Method for driving working face to quickly pass through collapse column
By using advanced drilling, grouting reinforcement and loosening cannon rock breaking technologies in the construction of coal mine excavation work surfaces, the construction problems of the fallen column area have been solved, and the safe and efficient passage of the excavation work surface has been achieved, the construction efficiency has been improved and accidents have been reduced. risk.
Patent Information
- Application Number
- CN202411314669.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-12
AI Technical Summary
During the construction of the coal mine excavation surface, geological abnormal areas such as fallen columns make it difficult to carry out smoothly, and there are large unknown safety hazards, affecting production safety and mining efficiency.
Advance drilling, grouting reinforcement and loose cannon rock breaking technology is used to detect, reinforce and crush the fall column area respectively to ensure safe and efficient passage of the excavation working surface.
It improves the construction efficiency of the excavation work surface, reduces accident risks and production costs, and ensures the safe production of the mine.
Smart Images

Figure CN118933804A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mining, and in particular relates to a method for a tunneling working face to quickly pass through a collapse column. Background Art
[0002] During the construction of coal mine excavation working face, it is inevitable to encounter geological anomalies such as collapse columns, faults, and folds. Collapse columns are common geological structures in coal mines. They are usually formed when cavities or caves in the overlying rock strata collapse under the action of gravity, destroying the original geological structure and causing the coal seam to no longer maintain its original continuity. Therefore, the existence of collapse columns will cause major unknown safety hazards in mine excavation projects.
[0003] Therefore, whether the collapse column can be passed quickly and safely is one of the important factors affecting the smooth construction of the excavation face, which will directly affect the safe production and mining efficiency of the mine. However, due to the lack of efficient methods to pass the collapse column, the construction of the excavation face is often difficult to carry out smoothly. Summary of the invention
[0004] In view of the problems existing in the prior art, the present invention provides a method for a tunneling working face to quickly pass through a subsidence column. During the construction of a coal mine tunneling working face, the tunneling working face can pass through the subsidence column efficiently and safely, thereby effectively improving the construction efficiency of the tunneling working face, reducing accident risks, and reducing production costs.
[0005] In order to achieve the above object, the present invention adopts the following technical solution: a method for a tunneling working face to quickly pass through a collapse column, comprising the following steps:
[0006] Step 1: Pre-drilling
[0007] When the excavation face is constructed to a distance of 19.5m to 20.5m from the collapse column, an advance exploration hole is constructed to detect the influence range of the collapse column, to prevent the mutual stress between the excavation face and the collapse column from causing damage to the excavation face, and to complete the construction of protective measures before the excavation face approaches the collapse column; for the edge area of the collapse column, a combination of long-wave and short-wave advance detection technology is used for detection;
[0008] Step 2: Grouting reinforcement
[0009] When the excavation working face reaches the collapse column, the grouting reinforcement technology is used to reinforce the local areas of the collapse column where cracks, expansions and crushing occur, so that the coal body and roof structure in front of the excavation working face remain intact;
[0010] Step 3: Loosen the rock
[0011] When the excavation working face reaches the hard rock area of the collapse column, the loosening blasting rock breaking technology is used to break the hard rock, so that the excavation working face can efficiently pass through the hard rock area of the collapse column.
[0012] In step one, the construction depth of the advance drilling hole is 14.5 meters to 15.5 meters, and the detection range includes the exposure range of the excavation working face and the exposure range of the collapse column.
[0013] In step 1, during the construction of the excavation working face, for every 4.5-5.5 meters of advancement, a 2.5-3.5-meter detection borehole is constructed within the exposure range of the collapse column, and the spatial position relationship between the two sides of the tunnel and the collapse column within the range of 4.5-5.5 meters in the advancement direction is determined by using the detection borehole, so as to manage the coal-rock interface of the two sides of the tunnel in advance;
[0014] In step two, the construction parameters of the grouting holes for grouting reinforcement are as follows: the grouting holes are arranged in a three-eye arrangement, and the spacing between adjacent grouting holes in the horizontal direction is 1.6 meters to 1.8 meters; the construction depth of the grouting holes is 7.5 meters to 8.5 meters, and the sealing depth of the grouting holes is 3.5 meters to 4.5 meters; the spacing between the grouting holes at low positions and the bottom plate of the tunnel is 0.8 meters to 1.2 meters, and the grouting holes at low positions are distributed vertically to the excavation working face; the spacing between the grouting holes at high positions and the top plate of the tunnel is 0.4 meters to 0.6 meters, and the grouting holes at high positions have an elevation angle of 4° to 6° relative to the horizontal plane.
