Configuration determination method and device of bridge temporary structure and electronic equipment

By calculating the length and internal force expression of component units and optimizing the topological structure, the problem of difficulty in quickly building and stability of temporary bridge structure design in the prior art is solved, and a low-cost and stable temporary structural design is achieved.

CN118940360AActive Publication Date: 2024-11-12CHINA RAILWAY 19 BUREAU GRP CO LTD

Patent Information

Application Number
CN202410942763.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-12
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

The prior art cannot design a stable temporary bridge structure quickly and at low cost, and it is difficult to meet the rapid construction, stability and economic needs of temporary structures.

Method used

By obtaining component unit information and connection relationship information, establishing the length and internal force expression of component unit, calculating the configuration evaluation function, and optimizing the topological structure using partial differential derivative to determine the configuration of the temporary structure of the bridge.

Benefits of technology

It has achieved efficient and low-cost stable temporary structural design solutions, meeting the requirements of rapid construction and economicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940360A_ABST
    Figure CN118940360A_ABST
Patent Text Reader

Abstract

The invention provides a configuration determination method and device for a bridge temporary structure and electronic equipment, and relates to the technical field of bridge design. The configuration determination method of the bridge temporary structure comprises the steps of obtaining component unit information of a target temporary structure and connection relation information between component units; obtaining a length expression and an internal force expression of each component unit of the target temporary structure according to the component unit information and the connection relation information between the component units; obtaining a configuration evaluation function of the target temporary structure according to the product of the length expression and the internal force expression of each component unit and the weight coefficient distributed for each component unit; utilizing partial differential derivation operation to obtain an optimized topological structure of the target temporary structure according to the configuration evaluation function of the target temporary structure; and determining the configuration of the target temporary structure according to the optimized topological structure of the target temporary structure. According to the method, a stable temporary structure design scheme can be efficiently obtained with low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge design, and in particular to a method, device and electronic equipment for determining the configuration of a temporary bridge structure. Background Art

[0002] The key to temporary structure design is to design the force transmission path that meets the functional requirements, which involves material selection, configuration selection, various internal proportional relationships related to force, local and overall stability analysis of the structure, nonlinear analysis of structure and materials, etc. An excellent structural design lies in grasping the material properties and finding a structural shape that matches the material properties. Whether the structural force is reasonable or not depends on the formulation of the configuration and proportional relationship.

[0003] In the related technology, there are many methods for formulating configurations, such as analogy, reference to natural selection (minimum energy principle), etc., to obtain a stable temporary structure design scheme, which requires a long period of time. In the design of temporary structures, since the structure usually needs to be built in a short time and bear a certain load, the related technology cannot meet the requirements of rapid construction, stability and economy of temporary structures.

[0004] Therefore, how to obtain a stable temporary structure design solution efficiently and at low cost is a technical problem that needs to be solved urgently. Summary of the invention

[0005] In view of the problems existing in the prior art, the present invention provides a method, device and electronic equipment for determining the configuration of a temporary bridge structure, so as to obtain a stable temporary structure design scheme efficiently and at low cost.

[0006] The present invention provides a method for determining the configuration of a temporary bridge structure, comprising the following steps.

[0007] Obtain component unit information of a target temporary structure and connection relationship information between component units; obtain length expressions and internal force expressions of each component unit of the target temporary structure based on the component unit information and connection relationship information between the component units; obtain a configuration evaluation function of the target temporary structure based on the product of the length expression and the internal force expression of each component unit and a weight coefficient assigned to each component unit; obtain an optimized topological structure of the target temporary structure based on the configuration evaluation function of the target temporary structure using a partial differential derivation operation; and determine the configuration of the target temporary structure based on the optimized topological structure of the target temporary structure.

[0008] According to a configuration determination method for a temporary structure of a bridge provided by the present invention, the target temporary structure is a seven-rod diamond hanging basket, and the component units of the target temporary structure include multiple compression rods and multiple tension rods; the length expression and internal force expression of each component unit of the target temporary structure are obtained based on the component unit information and the connection relationship information between the component units, including: taking the length of the tension rod of the seven-rod diamond hanging basket as the zero rod, the first vertical distance, the second vertical distance and the third vertical distance as variables, respectively establishing the length expressions of each compression rod and each tension rod; wherein the first vertical distance is the vertical distance between the vertex of the seven-rod diamond hanging basket located on the first side and the zero rod, The second vertical distance is the vertical distance between the vertex of the seven-rod diamond hanging basket located on the second side and the zero rod, and the third vertical distance is the vertical distance between the vertex of the seven-rod diamond hanging basket located in the middle position and the zero rod; according to the force transmission path of the seven-rod diamond hanging basket, according to the connection relationship information between each compression rod and each tension rod, the node load borne by the seven-rod diamond hanging basket is statically decomposed to obtain the internal force expression of each compression rod and each tension rod; according to the product between the length expression and the internal force expression of each component unit, and the weight coefficient assigned to each component unit, the configuration evaluation function of the target temporary structure is obtained, including: according to the weight coefficient assigned to each tension rod and the compression rod The weight coefficient of each compression rod and tension rod is weighted and summed for the product of the length expression and the internal force expression to obtain the configuration evaluation function; wherein the weight coefficient of the tension rod is 1, and the weight coefficient of the compression rod is the inverse of the stability coefficient of the compression rod; the partial differential derivation operation is used to obtain the optimized topological structure of the target temporary structure according to the configuration evaluation function of the target temporary structure, including: taking the first vertical distance and the second vertical distance as optimization variables, performing partial differential derivation operation on the configuration evaluation function, and obtaining the length ratio relationship between the first vertical distance and the second vertical distance and the third vertical distance respectively; using the third vertical distance The first vertical variable, the second vertical variable and the third vertical variable are eliminated from the configuration evaluation function to obtain an optimized configuration evaluation function using the first horizontal distance and the proportional coefficient as optimization variables; wherein the first distance is a preset value of the horizontal distance between the force point of the node load and the zero rod; the first horizontal distance and the proportional coefficient are respectively used as optimization variables, and partial differential operations are performed on the optimized configuration evaluation function to obtain the optimized topological structure of the seven-rod rhombus hanging basket;The optimized topological structure of the seven-rod diamond hanging basket is represented by an expression based on the relationship between the first vertical distance, the second vertical distance, the third vertical distance, the first horizontal distance and the stability coefficient of the compression rod. ;

