Measuring anchor rod, method and system capable of measuring deep displacement of surrounding rock

By designing a measurement anchor that can measure the displacement of the surrounding rock deep, using anchor deformation data to monitor the displacement of surrounding rock in real time, the accuracy and timely warning of traditional monitoring methods are solved, and the safety monitoring and early warning of the full life of the tunnel is realized, and construction is reduced and operational risks.

CN118933949APending Publication Date: 2024-11-12SICHUAN COMM SURVEYING & DESIGN INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411249438.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional methods of deep surrounding rock displacement monitoring are difficult to accurately predict and monitor in real time, which increases the risks of tunnel construction and operation. The existing equipment is large in diameter and does not have a bearing capacity, so early warning information cannot be released in a timely manner.

Method used

A measurement anchor rod that can measure the displacement of the deep part of the surrounding rock is designed. By monitoring the deformation of the anchor rod, the deep part of the inner rock is estimated, and the length deformation is calculated based on resistance and temperature data. A multi-channel data collector is used to monitor and transmit data in real time. Achieve full life safety warning.

Benefits of technology

It realizes accurate and timely monitoring of the displacement of deep surrounding rock, provides timely warnings in the construction and operation stages, reduces the risks of tunnel construction and operation, and is cheap, can replace system anchors and has convenient construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933949A_ABST
    Figure CN118933949A_ABST
Patent Text Reader

Abstract

The invention discloses a measuring anchor rod, method and system capable of measuring deep displacement of surrounding rock, and the measuring anchor rod comprises a rod body which is averagely divided into a plurality of sections, the two ends of each section of rod body are provided with monitoring welding spots, and the adjacent rod bodies share one monitoring welding spot; each monitoring welding spot is provided with a connecting wire, and the connecting wires are used for being matched with the monitoring welding spots to monitor resistance data of each section of rod body in real time; each monitoring welding spot is connected to the multi-channel data collector through a corresponding connecting wire. The temperature sensor is arranged in the middle of the whole rod body and used for acquiring temperature data of the rod body; and the temperature sensor is connected to the multi-channel data acquisition unit. The deep displacement in the surrounding rock is calculated by monitoring the deformation of the measuring anchor rod, then early warning is provided for the construction stage and the operation stage of the tunnel, and full-life safety early warning of the tunnel is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of highway engineering tunnel anchor rods, and in particular to a measuring anchor rod, method and system capable of measuring deep displacement of surrounding rocks. Background Art

[0002] With the advancement of the strategy of building a strong transportation nation, my country's transportation tunnel construction technology has become more mature. Among them, the method of using shotcrete technology to stabilize the tunnel surrounding rock is the most widely used. However, traditional surrounding rock stability monitoring methods often rely on indirect geological exploration data and empirical judgments, and it is difficult to accurately predict and monitor the deep displacement of the surrounding rock in real time, which increases the risk of tunnel construction and operation to a certain extent.

[0003] The existing technology generally uses a deep displacement meter to measure the deep displacement of surrounding rocks. On the one hand, the diameter of the deep displacement meter is large, which is inconvenient during construction and requires a larger borehole. Moreover, as the number of measuring points increases, the borehole diameter also increases. On the other hand, the rod of the deep displacement meter does not have a load-bearing function and cannot replace the system anchor rod at the test location. It can only play a monitoring role. In addition, since the monitoring data is often read, stored and identified manually, it is impossible to issue early warning information in time when danger occurs. Therefore, there is an urgent need for a real-time monitoring and early warning control system that measures the deep displacement of surrounding rocks.

[0004] In view of this, this application is hereby filed. Summary of the invention

[0005] The purpose of the present invention is to provide a measuring anchor, method and system that can measure the deep displacement of surrounding rock. A measuring anchor that can measure the deep displacement of surrounding rock is designed. By monitoring the deformation of the measuring anchor, the deep displacement inside the surrounding rock is inferred. The deep displacement of the surrounding rock can be accurately predicted and monitored in real time, thereby providing timely warnings during the construction and operation stages of the tunnel, thereby realizing full life safety warnings for the tunnel.

