Heat exchange tube cleaning assembly, condenser, cleaning method of condenser and central air conditioning unit

By designing the heat exchange tube cleaning components of ball storage tanks, track components and ball collection mechanisms, the precise introduction and uniform distribution of rubber balls are achieved, and the leakage problem caused by random entry of rubber balls is solved, and the energy efficiency and refrigeration of air-conditioning units are improved. Effect.

CN118936224APending Publication Date: 2024-11-12ZHUHAI GREE REFRIGERATION TECH CENT OF ENERGY SAVING & ENVIRONMENTAL PROTECTION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411264157.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the prior art, rubber balls randomly enter the heat exchange tube, resulting in leakage of heat exchange tubes, affecting the energy efficiency and refrigeration effect of the air conditioner unit.

Method used

A heat exchange tube cleaning assembly including ball storage tank, track assembly and ball collection mechanism is designed. The rubber balls are accurately introduced into each heat exchange tube inlet through the hose, and the trace cart and counter are used to ensure the uniform distribution of the rubber balls. , combine it with the water quality detector to judge the cleaning effect.

Benefits of technology

The uniformity and efficiency of the heat exchange tube cleaning are achieved, the phenomenon of missing washes is avoided, the energy efficiency and refrigeration effect of the air conditioner unit are improved, and the equipment is not load-reduced or shut down.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936224A_ABST
    Figure CN118936224A_ABST
Patent Text Reader

Abstract

The invention provides a heat exchange tube cleaning assembly, a condenser, a cleaning method of the condenser and a central air conditioning unit. The heat exchange tube cleaning assembly comprises a ball storage tank in which rubber balls are stored; the ball storage tank is provided with an inlet and an outlet, and water injected from the inlet carries the rubber balls and flows out from the outlet; the rail assembly comprises a rail and a moving part which are movably matched; the track is arranged at one end of each heat exchange tube, and the outlet is connected to the moving part through a hose, so that the outlet of the hose is movably communicated with the inlet of one heat exchange tube. The outlet of the ball storage tank communicates with the hose, and the outlet of the hose communicates with the inlet of each heat exchange tube through the moving part, so that the rubber balls can accurately enter each heat exchange tube, the rubber balls can enter each heat exchange tube for cleaning, and the cleaning uniformity of the heat exchange tubes is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of air-conditioning systems, and specifically relates to a heat exchange tube cleaning assembly, a condenser and a cleaning method thereof, and a water-cooled central air-conditioning unit. Background Art

[0002] With the development of society, the use of air conditioners is becoming more and more common, among which water-cooled central air conditioners are becoming more and more common in the market due to their good energy efficiency advantages. However, the cooling water in the condenser of the water-cooled central air conditioner will contain a lot of impurities such as sand and soil due to various reasons. These impurities will adhere to the inner wall of the heat exchange tube of the condenser, affecting the heat exchange efficiency of the heat exchange tube, causing the energy efficiency of the air conditioner unit to deteriorate, the cooling effect to deteriorate, and the power consumption to increase.

[0003] The equipment currently on the market for cleaning the inner wall of the heat exchange tube mainly includes a rubber ball cleaning device, which uses water to send rubber balls into the heat exchange tube to clean the inner wall and remove impurities attached to the inner wall; however, the rubber balls enter the heat exchange tube randomly in the process of entering the heat exchange tube with water, so there will be an uneven entry phenomenon, which will cause the heat exchange tube to be missed. Summary of the invention

[0004] Therefore, the present application provides a heat exchange tube cleaning assembly, a condenser and a cleaning method thereof, and a water-cooled central air conditioning unit, which can solve the problem in the prior art that rubber balls randomly enter the heat exchange tubes, resulting in leakage of heat exchange tubes.

