Grouting method for directional drilling of high-pressure sleeve valve pipe in deep-buried tunnel

By setting up annular drilling holes and valve pipes in the deep buried tunnel for high-pressure grouting, the low grouting efficiency and slurry leakage caused by water sludge in the deep buried tunnel was solved, and the uniform flooding and grouting quality of the rock mass was achieved. Improvement, suitable for subsequent excavation of TBM or shield machine.

CN118933859APending Publication Date: 2024-11-12CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD

Patent Information

Application Number
CN202410876944.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The grouting efficiency, high risk of sludge leakage, poor grouting effect caused by water sludge surges in deep buried tunnels, and large surface directional drilling has problems such as large engineering volume, high equipment requirements, and uneven grouting effect.

Method used

Set up a symmetrical drilling hole in the hole with an annular center, pass through the water rushing mud risk hole section, and install a valve tube and packing under the hole. Controlled grouting is carried out through a double-connected high-pressure grouting plug, and the slurry splits the filler to achieve Rock reinforcement.

Benefits of technology

Improve construction efficiency, rock mass irrigation uniformity, controllable grouting rate, good grouting quality, reduces the amount of hole sweeping and drilling requirements, reduces the risk of slurry leakage and drilling, and is suitable for the follow-up of TBM or shield machines. Excavation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933859A_ABST
    Figure CN118933859A_ABST
Patent Text Reader

Abstract

The invention provides an in-hole directional drilling high-pressure sleeve valve pipe grouting method for a deeply-buried tunnel, which comprises the following steps: drilling holes by adopting in-hole directional drilling, enabling the drilled holes to penetrate through a water burst and mud burst risk hole section at one time along the periphery of the tunnel, then putting a sleeve valve pipe and filling filler in the holes, and finally performing high-pressure controlled grouting from bottom to top by utilizing a duplex grouting plug. The method solves the problems of low working efficiency, high grout leakage and runout risk, poor grouting effect and the like in the treatment of the water-burst and mud-burst risk tunnel section of the deep-buried tunnel by the conventional advance grouting in the tunnel; and meanwhile, the defects that the earth surface directional drilling is easy to waste engineering quantity, large in hole sweeping engineering quantity, not direct in treatment effect, high in drilling machine requirement and the like are overcome. The method has the advantages that the construction efficiency is high, the rock mass grouting uniformity is good, the grouting injection rate is controllable, the grouting quality is good, the hole sweeping engineering amount is small, the in-hole treatment effect is direct, the grouting effect is easy to check, the requirement for a drilling machine is small, and subsequent excavation of the TBM or the shield tunneling machine cannot be affected even if the drilling machine falls off or is stuck.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of grouting treatment of poor geological bodies in tunnel engineering, and more specifically, relates to a grouting method for a high-pressure sleeve valve pipe in a directional drill in a deep-buried tunnel. Background Art

[0002] Water and mud bursts are important factors that restrict the safety, construction period and investment of deep buried tunnel construction. They are characterized by suddenness, high flow velocity, high water pressure and strong destructiveness. Deep buried tunnels are deep, bear high external water head, and inevitably pass through complex geological conditions such as regional faults. The problem of water and mud bursts in the tunnel section of high-pressure water-rich fracture zone is very prominent.

[0003] Pre-grouting is an important means to deal with water and mud bursts. In the existing conventional pre-grouting, a grouting wall is usually set up on the tunnel face. The horizontal reinforcement length of the pre-grouting hole is 30m to 40m. After each cycle of grouting, the tunnel is excavated 25m to 30m, and a 5m to 10m grouting rock plate is retained. The pre-grouting holes are arranged in an umbrella-shaped radial shape from the working face to the excavation direction. The typical arrangement is shown in Figure 1 The main problems of conventional advance grouting in this tunnel are: first, advance grouting directly occupies the linear construction period of the face; second, the maximum grouting pressure that the stop wall can withstand is limited, and it is easy to leak and run into the tunnel during the grouting process, and it is subjected to high-pressure water head, making grouting difficult under dynamic water conditions and poor grouting effect; third, the drilling and grouting footage is large, the footage per cycle is short, and the construction period is long. Fourth, it is difficult to implement advance grouting on the face at the TBM construction site.

