Method for exploring development height of coal seam roof water-conducting fissure zone

By using heavy inert gas and gradual drilling method in the coal seam roof water conduction crack belt, the problem that the existing technology cannot quickly and accurately determine the development height of the water conduction crack belt is solved, and rapid detection and prevention of coal seam roof water damage is achieved to ensure that Mine production safety.

CN118934062APending Publication Date: 2024-11-12SHANXI GAOHE ENERGY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411192978.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology is difficult to quickly and accurately determine the development height of the water-conducting crack zone on the top of the coal seam. Especially when the water-conducting crack zone develops to the surface in the western mining area, it is impossible to conduct conventional water injection tests, drilling TV tests and electrical tests. Work cannot solve the problem of whether the water conduction cracks are interconnected, affecting the safety of mine production.

Method used

Heavy inert gas and gradual drilling method are used to release heavy inert gas through ground drilling and detect it at the return air trough of the working surface to determine whether the drilling final hole is connected to the water conduction crack belt on the top plate of the coal seam, and combine theoretical calculations and The drilling depth is inversely calculated as the development height of the water conduction crack zone.

Benefits of technology

It realizes rapid, accurate and reliable judgment of the development height of the water conduction crack belt, ensures the safety of mine operations, and provides scientific basis to prevent water damage accidents on the roof of coal seam, which is low in cost and easy to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934062A_ABST
    Figure CN118934062A_ABST
Patent Text Reader

Abstract

The invention discloses a method for exploring the development height of a coal seam roof water-conducting fissure zone. The method comprises the following steps: (1) theoretically calculating the development height of the coal seam roof water-conducting fissure zone; (2) drilling holes in the construction ground; (3) putting heavy inert gas; (4) detecting whether inert gas exists in the working face or not, and if yes, entering the step (6); if not, entering the step (5); (5) the progressive drilling work is continued, and heavy inert gas is put into the drill hole; detecting whether the inert gas exists in the working surface again, and if so, entering the step (6); if not, repeating the step (5); (6) judging that the end hole position of the drill hole is communicated with the coal seam roof water guide crack zone; and (7) inversely calculating the development height of the coal seam roof water-conducting fissure zone. The development height of the water-conducting fissure zone is accurately judged, detection is convenient and fast, the result is accurate and reliable, coal seam roof water disaster accidents can be effectively prevented, and mine operation safety is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for detecting the development height of a water-conducting crack zone in a coal seam roof, and belongs to the technical field of preventing and controlling water damage in coal seam roofs in mines. Background Art

[0002] Coal mining causes the overburden to move, deform and damage, forming water-conducting cracks, which can cause surface water, groundwater, old kilns and water accumulated in goafs within the mining area to burst into the mine, and even cause the sand layer on the coal seam roof to migrate along the cracks to form sand burst accidents, which not only seriously endangers the safe production of the mine, but also seriously damages the ecological environment of the mining area, especially when the fully-mechanized caving mining method is adopted, this hazard is more prominent.

[0003] At present, the testing methods for the height of the water-conducting fracture zone in the roof of coal seams can be mainly divided into two categories, namely ground and underground. The conventional means used on the ground are mainly to construct ground drilling holes for water injection tests or borehole television, but in general, the results of ground water injection tests are not reliable due to factors such as drilling depth, plugging and strict pressure and flow requirements. Borehole television generally requires that the borehole should be dry or bare, and it cannot be carried out if there are measures such as mud wall protection. In addition to the water injection test and borehole television used on the ground, the conventional means used underground also use electrical methods to monitor the resistivity of the roof, but this method requires the construction of long-distance inclined boreholes underground, and has limitations in monitoring the ultra-high water-conducting fracture zones formed under large mining height conditions. In particular, in the western mining area, the water-conducting fracture zones have developed to the surface, and conventional water injection tests, borehole television tests and electrical tests cannot be carried out. In addition, the main goal of existing technical means is to determine whether the rock formation in the test section is broken. However, the various forms of cracks produced by rock formation fractures are not necessarily interconnected. The ultimate goal of studying water-conducting fracture zones is to determine whether the cracks are interconnected and conduct water. Existing means are unable to solve the most critical core problem.

[0004] Therefore, there is an urgent need for a method that can not only be applicable to various working conditions, but also can quickly and effectively determine whether rock fractures are water-conducting, and ultimately accurately determine the height of the development of water-conducting fracture zones, so as to ensure the safety of underground construction operations. Summary of the invention

[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for detecting the development height of water-conducting fracture zones in the roof of a coal seam. The method comprehensively uses heavy inert gas and progressive drilling to judge the water conductivity of rock fractures in the roof of the coal seam and accurately determine the development height of the water-conducting fracture zones. The detection is convenient and fast, and the results are accurate and reliable. The method can effectively prevent water disasters in the roof of the coal seam and ensure the safety of mine operations.

