Tunneling machine main bearing roller transfer equipment and use method

By designing a roller transfer device for the main bearing of a tunneling machine, the automated transfer and cleaning of the rollers is achieved using cantilever lifting components and adsorption components. This solves the problem of low efficiency in manual handling, improves operational efficiency, reduces labor intensity, and avoids secondary pollution.

CN118933834AActive Publication Date: 2024-11-12CHINA RAILWAY CONSTR HEAVY IND
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411320107.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-12
Estimated Expiration
2044-09-20

AI Technical Summary

Technical Problem

In the remanufacturing of tunneling machine main bearings, the disassembly and inspection of rollers mainly rely on manual handling, resulting in low work efficiency and high labor intensity for operators.

Method used

Design a main bearing roller transfer device for a tunneling machine, including a vehicle body, a gripping component and a unloading component. The device uses a cantilever lifting component and an adsorption component to automatically pick up and transfer the rollers, and a cleaning component to clean them simultaneously. Different adsorption components are used to handle the loading and unloading processes respectively.

Benefits of technology

It reduces the labor intensity of manual handling by operators, improves the transfer efficiency of rollers, avoids secondary contamination of rollers, and achieves simultaneous cleaning and transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933834A_ABST
    Figure CN118933834A_ABST
Patent Text Reader

Abstract

The invention provides tunneling machine main bearing roller transfer equipment and a using method, and relates to the technical field of tunneling machines. Comprising a vehicle body, a grabbing assembly, a cleaning assembly and a discharging assembly. The vehicle body is used for bearing and transferring bearing rollers; the grabbing assembly comprises a cantilever hoisting part, a first adsorption part and a second adsorption part, the cantilever hoisting part is rotationally arranged on the vehicle body, the first adsorption part and the second adsorption part are both arranged on the cantilever hoisting part, the cantilever hoisting part drives the first adsorption part and the second adsorption part to ascend and descend, and the first adsorption part is used for sucking the bearing roller so as to place the bearing roller into the vehicle body; the second adsorption part is used for adsorbing the bearing roller in the vehicle body so as to place the bearing roller in the discharging assembly; the cleaning assembly is arranged in the vehicle body and used for cleaning bearing rollers in the vehicle body. The discharging assembly is arranged on the vehicle body so as to dry the bearing rollers and move the bearing rollers out of the vehicle body. According to the transfer equipment for the main bearing rollers of the heading machine, the transfer efficiency of the bearing rollers is improved, and the labor intensity of operators is relieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of roadheaders, and in particular to a roadheader main bearing roller transfer device and a use method. Background Art

[0002] Tunnel boring machine remanufacturing is the current development trend of the global shield market. The main bearing, as the "heart" of the tunnel boring machine, is generally a three-row cylindrical roller structure. As a key component of the main bearing, the roller plays a role in supporting and reducing bearing friction. The main bearing of the tunnel boring machine bears all the heavy loads during operation and is also the main vulnerable component of the main bearing of the tunnel boring machine.

[0003] During the maintenance and remanufacturing of the tunnel boring machine, the main bearing needs to be disassembled for inspection and flaw detection. The main bearing of the tunnel boring machine is generally large in size (φ3~φ8.6m), and the large-diameter main bearing of the tunnel boring machine is not easy to adapt to the automation equipment like the small-diameter bearings commonly used in the market. At the same time, the rollers of the tunnel boring machine main bearing are generally large, heavy, and more numerous. Therefore, in the disassembly and inspection of the main bearing of the tunnel boring machine remanufacturing, the disassembly and inspection of the rollers accounts for the main labor time.

[0004] However, in the remanufacturing of the main bearings of tunnel boring machines, the disassembly and inspection of the rollers is mainly carried out by manual handling, which has low operating efficiency and high labor intensity for the operators. Summary of the invention

[0005] The present application provides a roadheader main bearing roller transfer device and a use method, which are used to solve the problem that in the remanufacturing of the roadheader main bearing, the rollers are mainly disassembled and inspected by manual handling, which has low operating efficiency and high labor intensity for operators.

[0006] On the one hand, the present application provides a main bearing roller transfer device for a roadheader, comprising a vehicle body, a grab assembly, a cleaning assembly, and a material discharge assembly;

[0007] The vehicle body is used to accommodate and transport bearing rollers;

[0008] The grabbing assembly includes a cantilever hanging member, a first adsorption member, and a second adsorption member. The cantilever hanging member is rotatably arranged on the vehicle body. The first adsorption member and the second adsorption member are both arranged on the cantilever hanging member. The cantilever hanging member drives the first adsorption member and the second adsorption member to rise and fall. The first adsorption member is used to absorb the bearing roller to place it in the vehicle body. The second adsorption member is used to absorb the bearing roller in the vehicle body to place it in the blanking assembly.

