Lining trolley for large-span tunnel lining

By designing a light and efficient lining trolley, including guide rail pulley system, hydraulic adjustment and lightweight material combination formwork, the problem of difficulty and safety risks of modification during the lining of large-span tunnels is solved, and efficient and safe construction and concrete quality are achieved. ensure.

CN118933879APending Publication Date: 2024-11-12CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411174018.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the lining process of large-span tunnels, traditional trolleys are difficult and take a long time to modify. The reinforced waterproof trolley needs to be modified when the cross-section changes, which has a lot of workload and large working space, poses a large safety risk, and is low assembling efficiency.

Method used

A lining trolley including walking unit, bracket, door frame, support unit, hydraulic unit, template unit and baffle unit is designed. The guide rail and pulley system are used to achieve movement, the hydraulic cylinder is adjusted in height, the disc-shaped buckle plate and caliper type The wedge pin locks the fixing bracket, lightweight square-stand main corrugated and square wood structure, plastic side formwork and wedge-shaped steel formwork combination formwork, hydraulic push rods to achieve vibration and mold release, and fenders prevent concrete from leaking.

Benefits of technology

The lining construction progress has been improved, labor intensity and cost have been reduced, the risk of dismantling and bracing has been reduced, the appearance quality of the concrete has been ensured, the installation and dismantling process has been simplified, and the construction efficiency and safety have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933879A_ABST
    Figure CN118933879A_ABST
Patent Text Reader

Abstract

The lining trolley comprises a walking unit, a support, a door frame, a supporting unit, a hydraulic unit, a formwork unit and a baffle unit, the lining trolley is constructed according to the steps that lofting is conducted through survey, the walking unit is installed, the construction position of the lining trolley is determined, then the support is erected, the door frame is erected, and the supporting unit is erected on the door frame; one end of the hydraulic unit is connected with the supporting unit, the other end of the hydraulic unit is connected with the inner side face of the formwork unit, finally, the baffle unit is installed on the outer side face of the formwork unit, the walking unit can drive the lining trolley to move, and a door frame can enable a vehicle to pass through. The supporting unit is responsible for supporting the formwork unit, and the baffle unit enables concrete not to leak when the concrete is poured, so that the large-span section lining construction progress is effectively accelerated, the labor intensity is reduced, the safety is guaranteed, the cost is saved, and the appearance quality of the concrete is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of large-span tunnel lining equipment, in particular to a lining trolley used for large-span tunnel lining. Background Art

[0002] The cross-section of a large-span tunnel changes frequently and is short. When using a trolley, it needs to be constantly modified according to the site. The modification of the trolley is difficult and time-consuming, and the assembly and modification of the trolley requires a large site. When the steel waterproof gantry used by the trolley needs to be modified as the cross-section changes, the workload is high and the working space is large. The distance that needs to be dismantled at one time is too long, and the initial support is exposed for a long time, which will pose a great safety risk. The traditional trolley formwork support system is relatively bulky as a whole, and the assembly difficulty is great. The assembly efficiency of workers is low. Therefore, it is necessary to study a lining trolley for large-span tunnel masonry to solve the above problems. Summary of the invention

[0003] The object of the present invention is to provide a lining trolley for lining a large-span tunnel to solve the problems raised in the above-mentioned background technology.

[0004] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0005] Furthermore, the lining trolley includes a walking unit, a bracket, a door frame, a supporting unit, a hydraulic unit, a template unit and a baffle unit. The walking unit is fixedly connected to the lower end of the door frame, and both ends of the supporting unit are respectively fixedly connected to the upper ends of the two door frames. The bracket is located inside the space formed by the two door frames and the supporting unit. One end of the hydraulic unit is connected to the template unit by bolts, and the other end of the hydraulic unit is connected to the supporting unit by bolts. The template unit is placed on the supporting unit, and the baffle unit is arranged at both ends of the template unit. The baffle unit and the template unit are fixedly connected.

[0006] First, measurement and layout are carried out on site, and then the traveling unit is installed to determine the construction position of the lining trolley. Then, the bracket is set up, the door frame is erected, the supporting unit is built on the door frame and fixed. Then, the formwork unit is assembled and mounted on the supporting unit. One end of the hydraulic unit is connected to the supporting unit, and the other end is connected to the inner side of the formwork unit. Finally, the baffle unit is installed on the outer side of the formwork unit. The traveling unit can drive the lining trolley to move, and the door frame can allow vehicles to pass. The supporting unit is responsible for supporting the formwork unit, and the baffle unit prevents concrete from leaking when pouring concrete.

