Full dry quenching production system and method thereof

The production system, consisting of two dry quenching furnaces, three dry quenching coke boilers, and a three-stage temperature inert gas header, solves the problem of production stability during maintenance of the full dry quenching coke system, achieves the effect of saving land and investment, and has the advantages of environmental protection and low operating costs.

CN118956428APending Publication Date: 2024-11-15ACRE COKING & REFRACTORY ENG CONSULTING CORP DALIAN MCC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411242125.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In existing dry quenching systems, when one dry quenching furnace is under maintenance, the other cannot meet the full-load production of coking plants. In addition, the three dry quenching furnace systems occupy a large area and require high investment.

Method used

The production system consists of two dry quenching furnaces, three dry quenching coke boilers, and a three-stage temperature inert gas header. Online maintenance without interruption is achieved through cut-out valves and inlet valves. Combined with the design of multi-channel dust collectors and circulating fans, the system ensures stable operation.

Benefits of technology

It achieves the goal of ensuring that the dry quenching system does not affect production stability during maintenance, saves space and investment, has low operating costs, and has environmental advantages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118956428A_ABST
    Figure CN118956428A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of dry quenching waste heat utilization, and particularly relates to a full dry quenching production system and method, and the full dry quenching production system comprises two dry quenching furnaces, three dry quenching boilers, a high-temperature inert circulating gas main pipe, a medium-temperature inert circulating gas main pipe and a low-temperature inert circulating gas main pipe, high-temperature inert circulating gas of the two dry quenching boilers can enter any three dry quenching boilers, the three dry quenching boilers are arranged between the high-temperature inert circulating gas main pipe and the medium-temperature inert circulating gas main pipe side by side, and any one dry quenching boiler can be overhauled on line without stopping production; two dry quenching furnaces are arranged between the high-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe side by side, and any dry quenching furnace can be overhauled on line without stopping production. The system has the advantages that the industrial problem that one of the full dry quenching systems of the two dry quenching furnaces is overhauled while the other one cannot meet the coking full-load production is solved, and meanwhile, the problems that the full dry quenching systems of the three dry quenching furnaces are large in occupied area and high in investment are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of utilization of waste heat from dry coke quenching, and in particular relates to a production system and method for full dry coke quenching. Background Art

[0002] Dry coke quenching is a coke quenching method that uses inert gas to quench red-hot coke. It originated in Switzerland and was researched and developed from the 1920s to the 1940s. After entering the 1960s, it achieved continuous and stable production and gradually developed in the direction of large-scale, automation and low energy consumption. This method can recycle the sensible heat of red coke, improve the quality of coke, and reduce the pollution of the quenching operation to the environment. On the one hand, dry coke quenching can use inert gas to cool the high-temperature coke to a qualified temperature, and on the other hand, it can recover the sensible heat of high-temperature coke through a heat exchange system to produce power steam.

[0003] The process of wet quenching involves transporting the high-temperature coke from the coke oven to a quenching tower via a quenching truck. During this process, water is directly sprinkled on the high-temperature coke to cool it down. The steam generated by this method and the corrosive media such as phenol, cyanide, and sulfide remaining in the coke may corrode surrounding buildings and spread the pollution to a range of several kilometers away. At present, some coking projects still use wet quenching towers for coke quenching during dry quenching maintenance, which will cause large-scale air pollution. Therefore, local governments have clearly required that new coking projects must adopt a full dry quenching production model, that is, wet quenching during maintenance is no longer allowed.

[0004] Generally, two sets of dry quenching or three or more sets of dry quenching are used to achieve full dry quenching (normally all dry quenching are synchronously operated at low load, and when one set of dry quenching is under maintenance, the remaining dry quenching is operated at full load). When the required full dry quenching capacity is Q, two sets of dry quenching are designed. Considering the stable and safe production of the dry quenching boiler (generally the minimum load of the dry quenching boiler is about 50% of the maximum load, if the load is too low, the superheater wall temperature of the dry quenching boiler is prone to overheating, which will cause pipe bursting), the dry quenching scale of each set is designed to be 0.8~0.9Q, so as to ensure that the load of the two dry quenching units is greater than 50% during normal production. However, the problem is that when one set of dry quenching coke ovens is under maintenance, the other set of dry quenching can only meet 80%~90% of the production load. At this time, the coke oven needs to extend the coking time and reduce production capacity. When the design adopts three or more sets of dry quenching coke, the dry quenching scale of each set is Q / (n-1). When one set of dry quenching coke is under maintenance, the remaining dry quenching coke can still meet the production load demand, but this configuration occupies a large area and requires a large investment. Summary of the invention

[0005] The purpose of the present invention is to provide a full dry quenching coke production system and method thereof, which overcomes the shortcomings of the prior art and adopts a production system consisting of two dry quenching furnaces, three dry quenching coke boilers and a three-level temperature inert gas mother pipe to solve the problem that one set of dry quenching furnaces in the full dry quenching coke system is under maintenance while the other set cannot meet the full load production of coking, thereby achieving full dry quenching of coke and having the advantages of environmental protection, saving land investment, etc.