[0006] The present invention is achieved through the following technical solutions:

[0007] In a first aspect, the present invention provides a measuring anchor capable of measuring deep displacement of surrounding rock, the measuring anchor comprising:

[0008] The rod body is evenly divided into several sections, and monitoring welding points are set at both ends of each section of the rod body, and adjacent rod bodies share one monitoring welding point;

[0009] Connecting wires: Each monitoring welding point is equipped with a connecting wire, which is used to cooperate with the monitoring welding point to monitor the resistance data of each section of the rod in real time; each monitoring welding point is connected to the multi-channel data collector through the corresponding connecting wire;

[0010] The temperature sensor is arranged in the middle of the entire rod body and is used to obtain the temperature data of the rod body; the temperature sensor is connected to the multi-channel data collector.

[0011] The above multi-channel data collector can monitor the resistance data of each section of the rod by controlling and connecting to any two adjacent connecting wires, and the temperature data of the rod can be obtained through the connected temperature sensor.

[0012] Furthermore, the measuring anchor rod also includes a pad, which is arranged at one end of the rod body and is installed on the surrounding rock wall through a nut.

[0013] Furthermore, the monitoring process of the measuring anchor is:

[0014] Combining the resistance data collected by the connecting wire and the temperature data collected by the temperature sensor, the deformation data ΔL of each section of the rod body, that is, the deep displacement ΔS of the surrounding rock, is calculated;

[0015] The deformation data ΔL of each section of the rod length are added together to obtain the total deformation ΣΔL of the measuring anchor rod.

[0016] Furthermore, the expression of the deformation data ΔL of each rod length is:

[0017]

[0018] Wherein: L0 is the initial length of the rod section; V is the volume of the rod section; R is the measured resistance data monitored by controlling the two connecting wires corresponding to the rod section through a multi-channel data acquisition device; ρ0 is the initial resistivity; α is the temperature coefficient of resistivity, which is calibrated before the measuring anchor rod leaves the factory; t is the measured temperature data of the measuring anchor rod.

[0019] Furthermore, the rod body is evenly divided into 3-5 sections.

[0020] Furthermore, the rod body is made of metal.

[0021] In a second aspect, the present invention further provides a measurement method capable of measuring deep displacement of surrounding rock, the measurement method comprising:

[0022] On the same section, measuring anchor rods are installed at five measuring points, namely, the arch crown, the left arch waist, the right arch waist, the left arch wall, and the right arch wall. The measuring anchor rods are the above-mentioned measuring anchor rods capable of measuring the deep displacement of the surrounding rock.

[0023] In the tunnel axial direction, a ring of test sections is set for every meter. If there are system anchors designed within the meter, the system anchors at the corresponding positions are replaced by measuring anchors.

[0024] By writing the position information of each measuring point in the tunnel axial, circumferential and radial directions into the multi-channel collector, the pile number, section location and depth where the deformation occurred can be determined according to whether the surrounding rock has deformed. This can provide early warning for construction personnel and passing vehicles, and provide point support for subsequent surrounding rock deformation treatment.

[0025] Furthermore, whether the surrounding rock is deformed includes:

[0026] If the deformation data ΔL of each rod length is not equal to 0, it means that the surrounding rock has deformed;

[0027] If the deformation data ΔL of each rod length is equal to 0, it means that the surrounding rock has not been deformed.

[0028] Furthermore, if the deformation data ΔL of each rod length is not equal to 0, it means that the surrounding rock has deformed, including:

[0029] When the deformation data ΔL of each rod length is greater than 0, the measuring anchor is stretched, indicating that the surrounding rock has displaced into the tunnel;

[0030] When the deformation data ΔL of each rod length is less than 0, the measuring anchor is compressed, indicating that the surrounding rock has moved away from the tunnel.