[0006] In order to achieve the above object, a method for detecting the height of the water-conducting fracture zone in the roof of a coal seam adopted by the present invention comprises the following steps:

[0007] (1) Theoretical calculation of the height of the water-conducting fracture zone in the coal seam roof: Calculate the height of the water-conducting fracture zone in the coal seam roof according to the prediction formula for the height of the water-conducting fracture zone;

[0008] (2) Construction of ground drilling: Based on the theoretically calculated height of the water-conducting fracture zone in the coal seam roof, the distance between the maximum development height of the water-conducting fracture zone and the ground is calculated and a hole is drilled to that location;

[0009] (3) Release of heavy inert gas: Release of heavy inert gas into the borehole;

[0010] (4) Whether inert gas is detected on the working surface: a gas detection sensor is placed at the return air chute of the working surface to detect whether there is inert gas in the working surface. If inert gas is detected, the process proceeds to step (6); if no inert gas is detected, the process proceeds to step (5);

[0011] (5) It is determined that the final position of the borehole is not connected to the water-conducting fracture zone of the coal seam roof, and the progressive drilling work is continued, while the heavy inert gas is continued to be introduced into the borehole; a gas detection sensor is again placed at the return air chute of the working face to detect whether there is inert gas in the working face. If inert gas is detected, the process proceeds to step (6); if no inert gas is detected, the process repeats step (5);

[0012] (6) Inert gas is detected at the working face, and it is determined that the final hole position of the drilling is connected to the water-conducting fracture zone of the coal seam roof;

[0013] (7) Back-calculation of the height of the water-conducting fracture zone in the roof of the coal seam: Based on the final hole depth connecting the drill hole with the water-conducting fracture zone in the roof of the coal seam, back-calculate the height of the water-conducting fracture zone in the roof of the coal seam.

[0014] In some embodiments, the water-conducting fracture zone development height prediction formula in step (1) includes:

[0015] ① Hardness:

[0016] ②Medium hard:

[0017] ③ Weakness:

[0018] ④ Extremely weak:

[0019] In the formula, H li is the height of the water-conducting fracture zone, m; ΣM is the cumulative mining thickness, m; the ± items in the calculation formula are the mean error.

[0020] In some embodiments, the formula in step (1) is applied within a single-layer mining thickness of 1 to 3 m, and the cumulative mining thickness does not exceed 15 m.

[0021] In some embodiments, the drilling hole in step (2) is required to be a vertical hole on the ground, and the drilling depth is consistent with the result of calculating the height of the water-conducting fracture zone using the formula in step (1).

[0022] In some embodiments, the heavy inert gas in step (3) is SF6.

[0023] In some embodiments, during the progressive drilling in step (5), the drilling depth is increased by no more than 1 m each time.

[0024] In some embodiments, the detection of heavy inert gas in the return air chute in steps (4) and (5) is the main condition for determining whether the borehole is connected to the water-conducting fracture zone, and is also compared and verified with the leakage of the borehole flushing fluid.

[0025] In some embodiments, the height of the water-conducting fracture zone in step (7) is H li =H ms -H zk ;

[0026] In the formula, H li is the height of water-conducting fracture zone, m; Hms is the burial depth of coal seam, m; Hzk is the drilling depth, m.

[0027] The principle of the present invention for judging the height of the water-conducting fracture zone is as follows: a vertical borehole is constructed on the ground, and the height of the water-conducting fracture zone calculated by the formula is first used as the depth of the borehole construction, and then a heavy inert gas is put in after the borehole is completed. Since the density of the heavy inert gas is much greater than that of air, it is difficult (in)soluble in water, easy to detect, chemically inactive, non-flammable, non-toxic, and low in cost, it is a key substance for proving whether the crack is water-conducting or not, and is suitable for coal mine production activities. Since the gas density is relatively large, it can migrate downward along the cracks by itself. If the bottom of the borehole is connected to the water-conducting fracture zone, the gas will migrate to the return air chute of the working face, and be captured by the gas detection sensor, which can prove that the cracks on the coal seam roof have developed to the position of the end hole of the borehole and have water conductivity. On the contrary, if the gas is not detected in the return air chute of the working face, it means that the position of the end hole of the borehole is not connected to the water-conducting fracture zone on the coal seam roof. Finally, the height of the water-conducting fracture zone on the coal seam roof can be calculated according to the burial depth of the coal seam at the drilling opening position and the drilling depth.

