Integrated pipeline for gas extraction under mine and use method
By adopting integrated pipeline design and docking device in gas extraction pipelines, the problems of cumbersome and eccentricity of pipeline installation sensors in the prior art are solved, and fast and accurate pipeline docking and sensor installation are achieved, which improves the efficiency of gas extraction and Security.
Patent Information
- Application Number
- CN202411010917.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-12
AI Technical Summary
When installing sensors or equipment in existing gas extraction pipelines, they need to cut off the pipeline and assemble the flange. The operation is cumbersome and can easily lead to eccentricity of the flange, affecting safety and efficiency.
Adopt an integrated pipeline design, including equally spaced shrinkage zone and bifurcated pipe, equipped with docking device, which enables fast and accurate flange docking through docking pipes, connecting bolts, transmission gears and adapters to avoid eccentricity problems during bolt tightening. .
It realizes rapid docking and precise installation of pipelines, reduces operating time, improves layout efficiency, and provides a convenient sensor installation method to avoid space occupation and eccentricity problems.
Smart Images

Figure CN118933989A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of gas extraction, and in particular provides an integrated pipeline for underground gas extraction and a use method thereof. Background Art
[0002] Gas extraction pipelines are widely used in mines to extract gas (mainly methane) from underground, reduce gas accumulation in mines, prevent gas explosions, and improve mine safety.
[0003] The existing extraction scheme is mainly based on drilling and pipelines. The pipeline system needs to be equipped with real-time monitoring equipment to monitor gas concentration, pressure and other parameters in order to detect abnormal situations in a timely manner.
[0004] Conventional extraction pipelines are mostly straight pipes, and multiple pipelines are connected through flanges. When sensors or other equipment need to be installed, the pipelines need to be cut at the corresponding positions and flanges installed, and then the sensors or other equipment are installed through the flanges. The operation process of tightening the outer bolts of the flanges one by one is relatively cumbersome, and the tightening process may also cause the flange to be eccentric, and the subsequent calibration is also relatively cumbersome.
[0005] If the tee is pre-installed directly at the location where the sensor or other equipment may need to be installed, the protruding pipe opening will take up space and affect the development of other work. Summary of the invention
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: an integrated pipeline for underground gas extraction, comprising a pipeline, the pipeline comprising a pipe body, the radial position of the pipe body is evenly spaced with sunken areas, the top of the sunken area is bent to form a bifurcated pipe, and the outer wall of the bifurcated pipe and the outer wall of the sunken area are integrally formed with a connecting piece at the minimum spacing position;
[0007] The butt joint positions of the two sections of the pipe body are equipped with butt joint devices;
[0008] The docking device comprises a docking tube, the docking tube is inserted into the inner wall of the pipe body, the outer part of the docking tube is threaded with a connecting bolt, the inner side of the connecting bolt is clamped with a flange, the inner side of the flange is welded with an external expansion tube, and the external expansion tube is sleeved on the outer wall of the pipe body;
[0009] The outer wall of the butt-jointed tube is evenly distributed with synchronously rotating transmission gears, and the outer side of the transmission gear is threadedly connected with a threaded member, and the threaded member is threadedly fixed with a connecting bolt.
[0010] Furthermore, a sealing head is integrally formed at the end of the bifurcated pipe, and an adapter can be installed after the bifurcated pipe is cut off.
[0011] Furthermore, the outer expansion tube gradually increases in diameter from one side of the flange to the outside, the two ends of the butt tube are welded by the inner expansion tube, the outer wall diameter of the inner expansion tube gradually decreases from the middle of the butt tube to both sides, and the minimum inner diameter of the outer expansion tube is equal to the maximum diameter of the tube body, and the maximum diameter of the inner expansion tube is not less than the maximum diameter of the tube body.
[0012] Furthermore, the outer wall of the butt joint is laterally evenly rotated and assembled by a guide wheel, the outer side of the guide wheel is meshed with a gear ring, the outer side of the gear ring is meshed with the inner side of the transmission gear, and the inner side of the screw connection is coaxially fixed with a bevel gear, which meshes with the transmission gear.
[0013] Furthermore, the transmission gear is a combination of a bevel gear and a spur gear, the bevel gear teeth are arranged on the top surface of the spur gear teeth, and the bevel gear teeth have the same number of teeth as the spur gear teeth.
[0014] Furthermore, the outer wall of the butt-jointed tube is uniformly welded with fixing claws, and the fixing claws are sleeved between the screw connection piece and the bevel gear structure.
