Pre-existing fault deformation structure simulation device and method
By designing a structural simulation device for deformation of pre-stored faults, using sand boxes to build experimental models and dynamic analysis technology, the problem of insufficient accuracy and intuitiveness in the existing research methods is solved, and accurate simulation and later simulation of the impact of pre-stored faults is achieved. The clarity of structural deformation associations improves research efficiency and accuracy.
Patent Information
- Application Number
- CN202310518228.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When the existing research methods study the impact of pre-existing faults and their association with later structural deformation, there is insufficient accuracy, continuity and intuitiveness. This is mainly due to the current geological data that rely on later deformation, and the lack of direct simulation of pre-existing faults. ability.
A structural simulation device for first-stored fault deformation is designed, including sand box body, linear drive device, consolidation device, heating device, thermometer and image acquisition device. By controlling the deformation amount and deformation rate, dynamically reduce and analyze the first-stored fault layer. The structural simulation process of the sand box is used to build an experimental model to simulate the development area where the faults are stored, and the deformation process is collected and analyzed in real time.
It realizes the accurate and intuitive display of the effect of pre-stored faults, clarifies the correlation with later structural deformation, improves research efficiency, ensures the accuracy, continuity and intuitiveness of structural deformation patterns, and is suitable for oil and gas exploration of complex structural belts. .
Smart Images

Figure CN118942319A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of geological structure simulation, and relates to a structure simulation device and method, and specifically to a structure simulation device and method for pre-existing fault deformation. Background Art
[0002] Pre-existing faults refer to early faults that existed before the geological deformation occurred in the region. With the gradual refinement of geological structure research and the continuous increase in exploration depth, it is proved that the current geological deformation is controlled by many factors including early pre-existing faults. For example, the Kelasu thrust fault involved in the basement of the Kuche Depression was formed by the reversal of normal faults in the Jurassic rifting background. Pre-existing faults are structural weak zones, and later deformation will develop on this basis. Pre-existing faults determine the location, type, scale and other characteristics of later structural development in the region, resulting in significant geological differences with adjacent areas. Later structural deformation will also transform the properties, occurrence and fault throw of pre-existing faults. Therefore, clarifying the control role of pre-existing faults and their relationship with later structural deformation is of vital importance for accurately understanding the mechanism of geological deformation and promoting oil and gas exploration in complex structural belts. However, the existing research methods are limited to current geological data (such as well seismic data) that have undergone later deformation. According to the current geological characteristics, only universal geological laws can be used to reverse the influence of pre-existing faults, which lacks accuracy, continuity and intuitiveness to a certain extent. Summary of the invention
[0003] The purpose of the present invention is to provide a structural simulation device for pre-existing fault deformation. By combining the advantages of structural physical simulation, a three-dimensional structural simulation device for pre-existing fault deformation is designed to study the influence of pre-existing faults and their relationship with later structural deformation, so as to solve the limitations of research data and methods for solving pre-existing structures.
[0004] Another object of the present invention is to provide a structural simulation method for pre-existing fault deformation. By controlling the deformation amount and deformation rate, the deformation process of the structural simulation device for pre-existing fault deformation is dynamically restored and analyzed in a forward modeling manner, the influence of the pre-existing fault is accurately and intuitively displayed, and the relationship with the later structural deformation is clarified.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0006] A structural simulation device for pre-existing fault deformation, comprising a sand box body, a linear drive device, a consolidation device, a heating device, a thermometer, an image acquisition device for acquiring real-time images of the side and top surfaces of the sand box body, and a controller; the heating device is laid on the bottom outer surface of the sand box body, and the thermometer is arranged on the outer wall surface of the sand box body;
[0007] The sand box body is a rectangular hollow structure with an opening on the top. The sand box body is made of transparent material. The sand box body includes a bottom plate, a first fixed side plate, a second fixed side plate, a third fixed side plate and a movable baffle. The second fixed side plate and the movable baffle are arranged opposite to each other, and the movable baffle is slidingly sealed with the bottom plate, the first fixed side plate and the third fixed side plate; the bottom plate is provided with marking lines arranged at intervals, and the marking lines are all arranged parallel to the movable baffle; the bottom of the outer side wall surface of the first fixed side plate and / or the third fixed side plate is provided with continuously arranged semicircular protractors, the straight edge length of the semicircular protractors is equal to the interval length of adjacent marking lines, and the straight edge of the semicircular protractors is arranged between adjacent marking lines;
[0008] At least one structural plate for simulating a pre-existing fault is provided in the sand box body, and the structural plate is fixedly arranged with the bottom plate, the first fixed side plate and the third fixed side plate; a first horizontally arranged ruler and a second vertically arranged ruler are provided at the edge of the outer side wall surface of the first fixed side plate and / or the third fixed side plate;
[0009] The linear drive device is connected to the movable baffle plate and is used to drive the movable baffle plate to reciprocate in the sand box body;
[0010] The consolidation device includes a liquid pump for pumping water or glue, and the liquid pump is connected to the inside of the sand box body through a pipeline;
[0011] The consolidation device, the heating device, the linear drive device and the image acquisition device are all electrically connected to the controller.