[0031] In a third aspect, the present invention provides a full life cycle monitoring and early warning system, which:

[0032] The monitoring module includes a measuring anchor rod and a multi-channel data collector. The measuring anchor rod adopts the above-mentioned measuring anchor rod capable of measuring the deep displacement of the surrounding rock. The monitoring module is used to collect the resistance data of each section of the rod body and the temperature data of the measuring anchor rod through the measuring anchor rod, and calculate the deformation data of the length of each section of the rod body and the total deformation of the measuring anchor rod.

[0033] The transmission module uses wireless or wired transmission to transmit the data collected by the monitoring module to the early warning system in real time;

[0034] The early warning module is used to issue early warnings in stages according to the data transmitted by the transmission module, including: early warnings in the construction stage and early warnings in the operation stage; the early warnings in the construction stage include: setting LED indicators every meter along the axis of the tunnel, and when the measuring anchor rod is deformed and does not exceed the set threshold, a yellow indicator light will light up at the deformed position for early warning; when the measuring anchor rod is deformed and has exceeded the set threshold, a red indicator light will light up at the deformed position for early warning; the early warnings in the operation stage include: setting electronic signs every meter along the axis of the tunnel, and when the measuring anchor rod is deformed and does not exceed the set threshold, an early warning will be issued on the electronic sign closest to the direction of the oncoming vehicle; when the measuring anchor rod is not deformed, no early warning will be issued.

[0035] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0036] 1. The present invention provides a measuring anchor rod, method and system capable of measuring the deep displacement of surrounding rock. A measuring anchor rod capable of measuring the deep displacement of surrounding rock is designed. The deep displacement inside the surrounding rock is inferred by monitoring the deformation of the measuring anchor rod. The deep displacement of the surrounding rock can be accurately predicted and monitored in real time, thereby providing timely warnings during the construction and operation stages of the tunnel, thereby realizing full life safety warnings for the tunnel.

[0037] 2. The present invention provides a measuring anchor rod, method and system capable of measuring the deep displacement of surrounding rock. Compared with the prior art which uses a surrounding rock deep displacement meter for measurement, the construction method of the present invention is basically consistent with the system anchor rod, and the cost of the monitoring anchor rod is close to that of an ordinary anchor rod, which is much lower than the cost of a surrounding rock deep displacement meter. Moreover, the detection anchor rod can both monitor deformation and play a load-bearing role, and has the advantages of convenient construction, low cost and can directly replace the original system anchor rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0039] Figure 1 It is a structural schematic diagram of a measuring anchor rod capable of measuring deep displacement of surrounding rock according to the present invention;

[0040] Figure 2 A schematic diagram of testing deep displacement of a measuring anchor rod capable of measuring deep displacement of surrounding rock according to the present invention;

[0041] Figure 3 This is a schematic diagram of the operation of a full-life monitoring and early warning system of the present invention;

[0042] Figure 4 It is a schematic diagram of a situation of the present invention;

[0043] Figure 5 This is a schematic diagram of the second situation of the present invention;

[0044] Figure 6 It is a schematic diagram of the third situation of the present invention;

[0045] Figure 7 It is a schematic diagram of the fourth situation of the present invention;

[0046] Reference numerals and corresponding component names:

[0047] 1-rod body, 2-monitoring welding point, 3-connecting wire, 4-temperature sensor, 5-backing plate, 6-nut. DETAILED DESCRIPTION

[0048] Hereinafter, the term "include" or "may include" used in various embodiments of the present invention indicates the presence of the invented function, operation or element, and does not limit the addition of one or more functions, operations or elements. In addition, as used in various embodiments of the present invention, the terms "include", "have" and their cognates are intended only to indicate specific features, numbers, steps, operations, elements, components or combinations of the foregoing items, and should not be understood as first excluding the presence of one or more other features, numbers, steps, operations, elements, components or combinations of the foregoing items or the possibility of adding one or more features, numbers, steps, operations, elements, components or combinations of the foregoing items.

