Method for matching building design project personnel
By defining the project difficulty coefficient gears and establishing an employee database, employees in architectural design projects are recommended based on multiple factors, solving the problem of inefficiency in traditional methods and achieving more efficient and accurate project personnel matching.
Patent Information
- Application Number
- CN202310513690.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-09
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the architectural design industry, traditional project management and employee scheduling methods are inefficient and cannot effectively consider factors such as employee schedule, project difficulty coefficient and project type they are good at, resulting in poor project matching and inefficiency.
By defining project difficulty coefficient gears, establishing an employee database, and recommending suitable employees based on factors such as project difficulty coefficient gears, employee schedules, project type, estimated labor costs and project cycles, three recommendation plans are provided to improve employee matching. degree and work efficiency.
It realizes rapid and accurate recommendations based on factors such as employee position level, experience, and project type, which improves the efficiency and accuracy of project management and employee scheduling, and avoids the shortcomings of trial and error and manual recommendation in traditional methods.
Smart Images

Figure CN118940983A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of project management and staff scheduling in the architectural design industry, and in particular to a method for matching architectural design project personnel. Background Art
[0002] Among various industries, project management and employee scheduling in the architectural design industry are very important. In the process of project development, in order to ensure the success and high quality of the project, it is necessary to select the right employees to do the work. However, in most cases, how to select the right employees is a challenging task. In traditional methods, manual recommendation and trial and error methods are very time-consuming and inefficient, which can easily lead to project failure.
[0003] To solve this problem, some AI-based methods have emerged. However, these methods still have some problems. For example, they cannot take into account factors such as employees' schedules, project difficulty, and the types of projects that employees are good at.
[0004] Therefore, a method for matching architectural design project personnel is needed that can take these factors into account and improve employee matching and work efficiency. Summary of the invention
[0005] The purpose of the present invention is to overcome the existing defects and provide a method for matching architectural design project personnel, thereby improving the matching degree and work efficiency of the employees.
[0006] The technical solution to achieve the above purpose is:
[0007] A method for matching personnel for a building design project, comprising:
[0008] Step S1, define a new parameter project difficulty coefficient, determine the interval to which it belongs, and obtain the project difficulty coefficient level;
[0009] Step S2, establishing an employee database;
[0010] Step S3, recommending employees suitable for the project based on the project difficulty level, employee schedule, project type, estimated project labor cost, project cycle and number of people in each project position, and providing three recommendation options.
[0011] Preferably, in step S1, different weights are assigned to four parameters, namely, project type, project estimated workload, project budgeted labor cost and project cycle, by a weighted summation method, and the minimum and maximum values after the summation are calculated. Five difficulty coefficient levels are divided according to the minimum and maximum values. For a project, the project difficulty coefficient is calculated according to the four parameters of the project, and the interval to which it belongs is determined to obtain the project difficulty coefficient level.
[0012] Preferably, in step S1, the project difficulty coefficient levels include S level, A level, B level, C level and D level, and the corresponding relationship between the project difficulty coefficient levels and employee recommendations is as follows:
[0013] S-level candidates have at least one professor-level senior engineer or the calculated score meets the S-level criteria;
[0014] Category A means there are at least two senior engineers or the calculated score meets the criteria of Category A;
[0015] Category B means there is at least one senior engineer or the calculated score meets the criteria of Category B;
[0016] Category C means there are at least two engineers or the calculated score meets the criteria of Category C;
[0017] Category D means there is at least one engineer or the calculated score meets the criteria of Category D.
[0018] Preferably, in step S1, the specific steps of obtaining the difficulty level of the project include:
[0019] Step S11, the four parameters of project type, project estimated workload, project budgeted labor cost and project period are weighted summed, and different weights are assigned to the four parameters, namely 4, 1, 2 and 3;
[0020] Step S12, for each parameter, a code table for each parameter is provided by professionals through historical data or experience, and the parameter is quantified;
[0021] Step S13, for a project, four parameters, namely, project type, estimated project workload, project budgeted labor cost and project cycle, are substituted into a weighted summation formula to obtain a project difficulty coefficient of the project;
[0022] Step S14, obtaining the project difficulty coefficient level of the project according to the range to which the project difficulty coefficient belongs.
[0023] Preferably, in step S2, an employee database is established, including job level, experience, project types that are good at, basic information and number of collaborations with colleagues, and employees are divided into three grades: high-end, mid-end and low-end according to their salaries, and employee data is classified to establish employee files.