[0012] As a limitation, the heating device is an electric blanket;
[0013] The image acquisition device includes cameras arranged on the side and top surfaces of the sand box body.
[0014] As a second limitation, the thermometer is arranged on the outer side wall surface of the first fixed side plate and / or the second fixed side plate and / or the third fixed side plate of the flask body.
[0015] As a third limitation, the linear drive device includes a drive motor and a lead screw, the output shaft of the drive motor is fixedly connected to one end of the lead screw, and the other end of the lead screw is threadedly connected to a threaded hole provided on the movable baffle;
[0016] The driving motor is electrically connected to the controller.
[0017] As a fourth limitation, the sand box body is made of a transparent rigid material.
[0018] The present invention also provides a simulation method of the above-mentioned structural simulation device for pre-existing fault deformation, comprising the following steps:
[0019] The similarity factor is obtained according to the range and geological elements of the simulated pre-existing fault development area;
[0020] Determine the simulated material in the sand box body, the active boundary of the movable baffle, and the number, position and angle of the pre-existing faults according to the similarity factor;
[0021] According to the similarity factor, the deformation amount and deformation rate of the active boundary of the mobile baffle in the sand box body are obtained by using the geological shortening, tension, shortening rate and tension rate of the pre-existing fault development area;
[0022] At a preset scale, according to the deformation amount and deformation rate, sand is laid in the accommodation space formed by the sand box body and the movable baffle to build an experimental model to simulate the geological structure of the pre-existing fault development area;
[0023] The linear drive device is started by the controller, and the movable baffle is used to squeeze the sand in the sand box body according to the deformation amount and deformation rate, and the heating device is turned on to control the temperature in the sand box body during the deformation process according to the thermometer;
[0024] The image acquisition device is used to collect images of the side and top surfaces of the sand box body during the deformation process to obtain plane information and cross-sectional information;
[0025] After the deformation is completed, the heating device is turned on again, and water or glue is injected into the sand box body through the liquid pump in the consolidation device to make the sand material simulating the pre-existing fault development area adhere and consolidate, cut the sand material in the sand box body, and observe and record the fracture deformation characteristics inside the sand box body.
[0026] As a limitation, the similarity factors include length similarity factor, strain similarity factor, density similarity factor, density gravity factor, viscosity similarity factor, velocity similarity factor, and stress similarity factor.
[0027] As a second limitation, sand is laid in the accommodation space formed by the sand box body and the movable baffle at a preset scale according to the deformation amount and deformation rate to simulate the geological structure of the pre-existing fault development area, including:
[0028] Using a preset scale and referring to the first and second scales on the sand box body, the structural plates used to simulate the pre-existing faults are respectively arranged on the marking lines on the bottom plate in the sand box body according to the number, position and angle of the pre-existing faults, and referring to the semicircular protractor, the angle of the structural plates is adjusted to the preset inclination and dip, and the structural plates are fixedly arranged with the bottom plate, the first fixed side plate and the third fixed side plate;
[0029] According to the deformation amount and deformation rate, sand is laid in the accommodation space formed by the sand box body and the movable baffle to build an experimental model to simulate the geological structure of the area where the pre-existing fault developed.
