Coal power unit and peak regulation steam supply system and operation method thereof
By introducing heat exchangers, molten salt heat storage devices and peak-to-steam steam supply systems for electrode boilers in coal-electric units, the problems of low heat storage efficiency and difficulty in deep peak-to-steaming are solved, and efficient heat energy utilization and large flow volume are achieved The steam supply enhances the peak shaving and steam supply capacity of coal-electric units.
Patent Information
- Application Number
- CN202411221879.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-11-12
AI Technical Summary
There are contradictions between the extraction steam heating and power generation of existing coal-electric units, resulting in limited peak shaving and steam supply capabilities, especially the main steam heat storage efficiency is low and deep peak shaving is difficult to achieve.
The peak steam supply system including heat exchanger, molten salt heat storage device and electrode boiler is adopted. Through the heat exchange between high-temperature steam and solid heat storage medium, combined with the circulating flow of liquid molten salt, the efficient storage and utilization of heat energy is achieved, and Provides high flow of industrial steam supply through electrode boilers.
It improves the energy utilization efficiency and peak-shaving depth of coal-electricity units, meets the demand for high-flow industrial steam supply, and reduces the grid load of the unit, enhancing operation flexibility and economy.
Smart Images

Figure CN118934127A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present disclosure belong to the technical field of coal-fired power generation units, and specifically relate to a coal-fired power generation unit and a peak-shaving steam supply system and an operation method thereof. Background Art
[0002] With the development of the new situation of the power system, coal-fired power units play an increasingly important role in flexibility regulation. However, due to the limitations of the operation of the generator sets, there is often a contradiction between steam extraction for heating and power generation. In order to solve this problem, heat storage technology has been introduced, which can not only alleviate this contradiction, but also significantly improve the peak load regulation, frequency regulation and steam supply guarantee capabilities of coal-fired power units. Molten salt heat storage technology, with its high cost-effectiveness, low steam pressure, high operating temperature, environmental friendliness and non-flammable characteristics, has become an ideal choice for large-scale frequent storage and release of thermal energy.
[0003] However, in practical applications, there are certain limitations in using steam from coal-fired power units as a heat source for molten salt heat storage. When extracting main steam for heat storage, considering the safety of the boiler reheater, usually only a limited amount of main steam can be extracted, generally not exceeding 10% of the total amount, and due to the high quality of the main steam, the energy utilization efficiency of main steam heat storage is low. When using high-temperature hot reheat steam for heat storage, due to the low pressure and the limitation of the pinch point temperature difference, usually only the sensible heat of steam can be used, that is, the sensible heat of steam is used to heat the molten salt, and the cooled steam is used for industrial steam supply. Although peak regulation can be performed to a certain extent, the depth of regulation is limited, and it is difficult to meet the needs of deep peak regulation. Summary of the invention
[0004] The embodiments of the present disclosure aim to solve at least one of the technical problems existing in the prior art, and provide a coal-fired power unit and a peak-shaving steam supply system and an operation method thereof.
[0005] In one aspect, an embodiment of the present disclosure provides a peak-shaving steam supply system for a coal-fired power unit, the peak-shaving steam supply system comprising:
[0006] A heat exchanger, wherein a first heat exchange inlet of the heat exchanger is used to connect to a hot re-steam pipeline of a coal-fired power unit, and a first heat exchange outlet of the heat exchanger is connected to an industrial steam supply pipeline;
[0007] A molten salt heat storage device, the molten salt heat storage device comprising a shell and a solid heat storage medium and a liquid molten salt arranged in the shell, a first molten salt inlet of the shell being connected to a second heat exchange outlet of the heat exchanger, and a first molten salt outlet of the shell being connected to a second heat exchange inlet of the heat exchanger;
[0008] A heat exchange pipeline, wherein a portion of the heat exchange pipeline is located in the shell, a first end of the heat exchange pipeline is used to communicate with the water delivery pipeline, and a second end of the heat exchange pipeline is connected to the industrial steam supply pipeline; wherein the portion of the pipeline exchanges heat through the solid heat storage medium to convert input water into steam to supply the industrial steam supply pipeline;
[0009] An electrode boiler, wherein the water inlet of the electrode boiler is connected to the water supply pipeline, and the steam outlet of the electrode boiler is connected to the industrial steam supply pipeline.