[0009] The cleaning assembly is arranged in the vehicle body to clean the bearing rollers in the vehicle body;

[0010] The blanking assembly is arranged on the vehicle body to dry the bearing rollers located in the blanking assembly and to move the bearing rollers out of the vehicle body.

[0011] In some embodiments, the cantilever lifting component includes a lifting arm, a track, a pulley and a hoist. The lifting arm is rotatably arranged on the vehicle body, the track is horizontally arranged on the lifting arm, and the pulley is slidably arranged on the track so that the pulley slides horizontally; the hoist is arranged on the pulley, and the first adsorption component and the second adsorption component are both arranged on the hoist so that the hoist drives the first adsorption component and the second adsorption component to rise and fall.

[0012] In some embodiments, the first adsorption component is a magnetic suction cup, and the second adsorption component is a vacuum suction cup.

[0013] In some embodiments, one side of the vehicle body is configured as an inclined plate, the inclined plate is used for the bearing roller to roll into the vehicle body, and the inclined plate is provided with a raceway for the bearing roller to roll down.

[0014] In some embodiments, a plurality of limit plates are disposed on the inclined plate. The limit plates are disposed in a horizontal direction on a side of the inclined plate facing the vehicle body, and the raceway is formed between adjacent limit plates.

[0015] In some embodiments, the inclined plate is provided with an adjustment groove arranged in the horizontal direction, and the limit plate is slidably inserted into the adjustment groove, and the distance between two adjacent limit plates is adjusted to adjust the width of the raceway. A fixing piece is provided on the inclined plate, and the fixing piece passes through the adjustment groove and is connected with the limit plate to fix the limit plate.

[0016] In some embodiments, the cleaning component includes an ultrasonic cleaner, a receiving cavity is provided in the vehicle body, and the ultrasonic cleaner is disposed in the receiving cavity to drive the cleaning liquid in the vehicle body to vibrate at a high frequency.

[0017] In some embodiments, the unloading assembly includes a conveyor belt, a demagnetizer and an air cooler, wherein the conveyor belt is arranged on the outer wall of the vehicle body; the air cooler is arranged on the vehicle body and blows air toward the conveyor belt to dry the bearing rollers; the demagnetizer is arranged on the vehicle body and is located above the unloading end of the conveyor belt to demagnetize the bearing rollers after air drying.

[0018] In some embodiments, the unloading assembly also includes an unloading inclined plate, which is arranged on the vehicle body and is smoothly connected to the unloading end of the conveyor belt so that the bearing roller slides onto the unloading inclined plate and slides out of the vehicle body.

[0019] On the other hand, the present application provides a method for using a main bearing roller transfer device for a tunnel boring machine, using the above-mentioned main bearing roller transfer device for a tunnel boring machine, the method comprising:

[0020] Move the car body to the main bearing to be disassembled;

[0021] Rotate the cantilever lifting member to move the first adsorption member to the upper part of the bearing roller to be removed from the main bearing, and lower the first adsorption member to absorb the bearing roller;

[0022] Adjust the cantilever hanging component to move the first adsorption component and the bearing roller into the vehicle body;

[0023] After the plurality of bearing rollers are moved into the vehicle body, a cleaning assembly is started to clean the bearing rollers, and the vehicle body is moved to a storage location for the bearing rollers;

[0024] Rotate the cantilever suspension member to the top of the vehicle body, and use the second suction member to absorb the cleaned bearing roller;

[0025] The cantilever hanging part is adjusted to place the bearing roller on the unloading assembly, and the unloading assembly dries the bearing roller and then sends it out of the vehicle body.

[0026] The present application provides a main bearing roller transfer device and a method of use for a tunnel boring machine. The main bearing roller transfer device for a tunnel boring machine is provided with a cantilever hoisting member, a first adsorbing member, and a second adsorbing member on a vehicle body. The position of the first adsorbing member and the second adsorbing member are moved by the cantilever hoisting member, so that the first adsorbing member is used to absorb the disassembled bearing roller, and the bearing roller is placed in the vehicle body by the cantilever hoisting member, so as to reduce the labor intensity of manual handling by the operator. In addition, after placing a plurality of bearing rollers in the vehicle body, the bearing rollers are cleaned by a cleaning component, and the cleaning process can be carried out synchronously with the movement and transportation of the vehicle body, thereby improving the conversion efficiency of the bearing rollers. After the cleaning is completed, the bearing rollers are sucked onto the unloading component by the second adsorbing member, and the unloading component dries the bearing rollers and moves them out of the vehicle body, so as to realize the entire transfer process of the bearing rollers. The first adsorbing member and the second adsorbing member are used for absorption respectively in the grabbing process of loading and unloading, so that the second adsorbing member of the unloading is always kept clean, avoiding secondary contamination of the bearing rollers. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0028] Figure 1 A schematic diagram of the structure of the roller transfer device for the main bearing of a tunnel boring machine provided in an embodiment of the present application;

[0029] Figure 2 for Figure 1 A side view of the diagram;

[0030] Figure 3 for Figure 1 Schematic diagram of the three-dimensional structure;

[0031] Figure 4 for Figure 1 A schematic diagram of the connection structure between the first adsorption member and the second adsorption member;

[0032] Figure 5 for Figure 1 Structural cross-section view of the middle inclined plate.