[0030] Due to the adoption of the above technical solution, the present invention has the following technical advances compared with the prior art:
[0031] (1) The structural simulation device for pre-existing fault deformation of the present invention is safe, environmentally friendly, low-cost, and easy to operate when conducting simulation experiments, and can improve the research efficiency of deformation mechanism and oil and gas exploration under pre-existing fault conditions;
[0032] (2) The structural simulation device for pre-existing fault deformation of the present invention can control the temperature inside the sand box body when performing structural simulation of pre-existing fault deformation by means of the consolidation device and the heating device, thereby enhancing the fluidity of water or glue input into the consolidation device and accelerating the penetration of water or glue into the sand box body;
[0033] (3) The structural simulation device for deformation of pre-existing faults of the present invention simulates pre-existing faults by adjusting the angle of the structural plate, and can study the process of structural deformation of the strata under different angles of the pre-existing faults;
[0034] (4) The structural simulation method of the pre-existing fault deformation of the present invention can obtain the fracture deformation characteristics inside the sand box body, ensuring that the obtained structural deformation pattern is accurate, continuous and intuitive.
[0035] In summary, the present invention analyzes the deformation process of the pre-existing fault through the deformation amount and deformation rate of the structural simulation device of the pre-existing fault deformation, accurately and intuitively shows the influence of the pre-existing fault, and clarifies the relationship with the later structural deformation. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 Shown is a schematic structural diagram of Embodiment 1 of the present invention;
[0037] Figure 2 Shown is a flow chart of the method of embodiment 2 of the present invention;
[0038] Figure 3 The CT scan cross-sectional view of Example 2 of the present invention before and after extrusion deformation is shown;
[0039] In the figure: 1. sand box body; 2. bottom plate; 3. first fixed side plate; 4. second fixed side plate; 5. third fixed side plate; 6. movable baffle; 7. marking line; 8. semicircular protractor; 9. structural plate; 10. first scale; 11. second scale; 12. liquid pump; 13. pipeline; 14. drive motor; 15. screw. DETAILED DESCRIPTION
[0040] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation modes in conjunction with the accompanying drawings.
[0041] Example 1 A structural simulation device for pre-existing fault deformation
[0042] like Figure 1 As shown, this embodiment is a structural simulation device for pre-existing fault deformation, including a sand box body 1, a linear drive device, a consolidation device, a heating device, a thermometer, an image acquisition device for acquiring real-time images of the side and top surfaces of the sand box body 1, and a controller; wherein the heating device is laid on the bottom outer surface of the sand box body 1, the thermometer is arranged on the outer wall surface of the sand box body 1, the image acquisition device includes cameras arranged on the side and top surfaces of the sand box body 1 (the heating device, the image acquisition device, and the thermometer are not drawn in the figure), and the consolidation device, the heating device, the linear drive device, and the image acquisition device are all electrically connected to the controller.
[0043] In this embodiment, the sand box body 1 is a rectangular hollow structure with an opening on the top. The sand box body 1 is made of a smooth, transparent rigid material. The sand box body 1 includes a bottom plate 2, a first fixed side plate 3, a second fixed side plate 4, a third fixed side plate 5 and a movable baffle 6. The second fixed side plate 4 and the movable baffle 6 are arranged opposite to each other, the first fixed side plate 3 and the third fixed side plate 5 are arranged opposite to each other, and the movable baffle 6 and the bottom plate 2, the first fixed side plate 3 and the third fixed side plate 5 are all slidingly sealed. Among them, the size of the sand box body 1 is 41 cm long * 22 cm wide * 13 cm high, and the height of the movable baffle 6 is 20 cm.
[0044] The bottom plate 2 of the sand box body 1 is provided with marking lines 7 set at intervals of 3 cm, and the marking lines 7 are all set parallel to the movable baffle 6; the bottom of the outer wall surface of the third fixed side plate 5 is provided with continuously arranged semicircular protractors 8, and the arc edge of the semicircular protractors 8 is located above the straight edge. The length of the straight edge of the semicircular protractor 8 is equal to the interval length of adjacent marking lines 7, both of which are 3 cm, and the straight edge of the semicircular protractor 8 is set between adjacent marking lines 7.