[0005] In order to solve the above problems, the present application provides a heat exchange tube cleaning assembly, comprising:

[0006] A ball storage tank stores rubber balls; the ball storage tank is provided with an inlet and an outlet, and water injected into the inlet flows out of the outlet with the rubber balls;

[0007] The track assembly comprises a movably matched track and a moving part; the track is arranged at one end of the heat exchange tube, and the outlet is connected to the moving part via a hose, so that the hose outlet can movably conduct to an inlet of the heat exchange tube.

[0008] In some embodiments,

[0009] The moving part is coupled to the track via a gear structure, and the moving part can perform reciprocating motion on the track.

[0010] In some embodiments,

[0011] The moving part comprises a tracking trolley, and the outlet end of the hose is fixed on the tracking trolley; the tracking trolley is also provided with a counter for recording the number of the rubber balls flowing out of the hose.

[0012] In some embodiments,

[0013] The heat exchange tube cleaning assembly also includes a ball collecting mechanism, which is connected to the outlet of the heat exchange tube and filters and collects the rubber balls.

[0014] In some embodiments,

[0015] The ball storage tank is provided with a ball inlet, and the ball collecting mechanism is connected to the ball inlet to deliver the collected rubber balls to the ball storage tank.

[0016] According to another aspect of the present application, a condenser is provided, comprising the heat exchange tube cleaning assembly as described above.

[0017] In some embodiments,

[0018] The condenser also includes a tube shell and an end cover, wherein the end cover seals the end of the tube shell; the heat exchange tube is arranged in the tube shell; the end cover is provided with a water inlet pipe, and the spherical storage tank is arranged in the water inlet pipe.

[0019] In some embodiments,

[0020] The heat exchange tube is configured as a U-shaped tube, and its outlet and inlet are located at the same end of the tube shell; a drain pipe is also provided on the end cover, and when the heat exchange tube cleaning assembly includes a ball collecting mechanism, the ball collecting mechanism is connected between the drain pipe and the water inlet pipe.

[0021] In some embodiments,

[0022] The water inlet pipe and the drain pipe are both provided with water quality detectors to detect the water quality entering and flowing out of the heat exchange tube respectively.

[0023] According to another aspect of the present application, there is provided a method for cleaning the condenser as described above, comprising:

[0024] The number of the rubber balls entering each heat exchange tube is regulated according to a preset value;

[0025] After the rubber balls are injected into one heat exchange tube, the moving part moves to the inlet of the next heat exchange tube, so that the rubber balls can enter the next heat exchange tube from the outlet of the hose.

[0026] In some embodiments,

[0027] Check the water quality of the drain pipe and water inlet pipe of the condenser, and compare the water quality difference between the two places with the set value;

[0028] If there is a difference, repeat the cleaning and testing of the water quality at both locations;

[0029] If there is no difference, the cleaning will end after the preset cleaning time.

[0030] According to another aspect of the present application, there is provided a central air conditioning unit, comprising the heat exchange tube cleaning assembly as described above, the condenser as described above, or a condenser operated according to the cleaning method as described above.

[0031] The present application provides a heat exchange tube cleaning assembly, comprising: a ball storage tank storing rubber balls; the ball storage tank is provided with an inlet and an outlet, and water injected into the inlet carries the rubber balls out from the outlet; a track assembly, comprising a movably matched track and a moving part; the track is provided at one end of the heat exchange tube, and the outlet is connected to the moving part via a hose, so that the hose outlet can movably connect to an inlet of the heat exchange tube.

[0032] This application has the following beneficial effects:

[0033] The outlet of the ball storage tank is connected to a hose, and the outlet of the hose is connected to the inlet of each heat exchange tube through a moving part, so that the rubber ball can accurately enter each heat exchange tube, thereby ensuring that each heat exchange tube can be cleaned by the rubber ball, thereby improving the uniformity of the heat exchange tube cleaning. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the implementation methods of the present application or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the implementation methods or the prior art descriptions. The drawings described below are merely exemplary, and for those of ordinary skill in the art, other implementation drawings can be derived from the provided drawings without creative work.