[0033] Description of reference numerals:

[0034] 100, vehicle body; 110, box body; 111, tilting plate; 112, limit plate; 113, adjustment groove; 114, raceway; 115, fixing part; 120, handle; 130, wheel; 140, drain pipe;

[0035] 200, grabbing assembly; 210, cantilever lifting member; 211, lifting arm; 212, track; 213, pulley; 214, hoist; 220, first adsorption member; 230, second adsorption member; 240, gripping part;

[0036] 300. Cleaning components;

[0037] 400, unloading assembly; 410, conveyor belt; 420, demagnetizer; 430, air cooler; 440, unloading inclined plate.

[0038] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0039] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.

[0040] It should be noted that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0041] In this application, unless otherwise clearly specified and limited, the terms "installation", "connection", "fixation" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0042] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0043] Tunnel boring machine remanufacturing is the current development trend of the global shield market. The main bearing, as the "heart" of the tunnel boring machine, is generally a three-row cylindrical roller structure. As a key component of the main bearing, the roller plays a role in supporting and reducing bearing friction. The main bearing of the tunnel boring machine bears all the heavy loads during operation and is also the main vulnerable component of the main bearing of the tunnel boring machine.

[0044] During the maintenance and remanufacturing of the tunnel boring machine, the main bearing needs to be disassembled for inspection and flaw detection. The main bearing of the tunnel boring machine is generally large in size (φ3~φ8.6m), and the large-diameter main bearing of the tunnel boring machine is not easy to adapt to the automation equipment like the small-diameter bearings commonly used in the market. At the same time, the rollers of the tunnel boring machine main bearing are generally large, heavy, and more numerous. Therefore, in the disassembly and inspection of the main bearing of the tunnel boring machine remanufacturing, the disassembly and inspection of the rollers accounts for the main labor time.

[0045] However, in the remanufacturing of the main bearings of tunnel boring machines, the disassembly and inspection of the rollers is mainly carried out by manual handling, which has low operating efficiency and high labor intensity for the operators.

[0046] In order to solve the above problems, the present application provides a main bearing roller transport device and a method for using the main bearing roller of a tunnel boring machine. The main bearing roller transport device of the tunnel boring machine is provided with a cantilever hoisting part, a first adsorbing part and a second adsorbing part on the vehicle body, and the positions of the first adsorbing part and the second adsorbing part are moved by the cantilever hoisting part, so as to use the first adsorbing part to absorb the disassembled bearing roller, and place the bearing roller into the vehicle body through the cantilever hoisting part, so as to reduce the labor intensity of manual handling by the operator. In addition, after placing multiple bearing rollers into the vehicle body, the bearing rollers are cleaned by a cleaning component, and the cleaning process can be carried out synchronously with the movement and transportation of the vehicle body, thereby improving the conversion efficiency of the bearing rollers. After the cleaning is completed, the second adsorbing part is used to absorb the bearing rollers onto the unloading component, and the unloading component dries the bearing rollers and moves them out of the vehicle body, so as to realize the entire transport process of the bearing rollers. The first adsorbing part and the second adsorbing part are used for absorption respectively in the grabbing process of loading and unloading, so that the second adsorbing part of the unloading is always kept clean, avoiding secondary contamination of the bearing rollers.

[0047] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.

[0048] On the one hand, the present application provides a main bearing roller transfer device for a tunnel boring machine, referring to Figures 1 to 5 , the main bearing roller transfer equipment of the tunnel boring machine includes a vehicle body 100, a grabbing assembly 200, a cleaning assembly 300 and a material discharging assembly 400;

[0049] The vehicle body 100 is used to accommodate and transport the bearing rollers;

[0050] The grabbing assembly 200 includes a cantilever hanging member 210, a first adsorption member 220 and a second adsorption member 230. The cantilever hanging member 210 is rotatably arranged on the vehicle body 100. The first adsorption member 220 and the second adsorption member 230 are both arranged on the cantilever hanging member 210. The cantilever hanging member 210 drives the first adsorption member 220 and the second adsorption member 230 to rise and fall. The first adsorption member 220 is used to absorb the bearing roller to place it in the vehicle body 100. The second adsorption member 230 is used to absorb the bearing roller in the vehicle body 100 to place it in the blanking assembly 400.

