Deep hole grouting method for underground excavation tunnel in water-rich stratum
Through deep-hole grouting technology, water-stop water is first used to use water glass or chemical slurry in the water-rich formation, and then reinforced with cement water glass double slurry. Combined with backward grouting, the problem of water-stop and reinforcement of traditional technologies is solved, and the problem of water-stop and reinforcement is improved. Construction safety and grouting efficiency.
Patent Information
- Application Number
- CN202411006533.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-12
AI Technical Summary
In water-rich formations, traditional double-liquid deep-hole grouting technology is difficult to effectively stop water and reinforce soil layers, affecting construction safety.
The deep-hole grouting method is adopted, water is stopped by water glass or chemical slurry first, and then cement water glass double slurry reinforced, combined with the backward segmented grouting technology, to ensure that the drilling holes are fully filled and soil layer reinforced.
It effectively reduces the possibility of water seeping into the tunnel construction area in the water-rich formation, improves construction safety, and improves grouting efficiency and soil layer stability.
Smart Images

Figure CN118933864A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction of dark-dig tunnels in water-rich strata, and in particular to a deep-hole grouting method for dark-dig tunnels in water-rich strata. Background Art
[0002] In traditional tunnel construction, the soil layer is usually reinforced by using advanced small pipes or deep hole grouting technology before excavation. For water-rich strata, double-liquid deep hole grouting is usually used for advanced water-stopping reinforcement.
[0003] However, when there is a large amount of water in the soil layer, the double-liquid slurry deep hole grouting method may not be able to achieve the effect of stopping water, let alone the effect of strengthening the soil, which in turn affects construction safety. Summary of the invention
[0004] In order to reduce the adverse effects on construction safety, the present application provides a deep hole grouting method for a dark tunnel in a water-rich stratum.
[0005] The deep hole grouting method for a dark tunnel in a water-rich stratum provided in the present application adopts the following technical solution: A deep hole grouting method for a dark tunnel in a water-rich stratum comprises the following steps: Determine the tunnel excavation range and install the guide arch, and drill holes evenly along the circumference of the tunnel excavation range; The overall sequence of bottom-up and unilateral sequential skipping is adopted, and the first deep hole grouting construction is carried out through the grouting machine and the first grouting conduit. Water glass or chemical slurry is used to stop water during the first grouting construction; The overall sequence of bottom-up and single-side sequential skipping construction is adopted, and the second deep hole grouting construction is carried out through the grouting machine and the second grouting conduit. During the second grouting construction, cement-water-glass double liquid slurry is used to strengthen the water stopping and reinforce the soil layer to complete the grouting.
[0006] By adopting the above technical scheme, deep hole grouting is used to inject water glass or chemical slurry into the borehole to stop water in the soil and form a first line of protection, and cement water glass double liquid slurry is injected into the borehole to form a second line of protection in the soil, further strengthening water stopping and consolidating the soil layer, reducing the possibility of water in the water-rich stratum infiltrating into the tunnel construction area, and reducing the adverse effects on construction safety.
[0007] Optionally, the deep hole grouting method is backward segmented grouting.
[0008] By adopting the above technical solution and the backward grouting method, the voids in the borehole can be quickly and effectively filled, which further facilitates water stopping and reinforcement of the soil layer, reduces the possibility of water infiltration from water-rich strata into the tunnel construction area, and reduces the adverse effects on construction safety.
[0009] Optionally, the grouting machine includes a machine body, on which are provided a plurality of first connecting blocks adapted to the first grouting tubes, the first grouting tubes being inserted into the corresponding first connecting blocks, a first corrugated pipe for conveying water glass or chemical slurry being passed through and fixedly connected between the first connecting blocks, the first grouting tubes being communicated with the first corrugated pipes, a limiting component for the distance between two adjacent first grouting tubes being provided, a guide groove corresponding to the borehole being provided on the guide arch, a positioning component for driving the first grouting tube to align with the borehole being provided between the first connecting block and the guide arch, a first hydraulic cylinder for driving the first grouting tube to be inserted into the borehole and a first motor for driving the first connecting block to rotate along the height direction of the tunnel being provided on the machine body.
[0010] By adopting the above technical scheme, the positioning component drives the first connecting block through the guide groove on the guide arch to drive the first grouting tube to adapt to the curvature of the borehole to be grouted. At this time, the limiting component is located at the end of the first grouting tube away from the first connecting block and limits the distance between the first grouting tubes, so that the end of the first grouting tube is aligned with the borehole. At this time, the first hydraulic cylinder drives the first grouting tube to be inserted into the borehole at the same time until the borehole is completely filled in the length direction. At this time, the first corrugated pipe transports the slurry to each first grouting tube and fills the borehole along the end of the first grouting tube away from the first connecting block. The first hydraulic cylinder drives the first grouting tube to gradually withdraw from the borehole until the slurry completely fills the borehole, thereby grouting multiple boreholes at the same time, and the first motor drives the first connecting block to drive the first grouting tube to rotate a certain angle along the circumference of the guide arch, so as to drive the first grouting tube to grout the boreholes in sequence along the circumference of the guide arch until all the boreholes are grouted, thereby improving the grouting efficiency.
[0011] Optionally, the limit assembly includes a limit rod located between the two first connected grouting tubes and away from the first connecting block, the ends of the limit rod are hinged to the limit blocks, the side walls of the first grouting tubes are provided with sliding grooves that are adapted to the limit blocks and are arranged along the length direction of the first grouting tubes, the limit blocks are inserted into the sliding grooves and slidably connected to the sliding grooves, and the sliding grooves are fixedly connected with first springs, the first springs are fixedly connected to the side walls of the limit blocks, and when the first spring is at its original length, the limit block is located at one end of the sliding groove away from the first connecting block.