[0035] Figure 1 This is a schematic diagram of the structure of a condenser according to an embodiment of the present application;

[0036] Figure 2 This is a partial structural schematic diagram of a heat exchange tube cleaning assembly according to an embodiment of the present application;

[0037] Figure 3 This is another partial structural schematic diagram of the heat exchange tube cleaning assembly of an embodiment of the present application;

[0038] Figure 4 This is a flow chart of the cleaning method of the condenser according to an embodiment of the present application.

[0039] The reference numerals are:

[0040] 1. Shell and tube; 11. Heat exchange tube;

[0041] 2. End cap;

[0042] 3. Drain pipe; 31. Drain outlet; 32. Drain water quality detector;

[0043] 4. Water inlet pipe; 41. Water inlet; 42. Inlet water quality detector;

[0044] 5. Ball receiving mechanism;

[0045] 51. Ball storage tank inlet; 52. Ball storage tank; 53. Hose;

[0046] 61. Track; 62. Track-seeking car. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present application and its application or use. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0048] In the description of the present application, it should be understood that the directions or positional relationships indicated by directional words such as "front, back, up, down, left, right", "lateral, vertical, perpendicular, horizontal" and "top, bottom" are usually based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description. Unless otherwise specified, these directional words do not indicate or imply that the device or element referred to must have a specific direction or be constructed and operated in a specific direction, and therefore cannot be understood as limiting the scope of protection of the present application; the directional words "inside and outside" refer to the inside and outside relative to the contours of each component itself.

[0049] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used here to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" can include both "above" and "below". The device can also be positioned in other different ways (rotated 90 degrees or in other orientations), and the spatially relative descriptions used here are interpreted accordingly.

[0050] In addition, it should be noted that the use of terms such as "first" and "second" to limit components is only for the convenience of distinguishing the corresponding components. Unless otherwise stated, the above terms have no special meaning and therefore cannot be understood as limiting the scope of protection of this application.

[0051] See also Figures 1 to 4 As shown, according to an embodiment of the present application, a heat exchange tube cleaning assembly includes:

[0052] The ball storage tank 52 stores the rubber balls; the ball storage tank 52 is provided with an inlet and an outlet, and the water injected into the inlet flows out from the outlet with the rubber balls;

[0053] The track assembly includes a movable track 61 and a movable part; the track 61 is arranged at one end of the heat exchange tube 11, and the outlet is connected to the movable part through a hose 53, so that the outlet of the hose 53 can be movably connected to an inlet of the heat exchange tube 11.

[0054] In the present application, the outlet of the ball storage tank 52 is connected to the hose 53, and the outlet of the hose 53 is separately connected to the inlet of each heat exchange tube 11 through a moving part, so that the rubber ball can accurately enter each heat exchange tube 11, thereby ensuring that each heat exchange tube 11 can be cleaned by the rubber ball, thereby improving the uniformity of cleaning the heat exchange tube 11.

[0055] The conventional structure of the heat exchange tube 11 is that a plurality of heat exchange tubes 11 are arranged in an array, and the inlet of the heat exchange tube 11 is connected to the water inlet 41. During cleaning, a large number of rubber balls randomly enter the inlets of different heat exchange tubes 11 along with the water flow, flow in the heat exchange tube 11, and clean the inner wall of the heat exchange tube 11. The uncontrollability of such random entry is well known, so it is inevitable that some heat exchange tubes 11 cannot be cleaned well.

[0056] The present application utilizes a hose 53 to guide each rubber ball directly to the inlet of a single heat exchange tube 11, ensuring that the flow direction of the rubber ball is controllable, and then combines the movement of the outlet of the hose 53 by the moving part to ensure that each heat exchange tube 11 can get the rubber ball to enter, especially the number of rubber balls entering each heat exchange tube 11 is controllable, thereby ensuring that all heat exchange tubes 11 can be well cleaned.