[0028] Compared with the prior art, the present invention makes up for the defects of the existing method of measuring the height of crack development in the overlying rock strata on the mining working face. Under the premise of not affecting the production of the working face, the stability and easy capture of heavy inert gas are utilized, combined with the conditions of the mined coal seam itself, to accurately determine the height and connectivity of the overlying crack development on the mining working face, and can verify the water conductivity of the cracks. This method is low-cost and easy to operate, and can provide a scientific basis for the prevention and control of water hazards in coal mine roofs. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a process flow chart of the present invention;

[0030] Figure 2 It is a schematic diagram of the exploration of the present invention;

[0031] In the figure: 1. Drilling rig, 2. Heavy inert gas, 3. Gas detection sensor, 4. Fracture channel for gas migration, 5. Coal seam. DETAILED DESCRIPTION

[0032] In order to make the objectives, technical solutions and advantages of the present invention more clear, the technical solutions of the present application are described in detail below with the help of accompanying drawings and specific embodiments. It should be understood that the embodiments of the present application and the specific features in the embodiments are detailed descriptions of the technical solutions of the present application, rather than limitations on the technical solutions of the present application. In the absence of conflict, the embodiments of the present application and the technical features in the embodiments can be combined with each other.

[0033] like Figure 1 , Figure 2 As shown, a method for detecting the height of the water-conducting fracture zone in the roof of a coal seam, using heavy inert gas and progressive drilling, includes the following steps:

[0034] S1. Theoretical calculation of the height of the water-conducting fracture zone in the roof of the coal seam: The theoretical height of the water-conducting fracture zone in the roof of the coal seam is calculated using the water-conducting fracture zone development height prediction formula recommended by the "Regulations on the Retention of Coal Pillars and Compressed Coal Mining in Buildings, Water Bodies, Railways and Main Wells and Lanes" issued by the State Coal Industry Bureau;

[0035] The formula given in the "Regulations on Coal Pillar Retention and Compressed Coal Mining in Buildings, Water Bodies, Railways and Main Wells and Lanes" is as follows:

[0036]

[0037] In the formula, H li is the height of the water-conducting fracture zone, m; ΣM is the cumulative mining thickness, m; the formula application range: single layer mining thickness is 1 to 3m, and the cumulative mining thickness does not exceed 15m; the ± items in the calculation formula are the mean error;

[0038] S2, drilling holes on the ground: according to the theoretically calculated height of the water-conducting fracture zone on the coal seam roof, the distance between the maximum height of the water-conducting fracture zone and the ground is calculated, and a hole is drilled to the position by drilling rig 1;

[0039] S3, releasing heavy inert gas: releasing heavy inert gas 2 into the borehole;

[0040] S4, no inert gas is detected in the working face: a gas detection sensor 3 is placed at the return air chute of the working face, but no heavy inert gas 2 is detected in the working face;

[0041] S5. Determine that the final hole position of the borehole is not connected to the water-conducting fracture zone of the coal seam roof: No inert gas is detected at the working face, indicating that there is no fracture channel 4 between the borehole and the working face for gas migration, and there is no fracture channel for water migration. It is determined that the final hole position of the borehole is not connected to the water-conducting fracture zone of the coal seam roof;

[0042] S6. Repeat and gradually increase the drilling depth: Continue the progressive drilling work, increasing the drilling depth by 1m each time;

[0043] S7, continue to inject heavy inert gas: continue to inject heavy inert gas 2 into the borehole;

[0044] S8. Inert gas is detected on the working surface: a gas detection sensor 3 is placed at the return air chute of the working surface, and heavy inert gas 2 is detected in the working surface;

[0045] S9, judging that the final hole position of the drilling hole is connected to the water-conducting fracture zone of the coal seam roof: inert gas is detected at the working face, indicating that there is a fracture channel 4 between the drilling hole and the working face for gas migration, and water can also migrate through the fracture, judging that the final hole position of the drilling hole is connected to the water-conducting fracture zone of the coal seam roof;

[0046] S10. Back-calculate the height of the water-conducting fracture zone in the roof of the coal seam: back-calculate the height of the water-conducting fracture zone in the roof of the coal seam according to the final hole depth at which the drill hole is connected to the water-conducting fracture zone in the roof of the coal seam;

[0047] H li =H ms -H zk

[0048] In the formula, H li is the height of water-conducting fracture zone, m; Hms is the burial depth of coal seam 5, m; Hzk is the drilling depth, m.

[0049] In some embodiments, the drilling hole in step S2 is required to be a vertical hole on the ground, and the drilling depth is consistent with the result of calculating the height of the water-conducting fracture zone using the formula in step S1.

[0050] In some embodiments, the heavy inert gas in step S3 can be selected from SF6 or other gases with similar physical and chemical properties, ensuring that the density is much greater than that of air, it is difficult (in)soluble in water, easy to detect, chemically inactive, non-flammable, non-toxic, and low in cost. In addition, the heavy inert gas detection sensor in step S4 must be compatible with the selected gas and placed in the return air chute of the working surface.