[0012] By adopting the above technical scheme, the positioning component drives the first connecting block to drive the end of the first grouting tube close to the first connecting block to align with the borehole to be grouted. At this time, the end of the limit rod connects the ends of the two adjacent grouting tubes away from the first connecting block through the limit block, so that the end of the first grouting tube where the slurry is discharged is aligned with the borehole. When the first hydraulic cylinder drives the end of the first grouting tube to be inserted into the corresponding borehole, the soil layer between the boreholes pushes the limit rod to move toward the first connecting block as the first grouting tube is inserted. At this time, the first spring is compressed, thereby not affecting the insertion of the first grouting tube into the borehole. When the first hydraulic cylinder drives the first grouting tube to be completely pulled out, the first spring restores its deformation and drives the limit block to drive the limit rod to reset, thereby facilitating alignment with the borehole to be grouted again, thereby improving the grouting efficiency.
[0013] Optionally, the positioning assembly includes a positioning rod corresponding to the first connecting block and slidably connected to the upper side of the first connecting block. When the bent end of the positioning rod is inserted into the guide groove and slidably connected to the guide arch, the first connecting block corresponds to the drill hole, and the end of the first grouting conduit away from the first connecting block is aligned with the drill hole, and a fixing assembly for fixing the curvature between the first connecting blocks is provided on the side of the adjacent first connecting block away from the first grouting conduit.
[0014] By adopting the above technical solution, when the ends of the positioning rod are simultaneously inserted into the corresponding guide grooves on the upper side of the borehole to be grouted, the first connecting block located at the lower side of the positioning rod forms the same arc as the borehole to be grouted. At this time, the position of the first connecting block is fixed by the fixing assembly, and the limiting rod makes the end of the first grouting conduit away from the first connecting block aligned with the borehole, and the first hydraulic cylinder drives the first grouting conduit to be inserted into the corresponding borehole. At this time, the positioning rod slides with the first connecting block, reducing the adverse effect on the insertion of the first grouting conduit into the borehole and improving the grouting efficiency.
[0015] Optionally, a second connecting block corresponding to the second grouting conduit is correspondingly provided on the lower side of the first connecting block, and the second connecting blocks are penetrated by a second corrugated tube for conveying cement-water-glass double liquid slurry, the second connecting blocks are evenly distributed along the length direction of the second corrugated tube and the second connecting block is fixedly connected to the second corrugated tube, one end of the second grouting conduit is inserted into the corresponding second connecting block and communicated with the second corrugated tube, and a limiting rod for limiting a position is also provided between adjacent second grouting conduits, and the connection between the second grouting conduit and the limiting rod is the same as the connection between the first grouting conduit and the limiting rod, and a driving device for the second grouting conduit is provided on the lower side of the first connecting block. A driving member has the same curvature between the second grouting conduits and the same curvature between the boreholes. A fixing component for fixing the curvature formed by the second connecting blocks is also provided between the second connecting blocks. A rotating component for driving the first connecting block and the second connecting block to rotate relative to each other is provided between the first connecting block and the second connecting block. A second hydraulic cylinder for driving the second grouting conduit to align with the borehole is provided on the machine body. The second hydraulic cylinder is perpendicular to the first hydraulic cylinder, and the end of the telescopic rod of the second hydraulic cylinder is fixedly connected to the end of the first hydraulic cylinder away from the borehole. The second hydraulic cylinder is rotationally connected to the machine body. The first motor is fixedly connected to the machine body and drives the second hydraulic cylinder to rotate along the tunnel height direction.
[0016] By adopting the above technical solution, when the arc formed by the positioning rod driving the first connecting block is the same as the arc of the drilled hole to be grouted, the driving member drives the second connecting block to be equal to the distance between the corresponding first connecting block, so that the arc formed by the second connecting block is also adapted to the arc of the drilled hole to be grouted. At this time, the first connecting block is relatively fixed by the fixing assembly, and the relative position of the second connecting block is fixed at the same time. The rotating assembly drives the second connecting block to drive the second grouting conduit to rotate to the side of the first connecting block away from the drilled hole. At this time, the first grouting conduit is opposite to the drilled hole, which is convenient for grouting. When grouting of the first grouting conduit is completed, the second liquid The pressure cylinder drives the first connecting block and the second connecting block to move upward. At this time, the first connecting block is driven by the rotating assembly to drive the first grouting tube and the positioning rod to rotate in the direction away from the borehole, and the second grouting tube is driven to rotate close to the borehole. At this time, the second hydraulic cylinder drives the end of the second grouting tube to be the same height as the borehole. The first hydraulic cylinder drives the second grouting tube to insert into the borehole, and the second bellows transports the double liquid slurry to the second grouting tube, which is convenient for the second grouting tube to retreat grouting until the grouting is completed, thereby facilitating grouting of multiple boreholes twice at the same time, and facilitating grouting of the boreholes along the circumference of the guide arch, thereby improving the grouting efficiency.