[0006] To achieve the above object, the present invention is implemented through the following technical solutions:

[0007] Technical solution 1: A full dry quenching production system, comprising two dry quenching furnaces, three dry quenching boilers, a high-temperature inert circulating gas main pipe, a medium-temperature inert circulating gas main pipe and a low-temperature inert circulating gas main pipe, wherein the high-temperature inert circulating gas of the two dry quenching furnaces can enter any three dry quenching boilers, wherein: three dry quenching boilers are arranged side by side between the high-temperature inert circulating gas main pipe and the medium-temperature inert circulating gas main pipe, a cut-out valve is respectively provided on the front and rear pipelines of the dry quenching boiler, and any dry quenching boiler can be repaired online without stopping production; two dry quenching furnaces are arranged side by side between the high-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe, a primary dust collector is respectively provided on the exhaust pipe of each dry quenching furnace, a network access valve is respectively provided on the front and rear pipelines of the dry quenching furnace, and any dry quenching furnace can be repaired online without stopping production; a secondary dust collector, a circulating fan and a feed water preheating device are arranged in sequence according to the flue gas flow direction on the pipeline between the medium-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe.

[0008] The pipe diameter ratio of the high-temperature inert circulating gas main pipe, the medium-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe is 3:1.1:1.

[0009] The cut-out valve and the network inlet valve are both high temperature resistant cut-off valves.

[0010] The water preheating device is a radial heat pipe water preheating device with a multi-channel structure.

[0011] The primary dust collector is a gravity type or a cyclone type dust collector.

[0012] The secondary dust collector is any one of a multi-cyclone separation dust collector, a cartridge dust collector or a pulse bag dust collector, which has a multi-channel structure, and a cut-off valve is provided before and after each channel to facilitate online maintenance without stopping production.

[0013] The circulating fans are arranged in two sets in parallel, and cut-off valves are arranged before and after the circulating fans to facilitate online maintenance without stopping production. The two circulating fans can operate at the same time, or one can operate and the other can be on standby.

[0014] The two CDQ furnaces have the same specifications and capacities, and the three CDQ boilers have the same specifications and capacities.

[0015] Technical solution 2: A full CDQ production method, in which a large mother pipe is used in two CDQ furnaces and three CDQ boilers. High-temperature inert circulating gas can enter any CDQ boiler to meet the safe operating temperature of the CDQ boiler. Low-temperature inert circulating gas can enter any CDQ furnace to complete the CDQ operation. The medium-temperature inert circulating gas is supplemented to the low-temperature inert circulating gas mother pipe after secondary dust removal and heat exchange to maintain the gas balance in the production system.

[0016] The temperature of the high-temperature inert circulating gas is 800-1000°C; the temperature of the medium-temperature inert circulating gas is 160-180°C; the temperature of the low-temperature inert circulating gas is 130°C.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1) It solves the industry problem that one of the two CDQ systems is under maintenance while the other cannot meet the full-load production of the coking plant. At the same time, it avoids the problem that the three CDQ systems occupy a large area and have high investment.

[0019] 2) Ensure that each sub-item in the system, such as the CDQ furnace, primary dust collector, CDQ boiler, secondary dust collector, circulating fan, radial heat pipe feed water preheating device and other equipment, can be maintained online without stopping production, without affecting the stable and safe operation of the entire system.

[0020] 3) The present invention is also applicable to other similar waste heat power generation systems, and has the advantages of environmental protection, space saving, investment saving, and low operating cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the process flow of an embodiment of the present invention.

[0022] In the figure: 1- CDQ furnace, 2- primary dust collector, 3- inlet valve, 4- high-temperature inert circulating gas main pipe, 5- cut-out valve, 6- CDQ boiler, 7- cut-out valve, 8- medium-temperature inert circulating gas main pipe, 9- secondary dust collector, 10- cut-off valve, 11- circulating fan, 12- cut-off valve, 13- radial heat pipe feed water preheating device, 14- low-temperature inert circulating gas main pipe, 15- inlet valve. DETAILED DESCRIPTION

[0023] The technical solution of the present invention will be clearly and completely described below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0024] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the specific embodiments required to be used in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the specific embodiments described below are some implementation methods of the present invention. For ordinary technicians in this field, other specific embodiments can be obtained based on these specific embodiments without paying creative work.