[0049] In various embodiments of the present invention, the expression "or" or "at least one of A or / and B" includes any combination or all combinations of the words listed at the same time. For example, the expression "A or B" or "at least one of A or / and B" may include A, may include B, or may include both A and B.

[0050] The expressions (such as "first", "second", etc.) used in various embodiments of the present invention may modify the various constituent elements in various embodiments, but may not limit the corresponding constituent elements. For example, the above expressions do not limit the order and / or importance of the elements. The above expressions are only used for the purpose of distinguishing an element from other elements. For example, the first user device and the second user device indicate different user devices, although both are user devices. For example, without departing from the scope of various embodiments of the present invention, the first element may be referred to as the second element, and similarly, the second element may also be referred to as the first element.

[0051] It should be noted that if it is described that one component element is “connected” to another component element, the first component element may be directly connected to the second component element, and a third component element may be “connected” between the first component element and the second component element. Conversely, when one component element is “directly connected” to another component element, it can be understood that there is no third component element between the first component element and the second component element.

[0052] The terms used in various embodiments of the present invention are only used for the purpose of describing specific embodiments and are not intended to limit various embodiments of the present invention. As used herein, the singular form is intended to also include the plural form, unless the context clearly indicates otherwise. Unless otherwise limited, all terms used here (including technical terms and scientific terms) have the same meaning as the meaning generally understood by those of ordinary skill in the art to which the various embodiments of the present invention belong. The terms (such as the terms defined in the dictionary generally used) will be interpreted as having the same meaning as the contextual meaning in the relevant technical field and will not be interpreted as having an idealized meaning or an overly formal meaning, unless clearly defined in various embodiments of the present invention.

[0053] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0054] Example 1

[0055] like Figure 1 and Figure 2 As shown, the present invention is a measuring anchor rod capable of measuring deep displacement of surrounding rock, and the measuring anchor rod comprises: a rod body 1, a monitoring welding point 2 and a connecting wire 3, a temperature sensor 4, a pad 5, a nut 6 and the like.

[0056] The rod body 1 is evenly divided into n sections, and 3-5 sections can be selected according to different anchor rod design lengths; monitoring welding points 2 are set at both ends of each rod body, and one monitoring welding point 2 is shared between adjacent rod bodies; the material of the rod body 1 is metal material, such as steel, iron, etc.

[0057] Connecting wire 3, each monitoring welding point 2 is equipped with a connecting wire 3, which is used to cooperate with the monitoring welding point 2 to monitor the resistance data of each section of the rod in real time; each monitoring welding point 2 is connected to the multi-channel data collector through the corresponding connecting wire 3;

[0058] The temperature sensor 4 is arranged in the middle of the entire rod body 1 and is used to obtain the temperature data of the rod body 1; the temperature sensor 4 can also be connected to a multi-channel data collector through a connection;

[0059] The backing plate 5 is arranged at one end of the rod body 1 and is installed on the surrounding rock wall through a nut 6 .

[0060] The above multi-channel data collector can monitor the resistance data of each section of the rod by controlling and connecting any two adjacent connecting wires 3, and the temperature data of the rod can be obtained through the connected temperature sensor.

[0061] In specific implementation, the monitoring process of the measuring anchor is as follows:

[0062] Combined with the resistance data collected by the connecting wire 3 and the temperature data collected by the temperature sensor 4, the deformation data ΔL of each section of the rod body is calculated; considering that the full-length bonded anchor rod body deforms with the surrounding rock, the deep displacement of the surrounding rock ΔS=ΔL;

[0063] The deformation data ΔL of each section of the rod length are added together to obtain the total deformation ΣΔL of the measuring anchor rod.

[0064] In this embodiment, the expression of the deformation data ΔL of each rod length is:

[0065]

[0066] Wherein: L0 is the initial length of the rod section; V is the volume of the rod section; R is the measured resistance data monitored by controlling the two connecting wires 3 corresponding to the rod section through a multi-channel data acquisition device; ρ0 is the initial resistivity; α is the temperature coefficient of resistivity, which is calibrated before the measuring anchor rod leaves the factory; t is the measured temperature data of the measuring anchor rod.