[0024] Preferably, in step S2, an employee database is established and employee data is classified into different categories, which specifically includes:
[0025] Step S21, the employee's job level is divided into junior, intermediate, senior, experienced and professor level;
[0026] Step S22, deriving scores by weighted summation method according to the number of projects the employees have participated in and their working age, and sorting the employees from high to low according to the scores;
[0027] Step S23, according to the types of projects that the employees have participated in, the employees are divided into two types: those who are good at the projects and those who are general in the projects;
[0028] Step S24, collecting basic information of employees, including education, certificates and length of service;
[0029] Step S25, determining the number of times the employee has cooperated with other employees based on the number of times the employee has cooperated with other employees.
[0030] Preferably, in step S3, employees suitable for the project are recommended and three recommendation schemes are provided. The specific steps include:
[0031] Step S31, find out each employee's file from the employee work experience table according to the number of people in each position of the project;
[0032] Step S32, screening out qualified employees according to the project difficulty level and employee schedule;
[0033] Step S33, screening out qualified employees again based on project types and project types they are good at;
[0034] Step S34, screening out qualified employees based on the project estimated labor costs and employee salaries;
[0035] Step S35, determining the priority of employees according to the project cycle and the number of times they have collaborated with colleagues;
[0036] Step S36, recommending three solutions based on priority.
[0037] Preferably, in step S31, the method for determining the number of people in each position of the project includes:
[0038] Step S311, determining the job types and the number of people required for each job according to different project requirements;
[0039] Step S312, searching for qualified employees in the database, and determining suitable positions for the employees based on their job type and rank, experience, project types they are good at, basic information, and the number of times they have collaborated with colleagues;
[0040] In step S32, the employee schedule is determined by:
[0041] Step S321, determining the employee's schedule according to the employee's work schedule and vacation;
[0042] Step S322: for a certain project, determine whether the employee can participate in the project according to the working hours of the project and the employee's schedule.
[0043] Preferably, in step S34, the method for calculating the estimated labor cost of the project includes:
[0044] Step S341, calculating the total estimated labor cost of the project based on the employee classification and the number of people in each position of the project;
[0045] Step S342, calculating the estimated labor cost for each position based on the total estimated labor cost and the number of people required for each position.
[0046] Preferably, in step S36, the three priority recommended solutions include:
[0047] The first option: recommend the best employee for the project, including the employee's name, rank, schedule, project type, and salary;
[0048] Option 2: Recommend the next best employee for the project, including the employee's name, rank, schedule, project type, and salary.
[0049] The third option: recommend candidate employees who are suitable for the project, including the employee's name, rank, schedule, project types they are good at, and salary.
[0050] The beneficial effects of the present invention are as follows: the present invention can classify employee data according to factors such as employee's rank, experience, project types he / she is good at, basic information and number of times he / she has collaborated with colleagues, and then recommend the best employee, second-best employee and alternative employee suitable for the project according to different needs of the project; it can also determine the employee's schedule according to factors such as the employee's work arrangement and holidays; it can also calculate the estimated labor cost of each position; the present invention can quickly and accurately recommend employees suitable for the project according to the needs of the project and the conditions of the employees, and at the same time, it can also consider factors such as the employee's schedule and project types he / she is good at, avoiding the defects of trial and error and manual recommendation in traditional methods, and improving the efficiency and accuracy of project management and employee scheduling in the architectural design industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 is a flow chart of a method for matching architectural design project personnel according to the present invention;
[0052] Figure 2 This is a flow chart for obtaining the difficulty level of a project in the present invention;
[0053] Figure 3 It is a flow chart of establishing an employee database and classifying employee data in the present invention;
[0054] Figure 4 It is a flowchart of recommending employees suitable for the project and providing three recommendation schemes in the present invention;
[0055] Figure 5 It is a flow chart of the method for determining the number of people in each position of the project in the present invention;
[0056] Figure 6 It is a flow chart of the method for determining employee schedules in the present invention;
[0057] Figure 7 It is a flow chart of the method for calculating the estimated labor cost of a project in the present invention. DETAILED DESCRIPTION
[0058] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms center, top, bottom, left, right, vertical, horizontal, inside, outside, etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms first, second, and third are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0059] The present invention will be further described below in conjunction with the accompanying drawings.
[0060] like Figure 1-7 A method for matching architectural design project personnel is shown, comprising:
[0061] Step S1, define a new parameter project difficulty coefficient, determine the interval to which it belongs, and obtain the project difficulty coefficient level.
[0062] Through the weighted summation method, different weights are assigned to the four parameters of project type, project estimated workload, project budgeted labor cost and project cycle, and the minimum and maximum values after the sum are calculated. Five difficulty coefficient levels are divided according to the minimum and maximum values. For a project, the project difficulty coefficient is calculated according to the four parameters of the project, and the range to which it belongs is determined to obtain the project difficulty coefficient level.
