Restoration method and control unit for metering valve of high-pressure fuel pump

By cleaning the metering valve in the common rail system, the use of current switching to remove particulate matter, the waste of metering valve replacement caused by misjudgment is solved, the accuracy of fault diagnosis is improved and resource waste is reduced.

CN118934376APending Publication Date: 2024-11-12ROBERT BOSCH GMBH
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202310532180.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-11
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the existing common rail system, many metering valves diagnosed as stagnation failure are actually functioning normally when replaced, resulting in waste of resources.

Method used

By cleaning the metering valve diagnosed as stuck, the control current is used to repeatedly switch between the set first current value and the second current value, so that the valve core moves back and forth in the valve body, and clears the stagnant caused by the stuck Particulate matter, thereby restoring the normal function of the metering valve.

Benefits of technology

It effectively avoids unnecessary metering valve replacement, reduces time and cost waste, and improves the accuracy of metering valve fault diagnosis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934376A_ABST
    Figure CN118934376A_ABST
Patent Text Reader

Abstract

The metering valve restoring method for the high-pressure fuel pump of the common rail system of the engine comprises the step of executing metering valve cleaning operation under the condition that a metering valve is diagnosed to be stuck and set metering valve cleaning conditions are met. The metering valve cleaning operation comprises the steps that control current is applied to the metering valve, the control current is repeatedly switched between a set first current value and a second current value lower than the first current value, a valve element of the metering valve reciprocates in a valve body, and therefore the metering valve is cleaned.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a metering valve recovery method for a high-pressure fuel pump of a common rail system and a related control unit. Background Art

[0002] Common rail systems are commonly used in various vehicles, construction machinery, and other equipment. A typical common rail system consists of a high-pressure pump and a fuel rail. The high-pressure pump includes a fuel supply pump and a high-pressure assembly. The fuel supply pump supplies fuel to the high-pressure assembly through a metering valve (ZME), which then pressurizes the fuel and supplies it to the rail. The metering valve is a critical component in the high-pressure pump for flow control, and proper functioning of the metering valve is crucial. To this end, high-pressure fuel pumps are typically equipped with diagnostic mechanisms to determine whether the metering valve is functioning properly. During operation, if a mechanical sticking fault, such as a mechanical sticking, is detected in the metering valve, the valve is replaced. However, it has been found that many replaced metering valves diagnosed as stuck are found to be functional, resulting in wasted resources. This means that most metering valves diagnosed as stuck do not actually need to be replaced. Summary of the Invention

[0003] The purpose of the present application is to provide a metering valve recovery solution for a high-pressure fuel pump of a common rail system, which can clean a metering valve diagnosed as stuck so as to restore its normal function and avoid unnecessary replacement.

[0004] To this end, according to one aspect of the present application, a method for restoring a metering valve of a high-pressure fuel pump of a common rail system is provided, comprising the following steps:

[0005] When the metering valve is diagnosed as being stuck and all set metering valve cleaning conditions are satisfied, a metering valve cleaning operation is performed, the metering valve cleaning operation comprising:

[0006] A control current is applied to the metering valve, and the control current is repeatedly switched between a set first current value and a second current value lower than the first current value, so that the valve core of the metering valve moves back and forth in the valve body, thereby achieving cleaning of the metering valve.

[0007] According to the present application, a method for restoring a metering valve of a high-pressure fuel pump for a common rail system is proposed, wherein a cleaning operation is performed on a metering valve diagnosed as stuck, so that particles causing the sticking in the metering valve fall off, thereby restoring the metering valve to its normal function and avoiding the waste of time and cost caused by unnecessary replacement of the metering valve.

[0008] Furthermore, in one embodiment, the metering valve restoration method of the present application can use a predictive diagnosis mechanism to diagnose the metering valve, which can ensure the authenticity of the determined abnormal points as much as possible, improve the accuracy of diagnosing metering valve stuck faults, and combined with metering valve cleaning, can further reduce the possibility of the metering valve being replaced unnecessarily.

[0009] According to another aspect of the present application, a control unit for a common rail system is provided, configured to execute the metering valve restoration method of the present application.