[0009] According to a configuration determination method for a temporary structure of a bridge provided by the present invention, the target temporary structure is a triangular bracket, and the component units of the target temporary structure include: a compression rod and a tension rod; the length expression and the internal force expression of each component unit of the target temporary structure are obtained based on the component unit information and the connection relationship information between the component units, including: taking the length of the tension rod as the first variable, and the proportional relationship between the projected length of the compression rod on the installation plane and the length of the tension rod as the second variable, to establish the length expression of the compression rod; according to the force transmission path of the triangular bracket, according to the proportional relationship between the length of the compression rod and the length of the tension rod, each of which has a projected length of the compression rod on the installation plane, the node load borne by the triangular bracket is statically decomposed to obtain the internal force expression of the tension rod and the internal force expression of the compression rod; the product between the length expression and the internal force expression of each component unit, and the weight coefficient assigned to each component unit , obtaining the configuration evaluation function of the target temporary structure, including: according to the weight coefficients assigned to the tie rod and the compression rod, performing weighted summation on the products of the length expressions and the internal force expressions of the compression rod and the tie rod to obtain the configuration evaluation function; wherein, the weight coefficient of the tie rod is 1, and the weight coefficient of the compression rod is the inverse of the stability coefficient of the compression rod; the using partial differential derivation operation, according to the configuration evaluation function of the target temporary structure, obtaining the optimized topological structure of the target temporary structure, including: taking the proportional relationship between the length of the tie rod and the projection distance of the compression rod on the installation plane as the optimization variable, performing partial differential derivation operation on the configuration evaluation function, and obtaining the optimized topological structure of the triangular bracket; wherein, the optimized topological structure of the triangular bracket uses the proportional relationship between the length of the tie rod and the projection length of the compression rod on the installation plane as the dependent variable, and the stability coefficient of the compression rod as the independent variable expression to represent the optimized topological structure of the triangular bracket.

[0010] According to a configuration determination method for a temporary bridge structure provided by the present invention, the target temporary structure is a flat-chord triangular web truss; the component units of the target temporary structure include: a plurality of upper chords, a plurality of lower chords, and a plurality of webs; wherein the lengths of the upper chords and the lower chords are the same and equal to the truss inter-section distance; the length expression and internal force expression of each component unit of the target temporary structure are obtained according to the component unit information and the connection relationship information between the component units, including: taking the truss inter-section distance and the first proportional relationship as variables, establishing the length expression of the web; wherein the first proportional relationship is the proportional relationship between the truss height and the truss inter-section distance; According to the force transmission path of the flat-chord triangular web truss, the node load borne by the flat-chord triangular web truss is statically decomposed according to the truss node spacing, the first proportional relationship, and the number of nodes, to obtain the internal force expression of each web member, each upper chord member, and each lower chord member; wherein the internal force expression of each web member includes a first internal force expression when the number of nodes is an odd number, and a second internal force expression when the number of nodes is an even number; the configuration evaluation function of the target temporary structure is obtained according to the product between the length expression and the internal force expression of each component unit, and the weight coefficient assigned to each component unit, including: according to the weight coefficient assigned to each upper chord member, the internal force expression of each upper chord member is calculated. The weight coefficients assigned to the upper chord, lower chord and web members are used to perform weighted summation on the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression and the first internal force expression of each web to obtain a first configuration evaluation function; according to the weight coefficients assigned to each upper chord, lower chord and web member, the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression and the second internal force expression of each web are weighted summation on the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression and the second internal force expression of each web to obtain a second configuration evaluation function; wherein the weight coefficient of the lower chord is The number is 1, the weight coefficient of the upper chord is the reciprocal of its stability coefficient, and the weight coefficient of the web is the sum of the reciprocal of its stability coefficient and the number 1; the use of partial differential derivation operation to obtain the optimized topological structure of the target temporary structure according to the configuration evaluation function of the target temporary structure includes: taking the first proportional relationship as the optimization variable, and performing partial differential derivation operations on the first configuration evaluation function and the second configuration evaluation function respectively to obtain a first optimized topological structure and a second optimized topological structure; wherein the first optimized topological structure and the second optimized topological structure are both the height-span ratio of the flat-chord triangular web truss expressed by the proportional relationship between the first proportional relationship and the number of spans.

[0011] The present invention also provides a configuration determination device for a temporary bridge structure, comprising the following modules: a first acquisition module, used to acquire component unit information of a target temporary structure and connection relationship information between component units; a second acquisition module, used to obtain length expressions and internal force expressions of each component unit of the target temporary structure based on the component unit information and the connection relationship information between the component units; a third acquisition module, used to obtain a configuration evaluation function of the target temporary structure based on the product between the length expression and the internal force expression of each component unit and a weight coefficient assigned to each component unit; a fourth acquisition module, used to obtain an optimized topological structure of the target temporary structure based on the configuration evaluation function of the target temporary structure using a partial differential derivation operation; a determination module, used to determine the configuration of the target temporary structure based on the optimized topological structure of the target temporary structure.

[0012] The present invention also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method for determining the configuration of a temporary bridge structure as described above is implemented.