[0007] Furthermore, the walking unit includes a guide rail and a pulley, one end of the wheel of the pulley is arranged on the track of the guide rail, and the other end of the pulley is fixedly connected to the door frame.

[0008] According to the on-site measurement and layout, the guide rail path is set, the lining route of the lining trolley is determined, and the pulley enables the lining trolley to move on the guide rail.

[0009] Furthermore, the connection between the brackets is locked and fixed by a disc-shaped buckle plate and a caliper-type wedge pin, a roller is provided at the bottom end of the bracket, and the bracket is an operating frame.

[0010] The connection between the brackets is fixed with disc-shaped buckles and caliper-type wedge pins, which can improve the load-bearing capacity, facilitate installation and disassembly, and reduce the time for building and disassembling the lining trolley. The support frame is used as an operating frame, which saves the steel waterproofing work platform, effectively reduces the working space required for construction, and reduces the construction risks caused by the long distance of dismantling the support. At the same time, it effectively improves the construction progress of large-span linings, reduces labor intensity to ensure safety, saves costs, and ensures the appearance quality of concrete.

[0011] Furthermore, the two door frames each include a hydraulic cylinder and a frame, one end of the two hydraulic cylinders are slidably connected to the two supporting feet at the bottom of the frame respectively, the other end of the hydraulic cylinder is fixedly connected to one end of the pulley, the top ends of the two frames are fixedly connected to the support unit, and the support unit is located between the two frames.

[0012] The hydraulic cylinder can lower and raise the height of the frame, thereby achieving the effect of adjusting the formwork unit of the lining trolley. According to the on-site measurement and layout results, the height of the formwork unit is adjusted so that the construction can proceed normally.

[0013] Furthermore, the supporting unit includes a supporting base, a main rib, square wood and a secondary rib, the two ends of the supporting base are respectively fixedly connected to the top ends of the two frames, the main rib is arranged on the supporting base, the main rib and the supporting base are fixedly connected, the secondary rib is placed on the main rib, the secondary rib and the main rib are fixedly connected, the square wood is arranged in the gap between the main rib and the secondary rib, the two sides of the supporting base are connected to the hydraulic unit by bolts, and the main rib is square steel.

[0014] Furthermore, the supporting base includes a cross beam, a fixed steel bar and a fixed base. The two ends of the cross beam and the fixed steel bar are fixedly connected by a base connecting plate. The cross beam is an I-beam. Positioning blocks are provided on the two end faces of the fixed steel bar. The hydraulic unit and the positioning blocks are connected by bolts. The main rib is placed on the fixed base.

[0015] The main ribs are made of square steel, which makes the material lighter and easier to transport, and is more convenient for workers to install, thereby improving the efficiency of installing the lining trolley and improving construction efficiency.

[0016] Furthermore, the hydraulic unit includes a first hydraulic push rod, a second hydraulic push rod, a third hydraulic push rod and a fourth hydraulic push rod, one end of the first hydraulic push rod is bolted to a positioning block on one end surface of a steel bar fixed on one side of the beam, the other end of the first hydraulic push rod is bolted to the template unit, one end of the second hydraulic push rod is bolted to a positioning block on the other end surface of a steel bar fixed on one side of the beam, the other end of the second hydraulic push rod is bolted to the template unit, one end of the third hydraulic push rod is bolted to an end surface of a steel bar fixed on the other side of the beam, the other end of the third hydraulic push rod is bolted to the template unit, one end of the fourth hydraulic push rod is bolted to the positioning block on the other end surface of a steel bar fixed on the other side of the beam, the other end of the fourth hydraulic push rod is bolted to the template unit, and the first and third hydraulic push rods are above the second and fourth hydraulic push rods.

[0017] The first hydraulic push rod, the second hydraulic push rod, the third hydraulic push rod and the fourth hydraulic push rod are responsible for retracting the plastic side formwork inwards. At the same time, the first hydraulic push rod, the second hydraulic push rod, the third hydraulic push rod and the fourth hydraulic push rod are extended and retracted together to achieve a vibration effect, making it easier to separate the formwork unit from the poured concrete and realize demoulding.