[0010] According to another aspect of the present application, a machine-readable storage medium is provided, which stores executable instructions. When the instructions are executed by a processor, the metering valve restoration method of the present application is implemented. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The foregoing and other aspects of the present application will be more fully understood through the following detailed description made with reference to the accompanying drawings, in which:

[0012] Figure 1 is a schematic layout diagram of a common rail system to which the metering valve recovery method according to the present application is applicable;

[0013] Figure 2 yes Figure 1 A cross-sectional view of an exemplary structure of a metering valve in a common rail system;

[0014] Figure 3 It is a flow chart of a feasible implementation of the metering valve recovery method according to the present application. DETAILED DESCRIPTION

[0015] The present application generally applies to engine common rail systems. Figure 1 A typical common rail system is schematically illustrated, comprising a high-pressure pump 1. High-pressure pump 1 includes a fuel supply pump 2, which supplies fuel, such as diesel, from a fuel tank 10 via a metering valve (ZME) 3 to a high-pressure assembly 4. The high-pressure assembly 4 pressurizes the fuel and supplies it to a fuel rail 5. An overflow channel and a throttle channel leading to the fuel tank 10 are provided upstream and downstream of the metering valve 3, respectively.

[0016] Fuel rail 5 supplies fuel to fuel injectors 7 of engine 6. Engine 6 drives the vehicle, construction machinery, and other equipment that utilizes the engine through a transmission (not shown). Control unit 8 is connected to high-pressure pump 1, fuel rail 5, and engine 6 to control their operation and monitor their status.

[0017] The metering valve 3 adopts a conventional structure, for example Figure 2 The structure shown in Figure 2In the example shown, the metering valve 3 includes a valve body 11, a valve core (piston) 12 axially movable within a valve cavity defined by the valve body 11, a push rod 13 that applies an axial thrust to the valve core 12 under the influence of a magnetic field generated by an electromagnetic coil (not shown), and a return spring 14 that applies an elastic force opposite to the thrust to the valve core 12. An oil inlet 15 is formed on the sidewall of the valve body 11, leading from the outside to the valve cavity. The valve cavity forms an oil outlet 16 at one axial end of the valve body 11. One or more openings 17 are formed on the sidewall of the valve core 12. The metering valve 3 is typically a normally open solenoid valve. In normal operation, no control current, or a minimum control current, is applied to the electromagnetic coil. The valve core 12 is in a retracted position under the influence of the return spring 14. The opening 17 faces the oil inlet 15 and connects the oil inlet 15 with the oil outlet 16. The metering valve 3 is in an open state, with the maximum flow area between the oil inlet 15 and the oil outlet 16, i.e., the metering valve 3 is at its maximum opening. When sufficient control current is applied to the electromagnetic coil, the push rod 13 pushes the valve core 12 to move toward the side of the oil outlet 16 against the elastic force of the return spring 14, so that the opening 17 and the oil inlet 15 are gradually offset axially, and the flow area between the oil inlet 15 and the oil outlet 16 gradually decreases until it reaches zero, so that the metering valve 3 is switched to the closed state, and the metering valve 3 has zero opening.

[0018] Understandable, not limited to Figure 2 The exemplary structure shown may also employ metering valves 3 having other structures in the high-pressure pump 1. Furthermore, a normally closed metering valve 3 may also be employed in the high-pressure pump 1. Regardless of the specific form of the metering valve 3, in general, the opening of the metering valve 3 is directly related to the magnitude of the applied control current. For a normally open metering valve 3, the opening of the metering valve 3 is negatively correlated with the magnitude of the applied control current, where the maximum opening corresponds to the minimum control current (which may be zero), and zero opening corresponds to the maximum control current. For a normally closed metering valve 3, the opening of the metering valve 3 is positively correlated with the magnitude of the applied control current, where the maximum opening corresponds to the maximum control current, and zero opening corresponds to the minimum control current (which may be zero).

[0019] When the valve core in the metering valve 3 is stuck due to factors such as particulate matter, especially when particulate matter is attached to the inner wall of the valve cavity of the valve body 11 and / or the outer wall of the valve core 12, causing the valve core 12 to move slower, the relationship between the opening of the metering valve 3 and the applied control current changes, that is, the valve core 12 cannot reach the expected axial position corresponding to the applied control current, and the opening of the metering valve 3 does not match the expected opening corresponding to the applied control current, thereby causing a deviation in the amount of fuel supplied by the fuel supply pump 2 to the high-pressure component 4, and further causing a deviation in the working characteristics of the engine 6.