[0045] At least one structural plate 9 for simulating a pre-existing fault is provided in the sand box body 1. The surface of the structural plate 9 is smooth. The structural plate 9 is fixed to the bottom plate 2, the first fixed side plate 3 and the third fixed side plate 5 by glue. A first horizontally arranged ruler 10 is provided at the top edge of the outer wall surface of the third fixed side plate 5, and a second vertically arranged ruler 11 is provided at one side edge of the outer wall surface of the third fixed side plate 5. According to research needs, the structural plate 9 can be selected at any angle of 0 to 90°. After adjusting the angle, the structural plate 9 is fixed tightly against the bottom plate 2, the first fixed side plate 3 and the third fixed side plate 5 of the sand box body 1 as a pre-existing fault. At positions different in distance from the active boundary of the movable baffle 6, multiple structural plates 9 can be placed as needed to simulate the structural deformation of multiple pre-existing faults.
[0046] Among them, this embodiment is provided with a tectonic plate 9, and the first scale 10 and the second scale 11 can provide an azimuth reference for the tectonic plate 9 to simulate the pre-existing fault, and at the same time be used to observe the size of the developed structure on the plane, the size of the developed structure on the section and the spatial combination relationship between the pre-existing fault under different deformation amounts. The semicircular protractor 8 can provide an inclination reference for the tectonic plate 9 to simulate the pre-existing fault, and at the same time be used to observe the geometric parameters such as the inclination and inclination of the developed structure on the section and its spatial combination relationship with the pre-existing fault under different deformation amounts.
[0047] In this embodiment, the linear drive device is connected to the movable baffle 6 and is used to drive the movable baffle 6 to move linearly back and forth in the sand box body 1; the linear drive device includes a drive motor 14 and a lead screw 15, the output shaft of the drive motor 14 is fixedly connected to one end of the lead screw 15, and the other end of the lead screw 15 is threadedly connected to the threaded hole set on the movable baffle 6, and the drive motor 14 is electrically connected to the controller.
[0048] The consolidation device includes a liquid pump 12 for pumping water or glue, and the liquid pump 12 is connected to the inside of the sand box body 1 through a pipeline 13; the heating device is an electric blanket, which is flatly adhered to the outside of the bottom plate 2 of the sand box body 1 ( Figure 1 The thermometer is arranged on the outer wall surface of the first fixed side plate 3 and / or the second fixed side plate 4 and / or the third fixed side plate 5 of the flask body 1. After the controller controls the heating device to be powered on, the temperature inside the flask body 1 can be increased. At the same time, the temperature inside the flask body 1 can be conveniently controlled by the thermometer.
[0049] In practical applications of this embodiment, the semicircular protractor 8 can also be set at the bottom of the outer wall surface of the first fixed side plate 3, and a first horizontal ruler 10 can also be set at the top edge of the outer surface of the first fixed side plate 3.
[0050] Example 2 A structural simulation method for pre-existing fault deformation
[0051] like Figure 2 As shown, the present invention also provides a simulation method of the structural simulation device of the above-mentioned pre-existing fault deformation, comprising the following steps:
[0052] S1. Obtaining similarity factors between the experimental model and the pre-existing fault development area according to the range and geological elements of the simulated pre-existing fault development area;
[0053] In this step, the similarity factors include length similarity factor, strain similarity factor, density similarity factor, density gravity factor, viscosity similarity factor, velocity similarity factor, and stress similarity factor;
[0054] Among them, the stress similarity factor between the experimental model and the simulated pre-existing fault development area is obtained by the length similarity factor, density gravity factor and density similarity factor:
[0055] Δσ=Δρ×Δg×Δl (1);
[0056] Wherein, Δσ represents the stress similarity factor between the experimental model and the simulated pre-existing fault development area; Δρ represents the density similarity factor between the experimental model material and the simulated pre-existing fault development area; Δg represents the density gravity factor between the experimental model and the simulated pre-existing fault development area; Δl represents the length similarity factor between the experimental model and the simulated pre-existing fault development area, and the above parameters are dimensionless.
[0057] The strain similarity factor between the experimental model and the simulated pre-existing fault development area is obtained from the stress similarity factor and the viscosity similarity factor:
[0058]
[0059] Where Δε represents the strain similarity factor between the experimental model and the simulated pre-existing fault development area; It represents the viscosity similarity factor between the experimental model material and the simulated pre-existing fault development area. The above parameters are dimensionless.