[0004] Directional drilling is introduced in some projects for surface advance grouting, such as CN116877136A. This surface directional drilling has flexible drilling direction, and the maximum drilling hole can reach thousands of meters. The drilling holes can be arranged at a distance from the grouting body. In addition, since the buried depth of deep-buried tunnels is generally more than 250m, the non-grouting section from the surface to the grouting section is very long, generally more than 300m, which will cause the following problems:

[0005] 1. The drilling work is large and the equipment requirements are high: The drilling work in the grouting section leads to a large drilling work and a slow construction period. In addition, due to the long borehole, the torque required for the drill rod to advance is very large, so it is necessary to use high-torque drilling equipment, which increases the investment;

[0006] 2. High consumption of slurry: Due to the large burial depth, low-pressure grouting cannot be adopted. For example, if the tunnel burial depth reaches 500m, the pressure generated by the deadweight of the slurry alone will reach 10MPa, which will increase the slurry injection volume and investment.

[0007] 3. Large hole sweeping workload: If hole-sealing grouting is required, each grouting section needs to be swept for the non-grouting section, resulting in a huge hole sweeping workload, which greatly increases the construction period and investment;

[0008] 4. Misjudgment of geological conditions is easy to occur: it is difficult to obtain intuitive geological data due to the large burial depth, it is difficult to directly see the surrounding rock properties due to ultra-deep directional drilling core sampling, and it is easy to make misjudgments, resulting in a larger grouting section, increased investment, or a smaller grouting section, resulting in additional grouting, which increases investment;

[0009] 5. The inspection hole project is large and the inspection results are not intuitive: the inspection hole is long and the project volume is large, it is difficult to arrange more inspection holes, and it is difficult to drill and coring holes in ultra-deep directional drilling, and it is difficult to check the grouting quality. The grouting time is long from the excavation exposure. If the grouting quality is found to be not up to expectations after excavation, supplementary grouting will lead to increased project volume and investment, affecting the construction period.

[0010] Conventional advance grouting and surface directional drilling advance grouting technologies still have problems such as low efficiency, uneven grouting, large injection volume, and poor grouting effect in the treatment of deep tunnel sections with risk of water gushing and mud bursting. It is necessary to propose a better grouting method for deep tunnel grouting. Summary of the invention

[0011] The purpose of the present invention is to provide a method for grouting high-pressure sleeve valve tubes through directional drilling in a deep-buried tunnel. The method is a method for grouting high-pressure sleeve valve tubes through directional drilling in a deep-buried tunnel with high construction efficiency, good rock mass grouting uniformity, controllable grouting injection rate and good grouting quality.

[0012] To achieve the above object, the present invention provides a method for grouting a high-pressure sleeve valve pipe by directional drilling in a deep-buried tunnel, comprising the following steps:

[0013] S1. Starting from the tunnel, directional drilling holes are arranged on the tunnel face of the deep-buried tunnel. The arrangement of the holes is as follows: multiple holes are arranged symmetrically in a circular shape along the periphery of the tunnel. Each hole includes a borehole deflection section and a horizontal grouting section connected to each other. One end of the borehole deflection section is located on the tunnel face of the deep-buried tunnel. The horizontal grouting section is arranged through the tunnel section with water gushing and mud bursting risks.

[0014] S2, after the drilling is completed, a casing valve pipe is installed under the horizontal grouting section to the bottom of the hole; after the casing valve pipe is installed, the space between the casing valve pipe and the wall of the drilled hole is filled with filler;

[0015] S3, using a directional drill pipe to lower a double-type high-pressure grouting plug into the casing valve pipe to the bottom of the hole, and performing high-pressure grouting between the double-type grouting plugs through a grouting pipeline. After the grouting fluid splits the filler, it is injected into the rock mass. Controlled grouting is used. When the grouting fluid injection rate is less than a specified value or the unit injection rate reaches the designed injection volume, the grouting of this section is terminated.

[0016] S4, raise the grouting pipeline by the length of the grouting plug, and repeat step S3;

[0017] S5. Repeat step S4 until the grouting of the horizontal grouting section is completed, and the thickness of the reinforced grouting ring formed after grouting is 0.5 to 1.5 times the diameter of the deep buried tunnel.

[0018] Furthermore, in step S1, after the drilling of the borehole deflection section is completed, a casing string is lowered, and the entire section of the casing is fixed to the borehole with cement slurry, and then the drilling of the horizontal grouting section is carried out.