[0025] The components of the embodiments of the present invention generally described and shown in the specific embodiments herein can be arranged and designed in countless different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the specific embodiments is not intended to limit the scope of the invention claimed, but merely represents selected embodiments of the present invention.

[0026] See Figure 1 , is a process flow diagram of an embodiment of a full dry coke quenching production system of the present invention, comprising two dry quenching furnaces 1, three dry coke quenching boilers 6, a high-temperature inert circulating gas main pipe 4, a medium-temperature inert circulating gas main pipe 8 and a low-temperature inert circulating gas main pipe 14, the high-temperature inert circulating gas of the two dry quenching furnaces 1 can enter any three dry coke quenching boilers 6, wherein: three dry coke quenching boilers 6 are arranged side by side between the high-temperature inert circulating gas main pipe 4 and the medium-temperature inert circulating gas main pipe 8, and a cut-out valve 5 and 7 are respectively arranged on the front and rear pipelines of the dry coke quenching boiler 6, and any dry coke quenching boiler The boiler 6 can be repaired online without stopping production; two dry quenching furnaces 1 are arranged side by side between the high-temperature inert circulating gas main pipe 4 and the low-temperature inert circulating gas main pipe 14, and each dry quenching furnace 1 is provided with a primary dust collector 2 on the exhaust pipe, and a network valve 3 and a network valve 15 are respectively provided on the front and rear pipelines of the dry quenching furnace 1. Any dry quenching furnace 1 can be repaired online without stopping production; a secondary dust collector 9, a circulating fan 11 and a radial heat pipe type feed water preheating device 13 are arranged in sequence on the pipeline between the medium-temperature inert circulating gas main pipe 8 and the low-temperature inert circulating gas main pipe 14 according to the flue gas flow direction. The cut-out valve and the network valve are both high-temperature resistant cut-off valves.

[0027] In the embodiment, the diameter ratio of the high temperature inert circulating gas main pipe 4, the medium temperature inert circulating gas main pipe 8 and the low temperature inert circulating gas main pipe 14 is a gravity or cyclone dust collector. The primary dust collector 2 is a gravity or cyclone dust collector.

[0028] The secondary dust collector 9 is any one of a multi-cyclone separation dust collector, a cartridge dust collector or a pulse bag dust collector, which has a multi-channel structure, and valves are provided before and after each channel to facilitate online maintenance without stopping production.

[0029] Two circulating fans 11 are arranged side by side, and cut-off valves 10 and 12 are arranged before and after the circulating fans 11 to facilitate online maintenance without stopping production. The two circulating fans 11 can operate at the same time, or one can operate and the other can be on standby.

[0030] In order to achieve stable production of the system, it is preferable that the two CDQ furnaces 1 have the same specification and capacity, and it is preferable that the three CDQ boilers 6 have the same specification and capacity.

[0031] A production method for full dry quenching of coke of the present invention adopts a large mother pipe in two dry quenching furnaces 1 and three dry quenching boilers 6, and the high-temperature inert circulating gas can enter any dry quenching boiler 6 to meet the safe working temperature of the dry quenching boiler 6, and the low-temperature inert circulating gas can enter any dry quenching furnace 1 to complete the dry quenching operation. The medium-temperature inert circulating gas is supplemented to the low-temperature inert circulating gas mother pipe 14 after secondary dust removal and heat exchange to maintain the gas balance in the production system. The temperature of the high-temperature inert circulating gas is 800-1000°C; the temperature of the medium-temperature inert circulating gas is 160-180°C; and the temperature of the low-temperature inert circulating gas is 130°C.

[0032] The high-temperature inert gas (800-1000°C) of the two CDQ furnaces 1 passes through their respective primary dust collectors 2 to remove large coke powder particles, and then enters the high-temperature inert circulating gas main pipe 4 through the network valve 3, and is then distributed to the three CDQ boilers 6. Cut-out valves 5 and 7 are set before and after the CDQ boilers 6 to facilitate online maintenance without stopping production. After the high-temperature inert circulating gas is cooled to 160-180°C, it enters the secondary dust collector 9 through the 160-180°C low-temperature inert circulating gas main pipe 8. The secondary dust collector 9 adopts a multi-channel structure, and cut-off valves are set before and after each channel to facilitate online maintenance without stopping production. The dust is removed again through the secondary dust collector 9 After that, it enters two circulating fans 11, which provide operating power for the entire circulating gas system. Cut-off valves 10 and 12 are set before and after the circulating fans 11 to facilitate online maintenance without stopping production. Then it enters a radial heat pipe feed water preheating device 13. The radial heat pipe feed water preheating device 13 adopts a multi-channel structure. Cut-off valves are set before and after each channel to facilitate online maintenance without stopping production. After that, the circulating gas temperature drops to ~130℃, and is distributed to two dry quenching furnaces 1 through a ~130℃ low-temperature inert circulating gas main pipe 14. The low-temperature inert circulating gas main pipe 14 and the two dry quenching furnaces 1 are respectively provided with network access valves 15. The system realizes full dry quenching production by adopting a system of two dry quenching furnaces, two primary dust collectors, corresponding to three dry quenching boilers, a secondary dust collector, two circulating fans, and a main pipe + cut-off valve of a radial heat pipe feed water preheating device.