[0063] The specific steps to obtain the project difficulty level include:
[0064] Step S11, the four parameters of project type, project estimated workload, project budgeted labor cost and project period are weighted summed, and different weights are assigned to the four parameters, namely 4, 1, 2 and 3 respectively.
[0065] Step S12: for each parameter, a code table of each parameter is provided by professionals through historical data or experience, and the parameter is quantified.
[0066] Step S13, for a project, four parameters, namely, project type, project estimated workload, project budgeted labor cost and project cycle, are substituted into a weighted summation formula to obtain a project difficulty coefficient of the project.
[0067] Step S14, obtaining the project difficulty coefficient level of the project according to the range to which the project difficulty coefficient belongs.
[0068] The project difficulty coefficient levels include S, A, B, C and D. The correspondence between the project difficulty coefficient levels and employee recommendations is as follows: S level means there is at least one professor-level senior engineer or the calculated score meets the S level standard; A level means there are at least two senior engineers or the calculated score meets the A level standard; B level means there is at least one senior engineer or the calculated score meets the B level standard; C level means there are at least two engineers or the calculated score meets the C level standard; D level means there is at least one engineer or the calculated score meets the D level standard.
[0069] For example, for a software development project, the type is "software development", the estimated workload is 1,000 man-hours, the budgeted labor cost is 100,000 yuan, and the cycle is 6 months. Substituting these parameters into the formula, the difficulty coefficient of the project is 68. According to the range of the difficulty coefficient, the difficulty coefficient of the project is B.
[0070] Step S2, establish an employee database; including job level, experience, project types that are good at, basic information and the number of times co-operating with colleagues, divide employees into three levels: high-end, mid-range and low-end according to their salaries, classify employee data and establish employee files.
[0071] Establish an employee database and classify employee data, including:
[0072] Step S21, the employee's job level is divided into junior, intermediate, senior, experienced and professor level grades.
[0073] Step S22, deriving scores by weighted summation method according to the number of projects the employees have participated in and their working age, and sorting the employees from high to low according to the scores.
[0074] Step S23, according to the types of projects that the employees have participated in, the employees are divided into two types: the types of projects that they are good at and the types of projects that they are generally good at.
[0075] Step S24, collecting basic information of employees, including education background, certificates and length of service.
[0076] Step S25, determining the number of times the employee has cooperated with other employees based on the number of times the employee has cooperated with other employees.
[0077] Step S3, recommending employees suitable for the project based on the project difficulty level, employee schedule, project type, estimated project labor cost, project cycle and number of people in each position of the project, and providing three recommendation plans.
[0078] Recommend employees who are suitable for the project and provide three recommendation options. The specific steps include:
[0079] Step S31, looking up each employee's file from the employee work experience table according to the number of people in each position of the project.
[0080] Step S311, according to different requirements of the project, determine the type of position required for the project and the number of people required for each position.
[0081] Step S312, searching the database for qualified employees, and determining suitable positions for the employees based on their job type and rank, experience, project types they are good at, basic information, and the number of times they have collaborated with colleagues.
[0082] Step S32, screening out qualified employees based on the project difficulty level and employee schedules.
[0083] Step S321, determine the employee's schedule based on the employee's work schedule and vacation.
[0084] Step S322: for a certain project, determine whether the employee can participate in the project according to the working hours of the project and the employee's schedule.
[0085] Step S33, according to the project type and the project type they are good at, screen out qualified employees again.
[0086] Step S34, screening out qualified employees based on the project estimated labor costs and employee salaries.
[0087] Step S341, calculate the total estimated labor cost of the project based on the employee classification and the number of people in each position of the project.
[0088] Step S342, calculating the estimated labor cost for each position based on the total estimated labor cost and the number of people required for each position.
[0089] Step S35, determining the priority of employees according to the project cycle and the number of times they have collaborated with colleagues.
[0090] Step S36, recommending three solutions based on priority.
[0091] The first option: recommend the best employee for the project, including detailed information such as the employee's name, rank, schedule, project type, and salary;
[0092] Option 2: Recommend the next best employee for the project, including detailed information such as the employee's name, rank, schedule, project types they are good at, and salary.
[0093] The third option: recommend candidate employees who are suitable for the project, including detailed information such as employee name, rank, schedule, project types they are good at, and salary.
[0094] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the technical solutions described in the above embodiments may still be modified, or some or all of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for matching architectural design project personnel, characterized in that: include: Step S1, define a new parameter project difficulty coefficient, determine the interval to which it belongs, and obtain the project difficulty coefficient level; Step S2, establishing an employee database; Step S3, recommending employees suitable for the project based on the project difficulty level, employee schedule, project type, estimated project labor cost, project cycle and number of people in each project position, and providing three recommendation options.