[0018] Furthermore, the template unit includes a plastic side template, a plastic top template and a wedge-shaped steel template, one side of the wedge-shaped steel template is fixedly connected to the plastic top template, the plastic side template, the plastic top template and the wedge-shaped steel template are arc-shaped after splicing, an upper positioning steel bar and a lower positioning steel bar are arranged on the inner side of the plastic side template, the upper positioning steel bar is located above the lower positioning steel bar, and positioning parts are arranged on the upper positioning steel bar and the lower positioning steel bar, the positioning parts on the two upper positioning steel bars are respectively bolted to the first hydraulic push rod and the third hydraulic push rod, and the positioning parts on the two lower positioning steel bars are respectively bolted to the second hydraulic push rod and the fourth hydraulic push rod.

[0019] Both the plastic side formwork and the plastic top formwork are made of plastic. Compared with the traditional steel formwork, the plastic formwork is light in weight, high in strength, has a high number of repeated turnovers, is easy and quick to disassemble and assemble, greatly reducing labor intensity and construction costs and improving construction efficiency. The wedge-shaped steel formwork connects the plastic side formwork and the plastic top formwork to achieve tight joints in the arc-shaped arch wall formwork, ensuring the appearance quality of the concrete.

[0020] Furthermore, the baffle unit includes a mudguard and a baffle connecting plate, wherein the mudguard is arranged on the outer surface of the arc-shaped part after the plastic side template, the plastic top template and the wedge-shaped steel template are spliced ​​together, and the mudguard is also arc-shaped, and the inner diameter of the mudguard is equal to the outer diameter of the arc-shaped part after the plastic side template, the plastic top template and the wedge-shaped steel template are spliced ​​together, one end of two baffle connecting plates are connected to the mudguard studs, and the other ends of two baffle connecting plates are connected to the studs on the upper surface of the plastic side template, one end of another baffle connecting plate is connected to the mudguard studs, and the other end of another baffle connecting plate is connected to the studs on the upper surface of the plastic top template.

[0021] When pouring concrete, the fender forms a space with only two ends together with the plastic side formwork, plastic top formwork and wedge-shaped steel formwork to prevent concrete from leaking from both sides. At the same time, when the first pouring is completed, the fender at one end can be removed to facilitate the movement of the lining trolley for the next pouring.

[0022] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention requires measurement and layout before installation, and then the guide rail is installed, and then the bracket is built, the frame is erected and placed on the guide rail, the support base is placed on the frame, and then the main ribs and secondary ribs are installed on the support base in sequence, and the elevation is adjusted according to the on-site measurement data, and then the assembled plastic top template and wedge-shaped steel template are hoisted on the secondary ribs, and the space between the main ribs and the secondary ribs is filled with square wood, and then the plastic side template is installed, and the angle between the plastic side template and the wedge-shaped steel template is adjusted so that the joints of the assembled arc-shaped arch wall template are tight, ensuring the appearance quality of the concrete, and the support base and the plastic side template are connected by a hydraulic unit to achieve vibration and demoulding after pouring, and the mudguard is finally installed at both ends of the outer side surface of the assembled arc-shaped arch wall template. After the first pouring, the mudguard at the outer end of the tunnel can be removed, so that the lining trolley can move in the tunnel for the next pouring, which effectively improves the construction progress of the large-span lining, reduces labor intensity to ensure safety, saves costs, and ensures the appearance quality of the concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0024] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0025] Figure 2 It is a front view of the present invention;

[0026] Figure 3 is a schematic diagram of the support unit structure of the present invention;

[0027] Figure 4It is a schematic diagram of the structural connection of the hydraulic unit of the present invention;

[0028] Figure 5 It is a schematic diagram of the walking unit and door frame structure of the present invention;

[0029] Figure 6 is a schematic diagram of the support connection structure of the present invention;