[0057] The rubber balls of the present application flow out along with the water flow entering the ball storage tank 52 and then enter the hose 53 together with the water flow, so that the rubber balls can be transported with good continuity and cleaning can be completed without stopping the machine. The whole structure and operation are very simple.

[0058] In a conventional structure, a plurality of heat exchange tubes 11 are arranged at intervals, and a support plate is provided at the end of the heat exchange tube 11 . The track 61 can be provided on the support plate near the inlet of the heat exchange tube 11 .

[0059] In some embodiments,

[0060] The moving member is coupled to the track 61 via a gear structure, and the moving member can perform reciprocating motion on the track 61 .

[0061] A variety of coordinated movement modes can be adopted between the moving part and the track 61. The present application adopts a gear structure for coupling, which can ensure the displacement of the moving part, and the moving part can perform reciprocating motion, and can guide the rubber ball into the heat exchange tube 11 in two moving directions, with good operating effect and high cleaning efficiency.

[0062] In some embodiments,

[0063] The moving part includes a tracking trolley 62 , and the outlet end of the hose 53 is fixed on the tracking trolley 62 ; the tracking trolley 62 is also provided with a counter for recording the number of the rubber balls flowing out of the hose 53 .

[0064] The tracking trolley 62 is a small robot that can automatically run along a preset track. The moving part of the present application adopts the tracking trolley 62, and the outlet end of the hose 53 is fixed on the tracking trolley 62. The movement of the tracking trolley 62 on the track 61 is used to introduce the rubber balls into each heat exchange tube 11; in particular, a counter is set on the tracking trolley 62 to ensure the equality of the number of rubber balls entering each heat exchange tube 11, so as to achieve better uniformity of cleaning.

[0065] The tracking trolley 62 moves along the track 61 from the starting point to the end point, and then returns along the track 61 after reaching the end point (the end point becomes the starting point, and the starting point becomes the end point), and the cycle continues. Since most of the heat exchange tubes 11 are arranged in rows and layers, the lateral and longitudinal distances between the heat exchange tubes 11 are constant. After the distance parameter is set in advance for the tracking trolley 62, the tracking trolley 62 stops after each travel distance from the starting point (the control system calculates the travel distance by controlling the number of optional circles of the trolley stepper motor and the circumference of the wheel). At this time, the ball delivery hose 53 is facing the heat exchange tube 11, and the valve of the hose 53 opens to allow the rubber ball to enter the heat exchange tube 11. After the counter counts and passes the preset parameter B (parameter B can be preset in advance) rubber balls, the valve closes, completing the ball delivery operation of one heat exchange tube 11. The ball delivery operations of the subsequent heat exchange tubes 11 are completed in sequence.

[0066] In some embodiments,

[0067] The heat exchange tube cleaning assembly further includes a ball collecting mechanism 5, which is connected to the outlet of the heat exchange tube 11 to filter and collect the rubber balls.

[0068] The rubber balls after cleaning the inner wall of the heat exchanger are collected by the ball collecting mechanism 5 to avoid waste; since the rubber balls pass through the heat exchange tube 11 together with the water flow, the ball collecting mechanism 5 filters out the water at the outlet of the heat exchange tube 11 to obtain the rubber balls, which is simple and convenient.

[0069] The ball collecting mechanism 5 can be a filter screen or the like, the aperture of which is smaller than the diameter of the rubber balls, and can intercept and collect the rubber balls in the water flow.

[0070] In some embodiments,

[0071] The ball storage tank 52 is provided with a ball inlet, and the ball collecting mechanism 5 is connected to the ball inlet to deliver the collected rubber balls to the ball storage tank 52 .

[0072] The rubber balls collected by the ball collecting mechanism 5 can be reused. A ball inlet is directly provided on the ball storage tank 52. The ball collecting mechanism 5 is connected to the ball inlet through a pipeline. The rubber balls enter the ball storage tank 52 through the pipeline and are put into the cleaning operation again.

[0073] According to another aspect of the present application, a condenser is provided, comprising the heat exchange tube cleaning assembly as described above.