[0013] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the configuration determination method of a temporary bridge structure as described in any one of the above is implemented.

[0014] The present invention also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the method for determining the configuration of a temporary bridge structure as described above is implemented.

[0015] The configuration determination method, device and electronic device of the temporary structure of a bridge provided by the present invention utilize a class analysis method to obtain the length expression and internal force expression of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units; obtain the configuration evaluation function of the target temporary structure according to the product between the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit. Utilize the topology optimization method and the partial differential derivation operation, and according to the configuration evaluation function of the target temporary structure, the optimized topological structure of the target temporary structure can be obtained. When designing, it is only necessary to determine the dimensional parameters in the optimized topological structure of the target temporary structure to determine the configuration of the target temporary structure; import the configuration of the target temporary structure into the finite element analysis software and the drawing software to carry out the design of the temporary structure. Thus, a stable temporary structure design scheme is obtained efficiently and at low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a flow chart of the method for determining the configuration of a temporary bridge structure provided by the present invention.

[0018] Figure 2 It is a flow chart of a method for determining the configuration of a seven-rod diamond hanging basket provided by the present invention.

[0019] Figure 3 It is a schematic flow chart of the configuration determination method of the triangular bracket provided by the present invention.

[0020] Figure 4 It is a schematic flow chart of the configuration determination method of the flat-chord triangular web truss provided by the present invention.

[0021] Figure 5 It is a simplified schematic diagram of the calculation of the seven-rod diamond hanging basket provided by the present invention.

[0022] Figure 6 It is a schematic diagram of the topological optimization results of the seven-rod diamond hanging basket provided by the present invention.

[0023] Figure 7 It is a schematic diagram of the configuration of the seven-rod diamond-shaped hanging basket provided by the present invention.

[0024] Figure 8 It is a schematic diagram of the plane structure of the triangular bracket provided by the present invention.

[0025] Fig. 9 It is a simplified schematic diagram of the calculation of the flat-chord triangular web truss provided by the present invention.

[0026] Fig.10 It is a schematic diagram of the variation trend of the height-to-span ratio of trusses with different numbers of spans provided by the present invention.

[0027] Fig.11 It is a schematic diagram of the configuration of multiple groups of flat-chord triangular web trusses provided by the present invention.

[0028] Fig.12 It is a structural schematic diagram of the configuration determination device of the temporary bridge structure provided by the present invention.

[0029] Fig.13 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Combine the following Figure 1-Figure 11 The configuration determination method of the temporary bridge structure of the present invention is described.

[0032] Figure 1 FIG. 1 is a flow chart of a method for determining a configuration of a temporary bridge structure provided by the present invention. Figure 1 As shown, the method includes the following: Step 101: Obtain component unit information of a target temporary structure and connection relationship information between component units.

[0033] The target temporary structure is a temporary bridge structure whose configuration needs to be determined.

[0034] Temporary bridge structures refer to temporary structures designed and built for the construction or maintenance of specific bridges. These structures are usually used to support various operations during the bridge construction process, such as concrete pouring, steel bar installation, etc., and are removed after the main bridge structure is completed.

[0035] Component units refer to parts or components used to form temporary bridge structures, such as tension rods, compression rods, etc.

[0036] In the specific implementation process, the component unit information may include the types (for example, beam units, truss units or cable units, etc.) and quantities of various component units constructing the target temporary structure, and the connection relationship information includes the connection sequence information between each component unit, and the angle information between two adjacent component units, etc.

[0037] Step 102: Obtain the length expression and internal force expression of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units.

[0038] In the specific implementation process, for different types of target temporary structures, the length expression and internal force expression of each component unit of the target temporary structure can be obtained in a variety of ways based on the component unit information and the connection relationship information between the component units, which is not limited to the description of this specification.

[0039] For example, the length of the component unit as a variable can be selected based on the connection order information between the component units and the angle information between two adjacent component units, and the length expression of each component unit can be obtained based on the length of the component unit as a variable. For a target temporary structure with a symmetrical structure, the symmetry of the structure can be used to reduce the length variables of the analysis.

[0040] For another example, the internal force expression of each component unit can be decomposed using the static method according to the connection sequence information between component units and the angle information between two adjacent component units and the force transmission path of the target temporary structure.

[0041] For multiple embodiments of obtaining the length expressions and internal force expressions of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units, see Figure 2 , Figure 3 as well as Figure 4 The relevant content in will not be repeated here.

[0042] Step 103: Obtain a configuration evaluation function of the target temporary structure according to the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit.

[0043] The configuration evaluation function can be used to count the material usage (or total value, etc.) of different force transmission paths. By performing partial differentiation on the configuration evaluation function, the topological structure of the optimal configuration of the target temporary structure can be obtained.

[0044] In the specific implementation process, a weight coefficient can be assigned to each component unit according to experimental results or construction experience. For example, for truss units and beam units, a weight coefficient can be assigned to the component unit according to the stability coefficient of the tension and compression rod; for cable units, a weight coefficient can be assigned to the component unit according to the value ratio.

[0045] For multiple embodiments of obtaining the configuration evaluation function of the target temporary structure based on the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit, see Figure 2 , Figure 3 as well as Figure 4 The relevant content will not be repeated here.

[0046] Step 104: using partial differential derivation operations, according to the configuration evaluation function of the target temporary structure, an optimized topological structure of the target temporary structure is obtained.

[0047] The configuration evaluation function will contain two parameters: dimensional parameters and type parameters. Dimensional parameters include design known quantities such as load size and the distance the load is transferred to the boundary. Type parameters include the configuration ratio of the load transfer path, which can be an angle ratio or a length ratio. Since the exponents of dimensional parameters are all 1, they can be separated by introducing a proportionality coefficient. Since configuration parameters are generally nonlinear, it may be very difficult to solve them directly. Partial differential operations can be used to find the configuration parameter values ​​that make the configuration evaluation function optimal.