[0060] When the experimental model and the simulated pre-existing fault development area have the same order of magnitude of strain similarity factor, it conforms to the dynamic similarity principle of physical simulation; the velocity similarity factor between the experimental model and the simulated pre-existing fault development area can be obtained by using formula (1) and formula (2);
[0061] Δv=Δεε×Δl (3);
[0062] Where: Δv represents the velocity similarity factor between the experimental model and the simulated pre-existing fault development area, dimensionless;
[0063] S2, determining the simulated material in the sand box body 1, the movable boundary of the movable baffle 6, and the number, position and angle of the pre-existing faults according to the similarity factor;
[0064] Among them, the cohesion, internal friction angle, viscosity and thickness of each layer of sand used to simulate the brittle formation in the sand box body 1 can be determined by the similarity factor, and the viscosity and thickness of each layer of glass beads and silica gel used to simulate the plastic formation can be determined; for example, when simulating the pre-existing fault development area in the sand box body 1, quartz sand particles with a particle size of 0.1-0.3 mm, a friction coefficient of 0.5-0.7, and an internal friction angle of 30-33° are used to simulate the deformation of brittle formations (such as sandstone, conglomerate, siltstone, and carbonate rock); glass beads with a particle size of 0.1-0.3 mm, a friction coefficient of 0.49-0.59, and an internal friction angle of 26-30° are used to simulate the deformation of plastic formations (such as mudstone and coal seams); silica gel with a viscosity of 1.1-1.6*104Pa is used to simulate the deformation of formations with strong plasticity (such as gypsum and salt rock);
[0065] S3. According to the similarity factor, the deformation amount and deformation rate of the active boundary of the movable baffle 6 in the sand box body 1 are obtained by using the geological shortening amount, tension amount, shortening rate and tension rate of the pre-existing fault development area;
[0066] S4, laying sand materials in the accommodation space formed by the sand box body 1 and the movable baffle 6 to build an experimental model according to the preset scale, the deformation amount and the deformation rate, and simulating the geological structure of the pre-existing fault development area;
[0067] The specific process of this step is:
[0068] With a preset scale, referring to the first scale 10 and the second scale 11 on the sand box body 1, the structural plates 9 used to simulate the pre-existing faults are respectively arranged on the marking lines 7 on the bottom plate 2 inside the sand box body 1 according to the number, position and angle of the pre-existing faults, thereby fixing the direction of the pre-existing faults, referring to the semicircular protractor 8, adjusting the angle of the structural plates 9 to the preset inclination and dip, and making the structural plates 9 fixed and sealed with the bottom plate 2, the first fixed side plate 3 and the third fixed side plate 5;
[0069] According to the deformation amount and deformation rate, sand is laid in the accommodation space formed by the sand box body 1 and the movable baffle 6 to build an experimental model to simulate the geological structure of the area where the pre-existing faults developed; wherein, when building the experimental model, the sand used for each layer of the sand box body 1 is determined according to the lithological characteristics of the area where the pre-existing faults developed were actually simulated;
[0070] Since the pre-existing faults in actual geology already exist before deformation and disconnect the early strata, and the tectonic plate 9 set in the experiment can also achieve the effect of disconnecting the sand material after laying the sand material, the sand material is laid and the linear drive device is started, and the sand layer that has been disconnected by the tectonic plate 9 is very easy to produce displacement along the smooth tectonic plate 9 under the action of tectonic stress, so that the pre-existing faults continue to expand in the sand layer and form a series of derived structures in the sand layers on both sides, thereby simulating the influence of the pre-existing faults in the later deformation;
[0071] S5, start the linear drive device through the controller, make the movable baffle 6 squeeze the sand material in the sand box body 1 according to the deformation amount and deformation rate, turn on the heating device, and control the temperature in the sand box body 1 during the deformation process according to the thermometer;
[0072] S6, collecting images of the side and top surfaces of the sand box body 1 during the deformation process through an image acquisition device to obtain plane information and section information, and combining the plane information and section information to analyze the structural deformation caused by the pre-existing fault;
[0073] In this step, a high-definition camera arranged on the side of the sand box body 1 is used to take pictures at fixed time intervals to obtain a continuous process diagram of deformation, obtain section information, observe the geometric parameters such as the size, inclination and dip angle of the developed structure on the section under different deformation amounts, and the spatial combination relationship with the pre-existing fault, and analyze the section evolution characteristics; a high-definition camera arranged on the top surface of the sand box body 1 is used to take pictures at fixed time intervals to obtain a continuous process diagram of deformation, obtain plane information, record the size of the developed structure on the plane and the spatial combination relationship with the pre-existing fault, and analyze the influence of the pre-existing fault on the plane and section deformation at the same time;
[0074] S7. After the deformation is completed, the heating device is continued to be turned on, and the liquid pump 12 in the consolidation device is controlled by the controller to inject water or glue into the sand box body 1 through the pipeline 13 until it penetrates into the sand box body 1, so that the sand material simulating the pre-existing fault development area is adhered and consolidated, the sand material in the sand box body 1 is cut, and the fracture deformation characteristics inside the sand box body 1 are observed and recorded.