[0030] In the figure: 1-travel unit, 2-bracket, 3-door frame, 4-support unit, 5-hydraulic unit, 6-template unit, 7-baffle unit, 11-guide rail, 12-pulley, 21-roller, 31-hydraulic cylinder, 32-frame, 41-support base, 42-main rib, 43-square wood, 44-secondary rib, 51-first hydraulic push rod, 52-second hydraulic push rod, 53-third hydraulic push rod, 54-fourth hydraulic push rod, 61-plastic side template, 62-plastic top template, 63-wedge-shaped steel template, 71-mudguard, 72-baffle connecting plate, 411-crossbeam, 412-fixed steel bar, 413-fixed base, 414-base connecting plate, 415-positioning block, 611-upper positioning steel bar, 612-lower positioning steel bar, 613-positioning piece. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] The present invention provides a technical solution:

[0033] like Figure 1 to Figure 5 As shown, the lining trolley includes a walking unit 1, a bracket 2, a door frame 3, a support unit 4, a hydraulic unit 5, a template unit 6 and a baffle unit 7. The walking unit 1 is fixedly connected to the lower end of the door frame 3, and the two ends of the support unit 4 are respectively fixedly connected to the upper ends of the two door frames 3. The bracket 2 is located inside the space formed by the two door frames 3 and the support unit 4. One end of the hydraulic unit 5 is connected to the template unit 6 by bolts, and the other end of the hydraulic unit 5 is connected to the support unit 4 by bolts. The template unit 6 is placed on the support unit 4, and the baffle unit 7 is arranged at both ends of the template unit 6. The baffle unit 7 and the template unit 6 are fixedly connected.

[0034] First, measurement and layout are carried out on site, and then the walking unit 1 is installed to determine the construction position of the lining trolley. Then the bracket 2 is set up, the door frame 3 is erected, and the support unit 4 is built on the door frame 3 and fixed. Then the formwork unit 6 is assembled and mounted on the support unit 4. One end of the hydraulic unit 5 is connected to the support unit 4, and the other end is connected to the inner side of the formwork unit 6. Finally, the baffle unit 7 is installed on the outer side of the formwork unit 6. The walking unit 1 can drive the lining trolley to move, and the door frame 3 can allow the vehicle to pass. The support unit 4 is responsible for supporting the formwork unit 6, and the baffle unit 7 prevents the concrete from leaking when the concrete is poured.

[0035] like Figure 5 As shown, the walking unit 1 includes a guide rail 11 and a pulley 12 , one end of the wheel of the pulley 12 is arranged on the track of the guide rail 11 , and the other end of the pulley 12 is fixedly connected to the door frame 3 .

[0036] According to the on-site measurement and layout, the path of the guide rail 11 is set, the lining route of the lining trolley is determined, and the pulley 12 enables the lining trolley to move on the guide rail 11.

[0037] like Figure 6 As shown, the connection between the brackets 2 is locked and fixed by a disc-shaped buckle plate and a caliper-type wedge pin, and a roller 21 is provided at the bottom end of the bracket 2. The bracket 2 is an operating frame.

[0038] The connection between the brackets 2 is fixed by disc-shaped buckles and caliper-type wedge pins, which can improve the load-bearing capacity, facilitate installation and disassembly, and reduce the time for building and disassembling the lining trolley. The support frame is used as an operating frame, which saves the steel waterproofing work platform, effectively reduces the working space required for construction, and reduces the construction risks caused by the long distance of dismantling the support. At the same time, it effectively improves the construction progress of large-span linings, reduces labor intensity to ensure safety, saves costs, and ensures the appearance quality of concrete.

[0039] like Figure 1 As shown, the two door frames 3 include a hydraulic cylinder 31 and a frame 32. One end of the two hydraulic cylinders 31 is slidably connected to the two supporting feet at the bottom of the frame 32 respectively, and the other end of the hydraulic cylinder 31 is fixedly connected to one end of the pulley 12. The top ends of the two frames 32 are fixedly connected to the support unit 4, and the support unit 4 is located between the two frames 32.

[0040] The hydraulic cylinder 31 can lower and raise the height of the frame 32, thereby achieving the effect of adjusting the template unit 6 of the lining trolley. According to the measurement and layout results on site, the height of the template unit 6 is adjusted so that the construction can proceed normally.

[0041] like Figure 3As shown, the support unit 4 includes a support base 41, a main rib 42, a square wood 43 and a secondary rib 44, the two ends of the support base 41 are fixedly connected to the top ends of the two frames 32 respectively, the main rib 42 is arranged on the support base 41, the main rib 42 and the support base 41 are fixedly connected, the secondary rib 44 is placed on the main rib 42, the secondary rib 44 and the main rib 42 are fixedly connected, the square wood 43 is arranged in the gap between the main rib 42 and the secondary rib 44, the two sides of the support base 41 are connected to the hydraulic unit 5 by bolts, and the main rib 42 is square steel.

