); at the same time, according to the interference degree level of each overlapping area obtained in step (6), obtaining the construction plan of each disturbance zone unit of the tunnel corresponding to the overlapping area, and then carrying out construction according to the plan.
2. According to the construction method of claim 1 based on the multi-arch tunnel passing through the empty cavity and the high-rise structure disturbing area, It is characterized in that In step (1), the topographical overview refers to the topographical conditions of the tunnel site, including the ground line and the strata below the ground line; Basic information includes function, geometric features, and specific location in the stratigraphy; The relative position relationship is indicated graphically.
3. The construction method based on the multi-arch tunnel passing through the empty cavity and the high-rise structure disturbance area according to claim 1, It is characterized in that In step (2): The scope of the concerned strata for the foundations of existing tall structures includes the main scope of the concerned strata for the foundations of existing tall structures and the secondary scope of the concerned strata for the foundations of existing tall structures; Among them, the main range of the disturbed strata of the existing high-rise structure foundation is the range enclosed by 0 to 0.3 times the foundation width on both sides of the foundation and 0 to 0.3 times the height of the upper structure below the base; The range of the disturbed area of the foundation of existing high-rise structures is the range enclosed by 0.3 to 0.6 times the width of the foundation on both sides of the foundation and 0.3 to 0.6 times the height of the upper structure below the base; The strata outside the range of the disturbed strata of concern for the foundations of existing tall structures are the non-disturbed strata of concern for the foundations of existing tall structures.
4. The construction method based on the multi-arch tunnel passing through the empty cavity and the high-rise structure disturbance area according to claim 1, It is characterized in that In step (3): The range of disturbed strata around existing cavities includes the main range of disturbed strata around existing cavities and the layer range of disturbed strata around existing cavities; Among them, the main range of disturbed strata around the existing cavities is the area around the cavities surrounded by 0 to 0.4 times the cavities’ top and sides, and 0 to 0.5 times the cavities’ bottom span. The range of the disturbed areas around the existing cavities is the area around the cavities surrounded by 0.4 to 0.8 times the cavities’ top and sides, and 0.5 to 1.0 times the cavities’ bottom span. The strata outside the range of the disturbed strata of concern around the existing cavities are the non-disturbed strata of concern around the existing cavities.
5. The construction method based on the multi-arch tunnel passing through the empty cavity and the disturbed area of the tall structure according to claim 1, It is characterized in that In step (4): The range of disturbed strata for the proposed multi-arch tunnel includes the main range of disturbed strata for the proposed multi-arch tunnel and the lower range of disturbed strata for the proposed multi-arch tunnel; Among them, the main range of disturbed strata for the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0 to 0.25 times the span of the multi-arch tunnel at the top and both sides, and 0 to 0.1 times the span of the multi-arch tunnel at the bottom; The range of disturbed ground levels for the proposed multi-arch tunnel is the tunnel surrounding area enclosed by 0.25 to 0.5 times the span of the multi-arch tunnel at the top and sides, and 0.1 to 0.2 times the span of the multi-arch tunnel at the bottom.
6. The construction method based on the multi-arch tunnel passing through the empty cavity and the disturbed area of the tall structure according to claim 1, It is characterized in that In step (5), all overlapping areas of the main range and sub-range of the disturbed strata of the foundation of the existing high-rise structure, the disturbed strata around the existing cavity, and the disturbed strata of the proposed multi-arch tunnel are marked.
7. The construction method based on the multi-arch tunnel passing through the empty cavity and the high-rise structure disturbance area according to claim 6, It is characterized in that The specific method of step (6) is: (6.1) Determine whether the overlapping area belongs to the disturbed stratum range of the proposed multi-arch tunnel; if so, determine whether the disturbed stratum range of the proposed multi-arch tunnel belongs to the main range of the disturbed stratum of the proposed multi-arch tunnel or the disturbed stratum layer range of the proposed multi-arch tunnel, and then go to (6.2); (6.2) Determine whether the existing high-rise structure foundation strata in the overlapping area belongs to the existing high-rise structure foundation disturbed strata concern range; if so, determine whether the existing high-rise structure foundation disturbed strata concern belongs to the main range of the existing high-rise structure foundation disturbed strata concern or to the secondary range of the existing high-rise structure foundation disturbed strata concern; Determine whether the existing void surrounding strata in the overlapping area belongs to the existing void surrounding disturbed strata range. If so, determine whether the existing void surrounding disturbed strata range belongs to the main range of the existing void surrounding disturbed strata range or the sub-range of the existing void surrounding disturbed strata range; then go to (6.3); (6.3) Based on the judgment results of (61) and (6.2), according to Table 1, the interference level corresponding to the overlapping area is obtained; Table 1 8. The construction method based on the multi-arch tunnel passing through the empty cavity and the disturbed area of the tall structure according to claim 7, It is characterized in that In step (7), the specific method for dividing the proposed multi-arch tunnel into tunnel disturbance zone units is as follows: each overlapping area is vertically projected downward to the bottom edge of the tunnel, and the corresponding tunnel part is the disturbance zone unit; the interference level of each disturbance zone unit is the maximum level among all the overlapping areas corresponding to the projection.
9. The construction method based on the multi-arch tunnel passing through the empty cavity and the disturbed area of the tall structure according to claim 7, It is characterized in that In step (7), The disturbed area unit adopts the conventional construction plan, plus the corresponding construction plan in Table 2, and the other units in the non-disturbed area adopt the conventional construction plan; Table 2
Citation Information
Cited By
Yellow risk grade refining method and system suitable for tunnel engineering
CN119940907A