[0015] In step three, the construction parameters of the blastholes for loosening blasting and breaking rock are as follows: the blastholes are arranged in a three-hole arrangement, and a total of five rows of blastholes are constructed in the height direction, the spacing between adjacent blastholes in the horizontal direction is 0.4m-0.6m, the spacing between two adjacent rows of blastholes is 0.8m-1.0m, and the construction depth of the blastholes is 1.7m-1.9m; the spacing between the blasthole holes 1 in the top row at the high position and the top plate of the tunnel is 0.4m-0.6m, and the blasthole holes in the top row at the high position have an elevation angle of 8°-10° relative to the horizontal plane; the spacing between the blasthole holes in the bottom row at the low position and the bottom plate of the tunnel is 0.4m-0.6m, and the blasthole holes in the bottom row at the low position have a depression angle of 8°-10° relative to the horizontal plane; the three middle rows of blasthole holes are vertically distributed to the excavation working face; the charge amount in each blasthole is 390g-410g, and the charging process adopts the forward charging principle.
[0016] Beneficial effects of the present invention:
[0017] The method for the excavation working face to quickly pass through the collapse column of the present invention enables the excavation working face to efficiently and safely pass through the collapse column during the construction of the coal mine excavation working face, thereby effectively improving the construction efficiency of the excavation working face, reducing the risk of accidents, and reducing production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1It is the layout diagram of blastholes;
[0019] Figure 2 for Figure 1 Middle AA section view;
[0020] In the figure, 1 is the blast hole. DETAILED DESCRIPTION
[0021] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0022] A method for a tunneling working face to quickly pass through a collapse column comprises the following steps:
[0023] Step 1: Pre-drilling
[0024] When the excavation face is constructed to a distance of 20 meters from the collapse column, an advance exploration borehole is constructed to detect the influence range of the collapse column by using the advance exploration borehole to prevent the mutual stress between the excavation face and the collapse column from causing damage to the excavation face, and to complete the construction of protective measures before the excavation face approaches the collapse column; for the edge area of the collapse column, an advance detection technology combining long wave and short wave is used for detection; the construction depth of the advance exploration borehole is 15 meters, and the detection range includes the exposure range of the excavation face and the exposure range of the collapse column; during the construction of the excavation face, for every 5 meters of advancement, a 3-meter detection borehole is constructed within the exposure range of the collapse column, and the detection borehole is used to determine the spatial position relationship between the two sides of the tunnel and the collapse column within a range of 5 meters in the advancement direction, so as to manage the coal-rock interface of the two sides of the tunnel in advance;
[0025] Step 2: Grouting reinforcement
[0026] When the excavation working face is constructed to the collapse column, the grouting reinforcement technology is used to reinforce the local areas of the collapse column with cracks, expansion and crushing, so that the coal body and roof structure in front of the excavation working face remain intact; the grouting hole construction parameters of the grouting reinforcement are: the grouting holes are arranged in a three-eye arrangement, and the spacing between adjacent grouting holes in the horizontal direction is 1.7 meters; the construction depth of the grouting holes is 8 meters, and the sealing depth of the grouting holes is 4 meters; the spacing between the grouting holes at the low position and the bottom plate of the tunnel is 1 meter, and the grouting holes at the low position are distributed vertically to the excavation working face; the spacing between the grouting holes at the high position and the top plate of the tunnel is 0.5 meters, and the grouting holes at the high position have an elevation angle of 5° relative to the horizontal plane.
[0027] Step 3: Loosen the rock
[0028] When the excavation face reaches the hard rock area of the collapse column, the loosening blasting rock breaking technology is used to break the hard rock, so that the excavation face can efficiently pass through the hard rock area of the collapse column; the construction parameters of the blast hole for loosening blasting rock breaking are: Figure 1, 2 As shown, the blasthole holes 1 adopt a three-hole arrangement form, and a total of five rows of blasthole holes 1 are constructed in the height direction, the spacing between adjacent blasthole holes 1 in the horizontal direction is 0.5 meters, the spacing between two adjacent rows of blasthole holes 1 is 0.9 meters, and the construction depth of the blasthole holes 1 is 1.8 meters; the spacing between the top row of blasthole holes 1 at a high position and the top plate of the tunnel is 0.5 meters, and the top row of blasthole holes 1 at a high position has an elevation angle of 9° relative to the horizontal plane; the spacing between the bottom row of blasthole holes 1 at a low position and the bottom plate of the tunnel is 0.5 meters, and the bottom row of blasthole holes 1 at a low position has a depression angle of 9° relative to the horizontal plane; the middle three rows of blasthole holes 1 are vertically distributed to the excavation working face; the charge amount in each blasthole hole 1 is 400 grams, and the charging process adopts the forward charging principle.