[0042] The support base 41 includes a crossbeam 411, a fixed steel bar 412 and a fixed base 413. The two ends of the crossbeam 411 and the fixed steel bar 412 are fixedly connected by a base connecting plate 414. The crossbeam 411 is an I-beam. Positioning blocks 415 are provided on the two end faces of the fixed steel bar 412. The hydraulic unit 5 and the positioning blocks 415 are connected by bolts. The main rib 42 is placed on the fixed base 413.

[0043] The main rib 42 is made of square steel, which makes the material lighter and easier to transport, and is more convenient for workers to install, thereby improving the efficiency of installing the lining trolley and improving construction efficiency.

[0044] like Figure 4 As shown, the hydraulic unit 5 includes a first hydraulic push rod 51, a second hydraulic push rod 52, a third hydraulic push rod 53 and a fourth hydraulic push rod 54, one end of the first hydraulic push rod 51 is bolted to a positioning block 415 on one end face of a fixed steel bar 412 on one side of the cross beam 411, the other end of the first hydraulic push rod 51 is bolted to the template unit 6, one end of the second hydraulic push rod 52 is bolted to a positioning block 415 on the other end face of a fixed steel bar 412 on one side of the cross beam 411, and the other end of the second hydraulic push rod 52 is bolted to the template unit 6 One end of the third hydraulic push rod 53 is bolted to a positioning block 415 on one end surface of a fixed steel bar 412 on the other side of the cross beam 411, and the other end of the third hydraulic push rod 53 is bolted to the template unit 6. One end of the fourth hydraulic push rod 54 is bolted to a positioning block 415 on the other end surface of a fixed steel bar 412 on the other side of the cross beam 411, and the other end of the fourth hydraulic push rod 54 is bolted to the template unit 6. The first hydraulic push rod 51 and the third hydraulic push rod 53 are above the second hydraulic push rod 52 and the fourth hydraulic push rod 54.

[0045] The hydraulic unit includes a first hydraulic push rod 51, a second hydraulic push rod 52, a third hydraulic push rod 53 and a fourth hydraulic push rod 54, which are responsible for retracting the plastic side formwork 61 inward. At the same time, the first hydraulic push rod 51, the second hydraulic push rod 52, the third hydraulic push rod 53 and the fourth hydraulic push rod 54 are extended and retracted together to achieve a vibration effect, making it easier to separate the formwork unit 6 from the poured concrete and realize demoulding.

[0046] like Figure 2 As shown, the template unit 6 includes a plastic side template 61, a plastic top template 62 and a wedge-shaped steel template 63, one side of the wedge-shaped steel template 63 is fixedly connected to the plastic top template 62, and the plastic side template 61, the plastic top template 62 and the wedge-shaped steel template 63 are arc-shaped after splicing, and an upper positioning steel bar 611 and a lower positioning steel bar 612 are arranged on the inner side of the plastic side template 61, and the upper positioning steel bar 611 is located above the lower positioning steel bar 612, and positioning members 613 are arranged on the upper positioning steel bar 611 and the lower positioning steel bar 612, and the positioning members 613 on the two upper positioning steel bars 611 are respectively bolted to the first hydraulic push rod 51 and the third hydraulic push rod 53, and the positioning members 613 on the two lower positioning steel bars 612 are respectively bolted to the second hydraulic push rod 52 and the fourth hydraulic push rod 54.

[0047] The plastic side formwork 61 and the plastic top formwork 62 are both made of plastic. Compared with traditional steel formworks, plastic formworks are light in weight, high in strength, have a high number of repeated turnovers, and are easy and quick to disassemble and assemble, which greatly reduces labor intensity and construction costs and improves construction efficiency. The wedge-shaped steel formwork 63 connects the plastic side formwork 61 and the plastic top formwork 62 to achieve tight joints in the arc-shaped arch wall formwork, ensuring the appearance quality of the concrete.