[0074] The condenser uses the above-mentioned heat exchange tube cleaning assembly, which can effectively clean the inner wall of the heat exchange tube 11 in the condenser.

[0075] In some embodiments,

[0076] The condenser further comprises a tube shell 1 and an end cover 2 , wherein the end cover 2 covers the end of the tube shell 1 ; the heat exchange tube 11 is arranged in the tube shell 1 ; the end cover 2 is provided with a water inlet pipe 4 , and the ball storage tank 52 is arranged in the water inlet pipe 4 .

[0077] A heat exchange tube 11 is arranged in the tube shell 1 of the condenser, and the extension direction of the heat exchange tube 11 is the same as the axial direction of the tube shell 1, so that a water inlet pipe 4 is arranged on the end cover 2 at one end of the tube shell 1 to realize water-cooled heat exchange and cooling; at this time, the ball storage tank 52 is arranged in the water inlet pipe 4, and the corresponding water flow will enter the ball storage tank 52 through the ball storage tank inlet 51, and be discharged from the outlet of the ball storage tank 52 with the rubber balls, and then be guided to the heat exchange tube 11 through the hose 53; this operation can be cleaned online without affecting the normal use of the condenser.

[0078] However, the existing cleaning device, since a large number of rubber balls are added into the heat exchange tube 11 at one time, more rubber balls will enter the heat exchange tube 11, which will cause a significant decrease in water flow and affect the heat exchange effect. As a result, when the existing cleaning device is working, the air conditioner host will be unloaded or the cleaning operation can only be performed when the air conditioner host is shut down.

[0079] The speed of injecting the rubber balls into the heat exchange tubes 11 of the present application can be regulated by the tracking trolley 62, which can ensure that some heat exchange tubes 11 have rubber balls for cleaning, while the remaining heat exchange tubes 11 do not have cleaning rubber balls, thereby achieving normal heat exchange.

[0080] In some embodiments,

[0081] The heat exchange tube 11 is configured as a U-shaped tube, and its outlet and inlet are located at the same end of the tube shell 1; a drain pipe 3 is also provided on the end cover 2. When the heat exchange tube cleaning assembly includes a ball collecting mechanism 5, the ball collecting mechanism 5 is connected between the drain pipe 3 and the water inlet pipe 4.

[0082] The heat exchange tube 11 adopts a U-shaped tube, so that the water inlet pipe 4 and the drain pipe 3 can be set on the same end cover 2, which is convenient to set up and has a compact structure; the corresponding ball collecting mechanism 5 is also arranged at this end, connected between the drain pipe 3 and the water inlet pipe 4, forming an end cover 2 type online cleaning device.

[0083] For the structure in which the water inlet pipe 4 and the drain pipe 3 are arranged on the same end cover 2, a partition is arranged between the end cover 2 and the end face of the heat exchange tube 11, forming a water inlet cavity and a drain cavity isolated from each other, the water inlet cavity is connected to the inlet of all the heat exchange tubes 11, and the drain cavity is connected to the outlet of the heat exchange tube 11. The cooling water injected into the water inlet 41 is diverted to the inlet of each heat exchange tube 11 through the water inlet pipe 4 and the water inlet cavity to achieve the condensation of the refrigerant; the water flowing out of the outlet of the heat exchange tube 11 flows to the drain port 31 through the drain cavity and the drain pipe 3, wherein the ball collecting mechanism 5 collects the rubber balls in the water flow by filtering.

[0084] Correspondingly, the track 61 is also arranged in the water inlet cavity, especially on the plate body supporting the heat exchange tubes 11 along the way that can reach the entrances of all heat exchange tubes 11, so as to ensure that the moving part can arrive smoothly with the hose 53 to complete the input of the rubber ball. Figure 1 The heat exchange tubes 11 are arranged in rows and layers, and the rails 61 are arranged in an S shape.