[0048] In the specific implementation process, the optimized topological structure of the target temporary structure represented by the configuration parameters can be obtained by using partial differential derivation operations.

[0049] For multiple embodiments of using partial differential derivation operations to obtain the optimized topological structure of the target temporary structure according to the configuration evaluation function of the target temporary structure, see Figure 2 , Figure 3 as well as Figure 4 The relevant content will not be repeated here.

[0050] Step 105: Determine the configuration of the target temporary structure according to the optimized topological structure of the target temporary structure.

[0051] During the specific implementation process, the optimal configuration parameters that can achieve the construction purpose can be selected through the optimized topological structure of the target temporary structure, so that the configuration of the target temporary structure can be determined according to the optimal configuration parameters.

[0052] For multiple embodiments of determining the configuration of the target temporary structure according to the optimized topological structure of the target temporary structure, see Figure 2 , Figure 3 as well as Figure 4 The relevant content will not be repeated here.

[0053] Figure 2 is a flow chart of a method for determining a configuration of a seven-rod diamond hanging basket provided by the present invention. In this embodiment, the target temporary structure is a seven-rod diamond hanging basket, such as Figure 2 As shown, the method includes the following: Step 201, using the length of the pull rod of the seven-rod diamond hanging basket as the zero rod, the first vertical distance, the second vertical distance and the third vertical distance as variables, respectively establish the length expressions of each compression rod and each pull rod.

[0054] The component unit of the seven-rod diamond hanging basket includes a plurality of compression rods and a plurality of tension rods, such as Figure 5 As shown, the blue rod is the tension rod (rod ① is the zero rod) and the red rod is the compression rod.

[0055] like Figure 5As shown, the first vertical distance is the vertical distance H1 between the vertex of the seven-rod diamond hanging basket on the first side and the zero pole, the second vertical distance is the vertical distance H2 between the vertex of the seven-rod diamond hanging basket on the second side and the zero pole, and the third vertical distance is the vertical distance H between the vertex of the seven-rod diamond hanging basket in the middle position and the zero pole.

[0056] For example only, Figure 5 The seven-rod diamond hanging basket shown can be used according to the force transmission path of the seven-rod diamond hanging basket, with the length of the pull rod as the zero rod and the vertical distance between each vertex of the seven-rod diamond hanging basket and the zero rod as variables to establish the length expressions of each compression rod and each pull rod as shown below.

[0057] (1)

[0058] (2)

[0059] (3)

[0060] (4)

[0061] (5)

[0062] (6)

[0063] (7)

[0064] in, l is the length of the zero rod, l 0~ l 7 for Figure 5 The lengths of rods ① to ⑦ are shown.

[0065] Step 202: According to the force transmission path of the seven-rod diamond hanging basket and the connection relationship information between each compression rod and each tension rod, the node load borne by the seven-rod diamond hanging basket is statically decomposed to obtain the internal force expression of each compression rod and each tension rod.

[0066] For example only, Figure 5 The seven-bar diamond hanging basket shown can be used to perform static decomposition of the node load borne by the seven-bar diamond hanging basket according to the force transmission path of the seven-bar diamond hanging basket and the connection relationship information between each compression rod and each tension rod, and obtain the internal force expressions of each compression rod and each tension rod as shown below.

[0067] (8)

[0068] (9)

[0069] (10)

[0070] (11)

[0071] (12)

[0072] (13)

[0073] (14)

[0074] Where P is the node load, N 0~ N 7 for Figure 5 The internal forces of rods ① to ⑦ are shown.

[0075] Step 203: According to the weight coefficient assigned to each tension rod and compression rod, weighted sum is performed on the product between the length expression and the internal force expression of each compression rod and tension rod to obtain a configuration evaluation function.

[0076] In a specific implementation process, the weight coefficient of the tension rod can be set to 1, and the weight coefficient of the compression rod can be set to the inverse of the stability coefficient φ of the compression rod.

[0077] For example only, Figure 5 The seven-rod diamond hanging basket shown can be weightedly summed up the products of the length expression and the internal force expression of each compression rod and pull rod according to the weight coefficient assigned to each tension rod and compression rod, to obtain the first configuration evaluation function shown below.

[0078] (15)

[0079] Step 204: taking the first vertical distance and the second vertical distance as optimization variables, respectively, performing partial differential operation on the configuration evaluation function, and obtaining the length ratio relationship between the first vertical distance and the second vertical distance, respectively, and the third vertical distance.

[0080] For example only, Figure 5 The seven-rod diamond hanging basket shown can perform partial differential operations on the configuration evaluation function as shown below to obtain the length ratio relationship between the first vertical distance and the second vertical distance and the third vertical distance respectively.

[0081] (16)

[0082] (17)

[0083] According to (16) and formula (17), the length ratio between the first vertical distance and the third vertical distance can be obtained as follows: ; The length ratio between the second vertical distance and the third vertical distance is .

[0084] Step 205, using the proportionality coefficient between the third vertical distance and the first horizontal distance, and the length proportionality relationship between the first vertical distance and the second vertical distance, respectively, and the third vertical distance, eliminate the first vertical variable, the second vertical variable, and the third vertical variable from the configuration evaluation function to obtain an optimized configuration evaluation function using the first horizontal distance and the proportionality coefficient as optimization variables.

[0085] like Figure 5 As shown, the first distance is the preset value of the horizontal distance between the force point P of the node load and the zero rod. l 0.

[0086] As an example only, the length ratio relationship between the first vertical distance and the third vertical distance obtained by formula (16) can be: , and the length ratio between the second vertical distance and the third vertical distance obtained using formula (17) , into the configuration evaluation function shown in formula (15), and introduce the proportional coefficient between the third vertical distance and the first horizontal distance , the variables of the configuration evaluation function are reduced from seven to five, and the optimized configuration evaluation function shown below is obtained using the first horizontal distance and the proportional coefficient as the optimization variables.