[0019] Furthermore, the turning radius of the connection between the orifice deflection section and the horizontal grouting section is greater than 250m.

[0020] Furthermore, the effective diffusion radius of the slurry around each borehole is 8m to 12m.

[0021] Furthermore, the distance between the heading face of the deep buried tunnel and the unfavorable geological body is 25m to 150m.

[0022] Furthermore, the length of the orifice deflection section is 20m to 100m.

[0023] Furthermore, the sleeve valve pipe is a seamless steel pipe with a closed bottom. A ring of slurry outlet holes is set every 30cm to 50cm, with 2 to 5 slurry outlet holes in each ring. The diameter of the slurry outlet hole is 8mm to 15mm, and the outside of the slurry outlet hole is sealed with a rubber hoop.

[0024] Furthermore, the double-jointed high-pressure grouting plug is of water pressure or air pressure type, can withstand a grouting pressure of not less than 15 MPa, and the spacing between the two joints is 1m to 3m.

[0025] Furthermore, the prescribed value is 0.5L to 1.0L / (min·m).

[0026] Furthermore, the filler is cement clay slurry, which is injected through the bottom of the hole of the sleeve valve pipe.

[0027] Compared with the prior art, the present invention has the following technical effects:

[0028] The method of grouting a high-pressure sleeve valve pipe in a deep-buried tunnel with directional drilling of the present invention adopts a directional drilling in the tunnel to drill a hole, and the hole passes through the risk tunnel section with water gushing and mud bursting (i.e., the bad geological body section) at one time along the periphery of the tunnel, and then the sleeve valve pipe and filling filler are placed in the hole, and finally a double-joint grouting plug is used for high-pressure controlled grouting from bottom to top. The method of the present invention solves the problems of low efficiency, high risk of leakage and grouting, and poor grouting effect in the treatment of the risk tunnel section with water gushing and mud bursting in the deep-buried tunnel; and also solves the shortcomings of surface directional drilling that is easy to waste engineering volume, large amount of hole sweeping engineering volume, indirect treatment effect, and high drilling machine requirements. The method of the present invention has the advantages of high construction efficiency, good uniformity of rock mass grouting, controllable grouting injection rate, good grouting quality, small amount of hole sweeping engineering volume, direct treatment effect in the tunnel, easy inspection of grouting effect, small requirements for drilling machine, and no impact on the subsequent excavation of TBM or shield machine even if the drill is dropped or stuck. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0030] Figure 1 A schematic diagram of conventional advance grouting arrangement in a hole provided as the background technology of the present invention;

[0031] Figure 2 A schematic diagram of a directional drilling arrangement in a hole provided by an embodiment of the present invention;

[0032] Figure 3 A schematic diagram of the arrangement of the valve pipe grouting of the directional drilling sleeve in the hole provided by the embodiment of the present invention;

[0033] Figure 4 for Figure 2 Left side view. DETAILED DESCRIPTION

[0034] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0035] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0036] The deep buried tunnel in the embodiment of the present invention refers to a tunnel with a burial depth exceeding 250m; high-pressure grouting refers to grouting with a grouting pressure of more than 5MPa; in-tunnel directional grouting refers to directional drilling grouting in the tunnel using directional drilling grouting equipment; casing valve pipe grouting refers to a method of inserting a casing valve pipe into a borehole and using a grouting plug in the casing valve pipe for grouting.

[0037] The embodiment of the present invention provides a method for grouting a high-pressure sleeve valve pipe by directional drilling in a deep-buried tunnel, comprising the following steps:

[0038] S1. Starting from the tunnel, directional drilling holes are arranged on the face of the deep buried tunnel. The arrangement of the holes is as follows: multiple holes (i.e. grouting holes) are arranged symmetrically in a circular shape along the periphery of the tunnel. Each hole includes a borehole beveling section and a horizontal grouting section connected to each other. One end of the borehole beveling section is located on the face of the deep buried tunnel. The horizontal grouting section is arranged through the tunnel section with water gushing and mud bursting risks (i.e., the section with poor geological conditions). Figure 2 , Figure 4 As shown;

[0039] S2. After the drilling is completed, the casing valve pipe is installed in the horizontal grouting section to the bottom of the hole; after the casing valve pipe is installed, the space between the casing valve pipe and the borehole wall is filled with fillers, such as Figure 3 As shown;

[0040] S3. Use the directional drill pipe to lower the double-joint high-pressure grouting plug into the casing valve pipe to the bottom of the hole, and use the grouting pipeline to perform high-pressure grouting between the double-joint grouting plugs. Figure 3 As shown, after the grouting material is split and filled, the rock mass is injected. Controlled grouting is adopted, and the grouting is basically not consumed. When the grouting rate is less than the specified value or the unit injection rate reaches the designed injection volume, the grouting of this section is ended.