2. A method for matching architectural design project personnel according to claim 1, characterized in that: In step S1, different weights are assigned to four parameters, namely, project type, estimated project workload, project budgeted labor cost and project cycle, by means of weighted summation method, and the minimum and maximum values after summation are calculated. Five difficulty coefficient levels are divided according to the minimum and maximum values. For a project, the project difficulty coefficient is calculated according to the four parameters of the project, and the range to which it belongs is determined to obtain the project difficulty coefficient level.
3. A method for matching architectural design project personnel according to claim 2, characterized in that: In step S1, the project difficulty coefficient levels include S level, A level, B level, C level and D level. The corresponding relationship between the project difficulty coefficient levels and employee recommendations is as follows: S-level candidates have at least one professor-level senior engineer or the calculated score meets the S-level criteria; Category A means there are at least two senior engineers or the calculated score meets the criteria of Category A; Category B means there is at least one senior engineer or the calculated score meets the criteria of Category B; Category C means there are at least two engineers or the calculated score meets the criteria of Category C; Category D means there is at least one engineer or the calculated score meets the criteria of Category D.
4. A method for matching architectural design project personnel according to claim 3, characterized in that: In step S1, the specific steps of obtaining the difficulty level of the project include: Step S11, the four parameters of project type, project estimated workload, project budgeted labor cost and project period are weighted summed, and different weights are assigned to the four parameters, namely 4, 1, 2 and 3; Step S12, for each parameter, a code table for each parameter is provided by professionals through historical data or experience, and the parameter is quantified; Step S13, for a project, four parameters, namely, project type, estimated project workload, project budgeted labor cost and project cycle, are substituted into a weighted summation formula to obtain a project difficulty coefficient of the project; Step S14, obtaining the project difficulty coefficient level of the project according to the range to which the project difficulty coefficient belongs.
5. A method for matching architectural design project personnel according to claim 1, characterized in that: In step S2, an employee database is established, including job level, experience, project types that are good at, basic information and the number of times of cooperation with colleagues. Employees are divided into three grades: high-end, mid-end and low-end according to their salaries, and employee data are classified to establish employee files.
6. A method for matching architectural design project personnel according to claim 5, characterized in that: In step S2, an employee database is established and employee data is classified into different categories, which specifically includes: Step S21, the employee's job level is divided into junior, intermediate, senior, experienced and professor level; Step S22, deriving scores by weighted summation method according to the number of projects the employees have participated in and their working age, and sorting the employees from high to low according to the scores; Step S23, according to the types of projects that the employees have participated in, the employees are divided into two types: those who are good at the projects and those who are general in the projects; Step S24, collecting basic information of employees, including education, certificates and length of service; Step S25, determining the number of times the employee has cooperated with other employees based on the number of times the employee has cooperated with other employees.
7. A method for matching architectural design project personnel according to claim 6, characterized in that: In step S3, employees suitable for the project are recommended, and three recommendation plans are provided. The specific steps include: Step S31, find out each employee's file from the employee work experience table according to the number of people in each position of the project; Step S32, screening out qualified employees according to the project difficulty level and employee schedule; Step S33, screening out qualified employees again based on project types and project types they are good at; Step S34, screening out qualified employees based on the project estimated labor costs and employee salaries; Step S35, determining the priority of employees according to the project cycle and the number of times they have collaborated with colleagues; Step S36, recommending three solutions based on priority.
8. A method for matching architectural design project personnel according to claim 7, characterized in that: In step S31, the method for determining the number of people in each position of the project includes: Step S311, determining the job types and the number of people required for each job according to different project requirements; Step S312, searching for qualified employees in the database, and determining suitable positions for the employees based on their job type and rank, experience, project types they are good at, basic information, and the number of times they have collaborated with colleagues; In step S32, the employee schedule is determined by: Step S321, determining the employee's schedule according to the employee's work schedule and vacation; Step S322: for a certain project, determine whether the employee can participate in the project according to the working hours of the project and the employee's schedule.
9. A method for matching architectural design project personnel according to claim 7, characterized in that: In step S34, the calculation method of the estimated labor cost of the project includes: Step S341, calculating the total estimated labor cost of the project based on the employee classification and the number of people in each position of the project; Step S342, calculating the estimated labor cost for each position based on the total estimated labor cost and the number of people required for each position.
10. A method for matching architectural design project personnel according to claim 7, characterized in that: In step S36, the three priority recommended solutions include: The first option: recommend the best employee for the project, including the employee's name, rank, schedule, project type, and salary; Option 2: Recommend the next best employee for the project, including the employee's name, rank, schedule, project type, and salary. The third option: recommend candidate employees who are suitable for the project, including the employee's name, rank, schedule, project types they are good at, and salary.