[0087] (18)

[0088] Among them, P, l 0 is a known constant, is a variable, the rest are dependent variables, and the parameters to be optimized are l and k .

[0089] Step 206: Taking the first horizontal distance and the proportional coefficient as optimization variables, respectively, performing partial differential operation on the optimized configuration evaluation function, and obtaining the optimized topological structure of the seven-rod diamond hanging basket.

[0090] For example only, Figure 5 The seven-rod diamond hanging basket shown takes the first horizontal distance and the proportional coefficient as optimization variables, and performs partial differential operations on the optimized configuration evaluation function as shown below.

[0091] (19)

[0092] (20)

[0093] The optimized topological structure of the seven-rod diamond hanging basket is obtained as shown below, which is represented by an expression based on the relationship between the first vertical distance, the second vertical distance, the third vertical distance and the first horizontal distance and the stability coefficient of the compression rod.

[0094] (twenty one)

[0095] (twenty two)

[0096] (twenty three)

[0097] (twenty four)

[0098] Among them, the variable The value range of is 0~1, and the optimized topology result is as follows Figure 6 As shown in part (a), the vertices of the three compression rods are connected to a circle with a radius ranging from ~ , the anchor end of the hanging basket forms a 1 / 4 honeycomb structure. When the radius is used, the internal forces of all members except the zero bar are equal and equal to the node load. When using As the radius, except for the internal force in rod 7, which is equal to the node load Except for the load of the other bars, the load of the other bars is smaller than the node load. It is recommended that the hanging basket design should be based on The cross section and length of the rod are designed for the radius. When encountering heavy loads on the short section, the elevation angle of rod 7 can be increased to improve the carrying capacity of the hanging basket.

[0099] In the specific implementation process, the final structure of the seven-rod diamond hanging basket is as follows Figure 7 As shown, the dotted line indicates that the boom can be adjusted.

[0100] In some embodiments, when a five-rod structure hanging basket is used, the topology optimization result obtained by using the embodiment of the present invention is as follows: Figure 6 As shown in part (b) of the figure, the rear anchor length of the basket is greater than that of the seven-rod basket, and the internal force of the rods is greater than that of the seven-rod basket.

[0101] Figure 3 is a flow chart of the method for determining the configuration of a triangular bracket provided by the present invention. In this embodiment, the target temporary structure is a triangular bracket, and the component units of the target temporary structure include: a compression rod and a tension rod, such as Figure 3 As shown, the method includes the following: Step 301: Taking the length of the pull rod as the first variable and the proportional relationship between the projection length of the compression rod on the installation plane and the length of the pull rod as the second variable, an expression for the length of the compression rod is established.

[0102] As a common form of aerial support, triangular brackets are often used in construction sites such as the zero block of cast-in-place bridges, straight sections of high pier side spans, cable tower beams, cable hanging platforms, and large cantilever cap beams. Triangular brackets are also commonly used in aerial platforms such as tower cranes, elevators, and walkways.

[0103] like Figure 8 The triangular bracket shown has a tie rod (blue) length A, a compression rod (red) length C, a projection length of the triangular bracket on the mounting plane B, and a node load P on the triangular bracket. The proportional relationship between the projection length of the compression rod on the mounting plane and the length of the tie rod is as follows: (25)

[0104] For example only, Figure 8 For the triangular bracket shown, establish the expression for the length of the strut as shown below.

[0105] (26)

[0106] Step 302: According to the force transmission path of the triangular bracket, based on the proportional relationship between the length of the compression rod and the length of the tension rod and the projection length of the compression rod on the installation plane, the node load borne by the triangular bracket is statically decomposed to obtain the internal force expression of the tension rod and the internal force expression of the compression rod.

[0107] For example only, Figure 8 For the triangular bracket shown, establish the internal force expressions of the tension rod and the compression rod as shown below.

[0108] (27)

[0109] (28)

[0110] Step 303: According to the weight coefficients assigned to the tension rods and compression rods, weighted sum is performed on the products of the length expressions and the internal force expressions of the compression rods and tension rods to obtain a configuration evaluation function.

[0111] In a specific implementation process, the weight coefficient of the tension rod may be set to 1, and the weight coefficient of the compression rod may be set to the inverse of the stability coefficient of the compression rod.

[0112] For example only, Figure 8 For the triangular bracket shown, establish the configuration evaluation function as shown below.

[0113] (29)

[0114] Step 304: taking the proportional relationship between the length of the pull rod and the projection distance of the pressure rod on the installation plane as the optimization variable, performing partial differential operation on the configuration evaluation function to obtain the optimized topological structure of the triangular bracket.

[0115] For example only, Figure 8 For the triangular bracket shown in FIG. 1 , the configuration evaluation function is subjected to partial differential operation as shown below to obtain the optimized topological structure of the triangular bracket.

[0116] (30)

[0117] The optimized topological structure of the triangular bracket is represented by an expression in which the proportional relationship between the length of the pull rod and the projection length of the pressure rod on the installation plane is used as the dependent variable and the stability coefficient of the pressure rod is used as the independent variable.

[0118] Figure 4 1 is a flow chart of a method for determining a configuration of a flat-chord triangular web truss provided by the present invention. In this embodiment, the target temporary structure is a flat-chord triangular web truss.

[0119] A truss is a structure made of rods connected to each other at both ends with hinges. A truss is a plane or space structure composed of straight rods, generally with triangular units. Truss rods mainly bear axial tension or pressure, so that the strength of the material can be fully utilized. When the span is large, it can save materials, reduce deadweight and increase rigidity compared to solid beams.