[0075] In the later stage of this embodiment, the fault position and other geological elements can be clearly drawn on the photo using drawing software, and can be used for comparison with other geological data. In addition, high-resolution industrial CT can be used to scan and image the inside of the sand box body 1 to collect fine deformation features under the control of pre-existing faults, ensuring that the obtained structural deformation pattern is accurate, continuous and intuitive.
[0076] In order to verify the present device and method, in this embodiment, when laying sand materials in the accommodation space formed by the sand box body 1 and the movable baffle 6 to build the experimental model, two structural plates 9 are fixedly set on the left side of the sand box body 1 to simulate the pre-existing fault, and the angle between the structural plate 9 and the bottom plate is 45°, and the two structural plates 9 are set on the same marking line 7. When laying sand materials, quartz sand with a particle size of 0.1mm is laid on the bottom of the experimental model with a total thickness of 30mm (simulating sandstone), glass beads with a particle size of 0.1mm are laid on the left side of the middle with a total thickness of 5mm (simulating mudstone), and 1.1*104Pa silica gel is laid on the right side of the middle with a total thickness of 5mm (simulating gypsum salt rock); quartz sand with a particle size of 0.1mm is laid on the top of the model with a total thickness of 15mm (simulating sandstone).
[0077] After the experimental model is built, the linear drive device is started by the controller, and the movable baffle 6 squeezes the sand in the sand box body 1 at a deformation rate of 0.003 mm / s. At the same time, the heating device is turned on to control the temperature to 45°. The extrusion deformation (shortening amount in the figure) is 9.60 mm and the extrusion is stopped. After the deformation is completed, the liquid pump 12 in the consolidation device is controlled by the controller to inject water or glue into the sand box body 1 through the pipeline 13, so that the sand in the experimental model is adhered and consolidated, and then the sand in the sand box body 1 is cut open, and the interior of the sand box body 1 is scanned and imaged by high-resolution industrial CT, as shown in the following figure. Figure 3The CT scan cross-section before and after the extrusion deformation is shown in Figure 3 It can be seen that after the compression deformation, the pre-existing faults continued to extend and develop upward, disconnecting the floating glass bead layer and the quartz sand layer. The scale of the faults continued to expand, and the strata between the faults bulged upward and bent.
[0078] It should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A structural simulation device for pre-existing fault deformation, characterized in that: It includes a sand box body, a linear drive device, a consolidation device, a heating device, a thermometer, an image acquisition device for acquiring real-time images of the side and top surfaces of the sand box body, and a controller; the heating device is laid on the bottom outer surface of the sand box body, and the thermometer is arranged on the outer side wall surface of the sand box body; The sand box body is a rectangular hollow structure with an opening on the top. The sand box body is made of transparent material. The sand box body includes a bottom plate, a first fixed side plate, a second fixed side plate, a third fixed side plate and a movable baffle. The second fixed side plate and the movable baffle are arranged opposite to each other, and the movable baffle is slidingly sealed with the bottom plate, the first fixed side plate and the third fixed side plate; the bottom plate is provided with marking lines arranged at intervals, and the marking lines are all arranged parallel to the movable baffle; the bottom of the outer side wall surface of the first fixed side plate and / or the third fixed side plate is provided with continuously arranged semicircular protractors, the straight edge length of the semicircular protractors is equal to the interval length of adjacent marking lines, and the straight edge of the semicircular protractors is arranged between adjacent marking lines; At least one structural plate for simulating a pre-existing fault is provided in the sand box body, and the structural plate is fixedly arranged with the bottom plate, the first fixed side plate and the third fixed side plate; a first horizontally arranged ruler and a second vertically arranged ruler are provided at the edge of the outer side wall surface of the first fixed side plate and / or the third fixed side plate; The linear drive device is connected to the movable baffle plate and is used to drive the movable baffle plate to reciprocate in the sand box body; The consolidation device includes a liquid pump for pumping water or glue, and the liquid pump is connected to the inside of the sand box body through a pipeline; The consolidation device, the heating device, the linear drive device and the image acquisition device are all electrically connected to the controller.