[0048] like Figure 1 As shown, the baffle unit 7 includes a mudguard 71 and a baffle connecting plate 72, wherein the mudguard 71 is arranged on the outer surface of the arc-shaped part after the plastic side template 61, the plastic top template 62 and the wedge-shaped steel template 63 are spliced ​​together, and the mudguard 71 is also arc-shaped, and the inner diameter of the mudguard 71 is equal to the outer diameter of the arc-shaped part after the plastic side template 61, the plastic top template 62 and the wedge-shaped steel template 63 are spliced ​​together, one end of the two baffle connecting plates 72 is connected to the mudguard 71 with studs, and the other end of the two baffle connecting plates 72 is connected to the upper surface of the plastic side template 61 with studs, one end of another baffle connecting plate 72 is connected to the mudguard 71 with studs, and the other end of the other baffle connecting plate 72 is connected to the upper surface of the plastic top template 62 with studs.

[0049] When pouring concrete, the fender 71 forms a space with only two ends together with the plastic side formwork 61, the plastic top formwork 62 and the wedge-shaped steel formwork 63, so that concrete does not leak out from both sides. At the same time, when the first pouring is completed, the fender 71 at one end can be removed to facilitate the movement of the lining trolley for the next pouring.

[0050] Working principle of the present invention: The present invention needs to be measured and laid out before installation, then the guide rail 11 is installed, then the bracket 2 is built, the frame 32 is erected and placed on the guide rail 11, the support base 41 is placed on the frame 32, and then the main rib 42 and the secondary rib 44 are installed on the support base 41 in sequence, and the elevation is adjusted according to the on-site measurement data, and then the assembled plastic top template 62 and the wedge-shaped steel template 63 are hoisted on the secondary rib 44, the space between the main rib 42 and the secondary rib 44 is filled with square wood 43, and then the plastic side template 61 is installed, and the adjustment and wedge The angle between the steel formwork 63 makes the joint of the assembled arc-shaped arch wall formwork tight, ensuring the appearance quality of the concrete. The support base 41 and the plastic side formwork 61 are connected by the hydraulic unit 5 to achieve vibration and demoulding after pouring. The mudguard 71 is finally installed at both ends of the outer side of the assembled arc-shaped arch wall formwork. After the first pouring, the mudguard 71 at the outer end of the tunnel can be removed, so that the lining trolley can move in the tunnel for the next pouring, which effectively improves the construction progress of the large-span lining, reduces labor intensity to ensure safety, saves costs, and ensures the appearance quality of the concrete.

[0051] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0052] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A lining trolley for long-span tunnel lining, characterized in that: The lining trolley comprises a walking unit (1), a bracket (2), a door frame (3), a support unit (4), a hydraulic unit (5), a template unit (6) and a baffle unit (7); the walking unit (1) is fixedly connected to the lower end of the door frame (3); the two ends of the support unit (4) are respectively fixedly connected to the upper ends of the two door frames (3); the bracket (2) is located inside the space formed by the two door frames (3) and the support unit (4); one end of the hydraulic unit (5) is connected to the template unit (6) by bolts; the other end of the hydraulic unit (5) is connected to the support unit (4) by bolts; the template unit (6) is placed on the support unit (4); the baffle unit (7) is arranged at both ends of the template unit (6); and the baffle unit (7) and the template unit (6) are fixedly connected.

2. A lining trolley for long-span tunnel lining according to claim 1, characterized in that: The walking unit (1) comprises a guide rail (11) and a pulley (12); one end of a wheel of the pulley (12) is arranged on the track of the guide rail (11), and the other end of the pulley (12) is fixedly connected to the door frame (3).

3. The lining trolley for long-span tunnel lining according to claim 2, characterized in that: The connection between the brackets (2) is in the form of locking and fixing by a disc-shaped buckle plate and a caliper-shaped wedge pin. A roller (21) is provided at the bottom end of the bracket 2. The bracket (2) is an operating frame.

4. The lining trolley for long-span tunnel lining according to claim 3, characterized in that: The two door frames (3) each comprise a hydraulic cylinder (31) and a frame (32); one end of the two hydraulic cylinders (31) are respectively slidably connected to two supporting feet at the bottom of the frame (32); the other end of the hydraulic cylinder (31) is fixedly connected to one end of a pulley (12); the top ends of the two frames (32) are fixedly connected to a support unit (4); and the support unit (4) is located between the two frames (32).