[0010] Optionally, the electrode boiler is electrically connected to a generator.
[0011] Optionally, the peak-shaving steam supply system further includes a pressure pump;
[0012] The pressure pump is arranged in series between the first molten salt outlet and the second heat exchange inlet, and is used to pump the liquid molten salt so as to transfer the heat energy at the heat exchanger to the solid heat storage medium through the liquid molten salt.
[0013] Optionally, a first valve is provided upstream of the first heat exchange inlet, and a second valve is provided at the end of the first heat exchange outlet.
[0014] Optionally, a third valve is disposed at the end of the first end of the heat exchange pipeline, and a fourth valve is disposed at the end of the second end of the heat exchange pipeline.
[0015] Optionally, a fifth valve is provided at the end of the water inlet, and the fifth valve is located upstream of the third valve; and a sixth valve is provided at the end of the steam outlet.
[0016] Optionally, the water pipeline is used to transport deoxygenated water.
[0017] On the other hand, an embodiment of the present disclosure provides a method for operating a peak-shaving steam supply system of a coal-fired power unit, using the peak-shaving steam supply system described above, the operating method comprising:
[0018] When the coal-fired power units are peak-shifted and the solid heat storage medium is used for heat storage, the high-temperature steam in the hot resteam pipeline enters the heat exchanger and then enters the industrial steam supply pipeline after heat exchange, and the liquid molten salt in the molten salt heat storage device transfers heat energy to the solid heat storage medium through the heat exchanger; and
[0019] The water delivery pipeline delivers water to the electrode boiler, and the water is converted into steam by the electrode boiler and delivered to the industrial steam supply pipeline;
[0020] When the coal-fired power unit is not in peak-shaving mode and the solid heat storage medium releases heat, the water pipeline transports water to the heat exchange pipeline, and the water generates steam through heat exchange with the solid heat storage medium and is transported to the industrial steam supply pipeline.
[0021] On the other hand, an embodiment of the present disclosure provides a coal-fired power unit, which adopts the peak-shaving steam supply system described above.
[0022] The coal-fired power unit and its peak-shaving steam supply system and operation method of the embodiments of the present disclosure can effectively improve energy utilization efficiency, realize large-flow industrial steam supply, and increase the peak-shaving depth of the unit through the provided heat exchanger, molten salt heat storage device, heat exchange pipeline and electrode boiler. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 The present invention is a schematic structural diagram of a peak-shaving steam supply system for a coal-fired power unit according to an embodiment of the present invention. DETAILED DESCRIPTION
[0024] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, the present disclosure is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0025] like Figure 1 As shown, a peak-shaving steam supply system 100 for a coal-fired power unit includes a heat exchanger 110, a molten salt heat storage device 130, a heat exchange pipeline 140, and an electrode boiler 160. The first heat exchange inlet 111 of the heat exchanger 110 is used to connect to the hot re-steam pipeline 121 of the coal-fired power unit, and the first heat exchange outlet 112 of the heat exchanger 110 is connected to the industrial steam supply pipeline 120. The molten salt heat storage device 130 includes a shell 131 and a solid heat storage medium and a liquid molten salt (not shown in the figure) arranged in the shell 131. The first molten salt inlet 132 of the shell 131 is connected to the second heat exchange outlet 113 of the heat exchanger 110, and the first molten salt outlet 133 of the shell 131 is connected to the second heat exchange inlet 114 of the heat exchanger 110.
[0026] Part of the heat exchange pipeline 140 is located in the shell 131, and the first end of the heat exchange pipeline 140 is used to communicate with the water pipeline 150, and the second end thereof is connected to the industrial steam supply pipeline 120. The part of the pipeline performs heat exchange through the solid heat storage medium to convert the input water into steam and supply it to the industrial steam supply pipeline 120. The water inlet 161 of the electrode boiler 160 is connected to the water pipeline 150, and the steam outlet 162 of the electrode boiler 160 is connected to the industrial steam supply pipeline 120.