[0017] Optionally, the rotating assembly includes a first rotating rod fixedly connected to the lower side of the first connecting block located in the middle, a second rotating rod fixedly connected to the upper side of the second connecting block corresponding to the first connecting block, the ends of the first rotating rod and the second rotating rod close to each other are both sleeved and rotatably connected to the same mounting shell, the ends of the first rotating rod and the second rotating rod close to each other are both fixedly connected to a first gear, a second gear that can cooperate with the first gear is plugged in and slidably connected to the outer side of the mounting shell, a second motor slidably connected to the mounting shell is installed on one side of the second gear, and the other side of the second gear is rotatably connected to a third hydraulic cylinder that drives the second gear to slide along the vertical direction of the mounting shell.
[0018] By adopting the above technical solution, when driving the second connecting block to rotate, the third hydraulic cylinder drives the second gear to slide until the first gear adapted to the second rotating rod is meshed with the second gear, thereby facilitating driving the second connecting block to rotate and reducing the adverse effect of the second grouting conduit during grouting of the first grouting conduit. When driving the first connecting block to rotate, the third hydraulic cylinder drives the second gear to drive the second motor to move upward until it is meshed with the side of the first gear corresponding to the first rotating rod, thereby facilitating driving the first rotating rod through the second motor and the second gear to drive the first connecting block to rotate at the same time, thereby improving work efficiency.
[0019] Optionally, the driving member includes a fixed rod fixedly connected to the lower side of the first connecting block except the first connecting block corresponding to the first rotating rod, and the second connecting block located on the lower side of the fixed rod is fixedly connected with a fourth hydraulic cylinder facing the corresponding fixed rod, and a waist-shaped hole is opened on the fixed rod, and the telescopic rod of the fourth hydraulic cylinder passes through the corresponding waist-shaped hole.
[0020] By adopting the above technical solution, when the positioning rod adjusts the curvature formed by the first connecting block, the fixing rod squeezes the second connecting block downward, so that the curvature formed by the second connecting block is adapted to the curvature formed by the first connecting block. At this time, the telescopic rod of the fourth hydraulic cylinder is located in the waist-shaped hole. When the fixing assembly fixes the relative position of the second connecting block, the telescopic rod of the fourth hydraulic cylinder contracts and disengages from the fixing rod. At this time, the fixation between the fixing rod and the second connecting block is released, which is convenient for driving the second connecting block and the first connecting block to rotate relative to each other. When the drilling and grouting are completed twice, the second connecting block is located on the lower side of the fixing rod and contacts the lower side of the fixing rod. The fourth hydraulic cylinder fixes the fixing rod and the second connecting block again, so as to facilitate adjusting the curvature formed by the second connecting block through the first connecting block and the fixing rod again, thereby further improving work efficiency.
[0021] Optionally, three of the first connecting block and the second connecting block are provided, and a side of the first connecting block away from the first grouting conduit is fixedly connected to a fixing column, and a side of the second connecting block away from the second grouting conduit is also fixedly connected to a fixing column, and the fixing assembly includes a hinge rod located between adjacent fixing columns, and one end of the hinge rod close to the first rotating rod is rotatably connected to the corresponding fixing column, and the fixing column located at the end is inserted into the other end of the corresponding hinge rod and rotatably connected to the hinge rod, and the sides of the hinge rods away from each other are fixedly connected to a torsion spring fixedly connected to the fixing column, and the sides of the hinge rods close to each other are fixedly connected to a third gear sleeved on the fixing column, and the lower side of the second gear is meshed with the same rack, and the first connecting block and the second connecting block corresponding to the hinge rod are fixedly connected to a fifth hydraulic cylinder that drives the rack to move in a direction close to or away from the third gear.
[0022] By adopting the above technical solution, when the positioning rod is not inserted in the guide groove, the torsion spring is at its original length. When the positioning rod is inserted in the guide groove and the curvature formed by the first connecting block is adjusted, the fixing rod adjusts the curvature formed by the second connecting block. At this time, the torsion spring is deformed, and the third gear rotates relatively. At this time, the fifth hydraulic cylinder drives the rack to move upward and engage with the third gear at the same time, thereby fixing the articulated rod through the third gear, reducing the possibility of relative rotation of the articulated rod and improving stability.
[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. Use deep hole grouting to inject water glass or chemical slurry into the borehole to stop water in the soil and form the first line of protection. Inject cement water glass double liquid slurry into the borehole to form the second line of protection in the soil, further strengthen water stopping and strengthen the soil layer, reduce water infiltration from water-rich strata into the tunnel construction area, and reduce adverse effects on construction safety; 2. The positioning component drives the first connecting block through the guide groove on the guide arch to drive the first grouting conduit to adapt to the arc of the borehole to be grouted. At this time, the limiting component is located at the end of the first grouting conduit away from the first connecting block and limits the distance between the first grouting conduits, so that the end of the first grouting conduit is aligned with the borehole. At this time, the first hydraulic cylinder drives the first grouting conduit to be inserted into the borehole at the same time until the borehole is completely filled in the length direction. At this time, the first corrugated pipe transports the slurry to each first grouting conduit and fills the borehole along the end of the first grouting conduit away from the first connecting block. The first hydraulic cylinder drives the first grouting conduit to gradually withdraw from the borehole until the slurry completely fills the borehole, thereby grouting multiple boreholes at the same time, and the first motor drives the first connecting block to drive the first grouting conduit to rotate a certain angle along the circumference of the guide arch, so as to drive the first grouting conduit to grout the boreholes in sequence along the circumference of the guide arch until all the boreholes are grouted, thereby improving the grouting efficiency; 3. When the arc formed by the positioning rod driving the first connecting block is the same as the arc of the borehole to be grouted, the driving member drives the second connecting block to be equal to the distance between the corresponding first connecting block, so that the arc formed by the second connecting block is also adapted to the arc of the borehole to be grouted. At this time, the first connecting block is relatively fixed by the fixing assembly, and the relative position of the second connecting block is fixed at the same time. The rotating assembly drives the second connecting block to drive the second grouting conduit to rotate to the side of the first connecting block away from the borehole. At this time, the first grouting conduit is opposite to the borehole, which is convenient for grouting. When grouting of the first grouting conduit is completed, the second hydraulic cylinder drives the second grouting conduit to rotate. A connecting block and a second connecting block move upward, and at this time, the first connecting block is driven by the rotating assembly to drive the first grouting tube and the positioning rod to rotate in the direction away from the borehole, and the second grouting tube is driven to rotate close to the borehole. At this time, the second hydraulic cylinder drives the end of the second grouting tube to be the same height as the borehole, and the first hydraulic cylinder drives the second grouting tube to be inserted into the borehole, and the second bellows transports the double liquid slurry to the second grouting tube, which is convenient for the second grouting tube to retreat grouting until the grouting is completed, thereby facilitating grouting of multiple boreholes twice at the same time, and facilitating grouting of the boreholes along the circumference of the guide arch, thereby improving the grouting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the overall structure of the grouting machine in the embodiment of the present application.