[0120] The truss is composed of an upper chord, a lower chord, and a web. The web can be divided into diagonal webs and straight webs. Since the rods themselves are relatively slender, although the connection between the rods may be fixed, the actual bending moment at the rod ends is generally very small. Therefore, it can be simplified to a hinged connection during design analysis. When simplifying the calculation, the rods are all two-force rods, bearing pressure or tension.

[0121] The out-of-plane stiffness of a single-frame truss is relatively weak, so supports are required outside the plane. When designing a truss, the out-of-plane is generally designed as a truss to form a whole with good stiffness in both directions. The chord of the truss is subjected to a relatively large force in the mid-span part and gradually decreases toward the support direction; while the force on the web is mainly greatest near the support, and the force on the web is relatively small in the mid-span part, and there is even a theoretical zero bar.

[0122] like Figure 4 As shown in FIG. 1 , the configuration determination method of the flat-chord triangular web truss includes the following: Step 401: Establish a length expression of the web member using the truss node spacing and the first proportional relationship as variables.

[0123] The component unit of the flat-chord triangular web truss includes: a plurality of upper chords, a plurality of lower chords, and a plurality of webs; wherein the lengths of the upper chords and the lower chords are the same and equal to the truss node spacing.

[0124] like Fig. 9 As shown in the figure, the number of lower chords of the flat chord triangular web truss is n, the number of upper chords is n-1, the number of webs is 2n, and the truss pitch is , truss height , diagonal rod length The first proportional relationship is the proportional relationship between the truss height and the truss interval: (31)

[0125] In the specific implementation process, the symmetry of the flat-chord triangular web truss is used to analyze the 1 / 2 span and obtain the main parameters. At the same time, the entire flat-chord triangular web truss is analyzed according to the difference between odd spans and even spans.

[0126] For example only, Fig. 9 For the flat-chord triangular web truss shown, the length expression of the web member is established as shown below, taking the truss node spacing and the first proportional relationship as variables.

[0127] (32)

[0128] Step 402: According to the force transmission path of the flat-chord triangular web truss, the node load borne by the flat-chord triangular web truss is statically decomposed according to the truss node spacing, the first proportional relationship, and the number of nodes, to obtain the internal force expression of each web member, each upper chord member, and each lower chord member.

[0129] For example only, Fig. 9 The flat chord triangular web truss shown in the figure can be expressed as follows: , the internal force expression of each lower chord is , and the first internal force expression of each web when the number of internodes is an odd number: Substituting formula (38) into formula (35) yields , and the second internal force expression when the number of internodes is even: Substituting formula (39) into formula (35) yields .

[0130] (33)

[0131] (34)

[0132] (35)

[0133] (36)

[0134] (37)

[0135] (38)

[0136] (39)

[0137] Step 403: Based on the weight coefficients assigned to each upper chord, lower chord, and web member, weighted sum is performed on the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression of each web member and the first internal force expression to obtain a first configuration evaluation function.

[0138] In a specific implementation, the weight coefficient of the upper chord member can be set to the inverse of the stability coefficient of the upper chord member, the weight coefficient of the lower chord member can be set to 1, and the weight coefficient of the web member can be set to the sum of the inverse of the stability coefficient of the web member and 1. Fig. 9 The flat-chord triangular web truss shown can construct the first configuration evaluation function when the number of nodes is an odd number as shown below.

[0139] (40)

[0140] Step 404: Based on the weight coefficients assigned to each upper chord, lower chord, and web member, weighted sum is performed on the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression and the second internal force expression of each web member to obtain a second configuration evaluation function.

[0141] In a specific implementation, the weight coefficient of the upper chord member can be set to the inverse of the stability coefficient of the upper chord member, the weight coefficient of the lower chord member can be set to 1, and the weight coefficient of the web member can be set to the sum of the inverse of the stability coefficient of the web member and 1. Fig. 9 The flat-chord triangular web truss shown can be constructed to obtain the second configuration evaluation function when the number of nodes is even as shown below.

[0142] (41)

[0143] Step 405: Using the first proportional relationship as an optimization variable, performing partial differential operations on the first configuration evaluation function and the second configuration evaluation function, respectively, to obtain a first optimized topological structure and a second optimized topological structure.

[0144] For example only, Fig. 9 The flat-chord triangular web truss shown can perform the following partial differential operations on the first configuration evaluation function and the second configuration evaluation function respectively to obtain the first optimized topological structure and the second optimized topological structure.

[0145] (42)

[0146] (43)

[0147] The first optimized topology and the second optimized topology are both the height-to-span ratios of the flat-chord triangular web trusses expressed using the proportional relationship between the first proportional relationship and the number of spans as shown below.

[0148] (44)

[0149] Fig.10 The trend diagram of the height-to-span ratio of the flat-chord triangular web truss with different numbers of spans is shown. Fig.11 The schematic diagram of multiple groups of parallel-chord triangular web truss structures obtained according to formula (44) is shown, among which structural types 2 to 6 are suitable as loose-member trusses, and structural types 7 to 13 are suitable as segment-assembled trusses.

[0150] The following is a description of the configuration determination device for the temporary bridge structure provided by the present invention. The configuration determination device for the temporary bridge structure described below and the configuration determination method for the temporary bridge structure described above can correspond to each other.

[0151] Fig.12 : is a schematic diagram of the structure of the device for determining the configuration of the temporary bridge structure provided by the present invention, such as Fig.12 As shown, the device includes the following modules.

[0152] The first acquisition module 1210 is used to acquire component unit information of the target temporary structure and connection relationship information between component units.

[0153] The second acquisition module 1220 is used to obtain the length expression and internal force expression of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units.

[0154] The third acquisition module 1230 is used to obtain the configuration evaluation function of the target temporary structure according to the product between the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit.