[0020] To this end, the present application provides a metering valve recovery method for cleaning the metering valve 3 when it is diagnosed as having a stuck fault, thereby removing any particles adhering to the metering valve 3 and restoring the metering valve's functionality, specifically restoring the intended relationship between the opening of the metering valve 3 and the applied control current. The metering valve recovery method is performed after the engine ignition switch is turned off to avoid interfering with normal engine operation.

[0021] Refer to the following Figure 3 A feasible implementation of the metering valve recovery method of the present application is described. It can be understood that the metering valve recovery method of the present application can be used for Figure 1 Common rail system shown or other common rail system, Figure 2 The metering valve 3 shown may have other structures and may be executed by the aforementioned control unit 8 or other control units.

[0022] like Figure 3 As shown, the method includes step S1, wherein the metering valve cleaning operation is released based on the metering valve being diagnosed as having a stuck fault, that is, the metering valve cleaning operation is allowed to be performed. The diagnosis of the metering valve stuck fault will be described in detail later.

[0023] After the metering valve cleaning operation is released in step S1, it is determined in step S2 whether the metering valve cleaning conditions are met. If all metering valve cleaning conditions are met, the process goes to step S3; if any metering valve cleaning condition is not met, the process goes to step S6.

[0024] The conditions that need to be met in step S2 include:

[0025] (1) The engine ignition switch is turned off;

[0026] (2) The engine fuel injection quantity demand is zero, or is less than a set injection quantity threshold to meet certain auxiliary functions that require engine support;

[0027] (3) The engine speed is less than a set speed threshold (e.g., approximately 100 RPM), and may be reduced to zero;

[0028] (4) There is no fault report for the common rail system.

[0029] The four conditions for on-site visits are the basic judgment conditions that must be met to execute subsequent steps. In addition to the above four conditions, you can also add some auxiliary judgment conditions, such as any one or more of the following temperature conditions:

[0030] (5) The engine temperature is within a set temperature range, that is, higher than a set engine temperature low threshold and lower than a set engine temperature high threshold;

[0031] (6) The fuel temperature in the common rail system (especially the fuel temperature at the metering valve) is higher than a set fuel temperature threshold;

[0032] (7) The ambient temperature is higher than a set ambient temperature threshold.

[0033] For the engine temperature, fuel temperature, and ambient temperature, if their temperatures do not meet the above threshold conditions, the metering valve cleaning effect is poor, so the metering valve cleaning can be prohibited based on the temperature conditions.

[0034] According to a specific common rail system (or high-pressure pump) structure or engine application, other conditions that need to be met for performing metering valve cleaning can be set.

[0035] Additionally, a metering valve purge enable option can be set. This option is provided to the user. Only when the user enables the metering valve purge function can subsequent metering valve purges be performed; if the user disables the metering valve purge function, subsequent metering valve purges are prohibited. The metering valve purge enable option can also be included in step S2 as a condition that must be met for metering valve purges.

[0036] If all metering valve cleaning conditions are met in step S2, the process proceeds to step S3, where the metering valve cleaning operation is performed. A control current is applied to the metering valve, switching repeatedly at a set frequency, causing the valve core of the metering valve to reciprocate within the valve body at the set frequency, thereby generating fuel pressure fluctuations within the valve chamber of the metering valve. The oscillation and impact caused by the fuel pressure fluctuations within the valve chamber, combined with the vibration of the valve core, dislodge particles adhering to the outer wall of the valve core and / or the inner wall of the valve body from the outer wall of the valve plug and / or the inner wall of the valve body.

[0037] During the experiment, pressure monitoring revealed that as the valve core reciprocated within the valve body, the fuel pressure within the valve cavity fluctuated at the same frequency. This fluctuation in fuel pressure within the valve cavity and the vibration of the valve core facilitated particle removal.

[0038] During the metering valve cleaning operation, the fuel supply pump can be stopped, and the particles can be removed by relying on the pressure fluctuations of the residual fuel in the metering valve cavity and the vibration of the valve core. When the high-pressure fuel pump is started again, the fuel from the fuel supply pump will carry the particles away from the metering valve.

[0039] Alternatively, the fuel supply pump may be kept running during the metering valve cleaning operation so that, after the particles are dislodged, they are immediately flushed away from the metering valve by the fuel from the fuel supply pump.

[0040] Therefore, during the metering valve cleaning operation, if the engine speed is zero, the high-pressure assembly can be stopped, and the fuel supply pump can be stopped or kept running (preferably at a low speed). On the other hand, during the metering valve cleaning operation, if the engine is in a low speed state (lower than the aforementioned set speed threshold), the high-pressure assembly and the fuel supply pump can be kept running, so that the fuel flowing through the metering valve is supplied to the engine via the high-pressure assembly and the fuel rail.