[0025] Figure 2 yes Figure 1 A magnified view of the structure in the middle.
[0026] Figure 3 It is a structural schematic diagram reflecting the positional relationship between the positioning component and the first connecting block in an embodiment of the present application.
[0027] Figure 4 yes Figure 3 A magnified view of the structure at B in the middle.
[0028] Figure 5 It is a structural schematic diagram showing the positional relationship between the rotating assembly and the mounting shell in the embodiment of the present application.
[0029] Figure 6 yes Figure 5 A magnified view of the structure at center C.
[0030] Description of the accompanying drawings: 1, machine body; 11, second hydraulic cylinder; 12, first motor; 13, first hydraulic cylinder; 14, mounting shell; 141, clearance hole; 2, first connecting block; 21, first bellows; 22, first grouting conduit; 221, slide groove; 3, limit assembly; 31, limit rod; 32, limit block; 33, first spring; 4, guide arch; 41, guide groove; 42, annular groove; 5, positioning assembly; 51, fixing cylinder; 52, Positioning rod; 6. Fixing assembly; 61. Fixing column; 62. Articulated rod; 63. Third gear; 64. Rack; 65. Fifth hydraulic cylinder; 7. Second connecting block; 71. Second bellows; 72. Second grouting conduit; 8. Rotating assembly; 81. First rotating rod; 82. Second rotating rod; 83. First gear; 84. Second gear; 85. Third hydraulic cylinder; 9. Driving member; 91. Fixing rod; 911. Waist-shaped hole; 92. Fourth hydraulic cylinder. DETAILED DESCRIPTION
[0031] The present application is further described in detail below in conjunction with the accompanying drawings.
[0032] The present application embodiment discloses a deep hole grouting method for a dark tunnel in a water-rich stratum. Figure 1 and Figure 2 A deep hole grouting method for a dark tunnel in a water-rich stratum comprises the following steps: Determine the tunnel excavation range and install the guide arch 4, and drill holes evenly along the circumference of the tunnel excavation range; The overall sequence of bottom-up and unilateral sequential skipping is adopted, and the first backward deep hole grouting construction is carried out through the grouting machine and the first grouting conduit 22, and water glass or chemical slurry is used to stop water during the first grouting construction; The grouting machine includes a machine body 1, the upper end of which is rotatably connected to a second hydraulic cylinder 11 that rotates along the cross section of the tunnel excavation area, and a first motor 12 that drives the second hydraulic cylinder 11 to rotate is fixedly connected to one side of the machine body 1. The telescopic rod of the second hydraulic cylinder 11 is fixedly connected to a horizontal first hydraulic cylinder 13, and the telescopic rod of the first hydraulic cylinder 13 is always facing the drill hole. The telescopic rod of the first hydraulic cylinder 13 is fixedly connected to a mounting shell 14, and a plurality of first connecting blocks 2 adapted to the first grouting conduit 22 are provided on the upper side of the mounting shell 14, and three are provided in the embodiment of the present application.
[0033] The first connecting block 2 is provided with a first corrugated pipe 21 in the middle thereof, and the first connecting block 2 is evenly distributed along the length direction of the first corrugated pipe 21 and is fixedly connected to the first corrugated pipe 21. In the embodiment of the present application, the first corrugated pipe 21 is used to transport water glass, and in other embodiments, the first corrugated pipe 21 can be used to transport other chemical slurries used for soil layer waterproofing. The first connecting block 2 is plugged and fixedly connected with a first grouting conduit 22 that is connected to the inside of the first corrugated pipe 21 on one side close to the borehole.
[0034] Reference Figure 1 and Figure 2 The ends of the two adjacent first grouting conduits 22 away from the first connecting block 2 are each provided with a limit assembly 3 for driving the distance between the two adjacent grouting conduits to be adapted to the distance between the adjacent boreholes. The guide arch 4 is provided with guide grooves 41 corresponding to the boreholes one by one, and the guide arch 4 is provided with an annular groove 42 adapted to the shape of the guide arch 4 and connected to the guide grooves 41. Figure 1 and Figure 3 A positioning component 5 is provided on the upper side of the first connecting block 2, which is adapted to the guide groove 41 and makes the curvature formed by the first connecting block 2 adapted to the curvature formed by the drill hole to be grouted, and a fixing component 6 for fixing the relative position between the first connecting blocks 2 is provided on the side of the first connecting block 2 located in the middle away from the corresponding first grouting conduit 22.