[0067] Example 2

[0068] The difference between this embodiment and embodiment 1 is that this embodiment provides a measurement method capable of measuring deep displacement of surrounding rock, and the measurement method comprises:

[0069] On the same section, measuring anchor rods are installed at five measuring points, namely, the arch crown, the left arch waist, the right arch waist, the left arch wall, and the right arch wall. The measuring anchor rods are the above-mentioned measuring anchor rods capable of measuring the deep displacement of the surrounding rock.

[0070] In the tunnel axial direction, a ring of test sections is set for every meter. If there are system anchors designed within the meter, the system anchors at the corresponding positions are replaced by measuring anchors.

[0071] By writing the position information of each measuring point in the tunnel axial, circumferential and radial directions into the multi-channel collector, the pile number, section location and depth where the deformation occurred can be determined according to whether the surrounding rock has deformed. This can provide early warning for construction personnel and passing vehicles, and provide point support for subsequent surrounding rock deformation treatment.

[0072] In this embodiment, whether the surrounding rock is deformed includes:

[0073] If the deformation data ΔL of each rod length is not equal to 0, it means that the surrounding rock has deformed;

[0074] If the deformation data ΔL of each rod length is equal to 0, it means that the surrounding rock has not been deformed.

[0075] In this embodiment, if the deformation data ΔL of each rod length is not equal to 0, it means that the surrounding rock has deformed, including:

[0076] When the deformation data ΔL of each rod length is greater than 0, the measuring anchor is stretched, indicating that the surrounding rock has displaced into the tunnel;

[0077] When the deformation data ΔL of each rod length is less than 0, the measuring anchor is compressed, indicating that the surrounding rock has moved away from the tunnel.

[0078] Compared with the prior art which uses a surrounding rock deep displacement meter for measurement, the construction method of the present invention is basically consistent with the system anchor rod. The cost of the monitoring anchor rod is close to that of the ordinary anchor rod, which is much lower than the cost of the surrounding rock deep displacement meter. The detection anchor rod can not only monitor the deformation but also play a load-bearing role. It has the advantages of convenient construction, low cost and can directly replace the original system anchor rod.

[0079] Example 3

[0080] like Figures 3 to 7 As shown, the difference between this embodiment and embodiment 1 is that this embodiment provides a full-life monitoring and early warning system, which uses a measuring anchor rod that can measure the deep displacement of the surrounding rock as a basic monitoring element to establish a full-life monitoring and early warning system to monitor and early warning the construction safety of the tunnel construction stage and the traffic safety of the operation stage. The system:

[0081] The monitoring module includes a measuring anchor rod and a multi-channel data collector. The measuring anchor rod adopts the above-mentioned measuring anchor rod capable of measuring the deep displacement of the surrounding rock. The monitoring module is used to collect the resistance data of each section of the rod body and the temperature data of the measuring anchor rod through the measuring anchor rod, and calculate the deformation data of the length of each section of the rod body and the total deformation of the measuring anchor rod.

[0082] The transmission module uses wireless or wired transmission to transmit the data collected by the monitoring module to the central processing system in real time to ensure the real-time and accuracy of the data; and then transmit it to the early warning system;

[0083] The early warning module is used to issue early warnings in different stages according to the data transmitted by the transmission module, including early warnings in the construction stage and early warnings in the operation stage;

[0084] Early warning during the construction phase includes:

[0085] An early warning lighting system is installed, and an LED indicator light is set every meter along the tunnel axis, which can display three colors: red, yellow, and green. When the measuring anchor rod is deformed and does not exceed the set threshold, a yellow indicator light will light up at the deformed position to remind construction workers to pay attention and pass through, and set up an escape pipe at that location for prevention; when the measuring anchor rod is deformed and exceeds the set threshold, a red indicator light will light up at the deformed position to remind construction workers to evacuate to the green indicator light.