[0155] The fourth acquisition module 1240 is used to obtain the optimized topological structure of the target temporary structure according to the configuration evaluation function of the target temporary structure by using partial differential derivation operation.

[0156] The determination module 1250 is used to determine the configuration of the target temporary structure according to the optimized topological structure of the target temporary structure.

[0157] Fig.13 An example of a physical structure diagram of an electronic device is shown in FIG. Fig.13 As shown, the electronic device may include: a processor 1310, a communication interface 1320, a memory 1330 and a communication bus 1340, wherein the processor 1310, the communication interface 1320 and the memory 1330 communicate with each other through the communication bus 1340. The processor 1310 may call the logic instructions in the memory 1330 to execute the configuration determination method of the bridge temporary structure, the method comprising: obtaining the component unit information of the target temporary structure and the connection relationship information between the component units; obtaining the length expression and the internal force expression of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units; obtaining the configuration evaluation function of the target temporary structure according to the product between the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit; obtaining the optimized topological structure of the target temporary structure according to the configuration evaluation function of the target temporary structure by using partial differential derivation operation; determining the configuration of the target temporary structure according to the optimized topological structure of the target temporary structure.

[0158] In addition, the logic instructions in the above-mentioned memory 1330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0159] On the other hand, the present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the configuration determination method of the temporary bridge structure provided by the above-mentioned methods, which includes: obtaining component unit information of the target temporary structure and connection relationship information between component units; obtaining length expressions and internal force expressions of each component unit of the target temporary structure based on the component unit information and the connection relationship information between the component units; obtaining a configuration evaluation function of the target temporary structure based on the product between the length expression and the internal force expression of each component unit, and a weight coefficient assigned to each component unit; obtaining an optimized topological structure of the target temporary structure based on the configuration evaluation function of the target temporary structure using partial differential derivation operations; and determining the configuration of the target temporary structure based on the optimized topological structure of the target temporary structure.

[0160] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the configuration determination method of a temporary bridge structure provided by the above-mentioned methods, the method comprising: obtaining component unit information of a target temporary structure and connection relationship information between component units; obtaining length expressions and internal force expressions of each component unit of the target temporary structure based on the component unit information and connection relationship information between the component units; obtaining a configuration evaluation function of the target temporary structure based on the product of the length expression and the internal force expression of each component unit and a weight coefficient assigned to each component unit; obtaining an optimized topological structure of the target temporary structure based on the configuration evaluation function of the target temporary structure using partial differential operations; and determining the configuration of the target temporary structure based on the optimized topological structure of the target temporary structure.

[0161] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0162] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0163] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for determining the configuration of a temporary bridge structure, characterized in that: include: Obtaining component unit information of the target temporary structure and connection relationship information between the component units; Obtaining length expressions and internal force expressions of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units; Obtaining a configuration evaluation function of the target temporary structure according to the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit; Obtaining an optimized topological structure of the target temporary structure according to a configuration evaluation function of the target temporary structure by using a partial differential derivation operation; The configuration of the target temporary structure is determined according to the optimized topological structure of the target temporary structure.

2. The method for determining the configuration of a temporary bridge structure according to claim 1, characterized in that: The target temporary structure is a seven-rod diamond-shaped hanging basket, and the component units of the target temporary structure include multiple compression rods and multiple tension rods; The obtaining, based on the component unit information and the connection relationship information between the component units, of length expressions and internal force expressions of each component unit of the target temporary structure includes: Using the length of the pull rod of the seven-rod diamond hanging basket as the zero rod, the first vertical distance, the second vertical distance, and the third vertical distance as variables, length expressions of each compression rod and each pull rod are established respectively; wherein the first vertical distance is the vertical distance between the vertex of the seven-rod diamond hanging basket on the first side and the zero rod, the second vertical distance is the vertical distance between the vertex of the seven-rod diamond hanging basket on the second side and the zero rod, and the third vertical distance is the vertical distance between the vertex of the seven-rod diamond hanging basket at the middle position and the zero rod; According to the force transmission path of the seven-rod diamond-shaped hanging basket and the connection relationship information between each compression rod and each tension rod, the nodal load borne by the seven-rod diamond-shaped hanging basket is statically decomposed to obtain the internal force expression of each compression rod and each tension rod; The configuration evaluation function of the target temporary structure is obtained based on the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit, including: According to the weight coefficients assigned to each tension rod and compression rod, a weighted sum is performed on the product of the length expression and the internal force expression of each compression rod and tension rod to obtain the configuration evaluation function; wherein the weight coefficient of the tension rod is 1, and the weight coefficient of the compression rod is the inverse of the stability coefficient of the compression rod; The method of obtaining the optimized topological structure of the target temporary structure by using a partial differential derivation operation according to a configuration evaluation function of the target temporary structure includes: Taking the first vertical distance and the second vertical distance as optimization variables, respectively, performing partial differential operations on the configuration evaluation function to obtain a length ratio relationship between the first vertical distance and the second vertical distance, respectively, and the third vertical distance; Using the proportionality coefficient between the third vertical distance and the first horizontal distance, and the length proportionality relationship between the first vertical distance and the second vertical distance, respectively, and the third vertical distance, the first vertical variable, the second vertical variable, and the third vertical variable are eliminated from the configuration evaluation function to obtain an optimized configuration evaluation function using the first horizontal distance and the proportionality coefficient as optimization variables; wherein the first distance is a preset value of the horizontal distance between the force point of the nodal load and the zero bar; The first horizontal distance and the proportional coefficient are respectively used as optimization variables, and partial differential operations are performed on the optimized configuration evaluation function to obtain the optimized topological structure of the seven-rod diamond basket; wherein, the optimized topological structure of the seven-rod diamond basket is represented by an expression based on the relationship between the first vertical distance, the second vertical distance, the third vertical distance, and the first horizontal distance and the stability coefficient of the compression rod.