[0041] S4, raise the grouting pipeline by the length of the grouting plug, and repeat step S3;

[0042] S5. Repeat step S4 until the grouting of the horizontal grouting section is completed, and the thickness of the reinforced grouting ring formed after grouting is 0.5 to 1.5 times the diameter of the deep buried tunnel.

[0043] Among them, in the above step S1, after the drilling of the borehole deflection section is completed, the whole section of cement slurry is used to fix the pipe to the borehole, and then the horizontal grouting section is drilled. This is to prevent the topsoil section of the borehole deflection section from collapsing and falling off, and to ensure the safe and rapid drilling of the subsequent horizontal grouting section. In the embodiment of the present invention, the length of the borehole deflection section is 20m to 100m, the borehole diameter is Φ153mm, and a Φ146×7mm oil casing string is inserted. The horizontal grouting section has a borehole diameter of Φ110mm.

[0044] Directional drilling in a tunnel generally adopts near-horizontal drilling. Due to the limitation of the drilling process, the turning radius of the near-horizontal drilling trajectory in the embodiment of the present invention is generally greater than 250m, that is, the turning radius at the connection between the hole mouth deflection section and the horizontal grouting section is greater than 250m, so as to meet the requirements of the directional drilling rig equipment in the tunnel.

[0045] The distance between the heading face of the deep buried tunnel in the embodiment of the present invention and the unfavorable geological body is 25m to 150m to ensure construction safety and reserve a turning distance for the orifice beveling section. When drilling, starting from the heading face in the tunnel, the orifice beveling section is curved and drilled to the horizontal grouting section. The horizontal grouting section is arranged parallel to the tunnel axis, and the arrangement range is 5m to 50m across the fault width and on both sides.

[0046] Because the rock bed at the face of a deep-buried tunnel needs to bear external water and grouting pressure, the retained thickness of the rock bed is generally 20m to 100m.

[0047] The principle of arranging boreholes at the face of a deep buried tunnel in the embodiment of the present invention is: multiple boreholes are arranged symmetrically in a circular shape along the periphery of the tunnel, and the thickness of the reinforcement grouting ring formed after grouting the boreholes is 0.5 to 1.5 times the diameter of the deep buried tunnel. The effective diffusion radius of the slurry around each borehole is 8 to 12 meters, that is, the slurry diffusion range is 8 to 12 meters.

[0048] In addition, during the drilling process, if the hole collapses severely, the upper part of the collapsed hole section can be blocked to carry out "hole grouting" first. The hole grouting adopts low-pressure grouting, and the grouting section length is generally 20m to 50m, which is determined according to the degree of rock mass fragmentation and the degree of hole collapse. The grouting pressure is generally 1.5MPa to 3MPa. The grouting material mainly adopts cement slurry or cement clay slurry.

[0049] In the above step S2, the sleeve valve tube of the embodiment of the present invention is a seamless steel tube with a smooth inner wall and a closed bottom. A ring of slurry outlet holes is set every 30cm to 50cm, with 2 to 5 slurry outlet holes in each ring. The diameter of the slurry outlet holes is 8mm to 15mm, and the slurry outlet holes are sealed with a rubber hoop with good elasticity. After the sleeve valve tube is set down, the space between the sleeve valve tube and the borehole wall is filled with fillers. The filler can be a cement clay slurry with low water separation rate and good stability, which is injected through the bottom of the sleeve valve tube hole. When the density of the filler returned from the orifice is less than 0.02g / cm 3 The filling can be finished. The filling ratio should be determined through tests according to the material properties, construction conditions, etc. The reference ratio of cement: clay: water (weight ratio) is 1:2.6:4. After the filling is completed, wait for more than 72 hours to solidify.