2. The structural simulation device for pre-existing fault deformation according to claim 1, characterized in that: The heating device is an electric blanket; The image acquisition device includes cameras arranged on the side and top surfaces of the sand box body.
3. The structural simulation device for pre-existing fault deformation according to claim 1, characterized in that: The thermometer is arranged on the outer side wall surface of the first fixed side plate and / or the second fixed side plate and / or the third fixed side plate of the flask body.
4. The structural simulation device for pre-existing fault deformation according to claim 1, characterized in that: The linear drive device comprises a drive motor and a lead screw, wherein the output shaft of the drive motor is fixedly connected to one end of the lead screw, and the other end of the lead screw is threadedly connected to a threaded hole provided on the movable baffle; The driving motor is electrically connected to the controller.
5. The structural simulation device for pre-existing fault deformation according to any one of claims 1 to 4, characterized in that: The sand box body is made of a transparent rigid material.
6. The simulation method of the structural simulation device for pre-existing fault deformation according to any one of claims 1 to 5, characterized in that: The following steps are involved: The similarity factor is obtained according to the range and geological elements of the simulated pre-existing fault development area; Determine the simulated material in the sand box body, the active boundary of the movable baffle, and the number, position and angle of the pre-existing faults according to the similarity factor; According to the similarity factor, the deformation amount and deformation rate of the active boundary of the mobile baffle in the sand box body are obtained by using the geological shortening, tension, shortening rate and tension rate of the pre-existing fault development area; At a preset scale, according to the deformation amount and deformation rate, sand is laid in the accommodation space formed by the sand box body and the movable baffle to build an experimental model to simulate the geological structure of the pre-existing fault development area; The linear drive device is started by the controller, and the movable baffle is used to squeeze the sand in the sand box body to build the experimental model according to the deformation amount and deformation rate, and the heating device is turned on to control the temperature in the sand box body during the deformation process according to the thermometer; The image acquisition device is used to collect images of the side and top surfaces of the sand box body during the deformation process to obtain plane information and cross-sectional information; After the deformation is completed, the heating device is turned on again, and water or glue is injected into the sand box body through the liquid pump in the consolidation device to make the sand material simulating the pre-existing fault development area adhere and consolidate, cut the sand material in the sand box body, and observe and record the fracture deformation characteristics inside the sand box body.
7. The simulation method of the structure simulation device of pre-existing fault deformation according to claim 6, characterized in that: The similarity factors include length similarity factor, strain similarity factor, density similarity factor, density gravity factor, viscosity similarity factor, velocity similarity factor, and stress similarity factor.
8. The simulation method of the structure simulation device of pre-existing fault deformation according to claim 6, characterized in that: At a preset scale, according to the deformation amount and deformation rate, sand is laid in the accommodation space formed by the sand box body and the movable baffle to simulate the geological structure of the pre-existing fault development area, including: Using a preset scale and referring to the first and second scales on the sand box body, the structural plates used to simulate the pre-existing faults are respectively arranged on the marking lines on the bottom plate in the sand box body according to the number, position and angle of the pre-existing faults, and referring to the semicircular protractor, the angle of the structural plates is adjusted to the preset inclination and dip, and the structural plates are fixedly arranged with the bottom plate, the first fixed side plate and the third fixed side plate; According to the deformation amount and deformation rate, sand is laid in the accommodation space formed by the sand box body and the movable baffle to build an experimental model to simulate the geological structure of the area where the pre-existing fault developed.
Citation Information
Patent Citations
A sandbox physical simulation experiment apparatus and a simulation experiment method thereof
CN107016917A
Deformation device for simulating development of complex basement-involved structure
CN109147531A
Multi-rigid-block-body multistage multi-position extension-retraction deformation physical simulation experiment method
CN109870358A
Physical simulation experimental apparatus with fault angle control function for positive inversion structures
CN109903663A
Coal series fault formation simulation test device and forward and reverse fault simulation test method
CN110006757A