[0051] In some embodiments, the detection of heavy inert gas in the return air chute is the main condition for determining that the borehole is connected to the water-conducting fracture zone, and can also be compared and verified with the leakage of the borehole flushing fluid.

[0052] In some embodiments, the drilling depth increased each time in steps S6 and S7 can be adjusted according to the on-site construction conditions, but shall not be greater than 1 m.

[0053] The present invention makes up for the defects of the existing method of measuring the height of crack development in the overlying rock strata on the mining working face. Under the premise of not affecting the production of the working face, the stability and easy capture of heavy inert gas are utilized, combined with the conditions of the mined coal seam itself, to accurately determine the height and connectivity of the overlying crack development on the mining working face, and can verify the water conductivity of the cracks. The method is low in cost and easy to operate, and can provide a scientific basis for the prevention and control of water hazards in coal mine roofs.

[0054] In addition, those skilled in the art will understand that, although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments also means being within the scope of protection of the present invention and forming different embodiments. For example, in the above embodiments, those skilled in the art can use them in combination according to the known technical solutions and the technical problems to be solved by this application.

Claims

1. A method for detecting the height of the water-conducting fracture zone in the roof of a coal seam, characterized in that: The following steps are involved: (1) Theoretical calculation of the height of the water-conducting fracture zone in the coal seam roof: Calculate the height of the water-conducting fracture zone in the coal seam roof according to the prediction formula for the height of the water-conducting fracture zone; (2) Construction of ground drilling: Based on the theoretically calculated height of the water-conducting fracture zone in the coal seam roof, the distance between the maximum development height of the water-conducting fracture zone and the ground is calculated and a hole is drilled to that location; (3) Release of heavy inert gas: Release of heavy inert gas into the borehole; (4) Whether inert gas is detected on the working surface: a gas detection sensor is placed at the return air chute of the working surface to detect whether there is inert gas in the working surface. If inert gas is detected, the process proceeds to step (6); if no inert gas is detected, the process proceeds to step (5); (5) It is determined that the final position of the borehole is not connected to the water-conducting fracture zone of the coal seam roof, and the progressive drilling work is continued, while the heavy inert gas is continued to be introduced into the borehole; a gas detection sensor is again placed at the return air chute of the working face to detect whether there is inert gas in the working face. If inert gas is detected, the process proceeds to step (6); if no inert gas is detected, the process repeats step (5); (6) Inert gas is detected at the working face, and it is determined that the final hole position of the drilling is connected to the water-conducting fracture zone of the coal seam roof; (7) Back-calculation of the height of the water-conducting fracture zone in the roof of the coal seam: Based on the final hole depth connecting the drill hole with the water-conducting fracture zone in the roof of the coal seam, back-calculate the height of the water-conducting fracture zone in the roof of the coal seam.

2. A method for detecting the height of the water-conducting fracture zone in the roof of a coal seam according to claim 1, characterized in that: The formula for predicting the height of the water-conducting fracture zone in step (1) includes: ① Hardness: ②Medium hardness: ③ Weakness: ④ Extremely weak: In the formula, H li is the height of the water-conducting fracture zone, m; ΣM is the cumulative mining thickness, m; the ± items in the calculation formula are the mean error.

3. A method for detecting the height of the water-conducting fracture zone in the roof of a coal seam according to claim 2, characterized in that: The formula in step (1) is applicable to single-layer mining thickness of 1 to 3 m, and the cumulative mining thickness does not exceed 15 m.

4. A method for detecting the height of the water-conducting fracture zone in the roof of a coal seam according to claim 1, characterized in that: The drilling hole in step (2) is required to be a vertical hole on the ground, and the drilling depth is consistent with the result of the height of the water-conducting fracture zone calculated by the formula in step (1).

5. The method for detecting the height of the water-conducting fracture zone in the roof of a coal seam according to claim 1, characterized in that: In the step (3), the heavy inert gas is SF6.

6. A method for detecting the height of water-conducting fracture zones in coal seam roof according to claim 1, characterized in that: In the step (5), during the progressive drilling, the drilling depth is increased by no more than 1 m each time.

7. A method for detecting the height of the water-conducting fracture zone in the roof of a coal seam according to claim 1, characterized in that: The detection of heavy inert gas in the return air chute in steps (4) and (5) is the main condition for determining that the borehole is connected to the water-conducting fracture zone, and is also compared and verified with the leakage of the borehole flushing fluid.

8. A method for detecting the height of water-conducting fracture zones in coal seam roof according to claim 1, characterized in that: The height of the water-conducting fracture zone in step (7) is H li =H ms -H zk ; In the formula, H li is the height of water-conducting fracture zone, m; Hms is the burial depth of coal seam, m; Hzk is the drilling depth, m.