5. The lining trolley for long-span tunnel lining according to claim 4, characterized in that: The support unit (4) comprises a support base (41), a main rib (42), a square wood (43) and a secondary rib (44); two ends of the support base (41) are respectively fixedly connected to the top ends of two frames (32); the main rib (42) is arranged on the support base (41); the main rib (42) and the support base (41) are fixedly connected; the secondary rib (44) is placed on the main rib (42); the secondary rib (44) and the main rib (42) are fixedly connected; the square wood (43) is arranged in a gap between the main rib (42) and the secondary rib (44); two sides of the support base (41) are connected to the hydraulic unit (5) by bolts; and the main rib (42) is made of square steel.

6. The lining trolley for long-span tunnel lining according to claim 5, characterized in that: The support base (41) comprises a crossbeam (411), a fixed steel bar (412) and a fixed base (413); the two ends of the crossbeam (411) and the fixed steel bar (412) are fixedly connected via a base connecting plate (414); the crossbeam (411) is an I-beam; positioning blocks (415) are arranged on the two end surfaces of the fixed steel bar (412); the hydraulic unit (5) and the positioning blocks (415) are connected via bolts; and the main rib (42) is placed on the fixed base (413).

7. The lining trolley for long-span tunnel lining according to claim 6, characterized in that: The hydraulic unit 5 comprises a first hydraulic push rod (51), a second hydraulic push rod (52), a third hydraulic push rod (53) and a fourth hydraulic push rod (54); one end of the first hydraulic push rod (51) is bolted to a positioning block (415) on one end surface of a steel bar (412) fixed on one side of the cross beam (411); the other end of the first hydraulic push rod (51) is bolted to a template unit (6); one end of the second hydraulic push rod (52) is bolted to a positioning block (415) on the other end surface of a steel bar (412) fixed on one side of the cross beam (411); the other end of the second hydraulic push rod (52) is bolted to the template unit (6); One end of the third hydraulic push rod (53) is bolted to a positioning block (415) on one end surface of a fixed steel bar (412) on the other side of the cross beam (411), and the other end of the third hydraulic push rod (53) is bolted to the template unit (6). One end of the fourth hydraulic push rod (54) is bolted to a positioning block (415) on the other end surface of a fixed steel bar (412) on the other side of the cross beam (411), and the other end of the fourth hydraulic push rod (54) is bolted to the template unit (6). The first hydraulic push rod (51) and the third hydraulic push rod (53) are above the second hydraulic push rod (52) and the fourth hydraulic push rod (54).

8. The lining trolley for long-span tunnel lining according to claim 7, characterized in that: The template unit (6) comprises a plastic side template (61), a plastic top template (62) and a wedge-shaped steel template (63), one side of the wedge-shaped steel template (63) is fixedly connected to the plastic top template (62), the plastic side template (61), the plastic top template (62) and the wedge-shaped steel template (63) are arc-shaped after being spliced, and an upper positioning steel bar (611) and a lower positioning steel bar (612) are arranged on the inner side of the plastic side template (61), and the upper positioning steel bar (611) Located above the lower positioning steel bar (612), positioning pieces (613) are provided on the upper positioning steel bar (611) and the lower positioning steel bar (612), the positioning pieces (613) on the two upper positioning steel bars (611) are respectively bolted to the first hydraulic push rod (51) and the third hydraulic push rod (53), and the positioning pieces (613) on the two lower positioning steel bars (612) are respectively bolted to the second hydraulic push rod (52) and the fourth hydraulic push rod (54).

9. The lining trolley for long-span tunnel lining according to claim 8, characterized in that: The baffle unit (7) comprises a fender (71) and a baffle connecting plate (72). The fender (71) is arranged on the outer surface of an arc-shaped member formed by splicing a plastic side template (61), a plastic top template (62) and a wedge-shaped steel template (63). The fender (71) is also arc-shaped. The inner diameter of the fender (71) is equal to the outer diameter of the arc-shaped member formed by splicing the plastic side template (61), the plastic top template (62) and the wedge-shaped steel template (63). One end of two baffle connecting plates (72) are connected to the studs of the fender (71), and the other ends of the two baffle connecting plates (72) are connected to the studs on the upper surface of the plastic side template (61). One end of another baffle connecting plate (72) is connected to the studs of the fender (71), and the other end of another baffle connecting plate (72) is connected to the studs on the upper surface of the plastic top template (62).