[0051] The cleaning assembly 300 is disposed in the vehicle body 100 to clean the bearing rollers in the vehicle body 100;

[0052] The blanking assembly 400 is disposed on the vehicle body 100 to dry the bearing rollers on the blanking assembly 400 and to move the bearing rollers out of the vehicle body 100 .

[0053] in, Figure 1 and Figure 3 In each of the figures, only the first adsorption member 220 is shown.

[0054] By adopting the above technical solution, the cantilever hoisting member 210 is driven to move the position of the first adsorbent member 220, so that the first adsorbent member 220 is used to absorb the disassembled bearing rollers, and the bearing rollers are placed in the vehicle body 100 through the cantilever hoisting member 210 to reduce the labor intensity of manual handling by the operator. In addition, after placing multiple bearing rollers in the vehicle body 100, the bearing rollers are cleaned by the cleaning component 300, and the cleaning process can be carried out synchronously with the movement and transportation of the vehicle body 100, thereby improving the conversion efficiency of the bearing rollers. After the cleaning is completed, the second adsorbent member 230 is used to absorb the bearing rollers onto the unloading component 400, and the unloading component 400 dries the bearing rollers and moves them out of the vehicle body 100 to realize the entire transportation process of the bearing rollers. In the process of loading and unloading, the first adsorbent member 220 and the second adsorbent member 230 are used for absorption respectively, so that the second adsorbent member 230 of unloading is always kept clean, avoiding secondary contamination of the bearing rollers.

[0055] Among them, refer to Figure 1 and Figure 2 The vehicle body 100 includes a box body 110, a handle 120 and a plurality of wheels 130. The box body 110 is a top-opening structure, and a cavity for mounting bearing rollers is formed inside the box body 110. The handle 120 is mounted on the outer wall of the box body 110 so that the box body 110 can be pushed to move by the handle 120. The internal hardness of the box body 110 is lower than the hardness of the bearing rollers to prevent the bearing rollers from being damaged by bumps during rolling in the box body 110.

[0056] A plurality of wheels 130 are installed at the bottom of the box 110. In the embodiment of the present application, the number of wheels 130 is four, and at least two of the wheels 130 are universal wheels with a self-locking structure, so that the operator can park the vehicle body 100 at any position and reduce unnecessary sliding of the vehicle body 100.

[0057] In some embodiments, the cantilever lifting component 210 includes a lifting arm 211, a track 212, a pulley 213 and a hoist 214. The lifting arm 211 is rotatably set on the vehicle body 100, the track 212 is horizontally set on the lifting arm 211, and the pulley 213 is slidably set on the track 212 so that the pulley 213 slides in the horizontal direction; the hoist 214 is set on the pulley 213, and the first adsorption component 220 and the second adsorption component 230 are both set on the hoist 214, so that the hoist 214 drives the first adsorption component 220 and the second adsorption component 230 to rise and fall.

[0058] The hoisting arm 211 includes a vertical rod and a horizontal beam. The vertical rod is rotatably mounted at the end of the vehicle body 100 near the handle 120, and the rotation axis of the vertical rod is in the vertical direction. One end of the horizontal beam is fixed to the top of the vertical rod, and the horizontal beam is perpendicular to the vertical rod. The length of the horizontal beam is greater than the length of the vehicle body 100, so as to facilitate grabbing the bearing roller. The height of the vertical rod is greater than the height of the vehicle body 100, so as to facilitate hoisting the bearing roller into the vehicle body 100.

[0059] The track 212 is installed at the bottom of the beam, and the track 212 is arranged along the length direction of the beam. The pulley 213 is slidably connected to the track 212 to adjust the horizontal position of the first adsorption member 220 and the second adsorption member 230. Among them, a limit block can also be set at the end of the track 212 to prevent the pulley 213 from sliding off the track 212. Among them, the pulley 213 can be a manual structure, which is manually pushed; it can also be driven by an electric structure or a hydraulic structure to move the pulley 213, which will not be elaborated here.

[0060] The hoist 214 is installed on the pulley 213. The hoist 214 is a commonly used electric hoist, elevator or other mechanism. The hoist 214 can be installed normally, and the hoist 214 is fixed on the pulley 213, so that the chain or lifting structure is connected to the first adsorption member 220 and the second adsorption member 230. The hoist 214 can also be installed upside down, the chain or lifting structure is installed on the pulley 213, and the first adsorption member 220 and the second adsorption member 230 are installed on the hoist 214 body.

[0061] Furthermore, a gripping portion 240 is fixed on the lifting machine 214, and the first adsorption member 220 and the second adsorption member 230 are both connected to the gripping portion 240. It is convenient for an operator to grip the gripping portion 240 to adjust the positions of the first adsorption member 220 and the second adsorption member 230, so as to accurately operate the first adsorption member 220 and the second adsorption member 230 to absorb the bearing roller.