[0015] Furthermore, the inner wall of the externally expanded tube is evenly distributed with hanging burrs.
[0016] Furthermore, a support shaft is uniformly welded to the outer wall of the butt-jointed tube, and the transmission gear is rotatably assembled on the outer wall of the support shaft.
[0017] Furthermore, the adapter includes an outer fixing head and an inner fixing head, a sealing slope is provided on the inner surface of the outer fixing head at a similar depth to the outer surface of the inner fixing head, and an inner surface of the inner fixing head is provided with an inner thread identical to the thread required for installing the sensor.
[0018] A method for using an integrated pipeline for underground gas extraction includes the following methods:
[0019] Step A: Pipeline layout: Drill holes according to actual needs based on the rock layer, coal seam and other gas-prone locations where gas is located in the mine. After drilling, lay the pipeline inside the hole or on the working surface. The direction of the pipeline is selected according to the site;
[0020] Step B: Additional equipment installation: When the gas flow rate, concentration, humidity, dust, etc. inside the pipeline need to be measured near the gas monitoring station or when a sensor that is connected to the inside of the pipeline is needed, a branch pipe is installed outside the pipeline at a suitable location to clean the dust outside the pipeline and ensure that no gas passes through the pipeline.
[0021] After confirming safety and cleaning, use tools to cut and separate the connecting piece from the middle, then restore the bent bifurcated pipe to its original state, and then remove the excess bifurcated pipe and the head according to the installation height, leaving a gap;
[0022] Finally, connect the adapter to the notch;
[0023] Step C: When the pipelines are butt-jointed, firstly, the flange and the outer expansion pipe are put on the outer walls of the adjacent two ends of the pipe body to be connected, and then the butt-jointed pipe is inserted into the interior of the pipe body, and then the connecting bolts are inserted from the external mounting holes of the flanges, and then the connecting bolts are screwed and tightly connected with the screw-jointed parts by rotating them, and the two sets of flanges are kept parallel, and then the transmission gears are rotated by the tool, and the rotation of a single transmission gear will drive the gear ring to transmit, and then the synchronous transmission effect of the gear ring drives all the transmission gears to rotate at the same speed and in the same direction, and then the screw-jointed parts are driven to rotate through the bevel gear, and when the flange fixing surface of the connecting bolts has been adjusted flat and the friction between the flange is stable, the synchronous tightening effect of all bolts can be achieved, thereby completing the rapid butt-jointing of the pipelines.
[0024] The beneficial effects of using the present invention are:
[0025] The present invention can be pre-assembled or temporarily assembled;
[0026] When pre-installing the pipeline, the bifurcated pipe part is in a storage state. When not in use, it does not take up extra space and does not affect the implementation of other projects.
[0027] When temporarily assembling pipes, the butt joint device is used for assembly, which can efficiently and accurately complete the flange butt joint and avoid eccentricity problems during bolt tightening;
[0028] It provides convenience for installing sensors and other equipment on the gas extraction pipelines under the mine. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the structure of the pipeline in the bifurcated pipe storage state of the present invention;
[0030] Figure 2 is a schematic diagram of an axial section of the pipeline of the present invention;
[0031] Figure 3 It is a schematic diagram of the structure of the pipeline in the bifurcated pipe unfolding state of the present invention;
[0032] Figure 4 It is a schematic diagram of the structure of the pipeline in the assembled state of the adapter of the present invention;
[0033] Figure 5 It is a schematic diagram of the internal structure of the adapter of the present invention;
[0034] Figure 6 It is a structural schematic diagram of the docking device of the present invention;
[0035] Figure 7 for Figure 6 The enlarged view of point a in the middle;
[0036] Figure 8 An exploded view of the docking device of the present invention;
[0037] Fig. 9 for Figure 8 The enlarged image of point b in the middle;
[0038] Fig.10 It is a partial front view of the docking device of the present invention;
[0039] Fig.11 It is a partial cross-sectional schematic diagram of the inner wall structure of the outwardly expanded tube of the present invention.
[0040] Reference numerals include:
[0041] 1. Pipeline;
[0042] 11. pipe body; 12. contraction area; 13. bifurcated pipe; 14. end cap; 15. connecting piece;
[0043] 2. Adapter;
[0044] 21. External fixing head; 22. Internal fixing head; 23. Sealing slope;
[0045] 3. Docking device;
[0046] 31. Flange; 32. Connecting bolts; 33. External expansion pipe; 34. Butt pipe; 35. Internal expansion pipe; 36. Fixing claw; 37. Screw connection; 38. Transmission gear; 39. Gear ring; 310. Guide wheel. DETAILED DESCRIPTION
[0047] The present invention is described in detail below with reference to the accompanying drawings.