[0035] The positioning component 5 drives the first connecting block 2 to drive the first grouting conduit 22 to adapt to the curvature of the borehole to be grouted through the guide groove 41 on the guide arch 4. At this time, the limiting component 3 is located at the end of the first grouting conduit 22 away from the first connecting block 2 and limits the distance between the first grouting conduits 22, so that the end of the first grouting conduit 22 is aligned with the borehole. At this time, the first hydraulic cylinder 13 drives the first grouting conduit 22 to be inserted into the borehole at the same time until the borehole is completely filled in the length direction. The first corrugated pipe 21 transports the slurry to each first grouting conduit 22 and fills the borehole along the end of the first grouting conduit 22 away from the first connecting block 2. The first hydraulic cylinder 13 drives the first grouting conduit 22 to gradually withdraw from the borehole until the slurry completely fills the borehole, thereby grouting multiple boreholes at the same time, and the first motor 12 drives the first connecting block 2 to drive the first grouting conduit 22 to rotate a certain angle along the circumference of the guide arch 4, so as to drive the first grouting conduit 22 to grout the boreholes in sequence along the circumference of the guide arch 4 until all the boreholes are grouted.
[0036] Reference Figure 1 , Figure 2 and Figure 3The limiting assembly 3 includes a limiting rod 31 located between adjacent first grouting conduits 22 and perpendicular to the length direction of the first grouting conduits 22. The ends of the limiting rods 31 are hinged with limiting blocks 32. The sides of the corresponding first grouting conduits 22 close to each other are provided with sliding grooves 221 arranged along the length direction of the first grouting conduits 22. The limiting blocks 32 are inserted into the corresponding sliding grooves 221 and are slidably connected to the first grouting conduits 22. Figure 3 and Figure 4 The end of the chute 221 close to the first connection block 2 is fixedly connected to a first spring 33 arranged along the length direction of the first grouting conduit 22, and the end of the first spring 33 away from the first connection block 2 is fixedly connected to the corresponding limit block 32. When the first spring 33 is at its original length, the limit block 32 is located at the end of the chute 221 away from the first connection block 2.
[0037] The positioning assembly 5 drives the first connecting block 2 to drive the end of the first grouting tube 22 close to the first connecting block 2 to align with the borehole to be grouted. At this time, the end of the limit rod 31 connects the ends of the two adjacent grouting tubes away from the first connecting block 2 through the limit block 32, so that the end of the first grouting tube 22 where the slurry is discharged is aligned with the borehole. When the first hydraulic cylinder 13 drives the end of the first grouting tube 22 to be inserted into the corresponding borehole, the soil layer between the boreholes pushes the limit rod 31 to move toward the first connecting block 2 as the first grouting tube 22 is inserted. The first spring 33 is compressed, thereby not affecting the insertion of the first grouting tube 22 into the borehole. When the first hydraulic cylinder 13 drives the first grouting tube 22 to be completely pulled out, the first spring 33 restores its deformation and pushes the limit block 32 to drive the limit rod 31 to reset, thereby facilitating alignment with the borehole to be grouted again.
[0038] Reference Figure 3 and Figure 5 The positioning assembly 5 includes a fixed cylinder 51 corresponding to the first connection block 2 and fixedly connected to the upper side of the first connection block 2. The end of the fixed cylinder 51 close to the first grouting conduit 22 is plugged and slidably connected with a positioning rod 52 adapted to the guide groove 41. The fixed cylinder 51 is provided with a second spring (not shown in the figure) connected to the positioning rod 52. When the ends of the positioning rod 52 away from the fixed cylinder 51 are both plugged into the guide groove 41 on the upper side of the borehole to be grouted, the first connection block 2 is aligned with the borehole to be grouted, and the limiting rod 31 makes the end of the first grouting conduit 22 away from the first connection block 2 aligned with the borehole to be grouted.
[0039] The positioning rod 52 moves along the annular groove 42 until the ends are simultaneously inserted into the corresponding guide groove 41 on the upper side of the borehole to be grouted. The first connecting block 2 located at the lower side of the positioning rod 52 forms the same arc as the borehole to be grouted. At this time, the position of the first connecting block 2 is fixed by the fixing assembly 6, and the limiting rod 31 makes the end of the first grouting conduit 22 away from the first connecting block 2 aligned with the borehole. The first hydraulic cylinder 13 drives the first grouting conduit 22 to be inserted into the corresponding borehole. The positioning rod 52 slides with the fixing tube 51, and the second spring is compressed, thereby reducing the adverse effect on the insertion of the first grouting conduit 22 into the borehole.
[0040] Reference Figure 3 and Figure 5 , a second connection block 7 is provided on the lower side of each of the first connection blocks 2. In the embodiment of the present application, three second connection blocks 7 are provided, and a second corrugated pipe 71 for conveying cement-water-glass double slurry is provided through each of the second connection blocks 7. The second connection blocks 7 are evenly distributed along the length direction of the second corrugated pipe 71 and are fixedly connected to the second corrugated pipe 71. A second grouting conduit 72 communicating with the inside of the second corrugated pipe 71 is inserted and fixedly connected on the same side of each of the second connection blocks 7. A stop rod 31 is also provided at one end of two adjacent second grouting conduits 72 away from the second connection block 7 to connect the two, and the connection mode between the second grouting conduit 72 and the stop rod 31 is the same as the connection mode between the first grouting conduit 22 and the stop rod 31.