3. The method for determining the configuration of a temporary bridge structure according to claim 1, characterized in that: The target temporary structure is a triangular bracket, and the component units of the target temporary structure include: a compression rod and a tension rod; The obtaining, based on the component unit information and the connection relationship information between the component units, of length expressions and internal force expressions of each component unit of the target temporary structure includes: The length of the pull rod is used as a first variable, and the proportional relationship between the projected length of the compression rod on the installation plane and the length of the pull rod is used as a second variable to establish an expression for the length of the compression rod; According to the force transmission path of the triangular bracket, based on the proportional relationship between the length of the compression rod and the length of the tension rod, and the projected length of the compression rod on the installation plane, the nodal load borne by the triangular bracket is statically decomposed to obtain the internal force expression of the tension rod and the internal force expression of the compression rod; The configuration evaluation function of the target temporary structure is obtained based on the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit, including: The configuration evaluation function is obtained by performing a weighted summation on the products of the length expressions and the internal force expressions of the compression rods and the tension rods according to the weight coefficients assigned to the tension rods and the compression rods; wherein the weight coefficient of the tension rods is 1, and the weight coefficient of the compression rods is the inverse of the stability coefficient of the compression rods; The method of obtaining the optimized topological structure of the target temporary structure by using a partial differential derivation operation according to a configuration evaluation function of the target temporary structure includes: The proportional relationship between the length of the pull rod and the projection length of the pressure rod on the installation plane is used as the optimization variable, and the configuration evaluation function is subjected to partial differential operation to obtain the optimized topological structure of the triangular bracket; wherein, the optimized topological structure of the triangular bracket uses the proportional relationship between the length of the pull rod and the projection length of the pressure rod on the installation plane as the dependent variable and the stability coefficient of the pressure rod as the independent variable to express the optimized topological structure of the triangular bracket.

4. The method for determining the configuration of a temporary bridge structure according to claim 1, characterized in that: The target temporary structure is a flat-chord triangular web truss; The component units of the target temporary structure include: a plurality of upper chords, a plurality of lower chords, and a plurality of web members; wherein the lengths of the upper chords and the lower chords are the same and equal to the truss node spacing; The obtaining, based on the component unit information and the connection relationship information between the component units, of length expressions and internal force expressions of each component unit of the target temporary structure includes: Establishing an expression for the length of the web member using the truss inter-section distance and a first proportional relationship as variables; wherein the first proportional relationship is the proportional relationship between the truss height and the truss inter-section distance; According to the force transmission path of the flat-chord triangular web truss, the nodal load borne by the flat-chord triangular web truss is statically decomposed according to the truss inter-node distance, the first proportional relationship, and the number of inter-nodes, to obtain internal force expressions for each web member, each top chord, and each bottom chord; wherein the internal force expression for each web member includes a first internal force expression when the number of inter-nodes is an odd number, and a second internal force expression when the number of inter-nodes is an even number; The configuration evaluation function of the target temporary structure is obtained based on the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit, including: According to the weight coefficients assigned to the upper chords, lower chords, and web members, a weighted sum is performed on the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression and the first internal force expression of each web to obtain a first configuration evaluation function; According to the weight coefficients assigned to each upper chord, lower chord, and web member, a weighted sum is performed on the product between the length expression and the internal force expression of each upper chord, the product between the length expression and the internal force expression of each lower chord, and the product between the length expression and the second internal force expression of each web member to obtain a second configuration evaluation function; wherein the weight coefficient of the lower chord is 1, the weight coefficient of the upper chord is the reciprocal of its stability coefficient, and the weight coefficient of the web member is the sum of the reciprocal of its stability coefficient and the number 1; The method of obtaining the optimized topological structure of the target temporary structure by using a partial differential derivation operation according to a configuration evaluation function of the target temporary structure includes: The first proportional relationship is used as an optimization variable, and partial differential operations are performed on the first configuration evaluation function and the second configuration evaluation function, respectively, to obtain a first optimized topological structure and a second optimized topological structure; wherein, the first optimized topological structure and the second optimized topological structure are both the height-to-span ratio of the flat-chord triangular web truss expressed by the proportional relationship between the first proportional relationship and the number of spans.

5. A device for determining the configuration of a temporary bridge structure, characterized in that: include: A first acquisition module is used to acquire component unit information of the target temporary structure and connection relationship information between the component units; A second acquisition module is configured to obtain a length expression and an internal force expression of each component unit of the target temporary structure according to the component unit information and the connection relationship information between the component units; a third acquisition module, configured to obtain a configuration evaluation function of the target temporary structure according to the product of the length expression and the internal force expression of each component unit and the weight coefficient assigned to each component unit; a fourth acquisition module, configured to obtain an optimized topological structure of the target temporary structure according to a configuration evaluation function of the target temporary structure by using a partial differential derivation operation; A determination module is used to determine the configuration of the target temporary structure according to the optimized topological structure of the target temporary structure.

6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the method for determining the configuration of a temporary bridge structure according to any one of claims 1 to 4 is implemented.

7. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for determining the configuration of a temporary bridge structure according to any one of claims 1 to 4 is implemented.

8. A computer program product comprising a computer program, characterized in that When the computer program is executed by a processor, the method for determining the configuration of a temporary bridge structure according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Structure topology optimization method for implementing diversified designs

    CN105760631A

  • Bridge structure design profile finding method and device

    CN109635368A

  • Optimal design method of triangular hanging basket

    CN111506953A

  • Rod system structural body optimization method and device, electronic equipment and storage medium

    CN116432274A

  • Tension and compression bar model construction method based on topological optimization and image processing

    CN117371090A

Cited By

  • Bridge temporary structure modeling method and system

    CN121902267A