[0027] Specifically, Figure 1As shown, during the application of the peak-shaving steam supply system 100 of the embodiment of the present disclosure, when the coal-fired power unit is peak-shaving and the solid heat storage medium is stored, the high-temperature steam in the hot re-steam pipeline 121 enters the heat exchanger 110 through the first heat exchange inlet 111 for heat exchange and cooling to meet the industrial steam supply standard and is transported to the industrial steam supply pipeline 120. The liquid molten salt enters the heat exchanger 110 through the first molten salt outlet 133 and the second heat exchange inlet 114 for heat exchange and temperature increase, and then returns to the molten salt heat storage device 130 through the second heat exchange outlet 113 and the first molten salt inlet 132, and exchanges heat with the solid heat storage medium in the shell 131 of the molten salt heat storage device 130, thereby storing thermal energy through the solid heat storage medium. In addition, the water delivery pipeline 150 also delivers water to the electrode boiler 160, and the water is converted into steam by the electrode boiler 160 and transported to the industrial steam supply pipeline 120.
[0028] When the coal-fired power unit is not in peak-shaving mode and the solid heat storage medium releases heat, water is transported to the heat exchange pipeline 140 through the water pipeline 150 , and the water exchanges heat with the solid heat storage medium to vaporize and generate steam, which is then transported to the industrial steam supply pipeline 120 .
[0029] The peak-shaving steam supply system of the coal-fired power unit of the embodiment of the present disclosure first uses the high-temperature steam in the hot re-steam pipeline 121 to heat the solid heat storage medium, thereby storing thermal energy, significantly reducing the heat energy loss during the peak-shaving process, and improving the thermal storage efficiency and energy utilization efficiency of the system. Furthermore, since the hot re-steam extraction flow is limited by the minimum flow of the steam turbine and cannot meet the requirements of industrial steam supply for steam flow, the high-temperature steam heat storage technology and subsequent steam supply alone cannot meet the requirements of large-flow industrial steam supply. Therefore, the coupling electrode boiler 160 is used for coordinated steam supply, which can achieve large-flow industrial steam supply, and can greatly reduce the unit's online load, increase the unit's peak-shaving depth, and obtain peak-shaving benefits.
[0030] The organic combination of coal-fired power units, molten salt heat storage devices and electrode boilers aims to give full play to the high efficiency of molten salt heat storage and the strong capabilities of electrode boilers in peak load regulation and steam supply, while taking advantage of their lower cost. Through this coupling system, not only can the operation flexibility and economy of coal-fired power units be improved, but also a deeper level of peak load regulation of the power system can be achieved while ensuring the stability of steam supply.
[0031] For example, Figure 1 As shown, the electrode boiler 160 is electrically connected to the generator 170. Specifically, the electrode boiler 160 obtains power through the generator 170, thereby converting input water into steam and discharging it to the industrial steam supply pipeline 120.
[0032] For example, Figure 1As shown, the peak-shaving steam supply system 100 further includes a pressure pump 180. The pressure pump 180 is arranged in series between the first molten salt outlet 133 and the second heat exchange inlet 114, and is used to pump the liquid molten salt to transfer the heat energy at the heat exchanger 110 to the solid heat storage medium through the liquid molten salt.
[0033] Specifically, Figure 1 As shown, a pressure pump 180 is also provided between the heat exchanger 110 and the molten salt heat storage device 130. The pressure pump 180 can pump the liquid molten salt from the molten salt heat storage device 130 to the heat exchanger 110 for heat exchange and temperature increase, and then the liquid molten salt continues to enter the molten salt heat storage device 130 to exchange heat with the solid heat storage medium, thereby storing thermal energy.
[0034] The peak-shaving steam supply system of the coal-fired power unit in the embodiment of the present disclosure can better transport liquid molten salt through the provided pressure pump, so that the liquid molten salt can circulate between the molten salt heat storage device and the heat exchanger.