[0033] The required coke quenching capacity in the scheme is Q, the capacity of each dry quenching furnace in the present invention is Q, the capacity of each primary dust collector is Q, the capacity of each dry quenching boiler is Q / 2, the capacity of the secondary dust collector is Q, one channel of which is spare, the capacity of each circulating fan is Q, the capacity of the radial heat pipe feed water preheating device is Q, one channel of which is spare, and under the need to ensure the normal operation of the system, the spare rate of each sub-item is the lowest, which has the advantages of saving investment and low operating costs.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A full dry quenching coke production system, characterized in that: It includes two CDQ furnaces, three CDQ boilers, a high-temperature inert circulating gas main pipe, a medium-temperature inert circulating gas main pipe and a low-temperature inert circulating gas main pipe. The high-temperature inert circulating gas of the two CDQ furnaces can enter any three CDQ boilers, including: Three dry coke quenching boilers are arranged side by side between the high-temperature inert circulating gas main pipe and the medium-temperature inert circulating gas main pipe. A cut-out valve is respectively arranged on the front and rear pipelines of the dry coke quenching boilers, so that any dry coke quenching boiler can be repaired online without stopping production; Two dry quenching furnaces are arranged side by side between the high-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe. A primary dust collector is arranged on the exhaust pipe of each dry quenching furnace. A network access valve is arranged on the front and rear pipelines of the dry quenching furnace. Any dry quenching furnace can be repaired online without stopping production. A secondary dust collector, a circulating fan and a feed water preheating device are arranged in sequence on the pipeline between the medium-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe according to the flue gas flow direction.

2. A fully dry quenching coke production system according to claim 1, characterized in that: The pipe diameter ratio of the high-temperature inert circulating gas main pipe, the medium-temperature inert circulating gas main pipe and the low-temperature inert circulating gas main pipe is 3:1.1:

1.

3. A fully dry quenching coke production system according to claim 1, characterized in that: The cut-out valve and the network inlet valve are both high temperature resistant cut-off valves.

4. A fully dry quenching coke production system according to claim 1, characterized in that: The water preheating device is a radial heat pipe water preheating device with a multi-channel structure.

5. The full dry quenching coke production system according to claim 1, characterized in that: The primary dust collector is a gravity type or a cyclone type dust collector.

6. A fully dry quenching coke production system according to claim 1, characterized in that: The secondary dust collector is any one of a multi-cyclone separation dust collector, a cartridge dust collector or a pulse bag dust collector, which has a multi-channel structure, and a cut-off valve is provided before and after each channel to facilitate online maintenance without stopping production.

7. The full dry quenching coke production system according to claim 1, characterized in that: The circulating fans are arranged in two sets in parallel, and cut-off valves are arranged before and after the circulating fans to facilitate online maintenance without stopping production. The two circulating fans can operate at the same time, or one can operate and the other can be on standby.

8. The full dry quenching coke production system according to claim 1, characterized in that: The two CDQ furnaces have the same specifications and capacities, and the three CDQ boilers have the same specifications and capacities.

9. A method for producing fully dry coke quenching, characterized in that: A large main pipe is used in two CDQ furnaces and three CDQ boilers. High-temperature inert circulating gas can enter any CDQ boiler to meet the safe operating temperature of the CDQ boiler. Low-temperature inert circulating gas can enter any CDQ furnace to complete the CDQ operation. The medium-temperature inert circulating gas is supplemented to the low-temperature inert circulating gas main pipe after secondary dust removal and heat exchange to maintain gas balance in the production system.

10. The method for producing fully dry quenched coke according to claim 9, characterized in that: The temperature of the high-temperature inert circulating gas is 800-1000°C; the temperature of the medium-temperature inert circulating gas is 160-180°C; the temperature of the low-temperature inert circulating gas is 130°C.