[0062] Further, in order to facilitate the absorption of the bearing roller, the first adsorption member 220 and the second adsorption member 230 are both hinged at the bottom of the gripping portion 240. The first adsorption member 220 and the second adsorption member 230 are hinged side by side at the bottom of the gripping portion 240, and the first adsorption member 220 and the second adsorption member 230 each have two fixed positions, and the angle between the two fixed positions is greater than or equal to 90°.

[0063] By adopting the above technical solution, when the first adsorbent 220 needs to be used, the first adsorbent 220 is rotated to a vertical direction and located directly below the bottom of the gripping portion 240, so that the first adsorbent 220 is facing the disassembled bearing roller; the second adsorbent 230 is rotated to a horizontal direction and fixed, so that the first adsorbent 220 can be used alone to prevent the second adsorbent 230 from being contaminated by oil. When the second adsorbent 230 needs to be used, the second adsorbent 230 is rotated to a vertical direction and located directly below the bottom of the gripping portion 240, and the first adsorbent 220 is rotated to a horizontal direction and fixed. In this way, a clean adsorbent is used to absorb the cleaned bearing roller to prevent the bearing roller from being contaminated again.

[0064] In some embodiments, reference Figure 1 and Figure 4 The first adsorption component 220 is a magnetic suction cup, and the second adsorption component 230 is a vacuum suction cup.

[0065] When the main bearing is remanufactured, the surface of the bearing roller is usually lubricated with oil, and it is faster and safer to use a magnetic adsorption device to absorb it. After the bearing roller is cleaned, the surface is clean. Considering that there should be no oil on the surface of the bearing roller, a vacuum adsorption device is used to adsorb the rolling surface of the bearing roller, and then gently placed in the pocket hole to prevent the bearing roller from falling and damaging the raceway 114 due to its own weight.

[0066] In some embodiments, one side of the vehicle body 100 is provided with an inclined plate 111 , and the inclined plate 111 is used for the bearing rollers to roll into the vehicle body 100 , and a raceway 114 is provided on the inclined plate 111 for the bearing rollers to roll down.

[0067] The inclined plate 111 is a side plate of the box body 110 away from the handle 120. The distance from the bottom of the inclined plate 111 to the handle 120 is smaller than the distance from the top of the inclined plate 111 to the handle 120. When hanging the bearing roller, the bearing roller is placed on the raceway 114 on the inclined plate 111, so that the bearing roller rolls from the raceway 114 to the bottom of the box body 110, so as to reduce the bump caused by the bearing roller during the hanging process.

[0068] In some embodiments, a plurality of limit plates 112 are disposed on the inclined plate 111, and the limit plates 112 are disposed horizontally on the side of the inclined plate 111 facing the inside of the vehicle body 100, and a raceway 114 is formed between adjacent limit plates 112. The bearing rollers roll along the raceway 114 into the vehicle body 100 to reduce collision of the bearing rollers.

[0069] Furthermore, an adjustment groove 113 arranged in the horizontal direction is opened on the inclined plate 111, and the limit plate 112 is slidably inserted into the adjustment groove 113, and the distance between two adjacent limit plates 112 is adjusted to adjust the width of the raceway 114. A fixing member 115 is provided on the inclined plate 111, and the fixing member 115 passes through the adjustment groove 113 and is connected with the limit plate 112 to fix the limit plate 112.

[0070] The adjusting groove 113 is provided on the top of the inclined plate 111 to prevent the cleaning liquid in the box 110 from flowing out of the adjusting groove 113. The limiting plate 112 can be a straight plate or an L-shaped plate. When the limiting plate 112 is an L-shaped plate, one side of the limiting plate 112 abuts against the inclined plate 111, thereby improving the stability of the limiting plate 112 and reducing the shaking of the limiting plate 112. By adjusting the position between the limiting plates 12, the width of the raceway 114 can be adjusted to adapt to bearing rollers of different sizes, thereby improving the adaptability of the equipment.

[0071] The fixing member 115 is a bolt, which is inserted into the adjusting groove 113 and threadedly connected to the limiting plate 112 through the adjusting groove 113 . The bolt head of the bolt abuts against the outer side wall of the inclined plate 111 to fix the limiting plate 112 .

[0072] In some embodiments, the cleaning component 300 includes an ultrasonic cleaner. A receiving cavity is provided in the vehicle body 100 . The ultrasonic cleaner is disposed in the receiving cavity to drive the cleaning liquid in the vehicle body 100 to vibrate at a high frequency.

[0073] The accommodating cavity is a frame structure installed in the box 110 for installing an ultrasonic cleaner. When in use, a cleaning liquid is first placed in the box 110. When the bearing roller completely rolls into the box 110, the ultrasonic cleaner is started to emit a high-frequency oscillation signal, which is converted into a high-frequency mechanical oscillation by the transducer and propagated into the cleaning liquid, thereby removing stains such as oil on the bearing roller. The cleaning liquid can be clean water plus detergent, or other prepared cleaning agents.