[0048] Reference Figure 1-Figure 11 An integrated pipeline for gas extraction in a mine includes a pipeline 1, the pipeline 1 includes a pipe body 11, and the pipe body 11 has evenly spaced contraction areas 12 at radial positions, a forked pipe 13 is formed by bending at the top of the contraction area 12, and a connecting piece 15 is formed integrally at the position of the minimum spacing between the outer wall of the forked pipe 13 and the outer wall of the contraction area;
[0049] The butt joint position of the two sections of the pipe body 11 is equipped with a butt joint device 3;
[0050] The docking device 3 includes a docking tube 34, which is inserted into the inner wall of the pipe body 11, and the outer part of the docking tube 34 is screwed with a connecting bolt 32, and the inner side of the connecting bolt 32 is clamped with a flange 31, and the inner side of the flange 31 is welded with an external expansion tube 33, and the external expansion tube 33 is sleeved on the outer wall of the pipe body 11;
[0051] The outer wall of the butt-joint pipe 34 is evenly distributed with synchronously rotating transmission gears 38 , and the outer side of the transmission gear 38 is threadedly connected with a screw connection member 37 , which is threadedly fixed to the connecting bolt 32 .
[0052] The present invention provides a pipeline 1 with a bifurcated pipe 13 that can be passively fixed and stored when it is no longer needed. When in use, a longer pipeline can be used for laying. Under the maximum length that meets the convenience of installation, a docking device 3 that can achieve a quick tightening effect is used at the joint position, which saves time in the installation process and improves the laying efficiency. It effectively solves the problem that half of the existing pipelines are straight pipelines. When it is necessary to install the required sensors, it is necessary to add a docking structure in advance at the pipeline joint position or a pre-conceived position to install the sensors, or after the pipelines are all closed, cut off the pipelines or punch holes in the outer wall of the pipeline to achieve the purpose of installing the required sensors.
[0053] The present invention can be pre-assembled or temporarily assembled;
[0054] When the pipeline 1 is pre-installed, the bifurcated pipe 13 is partially in a storage state, and does not occupy additional space when not in use, nor does it affect the implementation of other projects;
[0055] When temporarily assembling the pipeline 1, the butt joint device 3 is used for assembly, which can efficiently and accurately complete the flange butt joint and avoid the eccentricity problem during the bolt tightening process;
[0056] It provides convenience for installing sensors and other equipment on the gas extraction pipelines under the mine.
[0057] Specifically, the end of the bifurcated tube 13 is integrally formed with a cap 14, and the bifurcated tube 13 can be installed with the adapter 2 after being cut off. The bifurcated tube 13 is made of a cylindrical hollow pipe and bent in a sequential square shape and a hot-melt welded connecting piece 15 to achieve the bending and fixing of the bifurcated tube 13, and the head of the bifurcated tube 13 is welded and formed with the cap 14. After the tube body 11 is integrally formed, the tube body 11 is preheated, and a negative pressure condition is created on the outer wall of the tube body 11 by a negative pressure mold, and the bifurcated tube 13, the cap 14 and the longer connecting piece 15 are integrally formed, and finally the connecting piece 15 is bent by an automated mold. It is hot-melt fixedly docked with the tube body 11 to form a bifurcated tube 13 bent inside the sunken area 12, so that the outer diameter of the pipe 1 does not change after forming. When used in a perforation or other layout mode, the redundant structure will not cause difficulty or interference during perforation. When the area of the sunken area 12 of the tube body 11 is formed, the outer wall thickness of this area is greater than that of the ordinary area. The outer wall of the connecting piece 15 can be provided with a long strip groove structure, or a densely connected through-hole structure, so that the overall structure can be easily separated according to the "easy-to-tear area" with low connection strength of the groove or the connected through-hole area, so as to achieve the effect of easy tearing and separation.