[0041] A rotating assembly 8 is provided on the mounting shell 14 for driving the first connecting block 2 and the second connecting block 7 to rotate relative to each other along the vertical center line of the mounting shell 14. A driving member 9 is provided on the lower side of the first connecting block 2 for driving the second connecting block 7 to form an arc that is adapted to the arc formed by the drill hole to be grouted. A fixing assembly 6 is also provided on the side of the second connecting block 7 in the middle that is away from the second grouting conduit 72 for fixing the relative position of the second connecting block 7.
[0042] When the arc formed by the positioning rod 52 driving the first connecting block 2 is the same as the arc of the drilled hole to be grouted, the driving member 9 drives the second connecting block 7 to be equal to the distance between the corresponding first connecting block 2, so that the arc formed by the second connecting block 7 is also adapted to the arc of the drilled hole to be grouted. At this time, the first connecting block 2 is relatively fixed by the fixing component 6, and the fixing component 6 on the second connecting block 7 fixes the relative position of the second connecting block 7. The rotating component 8 drives the second connecting block 7 to drive the second grouting conduit 72 to rotate to the side of the first connecting block 2 away from the drilled hole. At this time, the first grouting conduit 22 is opposite to the drilled hole, which is convenient for grouting.
[0043] When grouting of the first grouting conduit 22 is completed, the second hydraulic cylinder 11 drives the first connecting block 2 and the second connecting block 7 to move upward. At this time, the first connecting block 2 is driven by the rotating assembly 8 to drive the first grouting conduit 22 and the positioning rod 52 to rotate in the direction away from the borehole, and the second grouting conduit 72 is driven to rotate close to the borehole. The second hydraulic cylinder 11 drives the end of the second grouting conduit 72 to be the same height as the borehole. The first hydraulic cylinder 13 drives the second grouting conduit 72 to be inserted into the borehole, and the second bellows 71 transports the double liquid slurry to the second grouting conduit 72, which is convenient for the second grouting conduit 72 to retreat grouting until the grouting is completed, thereby facilitating the grouting of the corresponding multiple boreholes twice, and at the same time facilitating the grouting of the boreholes along the circumference of the guide arch 4.
[0044] Reference Figure 5 The driving member 9 includes a fixing rod 91 corresponding to the first connecting blocks 2 at both ends of the first bellows 21 and fixedly connected to the lower side of the corresponding first connecting blocks 2, and the lower side of the fixing rod 91 contacts the second connecting block 7. The upper side of the corresponding second connecting block 7 is fixedly connected with a fourth hydraulic cylinder 92 which is horizontal and faces the mounting shell 14, and a vertical waist-shaped hole 911 is opened on the fixing rod 91, and the telescopic rod of the fourth hydraulic cylinder 92 passes through the corresponding waist-shaped hole 911.
[0045] When the positioning rod 52 adjusts the curvature formed by the first connecting block 2, the fixing rod 91 squeezes the second connecting block 7 downward, so that the curvature formed by the second connecting block 7 is adapted to the curvature formed by the first connecting block 2. At this time, the telescopic rod of the fourth hydraulic cylinder 92 is located in the waist-shaped hole. When the fixing assembly 6 fixes the relative position of the second connecting block 7, the telescopic rod of the fourth hydraulic cylinder 92 contracts and disengages from the fixing rod 91. At this time, the fixation between the fixing rod 91 and the second connecting block 7 is released, which is convenient for driving the second connecting block 7 and the first connecting block 2 to rotate relative to each other. When the drilling and grouting are completed twice, the second connecting block 7 is located on the lower side of the fixing rod 91 and contacts with the lower side of the fixing rod 91. The fourth hydraulic cylinder 92 fixes the fixing rod 91 and the second connecting block 7 again, so as to facilitate adjusting the curvature formed by the second connecting block 7 through the first connecting block 2 and the fixing rod 91 again.
[0046] Reference Figure 5 The rotating assembly 8 includes a first rotating rod 81 fixedly connected to the lower side of the first connecting block 2 in the middle, the lower side of the first rotating rod 81 is inserted into the mounting shell 14 and is rotatably connected to the mounting shell 14. A second rotating rod 82 is fixedly connected to the upper side of the second connecting block 7 in the middle, the upper end of the second rotating rod 82 is inserted into the mounting shell 14 and is rotatably connected to the mounting shell 14, and the first rotating rod 81 and the second rotating rod 82 both coincide with the vertical center line of the mounting shell 14.
[0047] One end of the first rotating rod 81 and the second rotating rod 82 inserted into the mounting shell 14 are both socketed and fixedly connected with the first gear 83, and a horizontal second gear 84 is provided on one side of the outside of the mounting shell 14. A clearance hole 141 is opened on one side of the mounting shell 14 close to the second gear 84, and one side of the second gear 84 passes through the clearance hole 141 and can engage with the first gear 83.
[0048] A third hydraulic cylinder 85 is provided vertically and fixedly connected to the mounting shell 14 on the upper side of the second gear 84. The telescopic rod of the third hydraulic cylinder 85 is rotatably connected to the axis of the second gear 84. A second motor (not shown in the figure) that drives the second gear 84 to rotate and is slidably connected to the side wall of the mounting shell 14 is installed on the lower side of the second gear 84.