[0074] Further, a drain pipe 140 is also provided at the bottom of the box body 110, and a valve is installed on the drain pipe 140 to open and close the drain pipe 140. When the cleaning is completed, the vehicle body 100 is moved to the wastewater discharge, and the valve is opened to discharge the cleaning liquid in the box body 110.

[0075] In some embodiments, the unloading assembly 400 includes a conveyor belt 410, a demagnetizer 420 and an air cooler 430. The conveyor belt 410 is arranged on the outer wall of the vehicle body 100; the air cooler 430 is arranged on the vehicle body 100 and blows air toward the conveyor belt 410 to dry the bearing rollers; the demagnetizer 420 is arranged on the vehicle body 100 and is located above the unloading end of the conveyor belt 410 to demagnetize the bearing rollers after air drying.

[0076] After the bearing rollers are cleaned and the cleaning liquid is discharged, the second adsorption member 230 is used to absorb the bearing rollers in the box 110 and place them on the conveyor belt 410. The conveyor belt 410 is arranged horizontally so that the bearing rollers can be air-dried by the air cooler 430, demagnetized by the demagnetizer 420, and then moved out of the vehicle body 100.

[0077] Among them, there cannot be magnetism during the operation of the bearing, so the bearing roller needs to be demagnetized; the cleaning agent used for the bearing roller generally has a certain volatility, and the use of the air cooler 430 can dry the surface of the bearing roller more quickly.

[0078] Furthermore, the unloading assembly 400 also includes an unloading inclined plate 440, which is arranged on the vehicle body 100. The unloading inclined plate 440 is smoothly connected to the unloading end of the conveyor belt so that the bearing roller slides onto the unloading inclined plate 440 and slides out of the vehicle body 100.

[0079] The side of the material discharging inclined plate 440 is provided with a baffle to prevent the bearing roller from rolling out of the material discharging inclined plate 440 from the edge of the material discharging inclined plate 440. The bottom of the material discharging inclined plate 440 can be used in conjunction with a material receiving container such as a pallet, a wooden box, etc., and a softer material should be used inside the material receiving container to prevent the roller from being bumped and damaged.

[0080] On the other hand, the present application provides a method for using a main bearing roller transfer device for a tunnel boring machine. Using the main bearing roller transfer device for a tunnel boring machine, the method comprises:

[0081] The vehicle body 100 is moved to a main bearing to be disassembled.

[0082] First, place a suitable cleaning liquid in the box 110, and then push the vehicle body 100 to move to the main bearing to be disassembled.

[0083] The cantilever hanging member 210 is rotated to move the first suction member 220 to above the bearing roller to be removed from the main bearing, and the first suction member 220 is lowered to absorb the bearing roller.

[0084] Adjust the first adsorption component 220 to the vertical direction, and rotate the second adsorption component 230 to the top of the first adsorption component 220; then rotate the cantilever hoisting component 210, and move the pulley 213 so that the first adsorption component 220 is located above the main bearing, and lower the first adsorption component 220 through the hoist 214, and use the first adsorption component 220 to adsorb a bearing roller. During this process, the operator holds the gripping part 240 to adjust the position of the first adsorption component 220 so that the first adsorption component 220 can accurately absorb the bearing roller.

[0085] The cantilever hanging component 210 is adjusted to move the first suction component 220 and the bearing roller into the vehicle body 100 .

[0086] The lifting machine 214 is adjusted to lift the first adsorbent 220, and the hoisting arm 211 is rotated to move the first adsorbent 220 to the inclined plate 111, and then the first adsorbent 220 is lowered so that the bearing roller contacts the inclined plate 111, and then the first adsorbent 220 is controlled to release the bearing roller so that the bearing roller rolls into the cleaning liquid in the box 110. Repeat the above grabbing operation to place multiple bearing rollers in the box 110. The number of bearing rollers placed in the box 110 changes according to the volume of the box 110.

[0087] After the plurality of bearing rollers are moved into the vehicle body 100, the cleaning assembly 300 is started to clean the bearing rollers, and the vehicle body 100 is moved to a storage location for the bearing rollers.

[0088] During the cleaning process of the vehicle body 100, the vehicle body 100 can be pushed and moved synchronously to save processing time. After the cleaning is completed, the vehicle body 100 is moved to the place where the bearing rollers are placed, which is also the place where the waste water is discharged. The cleaning liquid tray in the box 110 is first discharged, and the bearing rollers are exposed before hoisting.

[0089] The cantilever hanging member 210 is rotated to the top of the vehicle body 100 , and the second suction member 230 is used to absorb the cleaned bearing roller.