[0058] Specifically, the diameter of the outer expansion tube 33 gradually increases from one side of the flange to the outside, and the two ends of the butt tube 34 are welded to the inner expansion tube 35. The outer wall diameter of the inner expansion tube 35 gradually decreases from the middle of the butt tube 34 to both sides, and the minimum inner diameter of the outer expansion tube 33 is equal to the maximum diameter of the tube body 11. The maximum diameter of the inner expansion tube 35, the inner expansion tube 35 can be inserted into the inner wall of the tube body 11 to expand the tube body 11 outward to form an outer expansion area, and then the outer expansion tube 33 that has been sleeved on the outside of the tube body 11 before expansion is pulled inward so that the outer expansion tube 33 and the inner expansion tube 35 move toward each other, and the tube body 11 is clamped and locked between the butt tube 34 and the outer expansion tube 33 by utilizing the gripping force and friction force of the barbs. During actual installation, auxiliary heating can be performed to initially soften the tube body 11.
[0059] The overall structure of the tube body 11 used in the present invention is preferably made of a rubber composite material, with a spiral steel frame inside, and a base material wrapped outside the frame. The base material is made of corrosion-resistant rubber, and after shaping, a nylon outer packaging layer can be optionally coated to increase the wear resistance and aging resistance of the overall structure and improve the compressive resistance.
[0060] Specifically, the outer wall of the docking tube 34 is evenly rotated laterally by the guide wheel 310, the outer side of the guide wheel 310 is meshed with the gear ring 39, the outer side of the gear ring 39 is meshed with the inner side of the transmission gear 38, and the inner side of the screw connection 37 is coaxially fixed with a bevel gear, which meshes with the transmission gear 38.
[0061] Specifically, the transmission gear 38 is a combination of a bevel gear and a spur gear. The bevel gear teeth are provided on the top surface of the spur gear teeth, and the bevel gear teeth and the spur gear teeth have the same number of teeth. The number of gear teeth provided on the inner wall of the gear ring 39 is equal to an integer multiple of the bevel gear tooth grooves. During the transmission process, synchronous meshing can be achieved, and then in the process of rotating a single transmission gear 38, the rotation of all other meshing transmission gears 38 can be synchronously driven by the rotation of the meshing transmission gear ring 39. Bearing structures are installed between the transmission gear 38 and the support shaft, between the fixing claw 36 and the installation position of the screw connection 37, and between the guide wheel 310 and the fixing claw on the outside of the docking tube 34 to improve the smoothness of the transmission process. Ball structures are evenly arranged at the gap position between the gear ring 39 and the docking tube 34 to improve the overall transmission smoothness and ensure the smoothness during adjustment. A hexagonal inner wrench sleeve is arranged at the outermost side of the center. When adjusting, a stable transmission effect can be achieved by meshing between the external tool and the inner version glove. According to the different sizes of the pipe diameters, the torque requirements of the screw connector 37 are different. An appropriate number of tools can be selected and used synchronously on the outside of the symmetrical or adjacent transmission gears 38 to stabilize the torque and ensure the stability of the screw connection process. After the positioning is completed, a horizontally arranged flat-type wrench can be used, a hexagonal head is arranged on the left side of the wrench, and at least two fixing holes are arranged on the right side of the wrench. After the positioning is completed, the wrench is directly locked inside the inner version glove and fixed to the outer wall of the butt pipe 34 by bolts to achieve a stable fixing effect. A ratchet structure is preferably used between the hexagonal head and the flat-type wrench. Alternatively, a plurality of arc-shaped fixing holes or fixing grooves can be arranged on the outer wall of the butt pipe 34 to ensure a stable fixing effect at different inner wrench sleeve shaping angles.
[0062] Specifically, the outer wall of the butt-joint pipe 34 is evenly welded with fixing claws 36 , and the fixing claws 36 are sleeved between the screw connector 37 and the bevel gear structure.
[0063] like Fig.11 As shown, the inner wall of the outward expansion tube 33 is evenly distributed with hanging burrs, the cross-sectional shape of the hanging burrs is similar to a water drop shape, and the maximum length of the tip does not exceed 25% of the wall thickness of the tube body 11, thereby increasing the pulling effect of the outside of the tube body 11 when docking inward, ensuring that the structure is more stable after positioning and the sealing effect is stronger. The mechanism can be processed by spot welding and wire drawing, or it can be directly spot welded using prefabricated hanging nails.
[0064] The outer wall of the butt-joint pipe 34 is evenly welded with a support shaft, and the transmission gear 38 is rotatably assembled on the outer wall of the support shaft.
[0065] The adapter 2 includes an outer fixing head 21 and an inner fixing head 22. A sealing slope 23 is provided at a depth similar to that of the inner surface of the outer fixing head 21 and the outer surface of the inner fixing head 22. The inner surface of the inner fixing head 22 is provided with an inner thread which is the same as the thread required for installing the sensor. The adapter 2 is also an expansion quick docking structure similar to that of the docking tube 34 and the outer expansion tube 33. When in use, it is stably and quickly clamped on the outer wall of the bifurcated tube 13 by means of inner and outer outer coupling to achieve a better fixing effect.