[0041] During the metering valve purge operation, the control current applied to the metering valve is repeatedly switched between a first current value and a second current value. The first current value is higher than the second current value. The first current value may be the rated maximum control current of the metering valve, or lower than the rated maximum control current. The second current value may be the rated minimum control current of the metering valve, or higher than the rated minimum control current. To avoid or reduce impact vibration of the valve core of the metering valve during the purge operation, it may be advantageous to set the first current value lower than the rated maximum control current and / or the second current value higher than the rated minimum control current.

[0042] To achieve switching of the control current between the first and second current values, pulse width modulation (PWM) is applied to the applied control current, causing the control current to change from the first current value to the second current value, and vice versa, at a set modulation frequency (e.g., 120 Hz to 200 Hz). When the control current switches between the first and second current values, the change in current value achieved by pulse width modulation is a step-wise change. This step-wise change in current value causes the valve core to vibrate during its reciprocating movement, which is beneficial for forcing attached particulate matter to fall off the outer wall of the valve core and / or the inner wall of the valve body. The pulse width modulation is preferably adjustable.

[0043] Throughout the metering valve cleaning operation, the first current value and the second current value, and / or the pulse width modulation frequency of the control current, and / or the switching frequency of the control current between the first current value and the second current value, can be set to remain constant, or set to be variable (adjustable). Setting the first current value and the second current value and / or the pulse width modulation frequency of the control current and / or the switching frequency of the control current between the first current value and the second current value to be variable (adjustable) allows the valve core to move and vibrate with a varying stroke and / or frequency throughout the metering valve cleaning operation, which may be beneficial to the cleaning effect of the metering valve.

[0044] In addition, the frequency of periodic switching of the control current between the first current value and the second current value is usually several times per second, for example, twice per second, and this frequency is also set through experiments based on the specific metering valve structure.

[0045] The first and second current values ​​of the metering valve control current in the metering valve cleaning operation, the frequency of periodic switching of the control current between the first current value and the second current value, the pulse width modulation frequency of the control current, the duration of the metering valve cleaning operation, etc. can all be calibrated in the control unit.

[0046] While the metering valve cleaning operation is being maintained, in step S4 , the metering valve cleaning operation is timed using a timer while monitoring various metering valve cleaning conditions.

[0047] Next, in step S5, it is determined whether the cleaning operation end condition is met. If the cleaning operation end condition is met, the process goes to step S6; if not, the process goes back to step S3 to maintain the metering valve cleaning operation.

[0048] The cleaning operation end condition in step S5 may include one or more of the following conditions:

[0049] The timer counts the cleaning operation of the metering valve until the set operation time is reached;

[0050] Any of the metering valve cleaning conditions is no longer met (for example, the ignition switch is turned on, etc.);

[0051] Troubleshooting of metering valve sticking;

[0052] Received a forced exit cleanup operation instruction.

[0053] After the cleaning operation end condition is met, step S6 is executed to end the metering valve cleaning operation. In addition, the metering valve cleaning operation count is updated in the memory of the control unit, and relevant working parameters, abnormal conditions, etc. during the cleaning operation may also be recorded.

[0054] Whether the metering valve stuck fault has been eliminated can be determined through metering valve stuck fault diagnosis, as described in detail later.

[0055] Based on the number of metering valve cleaning operations recorded in the memory, the control unit can determine whether the metering valve has reached a point where it needs to be replaced. For example, if the number of metering valve cleaning operations reaches a preset number within a set period of engine operation, the control unit determines that the metering valve needs to be replaced and notifies the user accordingly.

[0056] Regarding the diagnosis of metering valve sticking failure, direct diagnosis and predictive diagnosis can be used.

[0057] Direct diagnosis identifies a stuck metering valve fault based on deviations from normal values ​​for one or more parameters related to the common rail system's metering valve condition. For example, a stuck metering valve can affect rail pressure. If the rail pressure falls below a preset lower limit or rises above a preset upper limit within a predetermined period, or if the rail pressure fluctuates beyond a predetermined limit, the metering valve is considered likely stuck. The metering valve purge can then be initiated to clean the metering valve. If relevant parameters in the common rail system still deviate from normal values ​​after the purge, the control unit will diagnose other components of the common rail system or alert the user to inspect the common rail system.