[0050] The double-joint high-pressure grouting plug of the embodiment of the present invention can be water pressure or air pressure type, can withstand grouting pressure not less than 15MPa, and the spacing between the two joints is 1m to 3m. High-pressure grouting is performed between the double-joint grouting plugs through the grouting pipeline, and the grouting pressure is 5MPa to 15M Pa (the higher value is taken for the tunnel section with a large burial depth, and the lower value is taken for the tunnel section with a small burial depth). The slurry is split and filled into the rock mass before being injected. The sleeve valve pipe grouting adopts controlled grouting. When the slurry injection rate is less than the specified value (0.5L to 1.0L / (min·m)), or the unit injection rate reaches the designed injection volume, the grouting of this section ends. The designed injection volume is calculated according to the grouting section length, slurry diffusion radius and rock mass porosity, according to the pore volume filling fraction.

[0051] The embodiment of the present invention adopts a bottom-up approach (i.e. Figure 2 The grouting is carried out by blocking the grouting in sections (from right to left in the figure), and the length of the grouting plug is lifted up each time to grout the rock mass from bottom to top until the advanced grouting of the unfavorable geological body is completed. By repeating the grouting steps in sections, the construction of directional drilling high-pressure sleeve valve pipe grouting in the deep buried tunnel is completed.

[0052] The segmented grouting method of the embodiment of the present invention can use a double grouting plug to carry out targeted chemical grouting on a small section with poor geology or abnormal grouting volume, thereby realizing composite grouting in the hole.

[0053] exist Figure 3 Among them, ① shows the schematic diagram of the drilling structure of the horizontal grouting section, ② shows the schematic diagram of the structure of lowering the casing valve pipe into the borehole of the horizontal grouting section, ③ shows the schematic diagram of the structure of injecting filler between the casing valve pipe and the hole wall of the borehole of the horizontal grouting section, and ④ shows the schematic diagram of the structure of grouting the double-joint grouting plug into the casing valve pipe through the grouting pipe.

[0054] Compared with the conventional advance grouting method in the tunnel, the method of the embodiment of the present invention has the following advantages:

[0055] (1) High efficiency

[0056] The conventional advance grouting drilling depth in the tunnel is generally 30m to 50m, the grouting pressure is generally less than 3MPa, and the slurry diffusion range is small, generally 2m to 3m. For tunnel sections with poor geological conditions with a length of more than 40m, conventional advance grouting in the tunnel is difficult to penetrate in one go, and multiple cycles of grouting are required, and grouting is required at the center of the face. The drilling workload is large, and more than 20 holes need to be arranged on the section for each cycle, such as Figure 1As shown in the figure, a 2m to 5m overlap length is generally required between each two cycle sections, and the drilling and grouting engineering workload is very large. Once the drill bit falls off or gets stuck, the drill bit will remain in the tunnel to be excavated, which will aggravate the wear of the TBM or shield machine, and may even make it impossible to continue excavating, resulting in low work efficiency. However, the grouting pressure of the in-hole directional grouting drilling in the embodiment of the present invention can reach more than 10MPa, the slurry diffusion range is large, the number of holes can be reduced, and the maximum drilling depth can reach one kilometer. It can pass through the fault of the bad geological section with a length greater than 40m at one time. After the grouting is completed, it can be excavated at one time, and there is no need for multiple cycles and overlaps. It only needs to drill holes around the face or around the tunnel, and the number of directional drilling grouting holes in the tunnel is small, only 6-8 holes are required. Figure 2 , Figure 4 As shown, the drilling workload is greatly reduced, construction time is saved, and the drilling holes are arranged around the tunnel. The drilling trajectory does not overlap with the range of the tunnel to be excavated. Even if the drill falls or gets stuck, it will not affect the subsequent excavation of the TBM or shield machine, greatly improving work efficiency.

[0057] (2) Low risk and high grouting pressure

[0058] The conventional advance grouting stop wall in the tunnel is generally 3 to 5 m long. The water-gushing and mud-bursting materials and slurry can easily penetrate or bypass the stop wall, resulting in leakage, slurry running and even water-gushing and mud-bursting. The grouting pressure is limited and is generally below 3 MPa. However, the directional grouting in the tunnel according to the embodiment of the present invention can reserve a 25 to 150 m long stop wall, which greatly reduces the risks of leakage, slurry running and water-gushing and mud-bursting, and can use a higher grouting pressure to improve the grouting effect.