[0049] When driving the second connecting block 7 to rotate, the third hydraulic cylinder 85 drives the second gear 84 to slide until the first gear 83 adapted to the second rotating rod 82 is meshed with the second gear 84, so as to facilitate driving the second connecting block 7 to rotate and reduce the adverse effect of the second grouting conduit 72 during grouting of the first grouting conduit 22. When driving the first connecting block 2 to rotate, the third hydraulic cylinder 85 drives the second gear 84 to drive the second motor to move upward until it is meshed with the side of the first gear 83 corresponding to the first rotating rod 81, so as to facilitate driving the first rotating rod 81 through the second motor and the second gear 84 to drive the first connecting block 2 to rotate at the same time.
[0050] Reference Figure 1 , Figure 5 and Figure 6 , the first connection block 2 is fixedly connected to a horizontal fixing column 61 on one side away from the first grouting conduit 22, the fixing assembly 6 includes a hinge rod 62 whose two ends are sleeved and rotatably connected to the fixing column 61 in the middle, and a torsion spring (not shown in the figure) is fixedly connected to the side away from each other of the hinge rod 62, the torsion spring is sleeved on the fixing column 61, and the end of the torsion spring away from the hinge rod 62 is fixedly connected to the side wall of the fixing column 61. When the torsion spring is at its original length, the hinge rod 62 is horizontal.
[0051] The fixed columns 61 at the ends of the first bellows 21 are all inserted into the ends of the hinged rods 62 away from the torsion springs and are connected to the corresponding hinged rods 62 in a sliding and rotational manner. The ends of the hinged rods 62 close to the torsion springs and the sides close to each other are fixedly connected with the third gear 63 sleeved on the fixed columns 61, and the lower side of the third gear 63 is provided with a same rack 64, and the rack 64 can mesh with the third gear 63 at the same time. The first connecting block 2 is fixedly connected with a fifth hydraulic cylinder 65 located at the lower side of the rack 64 and driving the rack 64 to move in the vertical direction, and the telescopic rod of the fifth hydraulic cylinder 65 is fixedly connected to the rack 64. The fixed assembly 6 on the second connecting block 7 is the same as the fixed assembly 6 on the first connecting block 2.
[0052] When the positioning rod 52 is not inserted in the guide groove 41, the torsion spring is at its original length. When the positioning rod 52 is inserted in the guide groove 41 and the curvature formed by the first connecting block 2 is adjusted, the fixing rod 91 squeezes the second connecting block 7 and adjusts the curvature formed by the second connecting block 7. At this time, the torsion spring is deformed, and the third gear 63 rotates relatively. At this time, the fifth hydraulic cylinder 65 drives the rack 64 to move upward and engage with the third gear 63 at the same time, thereby fixing the articulated rod 62 through the third gear 63.
[0053] The overall sequence of bottom-up and unilateral sequential skipping construction is adopted, and the second backward deep hole grouting construction is carried out through the grouting machine and the second grouting conduit 72. During the second grouting construction, cement-water-glass double liquid slurry is used to strengthen water stopping and reinforce the soil layer until the grouting is completed.
[0054] The implementation principle of a deep hole grouting method for a dark tunnel in a water-rich stratum in an embodiment of the present application is as follows: water glass or chemical slurry is injected into the borehole by a deep hole backward grouting method, thereby stopping water in the soil and forming a first line of protection, and cement water glass double liquid slurry is grouting into the borehole to form a second line of protection in the soil, further strengthening water stopping and reinforcing the soil layer, and the backward grouting method facilitates the rapid and effective filling of voids in the borehole, reduces the possibility of water in the water-rich stratum infiltrating into the tunnel construction area, and reduces the adverse effects on construction safety.
[0055] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A deep hole grouting method for a dark tunnel in a water-rich stratum, characterized in that: The following steps are involved: Determine the tunnel excavation range and install the guide arch (4), and drill holes evenly along the circumference of the tunnel excavation range; The overall sequence of bottom-up and unilateral sequential skipping of holes is adopted, and the first deep hole grouting construction is carried out by a grouting machine and a first grouting conduit (22), and water glass or chemical slurry is used to stop water during the first grouting construction; The overall sequence of bottom-up and single-side sequential skipping hole construction is adopted, and the second deep hole grouting construction is carried out through the grouting machine and the second grouting pipe (72). During the second grouting construction, cement-water-glass double liquid slurry is used to strengthen the water stop and the soil layer to complete the grouting.
2. The deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 1 is characterized by: The deep hole grouting method is backward segmented grouting.
3. The deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 2 is characterized by: The grouting machine comprises a machine body (1), wherein the machine body (1) is provided with a plurality of first connection blocks (2) adapted to the first grouting conduits (22), the first grouting conduits (22) being inserted into corresponding first connection blocks (2), a first corrugated pipe (21) for conveying water glass or chemical slurry being passed through and fixedly connected between the first connection blocks (2), the first grouting conduits (22) being communicated with the first corrugated pipe (21), a limiting component (3) for limiting the distance between the first grouting conduits (22) being provided between two adjacent first grouting conduits (22), a guide groove (41) corresponding to a borehole being provided on the guide arch (4), a positioning component (5) for driving the first grouting conduit (22) to align with the borehole being provided between the first connection block (2) and the guide arch (4), and a first hydraulic cylinder (13) for driving the first grouting conduit (22) to be inserted into the borehole and a first motor (12) for driving the first connection block (2) to rotate along the tunnel height direction being provided on the machine body (1).