[0066] A method for using an integrated pipeline for underground gas extraction includes the following methods:
[0067] Step A: Pipeline layout: according to the rock layer, coal seam and other gas accumulation locations under the mine, holes are drilled according to actual needs. After drilling, the pipeline 1 is laid inside the hole or on the working surface. The direction of the pipeline is selected according to the site;
[0068] Step B: Installation of additional equipment: When the flow rate, concentration, humidity, dust, etc. of the gas inside the pipeline need to be measured near the gas monitoring station or when a sensor that is connected to the inside of the pipeline needs to be used, a branch pipe 13 is set outside the pipeline 1 at a suitable position to clean the dust outside the pipeline and ensure that no gas passes through the pipeline;
[0069] After confirming safety and cleaning, use a tool to cut and separate the connecting piece 15 from the middle, then restore the bent bifurcated pipe 13 to its original state, and then remove the excess bifurcated pipe 13 and the end cap 14 according to the installation height, leaving a gap;
[0070] Finally, connect the adapter 2 to the notch position;
[0071] Step C: When the pipeline 1 is butt-jointed, the flange 31 and the outer expansion pipe 33 are firstly put on the outer walls of the adjacent two ends of the pipe body 11 to be connected, and then the butt-jointed pipe 34 is inserted into the interior of the pipe body 11, and then the connecting bolt 32 is inserted from the external mounting hole of the flange 31, and then the connecting bolt 32 is screwed and tightly connected with the screw connection 37 by rotating the connecting bolt 32, and the two sets of flanges 31 are kept parallel, and then the transmission gear 38 is rotated by a tool, and the rotation of a single transmission gear 38 drives the gear ring 39 to transmit, and then the synchronous transmission effect of the gear ring 39 drives all the transmission gears 38 to rotate at the same speed and in the same direction, and then the screw connection 37 is driven by the bevel gear. 7 rotation, when the flange fixing surface of the connecting bolt 32 has been adjusted to be flat and there is stable friction between the flange 31, the synchronous tightening effect of all the bolts can be achieved, thereby completing the rapid docking of the pipeline 1, and the diameter of the flange 31 is greater than the maximum distance between the outer walls of the two sets of threaded parts that are farthest apart. Therefore, when the ground is flat, the flange 31 can serve as a support to support the entire docking device 3 and isolate the ground, thereby facilitating the rotation of the transmission gear 38 and the matching driven structure. When the following support conditions are not met, you can choose to add a temporary bracket or a pipeline auxiliary positioning bracket to lift the docking device 3 to facilitate the docking operation.
[0072] It should be noted that the outside of the mounting hole on the outer wall of the flange 31 away from the external expansion tube 33 is provided with a friction pad, a metal mesh, a strip-shaped docking groove, etc., which can increase the friction force or axial rotation damping effect with the connecting bolt 32. When in use, the initially docked docking tube 34 and the two sets of flanges are initially fixed by the transmission gear 38, and then the connecting bolt 32 is inserted into the mounting hole and screwed together with the relatively fixed screw part 37. By initially rotating the connecting bolt 32 alone, the parallel effect between the docking tube 34 and the two sets of flanges 31 can be adjusted, and the tightening effect provided by the rotating connecting bolt 32 will achieve a tight fit and positioning effect between the connecting bolt 32 and the flange 31. After the initial adjustment is accurate, all subsequent operations can be completed by directly unlocking the transmission gear 38 and applying a rotational force.
[0073] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, many changes can be made in the specific implementation methods and application scopes based on the ideas of the present invention. As long as these changes do not deviate from the concept of the present invention, they all belong to the protection scope of the present invention.
Claims
1. An integrated pipeline for underground gas extraction, comprising a pipeline, characterized in that: The pipeline comprises a pipe body, wherein the pipe body has sunken areas at equal intervals in radial positions, the top of the sunken area is bent to form a bifurcated pipe, and a connecting piece is integrally formed at the position of the minimum interval between the outer wall of the bifurcated pipe and the outer wall of the sunken area; The butt joint positions of the two sections of the pipe body are equipped with butt joint devices; The docking device comprises a docking tube, the docking tube is inserted into the inner wall of the pipe body, the outer part of the docking tube is threaded with a connecting bolt, the inner side of the connecting bolt is clamped with a flange, the inner side of the flange is welded with an external expansion tube, and the external expansion tube is sleeved on the outer wall of the pipe body; The outer wall of the butt-jointed tube is evenly distributed with synchronously rotating transmission gears, and the outer side of the transmission gear is threadedly connected with a threaded member, and the threaded member is threadedly fixed with a connecting bolt.