[0059] (3) Low risk of drill getting stuck or falling

[0060] For a poor geological tunnel section with a length of more than 40m for TBM construction, conventional advance grouting in the tunnel requires multiple cycles of drilling and grouting, which is prone to drill jams or drill drops. Once drill drops or drill jams occur, it will have an adverse effect on TBM excavation. However, the directional grouting drilling arrangement in the tunnel of the embodiment of the present invention is flexible, and can drill through the poor geological tunnel section at one time, and only drill holes are arranged around the tunnel, such as Figure 2 , Figure 4 As shown, the drill is not likely to get stuck or fall off, and even if it does, it will not affect the next excavation of the TBM.

[0061] Compared with the traditional surface directional advance grouting method, the method of the embodiment of the present invention has the following advantages:

[0062] (1) The rock mass is evenly grouted and the grouting effect is good

[0063] The length of the traditional surface directional drilling grouting section is generally 30m to 50m. In the tunnel section with complex geological conditions, the grouting liquid is easy to leak along the weak surface during the long grouting, so that the rest of the parts cannot be fully grouted, the rock mass is unevenly grouted, the grouting effect is poor, and the parts that are not fully grouted may still have water and mud bursts. The single-section grouting length of the in-hole directional grouting in the embodiment of the present invention is 1m to 3m, which can effectively ensure the uniform grouting of the rock mass, and different grouting pressures and grouting materials can be used for each small section, so that the grouting is highly targeted and the grouting effect is good.

[0064] (2) The grouting volume is controllable and the single-stage grouting time is short

[0065] The traditional surface directional drilling grouting has high pressure, long sections, uncontrollable slurry injection, and long leakage. Due to uneven grouting, in order to prevent leakage, the end condition can only be set to end the grouting when the injection rate of the entire section is small. Therefore, the grouting time is long, the grouting injection volume is large, and the cost is high. The grouting section length of the high-pressure sleeve valve tube grouting method for directional drilling in the hole of the embodiment of the present invention is small, and the grouting slurry and pressure can be adjusted for local hole sections, such as changing to chemical grouting, etc., and composite grouting in the hole can be achieved to "adapt to local conditions", improve the grouting effect and reduce the grouting volume. And when splitting occurs, the required injection volume can be calculated according to the grouting section length, diffusion radius and rock porosity. When the grouting injection rate is small or reaches the designed injection volume, the grouting can be ended, avoiding the slurry leakage distance too long. The slurry injection volume is controllable, and the single-stage grouting time is short.

[0066] (3) Continuous grouting from bottom to top, high grouting efficiency

[0067] The traditional surface directional drilling grouting is grouting from top to bottom, with hole sweeping and grouting performed alternately. The deep hole repeatedly moves the drill rod up and down, sweeps the hole, and waits for solidification, which takes a long time and has low grouting efficiency. The in-hole directional drilling high-pressure sleeve valve pipe advance grouting method of the embodiment of the present invention uses one-time hole formation and then grouting in sections from bottom to top. During the grouting process, there is no need to wait for the slurry to solidify before moving the grout stopper and grouting the next section. The grouting is carried out continuously without repeatedly moving the drill rod up and down, sweeping the hole, and waiting for solidification, which greatly improves the grouting efficiency.

[0068] (4) Not likely to cause engineering waste

[0069] The in-tunnel directional drilling in the embodiment of the present invention is carried out after the tunnel excavation is exposed. The accuracy of the geological advance exploration hole data is much higher than the surface exploration data before excavation. It can make a more accurate judgment on the scale of unfavorable geological bodies and the risk of sudden mud and water gushing. It is not easy to "use a cannon to kill a mosquito", and it can avoid waste of engineering workload while ensuring the safety of the project.

[0070] (5) Small hole sweeping workload

[0071] When "hole grouting" is required from top to bottom or when hole collapse and other situations require hole sweeping, since the non-grouting section hole length of the embodiment of the present invention is relatively short, generally 25 to 100 meters, and the non-grouting section hole length of surface directional drilling is generally greater than 300 meters, in comparison, the amount of engineering work for hole sweeping in the embodiment of the present invention is greatly reduced.

[0072] (6) The treatment effect in the hole is direct and the grouting effect is easy to check

[0073] After the in-hole directional drilling treatment in the embodiment of the present invention is completed, it is convenient to drill holes for inspection and conduct a pumping test. After the inspection is passed, excavation can be carried out. If the inspection fails, it is also convenient to immediately carry out refilling or change other measures. The treatment effect is direct. However, after the surface directional drilling construction is completed, it is not easy to drill holes for inspection and conduct a pumping test. It often takes more than a year after construction to reach the tunnel, and the treatment effect is not direct.