[0085] In some embodiments,

[0086] The water inlet pipe 4 and the drain pipe 3 are both provided with water quality detectors to detect the quality of water entering and flowing out of the heat exchange tube 11 respectively.

[0087] The existing rubber ball cleaning device is also unable to judge whether the heat exchange tube 11 has been cleaned, and often requires human experience to judge, which may be inaccurate, resulting in problems such as incomplete cleaning or excessive cleaning.

[0088] The present application installs a water quality detector on each of the water inlet pipe 4 and the drain pipe 3 to judge whether the water is clean by judging the water quality. In particular, each heat exchange tube 11 will be cleaned by a rubber ball, so that the water quality detection method makes the judgment result more accurate and effective.

[0089] After the cleaning operation begins, the water quality detector starts to detect the water quality. When the water quality on both sides of the inlet and outlet is detected to be basically the same for two consecutive minutes, it is considered that the cleaning effect of the heat exchange tube 11 is good and the cleaning operation can be stopped.

[0090] According to another aspect of the present application, there is provided a method for cleaning the condenser as described above, comprising:

[0091] The number of the rubber balls entering each of the heat exchange tubes 11 is regulated according to a preset value;

[0092] After the rubber balls are injected into one heat exchange tube 11 , the moving member moves to the inlet of the next heat exchange tube 11 , so that the rubber balls can enter the next heat exchange tube 11 from the outlet of the hose 53 .

[0093] The residual impurities on the inner wall of the heat exchange tube 11 are different in different parts of the heat exchange tube 11, which can be obtained based on usage experience. During the rubber ball cleaning process, the number of rubber balls entering different heat exchange tubes 11 can be set to perform targeted cleaning. For example, for heat exchange tubes 11 that are prone to impurities deposited on the inner wall, the number of rubber balls entering should be larger, while for others, less.

[0094] After the corresponding number of rubber balls are injected into one heat exchange tube 11 , the moving part drives the hose 53 to move to the inlet of the next heat exchange tube 11 , so that the rubber balls flowing out of the outlet of the hose 53 can enter and clean another heat exchange tube 11 .

[0095] This method can ensure that the rubber balls enter the pipeline in an orderly and controllable manner for cleaning, ensure the consistency of the cleaning effects of different pipelines, solve a major drawback of all current cleaning devices, and greatly improve the cleaning effect of the cleaning device. Secondly, since the present application realizes the precise controllability of the rubber balls, it ensures that the number of rubber balls entering the pipeline is controllable, which brings another benefit: it avoids the increase of fluid resistance in the pipeline caused by a large number of rubber balls of the traditional cleaning device entering the pipeline at one time, resulting in load shedding or shutdown of the equipment.

[0096] In some embodiments,

[0097] Check the water quality of the drain pipe 3 and the water inlet pipe 4 of the condenser, and compare the water quality difference between the two places with the set value;

[0098] If there is a difference, repeat the cleaning and testing of the water quality at both locations;

[0099] If there is no difference, the cleaning will end after the preset cleaning time.

[0100] Whether the cleaning is clean or not is determined by comparing the difference between the inlet water quality detector 42 and the outlet water quality detector 32 with the set value. If there is a difference, it means that the impurities in the heat exchange tube 11 have not been cleaned out, and it is necessary to continue cleaning and perform water quality testing at the same time. If there is no difference, it means that the cleaning is basically clean, and the cleaning can be stopped after the preset cleaning time.

[0101] According to another aspect of the present application, a central air-conditioning unit is provided, comprising the heat exchange tube cleaning assembly as described above, the condenser as described above, or a condenser operated according to the cleaning method as described above.

[0102] In the central air conditioning unit of the present application, the heat exchange tube cleaning assembly is used, so that the cleaning rubber ball can enter the heat exchange tube 11 in a planned manner, and the ball can be thrown accurately, so as to ensure that each heat exchange tube 11 can obtain a good cleaning effect, and avoid the situation that the heat exchange tube 11 is missed and affects the overall cleaning effect. While the cleaning operation is being carried out, the host does not stop or reduce the load.