[0058] Predictive diagnostics utilize pre-established predictive models for metering valves and real-time measurements of metering valve parameters during common rail system operation to estimate control current. By comparing the estimated control current with the actual measured metering valve control current, potential metering valve anomalies, particularly sticking conditions, can be identified.

[0059] The prediction model characterizes the relationship between metering valve-related parameters as input parameters and metering valve control current as output parameter. This prediction model can be established through machine learning and training using conventional techniques in the field of artificial intelligence (e.g., multi-layer perceptron technology or random forest technology). This is well known to those skilled in the art of artificial intelligence, and the basic principles thereof are not described in this application.

[0060] The metering valve-related parameters determined in this application include at least: the actual metering valve control current, engine speed, the amount of fuel injected into the engine by the common rail system, the set rail pressure, and the actual rail pressure. Other common rail system-related parameters related to the metering valve, such as the pressure differential across the metering valve and the flow rate through the metering valve, can also be added to the model input parameters.

[0061] Furthermore, the present application constructs the prediction model as a time series prediction model, in which the metering valve-related parameters (excluding the control current measured at time point t) measured at the estimated time point t itself and at n (n>1) time points prior to the estimated time point t are used as input parameters, and the estimated control current at time point t is used as the output parameter. The estimated control current at time point t obtained based on the prediction model and the actual measured control current at time point t are compared in subsequent steps to determine metering valve abnormality.

[0062] The output parameter of the prediction model is the estimated control current at time point t.

[0063] Machine learning and training were performed on metering valve data from multiple healthy, non-sticky metering valves measured on a test bench under various operating conditions to develop a predictive model that characterizes the relationship between various input and output parameters. This predictive model is stored in the control unit and used to predict the control current, the output parameter, at time t based on real-time input parameter monitoring. Furthermore, the maximum mean absolute error (MAE) of the control current measured at time t and at n time points prior to time t serves as a difference threshold, which is subsequently used to assess whether the predicted control current is abnormal.

[0064] Using the prediction model constructed as described above, the output parameter, namely the estimated control current at time point t, can be determined by inputting the input parameters. This estimated control current is compared with the measured control current at time point t. If the difference between the two is greater than the difference threshold, a potential abnormal point is determined.

[0065] Whether this potential outlier is a true outlier requires a post-processing step. This step determines whether the fuel injection state changes significantly before and after time t. If the change is significant, the potential outlier is considered to be caused by this change and not a true outlier. If the change is minor, the potential outlier is confirmed to be a true outlier. This post-processing process ensures the authenticity of the identified outlier to the greatest extent possible.

[0066] The predictive diagnostic scheme for metering valves of the prediction model of the present application can be summarized as including the following steps:

[0067] Establishing a prediction model applicable to a metering valve, wherein the prediction model represents a relationship between a metering valve-related parameter as an input parameter and a control current as an output parameter;

[0068] During the operation of the common rail system, measuring the input parameters of the prediction model at a plurality of consecutive time points;

[0069] Determining an estimated control current as an output parameter at a time point for estimation based on measured values ​​of the input parameter at a plurality of consecutive time points using the prediction model;

[0070] confirming a potential abnormal point when a difference between the estimated control current and the control current measured at the time point for estimation is greater than a preset difference threshold;

[0071] Verify that the potential outlier is a real outlier through post-processing;

[0072] When the accumulated number of actual abnormal points is greater than a preset number threshold, it is predicted that a stuck fault exists in the metering valve.

[0073] In the predictive diagnosis scheme of the present application, the prediction model can be established through machine learning and training of a large amount of measured data using mature artificial intelligence technology, which not only improves the accuracy of the prediction model but also reduces the cost of manual analysis.

[0074] In the metering valve restoration method of the present application, regardless of whether a direct diagnostic method or a predictive diagnostic method is used to diagnose the metering valve stuck fault, the metering valve can be cleaned after being diagnosed as stuck to eliminate or reduce the accumulation of particulate matter in the metering valve, extend the life cycle of the metering valve, and avoid the waste caused by unnecessary replacement of the metering valve.

[0075] It should be noted that in the metering valve recovery method of the present application, the metering valve cleaning operation can be released each time a metering valve stuck condition is diagnosed. Alternatively, the metering valve cleaning operation can be released only after the metering valve stuck condition is diagnosed a predetermined number of times.