[0029] The solutions in the embodiments are not intended to limit the protection scope of the present invention. All equivalent implementations or changes that do not deviate from the present invention are included in the protection scope of the present invention.
Claims
1. A method for a tunneling working face to quickly pass through a collapse column, characterized in that: The steps include: Step 1: Pre-drilling When the excavation face is constructed to a distance of 19.5m to 20.5m from the collapse column, an advance exploration hole is constructed to detect the influence range of the collapse column, to prevent the mutual stress between the excavation face and the collapse column from causing damage to the excavation face, and to complete the construction of protective measures before the excavation face approaches the collapse column; for the edge area of the collapse column, a combination of long-wave and short-wave advance detection technology is used for detection; Step 2: Grouting reinforcement When the excavation working face reaches the collapse column, the grouting reinforcement technology is used to reinforce the local areas of the collapse column where cracks, expansions and crushing occur, so that the coal body and roof structure in front of the excavation working face remain intact; Step 3: Loosen the rock When the excavation working face reaches the hard rock area of the collapse column, the loosening blasting rock breaking technology is used to break the hard rock, so that the excavation working face can efficiently pass through the hard rock area of the collapse column.
2. A method for a tunneling working face to quickly pass through a subsidence column according to claim 1, characterized in that: In step one, the construction depth of the advance drilling hole is 14.5 meters to 15.5 meters, and the detection range includes the exposure range of the excavation working face and the exposure range of the collapse column.
3. A method for a tunneling working face to quickly pass through a subsidence column according to claim 1, characterized in that: In step one, during the construction of the excavation working face, for every 4.5 to 5.5 meters of advancement, a 2.5 to 3.5 meter detection drill hole is constructed within the exposure range of the collapse column. The detection drill hole is used to determine the spatial position relationship between the two sides of the tunnel and the collapse column within a range of 4.5 to 5.5 meters in the advancement direction, so as to manage the coal-rock interface on the two sides of the tunnel in advance.
4. A method for a tunneling working face to quickly pass through a subsidence column according to claim 1, characterized in that: In step two, the construction parameters of the grouting holes for grouting reinforcement are as follows: the grouting holes are arranged in a three-eye arrangement, and the spacing between adjacent grouting holes in the horizontal direction is 1.6 meters to 1.8 meters; the construction depth of the grouting holes is 7.5 meters to 8.5 meters, and the sealing depth of the grouting holes is 3.5 meters to 4.5 meters; the spacing between the grouting holes at low positions and the bottom plate of the tunnel is 0.8 meters to 1.2 meters, and the grouting holes at low positions are distributed vertically to the excavation working face; the spacing between the grouting holes at high positions and the top plate of the tunnel is 0.4 meters to 0.6 meters, and the grouting holes at high positions have an elevation angle of 4° to 6° relative to the horizontal plane.
5. A method for a tunneling working face to quickly pass through a subsidence column according to claim 1, characterized in that: In step three, the construction parameters of the blastholes for loosening blasting and breaking rock are as follows: the blastholes are arranged in a three-hole arrangement, and a total of five rows of blastholes are constructed in the height direction, the spacing between adjacent blastholes in the horizontal direction is 0.4m-0.6m, the spacing between two adjacent rows of blastholes is 0.8m-1.0m, and the construction depth of the blastholes is 1.7m-1.9m; the spacing between the blasthole holes 1 in the top row at the high position and the top plate of the tunnel is 0.4m-0.6m, and the blasthole holes in the top row at the high position have an elevation angle of 8°-10° relative to the horizontal plane; the spacing between the blasthole holes in the bottom row at the low position and the bottom plate of the tunnel is 0.4m-0.6m, and the blasthole holes in the bottom row at the low position have a depression angle of 8°-10° relative to the horizontal plane; the three middle rows of blasthole holes are vertically distributed to the excavation working face; the charge amount in each blasthole is 390g-410g, and the charging process adopts the forward charging principle.