[0074] (7) Small requirements for drilling rigs

[0075] The in-hole directional drilling of the embodiment of the present invention has a shallow hole and requires a small torque for the drilling rig, while the surface directional drilling has a deep hole and requires a high torque for the drilling rig.

[0076] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.

Claims

1. A method for grouting high-pressure sleeve valve pipes by directional drilling in a deep buried tunnel, characterized in that: The following steps are involved: S1. Starting from the tunnel, directional drilling holes are arranged on the tunnel face of the deep-buried tunnel. The arrangement of the holes is as follows: multiple holes are arranged symmetrically in a circular shape along the periphery of the tunnel. Each hole includes a borehole deflection section and a horizontal grouting section connected to each other. One end of the borehole deflection section is located on the tunnel face of the deep-buried tunnel. The horizontal grouting section is arranged through the tunnel section with water gushing and mud bursting risks. S2, after the drilling is completed, a casing valve pipe is installed under the horizontal grouting section to the bottom of the hole; after the casing valve pipe is installed, the space between the casing valve pipe and the wall of the drilled hole is filled with filler; S3, using a directional drill pipe to lower a double-type high-pressure grouting plug into the casing valve pipe to the bottom of the hole, and performing high-pressure grouting between the double-type grouting plugs through a grouting pipeline. After the grouting fluid splits the filler, it is injected into the rock mass. Controlled grouting is used. When the grouting fluid injection rate is less than a specified value or the unit injection rate reaches the designed injection volume, the grouting of this section is terminated. S4, raise the grouting pipeline by the length of the grouting plug, and repeat step S3; S5. Repeat step S4 until the grouting of the horizontal grouting section is completed, and the thickness of the reinforced grouting ring formed after grouting is 0.5 to 1.5 times the diameter of the deep buried tunnel.

2. A method for grouting high-pressure sleeve valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: In step S1, after the drilling of the borehole deflection section is completed, a casing string is lowered, and the entire section of the casing is fixed to the borehole with cement slurry, and then the drilling of the horizontal grouting section is carried out.

3. A method for grouting high-pressure sleeve valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The turning radius of the connection between the orifice deflection section and the horizontal grouting section is greater than 250m.

4. A method for grouting high-pressure sleeve valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The effective diffusion radius of the slurry around each borehole is 8m to 12m.

5. A method for grouting high-pressure sleeve valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The distance between the heading face of the deep buried tunnel and the unfavorable geological body is 25m to 150m.

6. A method for grouting high-pressure casing valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The length of the orifice deflection section is 20m to 100m.

7. A method for grouting high-pressure casing valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The sleeve valve pipe is a seamless steel pipe with a closed bottom. A ring of slurry outlet holes is arranged every 30cm to 50cm, with 2 to 5 slurry outlet holes in each ring. The diameter of the slurry outlet holes is 8mm to 15mm, and the slurry outlet holes are sealed with rubber hoop rings.

8. A method for grouting high-pressure casing valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The double-joint high-pressure grouting plug is of water pressure or air pressure type, can withstand a grouting pressure of not less than 15 MPa, and the distance between the two joints is 1m to 3m.

9. A method for grouting high-pressure casing valve pipes by directional drilling in a deep buried tunnel as claimed in claim 1, characterized in that: The prescribed value is 0.5L to 1.0L / (min·m).

10. A method for grouting high-pressure casing valve pipes by directional drilling in a deep buried tunnel according to any one of claims 1 to 9, characterized in that: The filler is cement clay slurry, which is injected through the bottom of the hole of the sleeve valve pipe.

Citation Information

Patent Citations

  • Advanced pre-treatment method for unfavorable geological stratum ground of deep-buried long and large tunnel

    CN116291483A

  • Advanced grouting method for deep-buried tunnel earth surface directional drilling high-pressure sleeve valve pipe

    CN116877136A

  • Tunnel and roadway surrounding rock water disaster treatment method

    CN117432423A

Cited By

  • Method for treating water burst of fault fracture zone through long-distance directional drilling and pre-grouting of working face in tunnel

    CN121251283A