[0035] For example, Figure 1 As shown, a first valve 200 is disposed upstream of the first heat exchange inlet 111 , and a second valve 300 is disposed at the end of the first heat exchange outlet 112 .
[0036] Specifically, Figure 1 As shown, the first valve 200 controls the hot re-steam pipeline 121 to supply steam to the heat exchanger 110, and the second valve 300 controls the heat exchanger 110 to supply steam to the industrial steam supply pipeline 120. As an example, the second valve 300 can be set as a pressure reducing valve, which can be used for industrial steam supply after the hot re-steam sensible heat is exchanged with the liquid molten salt for heat reduction, and then the steam is adjusted to a suitable pressure through the pressure reducing valve.
[0037] Furthermore, a third valve 400 is disposed at the end of the first end of the heat exchange pipeline 140 , and a fourth valve 500 is disposed at the end of the second end of the heat exchange pipeline 140 .
[0038] Specifically, Figure 1 As shown, the third valve 400 controls the water delivery pipeline 150 to deliver water to the heat exchange pipeline 140. As an example, the water can be specifically set to deoxygenated water. When the deoxygenated water passes through the heat exchange pipeline 140 located in the shell 130, the deoxygenated water becomes steam under the heat release of the solid heat storage medium, and the fourth valve 500 controls the heat exchange pipeline 140 to deliver steam to the industrial steam supply pipeline 120. The third valve 400 and the fourth valve 500 can also facilitate the maintenance of the molten salt heat storage device 130 when a fault occurs.
[0039] Furthermore, a fifth valve 600 is disposed at the end of the water inlet 161 , and the fifth valve 600 is located upstream of the third valve 400 . A sixth valve 700 is disposed at the end of the steam outlet 162 .
[0040] Specifically, Figure 1 As shown, the fifth valve 600 can control the water delivery pipeline 150 to deliver water to the electrode boiler 160, and the water is converted into steam under the action of the electrode boiler 160. The sixth valve 700 can control the steam in the electrode boiler 160 to be delivered to the industrial steam supply pipeline 120.
[0041] On the other hand, an embodiment of the present disclosure provides an operating method for a peak-shaving steam supply system of a coal-fired power unit, which adopts the peak-shaving steam supply system described above. The specific structure of the peak-shaving steam supply system can refer to the relevant records in the previous text and will not be described in detail here. The operating method includes: when the coal-fired power unit is peak-shaving and the solid heat storage medium is storing heat, the high-temperature steam in the hot re-steam pipeline enters the heat exchanger and enters the industrial steam supply pipeline after heat exchange, and the liquid molten salt in the molten salt heat storage device transfers heat energy to the solid heat storage medium through the heat exchanger. And, the water pipeline transports water to the electrode boiler, and the water is converted into steam by the electrode boiler and transported to the industrial steam supply pipeline.
[0042] When the coal-fired power unit is not in peak-shaving mode and the solid heat storage medium releases heat, the water pipeline transports water to the heat exchange pipeline, and the water generates steam through heat exchange with the solid heat storage medium and is transported to the industrial steam supply pipeline.
[0043] The method for operating the peak-shaving steam supply system of the coal-fired power unit of the embodiment of the present disclosure can improve the heat storage efficiency of the solid heat storage medium and improve the deep peak-shaving capability of the coal-fired power unit in the heat storage stage. At the same time, in the heat release stage, the solid heat storage medium and the liquid molten salt can be uniformly released through the circulation of the liquid molten salt, thereby ensuring the efficient use of thermal energy.
[0044] On the other hand, the embodiment of the present disclosure further provides a coal-fired power unit, which adopts the peak-shaving steam supply system described above. The specific structure of the peak-shaving steam supply system can refer to the relevant records above, and will not be described in detail here.
[0045] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present disclosure, but the present disclosure is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and substance of the present disclosure, and these modifications and improvements are also considered to be within the scope of protection of the present disclosure.