[0076] Based on the principles of the present application described above, those skilled in the art can make various adaptive modifications to the various details described above based on specific applications.

[0077] The metering valve restoration method described above can be executed in the control unit of the present application. The various steps and technical details of the restoration method described above can be stored in the control unit in the form of software. The present application also relates to a machine-readable storage medium storing executable instructions that, when executed, cause a processor to perform the aforementioned metering valve restoration method.

[0078] Although the present application is described herein with reference to specific embodiments, the scope of the present application is not limited to the details shown. Various modifications may be made to these details without departing from the basic principles of the present application.

Claims

1. A method for restoring a metering valve of a high-pressure fuel pump (1) for an engine common rail system, comprising: Based on the diagnosis that the metering valve (3) is stuck and the set metering valve cleaning conditions are satisfied, a metering valve cleaning operation is performed; Wherein, the metering valve cleaning operation includes: A control current is applied to the metering valve (3), and the control current is repeatedly switched between a set first current value and a second current value lower than the first current value, so that the valve core of the metering valve (3) moves back and forth in the valve body, thereby achieving cleaning of the metering valve (3).

2. The metering valve recovery method according to claim 1, wherein: The metering valve cleaning conditions include: The engine (6) ignition switch is turned off; The fuel injection quantity demanded by the engine (6) is less than a set injection quantity threshold; The engine (6) speed is less than a set speed threshold; and No faults reported in the common rail system.

3. The metering valve recovery method according to claim 2, wherein: The metering valve cleaning condition further includes any one or more of the following conditions: The temperature of the engine (6) is within a set temperature range; The fuel temperature is higher than the set fuel temperature threshold; The ambient temperature is higher than the set ambient temperature threshold; Optionally, the metering valve cleaning condition further includes: a metering valve cleaning enabling option is enabled.

4. The metering valve recovery method according to claim 2, wherein: During the metering valve cleaning operation: The engine (6) stops running, the high-pressure component (4) in the high-pressure fuel pump (1) also stops running, and the fuel supply pump (2) in the high-pressure pump (1) stops running or keeps running; Alternatively, the engine (6) operates at a speed lower than the speed threshold, and the high-pressure component (4) and the fuel supply pump (2) in the high-pressure fuel pump (1) keep operating.

5. The metering valve recovery method according to any one of claims 1 to 4, wherein: During the metering valve cleaning operation: The first current value is equal to or lower than the rated maximum control current of the metering valve (3); and / or The second current value is equal to or higher than the rated minimum control current of the metering valve (3); Optionally, in the metering valve cleaning operation, the first current value and / or the second current value is fixed or variable; and / or the pulse width modulation frequency of the control current is fixed or variable; and / or the frequency of periodic switching of the control current between the first current value and the second current value is fixed or variable.

6. The metering valve recovery method according to any one of claims 1 to 5, wherein: The metering valve cleaning operation is terminated after any one of the cleaning operation termination conditions is met, and the cleaning operation termination conditions include: The timing of the metering valve cleaning operation reaches the set operation time; Any of the metering valve cleaning conditions is no longer met; Receive a forced exit cleanup operation instruction; Troubleshooting of stuck metering valve.

7. The metering valve recovery method according to any one of claims 1 to 6, wherein: The metering valve cleaning operation is recorded at this time, and after the recorded number of metering valve cleaning operations reaches a predetermined value, a prompt is given to replace the metering valve (3).

8. The metering valve recovery method according to any one of claims 1 to 7, wherein: A stuck metering valve fault is diagnosed based on deviation of one or more parameters related to the condition of the metering valve (3) in the common rail system from normal values.

9. The metering valve recovery method according to any one of claims 1 to 8, wherein: Diagnosing a stuck metering valve fault based on a predictive model includes the following steps: The estimated control current is obtained by using a pre-established prediction model of the metering valve and relevant parameters of the metering valve detected in real time during the operation of the common rail system; The estimated control current is compared with the measured actual control current of the metering valve to determine whether the metering valve is stuck.

10. A control unit for a common rail system, configured to be able to execute the metering valve resetting method according to any one of claims 1 to 9.

11. A machine-readable storage medium storing executable instructions, wherein when the instructions are executed by a processor, the metering valve recovery method according to any one of claims 1 to 9 is implemented.

Citation Information

Cited By

  • Fuel system with self-optimizing fuel control valve

    US12781698B2

  • Fuel system with self-optimizing fuel control valve

    US20260251111A1