[0086] Early warnings during the operation phase include:

[0087] The early warning system is connected to traffic lights and electronic signs. Electronic signs are set up every meter along the tunnel axis. When the measuring anchor is deformed and does not exceed the set threshold, the nearest electronic sign in the direction of the vehicle will issue an early warning to guide the vehicle to slow down and observe driving or stop. The early warning system is also linked to the highway maintenance and management department. After the early warning information is issued, maintenance personnel will be dispatched immediately to carry out maintenance, and management personnel will be dispatched to guide vehicles to pass and maintain order. If the measuring anchor is not deformed, no early warning will be issued.

[0088] In specific implementation, early warning and disposal are divided into four situations:

[0089] like Figure 4 As shown in the figure, situation 1: During the construction phase, the test found that the surrounding rock was deformed, but it did not exceed the set threshold. The set threshold adopts the maximum limit of tunnel monitoring measurement specified in the current highway and railway specifications. In this case, a yellow indicator light is lit at the deformation position to remind construction personnel to pay attention and observe, and an escape pipe is set at the location for prevention. The construction unit strengthens monitoring and measurement and is ready to carry out reinforcement at any time.

[0090] like Figure 5 As shown in the figure, scenario 2: During the construction phase, if the test finds that the surrounding rock deformation exceeds the set threshold, the red indicator light will be turned on to remind the construction personnel to evacuate to the green indicator light. After eliminating the risk, the construction unit will promptly formulate a disposal plan and carry out reinforcement and maintenance.

[0091] like Figure 6 As shown in the figure, situation three: during the operation stage, the test found that the surrounding rock was deformed, but it did not exceed the set threshold. Considering that the deformation of the surrounding rock has been stable during the operation, the threshold is set using the maximum error limit of tunnel monitoring measurement specified in the current highway and railway specifications. When the deformation of the surrounding rock exceeds the set threshold, an early warning message is immediately displayed on the nearest sign in the direction of the oncoming vehicle to guide the vehicle to slow down, observe the driving or stop. The early warning system is also linked to the highway maintenance and management department. After the early warning message is issued, maintenance personnel are immediately dispatched to carry out maintenance, and management personnel are dispatched to guide vehicles to pass and maintain order.

[0092] like Figure 7 As shown, scenario 4: During the operation phase, the test found that the surrounding rock had no deformation and the road traffic lights indicated that vehicles were passing normally.

[0093] The present invention can effectively prevent accidents such as tunnel collapse, water seepage, and block drop through the application of the full-life monitoring and early warning system, and ensure the safety of engineering personnel and vehicles during operation. In addition, the system can also provide a scientific basis for the maintenance and repair of tunnels, extend the service life of tunnels, and reduce economic losses and social impacts caused by tunnel accidents.

[0094] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A measuring anchor rod capable of measuring deep displacement of surrounding rock. It is characterized in that The measuring anchor includes: The rod body (1) is evenly divided into a plurality of sections, each section of the rod body is provided with monitoring welding points (2) at both ends, and adjacent rod bodies share one monitoring welding point (2); A connecting wire (3), each monitoring welding point (2) is equipped with a connecting wire (3), which is used to cooperate with the monitoring welding point (2) to monitor the resistance data of each section of the rod in real time; each monitoring welding point (2) is connected to a multi-channel data collector through a corresponding connecting wire (3); The temperature sensor (4) is arranged in the middle of the entire rod body (1) and is used to obtain temperature data of the rod body (1); the temperature sensor (4) is connected to a multi-channel data collector.

2. A measuring anchor rod capable of measuring deep displacement of surrounding rock according to claim 1, It is characterized in that The measuring anchor rod also includes a pad (5), which is arranged at one end of the rod body (1) and is mounted on the surrounding rock wall via a nut.