[0090] Adjust the second adsorption member 230 to the vertical direction, rotate the first adsorption member 220 above the horizontal direction, rotate the lifting arm 211, adjust the position of the pulley 213, and lower the second adsorption member 230 into the box 110 through the hoist 214 to absorb the cleaned bearing rollers.

[0091] The cantilever hanging member 210 is adjusted, and the bearing roller is placed on the unloading assembly 400 . The unloading assembly 400 dries the bearing roller and then sends it out of the vehicle body 100 .

[0092] The bearing rollers are placed on the conveyor belt 410, dried by the air cooler 430 and demagnetized by the demagnetizer, and then placed in the corresponding receiving container through the unloading inclined plate 440. The receiving container contains cushioning materials such as sponges to prevent the cleaned bearing rollers from being damaged. Repeat the above steps to complete the disassembly and cleaning of all the rollers of the main bearing.

[0093] The cleaned bearing rollers are subjected to PT flaw detection near or beside the vehicle body 100 .

[0094] Make a judgment on the PT flaw detection; if the PT flaw detection fails, it is judged that the roller is defective and should be scrapped; if the PT flaw detection passes, it is judged that the roller is in good condition and can continue to be used. Continue to use the above-mentioned transfer equipment to lift the qualified bearing roller for cleaning, and thoroughly clean the colorant and developer on the bearing roller.

[0095] Assemble the bearing roller: Place the auxiliary thrust cage circumferentially on the auxiliary thrust raceway 114; Hold the grip 240, so that the second adsorption member 230 adsorbs the rolling surface of the auxiliary thrust roller, and places the roller in the pocket of the auxiliary thrust cage. Compared with manual handling, this process avoids the risk of hand slippage, avoids manually placing the roller in the pocket and damaging the raceway 114, and reduces labor intensity.

[0096] Lift the inner ring; lift the radial cage to the end face of the inner ring of the bearing, hold the holding portion 240, make the second adsorption member 230 adsorb the rolling surface of the radial roller, place the radial roller in the pocket of the radial cage, and assemble the radial cage and the radial roller together into the radial raceway 114;

[0097] Lift the main push cage and place it on the main push raceway 114 in a circular shape; hold the gripping portion 240 to allow the second adsorption member 230 to adsorb the rolling surface of the main push roller, and place the main push roller in the pocket of the main push cage. Compared with manual handling, this process avoids the risk of hand slippage, avoids manually placing the roller in the pocket and damaging the raceway 114, and reduces labor intensity. Lift the first outer ring to complete the assembly.

[0098] The present application provides a method for using a main bearing roller transport device for a tunnel boring machine. The first adsorption member 220 and the second adsorption member 230 are moved by a cantilever hoisting member 210 to absorb the removed bearing rollers using the first adsorption member 220, and the bearing rollers are placed in a vehicle body 100 by the cantilever hoisting member 210 to reduce the labor intensity of manual handling by operators. Moreover, after placing multiple bearing rollers in the vehicle body 100, the bearing rollers are cleaned by a cleaning assembly 300, and the cleaning process can be carried out synchronously with the movement and transportation of the vehicle body 100, thereby improving the conversion efficiency of the bearing rollers. After cleaning, the second adsorbent 230 is used to absorb the bearing roller onto the unloading component 400. The unloading component 400 dries the bearing roller and moves it out of the vehicle body 100 to realize the entire transportation process of the bearing roller. The first adsorbent 220 and the second adsorbent 230 are used for adsorption during the loading and unloading processes, respectively, so that the second adsorbent 230 for unloading is always kept clean, avoiding secondary contamination of the bearing roller.

[0099] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the present application. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the following claims.

[0100] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.

Claims

1. A roller transfer device for a main bearing of a tunnel boring machine, characterized in that: It comprises a vehicle body (100), a grabbing assembly (200), a cleaning assembly (300) and a material discharging assembly (400); The vehicle body (100) is used for receiving and transporting bearing rollers; The grabbing assembly (200) comprises a cantilever hanging component (210), a first adsorption component (220) and a second adsorption component (230); the cantilever hanging component (210) is rotatably arranged on the vehicle body (100); the first adsorption component (220) and the second adsorption component (230) are both arranged on the cantilever hanging component (210); the cantilever hanging component (210) drives the first adsorption component (220) and the second adsorption component (230) to rise and fall; the first adsorption component (220) is used to absorb the bearing roller to place it in the vehicle body (100); the second adsorption component (230) is used to absorb the bearing roller in the vehicle body (100) to place it in the blanking assembly (400); The cleaning component (300) is arranged in the vehicle body (100) to clean the bearing rollers in the vehicle body (100); The unloading assembly (400) is arranged on the vehicle body (100) to dry the bearing rollers located in the unloading assembly (400) and to move the bearing rollers out of the vehicle body (100).