2. The integrated pipeline for underground gas extraction according to claim 1 is characterized in that: The end of the bifurcated pipe is integrally formed with a sealing head, and the bifurcated pipe can be installed with an adapter after being cut off.
3. The integrated pipeline for underground gas extraction according to claim 2 is characterized in that: The outer expansion tube gradually increases in diameter from one side of the flange to the outside, and the two ends of the butt tube are welded to form an inner expansion tube. The outer wall diameter of the inner expansion tube gradually decreases from the middle of the butt tube to both sides, and the minimum inner diameter of the outer expansion tube is equal to the maximum diameter of the tube body, and the maximum diameter of the inner expansion tube is not less than the maximum diameter of the tube body.
4. The integrated pipeline for underground gas extraction according to claim 1 is characterized in that: The outer wall of the butt joint tube is evenly rotated laterally by a guide wheel, the outer side of the guide wheel is meshed with a gear ring, the outer side of the gear ring is meshed with the inner side of the transmission gear, and the inner side of the screw connection is coaxially fixed with a bevel gear, which is meshed with the transmission gear.
5. The integrated pipeline for underground gas extraction according to claim 4 is characterized in that: The transmission gear is a combination of a bevel gear and a spur gear, the teeth of the bevel gear are arranged on the top surface of the teeth of the spur gear, and the number of teeth of the bevel gear is the same as that of the spur gear.
6. The integrated pipeline for underground gas extraction according to claim 4 is characterized in that: The outer wall of the butt-jointed pipe is evenly welded with fixing claws, and the fixing claws are sleeved between the screw connection piece and the bevel gear structure.
7. The integrated pipeline for underground gas extraction according to claim 4 is characterized in that: The inner wall of the outwardly expanded tube is evenly distributed with hanging burrs.
8. The integrated pipeline for underground gas extraction according to claim 1 is characterized by: The outer wall of the butt-joint pipe is uniformly welded with a support shaft, and the transmission gear is rotatably assembled on the outer wall of the support shaft.
9. The integrated pipeline for underground gas extraction according to claim 2 is characterized in that: The adapter includes an outer fixing head and an inner fixing head. A sealing slope is provided at a depth similar to that of the inner surface of the outer fixing head and the outer surface of the inner fixing head. The inner surface of the inner fixing head is provided with an inner thread which is the same as the thread required for installing the sensor.
10. A method for using an integrated pipeline for underground gas extraction according to any one of claims 1 to 9, comprising the following method: Step A: Pipeline layout: Drill holes according to actual needs based on the rock layer, coal seam and other gas-prone locations where gas is located in the mine. After drilling, lay the pipeline inside the hole or on the working surface. The direction of the pipeline is selected according to the site; Step B: Installation of additional equipment. When a sensor that is connected to the inside of a pipeline is needed near a gas monitoring station or when it is necessary to measure the flow rate, concentration, humidity, dust, etc. inside the pipeline, select a branch pipe installed outside the pipeline at a suitable location, clean the dust outside the pipeline, and ensure that no gas passes through the pipeline. After confirming that it is safe and clean, use a tool to cut and separate the connecting piece from the middle, then restore the bent branch pipe to its original state, and then remove the excess branch pipe and the head according to the installation height, leaving a gap. Finally, connect the adapter to the notch; Step C: When the pipelines are butt-jointed, firstly, the flange and the outer expansion pipe are put on the outer walls of the adjacent two ends of the pipe body to be connected, and then the butt-jointed pipe is inserted into the interior of the pipe body, and then the connecting bolts are inserted from the external mounting holes of the flanges, and then the connecting bolts are screwed and tightly connected with the screw-jointed parts by rotating them, and the two sets of flanges are kept parallel, and then the transmission gears are rotated by the tool, and the rotation of a single transmission gear will drive the gear ring to transmit, and then the synchronous transmission effect of the gear ring drives all the transmission gears to rotate at the same speed and in the same direction, and then the screw-jointed parts are driven to rotate through the bevel gear, and when the flange fixing surface of the connecting bolts has been adjusted flat and the friction between the flange is stable, the synchronous tightening effect of all bolts can be achieved, thereby completing the rapid butt-jointing of the pipelines.