4. The deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 3 is characterized by: The limiting assembly (3) comprises a limiting rod (31) located between the two connected first grouting conduits (22) and away from the first connecting block (2); the ends of the limiting rod (31) are hingedly connected to the limiting blocks (32); the side walls of the first grouting conduits (22) are provided with sliding grooves (221) adapted to the limiting blocks (32) and arranged along the length direction of the first grouting conduits (22); the limiting blocks (32) are inserted into the sliding grooves (221) and are slidably connected to the sliding grooves (221); the sliding grooves (221) are fixedly connected with first springs (33); the first springs (33) are fixedly connected to the side walls of the limiting blocks (32); when the first springs (33) are at their original length, the limiting blocks (32) are located at one end of the sliding grooves (221) away from the first connecting block (2).
5. The deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 4 is characterized in that: The positioning assembly (5) comprises a positioning rod (52) corresponding to the first connection block (2) and slidably connected to the upper side of the first connection block (2); when the bent end of the positioning rod (52) is inserted into the guide groove (41) and slidably connected to the guide arch (4), the first connection block (2) corresponds to the drilled hole, and the end of the first grouting conduit (22) away from the first connection block (2) is aligned with the drilled hole; and a fixing assembly (6) for fixing the curvature between the first connection blocks (2) is provided on the side of the adjacent first connection blocks (2) away from the first grouting conduit (22).
6. A deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 5, characterized in that: A second connecting block (7) corresponding to the second grouting conduit (72) is provided on the lower side of the first connecting block (2), and each of the second connecting blocks (7) is provided with a second bellows (71) for conveying cement-water-glass double liquid slurry. The second connecting blocks (7) are evenly distributed along the length direction of the second bellows (71), and the second connecting block (7) is fixedly connected to the second bellows (71). One end of the second grouting conduit (72) is inserted into the corresponding second connecting block (7) and communicated with the second bellows (71). Position limiting rods (31) are also provided between adjacent second grouting conduits (72), and the connection between the second grouting conduit (72) and the position limiting rod (31) is the same as the connection between the first grouting conduit (22) and the position limiting rod (31). The lower side of the first connecting block (2) is provided with a driving mechanism for the second grouting conduit (72). A driving member (9) is provided so that the curvature between the grouting conduits (72) is the same as the curvature between the boreholes; a fixing assembly (6) for fixing the curvature formed by the second connecting blocks (7) is also provided between the second connecting blocks (7); and a rotating assembly (8) for driving the first connecting block (2) and the second connecting block (7) to rotate relative to each other is provided between the first connecting block (2) and the second connecting block (7); a second hydraulic cylinder (11) for driving the second grouting conduit (72) to align with the borehole is provided on the machine body (1); the second hydraulic cylinder (11) is perpendicular to the first hydraulic cylinder (13); the end of the telescopic rod of the second hydraulic cylinder (11) is fixedly connected to an end of the first hydraulic cylinder (13) away from the borehole; the second hydraulic cylinder (11) is rotationally connected to the machine body (1); and the first motor (12) is fixedly connected to the machine body (1) and drives the second hydraulic cylinder (11) to rotate along the height direction of the tunnel.
7. A deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 6, characterized in that: The rotating assembly (8) comprises a first rotating rod (81) fixedly connected to the lower side of the first connecting block (2) located in the middle, a second rotating rod (82) fixedly connected to the upper side of the second connecting block (7) corresponding to the first connecting block (2), the ends of the first rotating rod (81) and the second rotating rod (82) close to each other are both sleeved and rotatably connected to the same mounting shell (14), the ends of the first rotating rod (81) and the second rotating rod (82) close to each other are both fixedly connected to a first gear (83), the outer side of the mounting shell (14) is plugged and slidably connected to a second gear (84) that can cooperate with the first gear (83), a second motor slidably connected to the mounting shell (14) is installed on one side of the second gear (84), and the other side of the second gear (84) is rotatably connected to a third hydraulic cylinder (85) that drives the second gear (84) to slide along the mounting shell (14) in a vertical direction.
8. The deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 7 is characterized by: The driving member (9) comprises a fixed rod (91) fixedly connected to the lower side of the first connecting block (2) other than the first connecting block (2) corresponding to the first rotating rod (81); the second connecting block (7) located at the lower side of the fixed rod (91) is fixedly connected with a fourth hydraulic cylinder (92) facing the corresponding fixed rod (91); the fixed rod (91) is provided with a waist-shaped hole (911); and the telescopic rod of the fourth hydraulic cylinder (92) passes through the corresponding waist-shaped hole (911).
9. A deep hole grouting method for a dark tunnel in a water-rich stratum according to claim 8, characterized in that: The first connection block (2) and the second connection block (7) are each provided in three numbers; a side of the first connection block (2) away from the first grouting conduit (22) is fixedly connected to a fixing column (61); a side of the second connection block (7) away from the second grouting conduit (72) is also fixedly connected to a fixing column (61); the fixing assembly (6) comprises a hinged rod (62) located between adjacent fixing columns (61); an end of the hinged rod (62) close to the first rotating rod (81) is rotatably connected to a corresponding fixing column (61); and the fixing column (61) at the end is plugged into the corresponding hinged rod. The other end of the hinged rod (62) is rotatably connected to the hinged rod (62), the sides of the hinged rod (62) that are away from each other are fixedly connected to a torsion spring fixedly connected to the fixed column (61), the sides of the hinged rod (62) that are close to each other are fixedly connected to a third gear (63) sleeved on the fixed column (61), the lower side of the second gear (84) is meshed with the same rack (64), and the first connecting block (2) and the second connecting block (7) corresponding to the hinged rod (62) are fixedly connected to a fifth hydraulic cylinder (65) that drives the rack (64) to move in a direction close to or away from the third gear (63).