2. The main bearing roller transfer device of the tunnel boring machine according to claim 1, characterized in that: The cantilever hoisting member (210) comprises a hoisting arm (211), a track (212), a pulley (213) and a hoist (214); the hoisting arm (211) is rotatably arranged on the vehicle body (100); the track (212) is arranged on the hoisting arm (211) in a horizontal direction; the pulley (213) is slidably arranged on the track (212) so that the pulley (213) slides in a horizontal direction; the hoist (214) is arranged on the pulley (213); the first adsorption member (220) and the second adsorption member (230) are both arranged on the hoist (214) so ​​that the hoist (214) drives the first adsorption member (220) and the second adsorption member (230) to rise and fall.

3. The main bearing roller transfer device of the tunnel boring machine according to claim 1, characterized in that: The first adsorption component (220) is a magnetic suction cup, and the second adsorption component (230) is a vacuum suction cup.

4. The main bearing roller transfer device of the tunnel boring machine according to claim 1, characterized in that: One side of the vehicle body (100) is provided with an inclined plate (111), and the inclined plate (111) is used for the bearing roller to roll into the vehicle body (100), and a rolling track (114) for the bearing roller to roll down is provided on the inclined plate (111).

5. The main bearing roller transfer device of the tunnel boring machine according to claim 4, characterized in that: A plurality of limit plates (112) are arranged on the inclined plate (111), and the limit plates (112) are arranged in a horizontal direction on a side of the inclined plate (111) facing the inside of the vehicle body (100), and the rolling track (114) is formed between adjacent limit plates (112).

6. The main bearing roller transfer device of the tunnel boring machine according to claim 5, characterized in that: The inclined plate (111) is provided with an adjustment slot (113) arranged in the horizontal direction, the limit plate (112) is slidably inserted into the adjustment slot (113), and the distance between two adjacent limit plates (112) is adjusted to adjust the width of the raceway (114); the inclined plate (111) is provided with a fixing member (115), and the fixing member (115) passes through the adjustment slot (113) and is connected to the limit plate (112) to fix the limit plate (112).

7. The main bearing roller transfer device of a tunnel boring machine according to any one of claims 1 to 6, characterized in that: The cleaning component (300) comprises an ultrasonic cleaner. A receiving cavity is provided in the vehicle body (100). The ultrasonic cleaner is arranged in the receiving cavity to drive the cleaning liquid in the vehicle body (100) to vibrate at a high frequency.

8. The main bearing roller transfer device of a tunnel boring machine according to any one of claims 1 to 6, characterized in that: The unloading assembly (400) comprises a conveyor belt (410), a demagnetizer (420) and an air cooler (430); the conveyor belt (410) is arranged on the outer side wall of the vehicle body (100); the air cooler (430) is arranged on the vehicle body (100) and blows air toward the conveyor belt (410) to dry the bearing rollers; the demagnetizer (420) is arranged on the vehicle body (100) and is located above the unloading end of the conveyor belt (410) to demagnetize the bearing rollers after being air-dried.

9. The main bearing roller transfer device of a tunnel boring machine according to claim 8, characterized in that: The unloading assembly (400) further comprises an unloading inclined plate (440), wherein the unloading inclined plate (440) is arranged on the vehicle body (100), and the unloading inclined plate (440) is smoothly connected to the unloading end of the conveyor belt (410) so that the bearing roller slides onto the unloading inclined plate (440) and slides out of the vehicle body (100).

10. A method for using a roller transfer device for a main bearing of a tunnel boring machine, characterized in that: Using the roadheader main bearing roller transfer device according to any one of claims 1 to 9, the method comprises: Moving the vehicle body (100) to the main bearing to be disassembled; Rotating the cantilever hanging component (210), moving the first suction component (220) to the top of the bearing roller to be removed from the main bearing, and lowering the first suction component (220) to absorb the bearing roller; Adjusting the cantilever hanging component (210) to move the first adsorption component (220) and the bearing roller into the vehicle body (100); After the plurality of bearing rollers are moved into the vehicle body (100), a cleaning component (300) is started to clean the bearing rollers, and the vehicle body (100) is moved to a storage location for the bearing rollers; Rotating the cantilever hanging component (210) to the top of the vehicle body (100), and using the second suction component (230) to absorb the cleaned bearing roller; The cantilever hanging component (210) is adjusted to place the bearing roller on a material unloading component (400), and the material unloading component (400) dries the bearing roller and then sends it out of the vehicle body (100).

Citation Information

Patent Citations

  • Heading machine and material transfer method of heading machine

    CN114198110A

  • Automatic production equipment for bar grinding

    CN116690371A

  • Bearing degreasing and cleaning machine

    CN201900105U

  • Bearing transport vehicle

    CN214396800U

  • Conveying device for bearing rollers

    CN214455009U