[0103] It is easy for those skilled in the art to understand that the above-mentioned implementation modes can be freely combined and superimposed without conflict.

[0104] The above is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present application shall be included in the protection scope of the present application. The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and variations can be made without departing from the technical principles of the present application, and these improvements and variations should also be regarded as the protection scope of the present application.

Claims

1. A heat exchange tube cleaning assembly, characterized in that: include: The ball storage tank (52) stores the rubber balls; the ball storage tank (52) is provided with an inlet and an outlet, and water injected into the inlet flows out from the outlet carrying the rubber balls; A track assembly comprises a track (61) and a moving part that are movably matched; the track (61) is arranged at one end of a heat exchange tube (11), and the outlet is connected to the moving part via a hose (53), so that the outlet of the hose (53) can be movably connected to an inlet of the heat exchange tube (11).

2. The heat exchange tube cleaning assembly according to claim 1, characterized in that: The moving part is coupled to the track (61) via a gear structure, and the moving part can perform reciprocating motion on the track (61).

3. The heat exchange tube cleaning assembly according to any one of claims 1 to 2, characterized in that: The moving part comprises a tracing trolley (62), and the outlet end of the hose (53) is fixed on the tracing trolley (62); the tracing trolley (62) is also provided with a counter for recording the number of the rubber balls flowing out of the hose (53).

4. The heat exchange tube cleaning assembly according to claim 1, characterized in that: The heat exchange tube cleaning assembly also includes a ball collecting mechanism (5), wherein the ball collecting mechanism (5) is connected to the outlet of the heat exchange tube (11) and filters and collects the rubber balls.

5. The heat exchange tube cleaning assembly according to claim 4, characterized in that: The ball storage tank (52) is provided with a ball inlet, and the ball collecting mechanism (5) is connected to the ball inlet to deliver the collected rubber balls to the ball storage tank (52).

6. A condenser, characterized in that: It comprises a heat exchange tube cleaning assembly as described in any one of claims 1 to 5.

7. The condenser according to claim 6, characterized in that: The condenser further comprises a tube shell (1) and an end cover (2), wherein the end cover (2) covers the end of the tube shell (1); the heat exchange tube (11) is arranged in the tube shell (1); the end cover (2) is provided with a water inlet pipe (4), and the spherical storage tank (52) is arranged in the water inlet pipe (4).

8. The condenser according to claim 7, characterized in that: The heat exchange tube (11) is configured as a U-shaped tube, the outlet and the inlet of which are located at the same end of the tube shell (1); the end cover (2) is also provided with a drain pipe (3); when the heat exchange tube cleaning assembly includes a ball collecting mechanism (5), the ball collecting mechanism (5) is connected between the drain pipe (3) and the water inlet pipe (4).

9. The condenser according to claim 8, characterized in that: The water inlet pipe (4) and the drain pipe (3) are both provided with water quality detectors for respectively detecting the quality of water entering and flowing out of the heat exchange tube (11).

10. A method for cleaning a condenser according to any one of claims 6 to 9, characterized in that: include: The number of the rubber balls entering each heat exchange tube (11) is regulated according to a preset value; After the rubber ball is injected into one heat exchange tube (11), the moving part moves to the inlet of the next heat exchange tube (11), so that the rubber ball can enter the next heat exchange tube (11) from the outlet of the hose (53).

11. The cleaning method according to claim 10, characterized in that: Detecting the water quality of the drain pipe (3) and the water inlet pipe (4) of the condenser, and comparing the water quality difference between the two places with the set value; If there is a difference, repeat the cleaning and testing of the water quality at both locations; If there is no difference, the cleaning will end after the preset cleaning time.

12. A central air conditioning unit, characterized in that: It comprises a heat exchange tube cleaning assembly as described in any one of claims 1 to 5, a condenser as described in any one of claims 6 to 9, or a condenser operated according to the cleaning method as described in claims 10 to 11.