3. A measuring anchor rod capable of measuring deep displacement of surrounding rock according to claim 1, It is characterized in that The monitoring process of the measuring anchor is: Combining the resistance data collected by the connecting wire (3) and the temperature data collected by the temperature sensor (4), the deformation data ΔL of each section of the rod body, that is, the deep displacement ΔS of the surrounding rock, is calculated; The deformation data ΔL of each section of the rod length are added together to obtain the total deformation ΣΔL of the measuring anchor rod.

4. A measuring anchor rod capable of measuring deep displacement of surrounding rock according to claim 3, It is characterized in that The expression of the deformation data ΔL of each rod length is: Where: L 0 is the initial length of the rod section; V is the volume of the rod section; R is the measured resistance data monitored by controlling the two connecting wires (3) corresponding to the rod section through a multi-channel data acquisition device; ρ 0 is the initial resistivity; α is the resistance temperature coefficient, which is calibrated before the measuring anchor rod leaves the factory; t is the measured temperature data of the measuring anchor rod.

5. A measuring anchor rod capable of measuring deep displacement of surrounding rock according to claim 1, It is characterized in that The rod body (1) is evenly divided into 3-5 sections.

6. A measuring anchor rod capable of measuring deep displacement of surrounding rock according to claim 1, It is characterized in that The rod body (1) is made of metal.

7. A measurement method for measuring deep displacement of surrounding rock. It is characterized in that The measurement method includes: On the same section, measuring anchor rods are respectively installed at five measuring points, namely, the arch crown, the left arch waist, the right arch waist, the left arch wall, and the right arch wall; the measuring anchor rods are the measuring anchor rods capable of measuring deep displacement of surrounding rocks as described in any one of claims 1 to 6; In the tunnel axial direction, a ring of test sections is set for each linear meter. When a system anchor rod is designed within the linear meter, the system anchor rod at the corresponding position is replaced by the measuring anchor rod; By writing the position information of each measuring point in the axial, circumferential and radial directions of the tunnel into the multi-channel collector, the pile number, section position and depth where the deformation occurs can be determined based on whether the surrounding rock has deformed.

8. The measuring method according to claim 7, It is characterized in that Whether the surrounding rock has been deformed, including: If the deformation data ΔL of each rod length is not equal to 0, it means that the surrounding rock has deformed; If the deformation data ΔL of each rod length is equal to 0, it means that the surrounding rock has not been deformed.

9. The measuring method according to claim 8, It is characterized in that If the deformation data ΔL of each rod length is not equal to 0, it means that the surrounding rock has deformed, including: When the deformation data ΔL of each rod length is greater than 0, the measuring anchor is stretched, indicating that the surrounding rock has displaced into the tunnel; When the deformation data ΔL of each rod length is less than 0, the measuring anchor is compressed, indicating that the surrounding rock has moved away from the tunnel.

10. A full life cycle monitoring and early warning system, It is characterized in that The system: The monitoring module includes a measuring anchor rod and a multi-channel data collector, wherein the measuring anchor rod adopts a measuring anchor rod capable of measuring deep displacement of surrounding rock as described in any one of claims 1 to 6; and is used to collect resistance data of each section of the rod body and temperature data of the measuring anchor rod through the measuring anchor rod, and calculate the deformation data of the length of each section of the rod body and the total deformation of the measuring anchor rod; The transmission module uses wireless or wired transmission to transmit the data collected by the monitoring module to the early warning system in real time; The early warning module is used to issue early warnings in stages according to the data transmitted by the transmission module, including: early warnings in the construction stage and early warnings in the operation stage; the early warnings in the construction stage include: setting indicator lights every meter along the axis of the tunnel, and when the measuring anchor rod is deformed and does not exceed the set threshold, a yellow indicator light will light up at the deformed position for early warning; when the measuring anchor rod is deformed and has exceeded the set threshold, a red indicator light will light up at the deformed position for early warning; the early warnings in the operation stage include: setting electronic signs every meter along the axis of the tunnel, and when the measuring anchor rod is deformed and does not exceed the set threshold, an early warning will be issued at the electronic sign closest to the direction of the oncoming vehicle; when the measuring anchor rod is not deformed, no early warning will be issued.