Claims
1. A peak-shaving steam supply system for coal-fired power units, characterized in that: The peak-shaving steam supply system comprises: A heat exchanger, wherein a first heat exchange inlet of the heat exchanger is used to connect to a hot re-steam pipeline of a coal-fired power unit, and a first heat exchange outlet of the heat exchanger is connected to an industrial steam supply pipeline; A molten salt heat storage device, the molten salt heat storage device comprising a shell and a solid heat storage medium and a liquid molten salt arranged in the shell, a first molten salt inlet of the shell being connected to a second heat exchange outlet of the heat exchanger, and a first molten salt outlet of the shell being connected to a second heat exchange inlet of the heat exchanger; A heat exchange pipeline, wherein a portion of the heat exchange pipeline is located in the shell, a first end of the heat exchange pipeline is used to communicate with the water delivery pipeline, and a second end of the heat exchange pipeline is connected to the industrial steam supply pipeline; wherein the portion of the pipeline exchanges heat through the solid heat storage medium to convert input water into steam to supply the industrial steam supply pipeline; An electrode boiler, wherein the water inlet of the electrode boiler is connected to the water supply pipeline, and the steam outlet of the electrode boiler is connected to the industrial steam supply pipeline.
2. The peak load shaving steam supply system of coal-fired power generation unit according to claim 1, characterized in that: The electrode boiler is electrically connected to a generator.
3. The peak load shaving steam supply system of coal-fired power generation unit according to claim 1, characterized in that: The peak-shaving steam supply system also includes a pressure pump; The pressure pump is arranged in series between the first molten salt outlet and the second heat exchange inlet, and is used to pump the liquid molten salt so as to transfer the heat energy at the heat exchanger to the solid heat storage medium through the liquid molten salt.
4. The peak load shaving steam supply system for coal-fired power generation units according to any one of claims 1 to 3, characterized in that: A first valve is disposed upstream of the first heat exchange inlet, and a second valve is disposed at the end of the first heat exchange outlet.
5. The peak load shaving steam supply system for coal-fired power generation units according to any one of claims 1 to 3, characterized in that: A third valve is disposed at the end of the first end of the heat exchange pipeline, and a fourth valve is disposed at the end of the second end of the heat exchange pipeline.
6. The peak load shaving steam supply system of coal-fired power generation unit according to claim 5, characterized in that: A fifth valve is disposed at the end of the water inlet, and the fifth valve is located upstream of the third valve; a sixth valve is disposed at the end of the steam outlet.
7. The peak load shaving steam supply system for coal-fired power generation units according to any one of claims 1 to 3, characterized in that: The water delivery pipeline is used for delivering deoxygenated water.
8. A method for operating a peak load steam supply system of a coal-fired power unit, characterized in that: The peak load steam supply system according to any one of claims 1 to 7 is adopted, and the operation method comprises: When the coal-fired power units are peak-shifted and the solid heat storage medium is used for heat storage, the high-temperature steam in the hot resteam pipeline enters the heat exchanger and then enters the industrial steam supply pipeline after heat exchange, and the liquid molten salt in the molten salt heat storage device transfers heat energy to the solid heat storage medium through the heat exchanger; and The water delivery pipeline delivers water to the electrode boiler, and the water is converted into steam by the electrode boiler and delivered to the industrial steam supply pipeline; When the coal-fired power unit is not in peak-shaving mode and the solid heat storage medium releases heat, the water pipeline transports water to the heat exchange pipeline, and the water generates steam through heat exchange with the solid heat storage medium and is transported to the industrial steam supply pipeline.
9. A coal-fired power unit, characterized in that: A peak shaving steam supply system as described in any one of claims 1 to 7 is adopted.
Citation Information
Patent Citations
Deep peak shaving system and method for thermal power generating unit utilizing electrode steam boiler system to regulate steam supply
CN112050188A
Coal-fired unit thermoelectric decoupling power supply and generation deep peak regulation energy supply system and method
CN116182138A
Phase change energy storage and supply method using off-peak electricity
CN116678247A
Steam supply device system and method for coal-electricity steam coupling fused salt heat exchange
CN116717331A
Molten salt heat storage and release system with industrial steam supply
CN117928291A