Intelligent three-dimensional space synchronous pre-wetting and pre-mixing ice and snow removing material spreading device and method
Through the intelligent three-dimensional space synchronous pre-wet premixed ice and snow material dispersion device, combined with ultra-high pressure air delivery and liquid high-pressure system, the problem that existing snow melting agent dispersion equipment cannot achieve uniform coverage and rapid effect is achieved, and uniformity of the entire road surface is achieved Coverage and fast and efficient ice and snow removal effects reduce the safety risks and environmental pollution of roads in winter.
Patent Information
- Application Number
- CN202411226894.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-15
AI Technical Summary
The existing snow melting agent spreading equipment cannot achieve uniform coverage and pre-wet and premix of solid-liquid space, resulting in poor ice and snow removal effect, and the inability to effectively spread small particles or powdery snow melting agents, which increases the risk of safe passage of roads in winter and Environmental pollution.
Adopt intelligent three-dimensional space synchronous pre-wet premixed ice and snow material dispersion device, combined with ultra-high pressure air delivery system and liquid high-pressure enhancement system, to realize the synchronous wetting and dissolution and rapid mixing of solid-liquid two-phase materials in three-dimensional space, and surround the solid through liquid The fusion mode realizes uniform spread and rapid effect of solid-liquid materials.
Achieve uniform coverage, fast, efficient, accurate and reduced snow melting agent dispersion on all roads, improves the traffic capacity and safety of winter highways, reduces the safety hazards brought by ice and snow disasters, and extends the time of ice and snow removal materials .
Smart Images

Figure CN118958203A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of highway engineering, and in particular relates to an intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow material spreading device and method. Background Art
[0002] The low temperature in winter makes it easy for natural disasters such as snowfall and freezing rain to occur. Highway roads are easily affected by these disasters, causing snow accumulation and ice formation, which reduces the friction between vehicle tires and the road surface, making it extremely easy for vehicles to slip and cause traffic accidents. The sharp increase in traffic accidents in the low temperature environment in winter seriously threatens the safety of highway operations.
[0003] At present, the main way to remove ice and snow on highways in winter is to spread snow-melting agents. Snow-melting agents are divided into liquid and solid forms, of which solid snow-melting agents are the most commonly used. There are basically two ways to spread snow-melting agents: manual spreading and mechanical spreading. Manual spreading is inefficient and is generally suitable for low-grade roads or sections with low traffic volume and little impact from low temperatures. High-grade roads, sections with heavy traffic volume and severe snow and ice accumulation mostly use mechanical spreading of snow-melting agents.
[0004] The existing de-icing agent spreading vehicle adopts a disc-type rotating spreading method, relying on the centrifugal force generated by the rotation of the disc to spread the de-icing agent particles onto the road surface, which has obvious disadvantages. On the one hand, the existing spreading equipment causes uneven spreading of de-icing agent due to the centrifugal force, which easily leads to the accumulation of de-icing agent on both sides of the road, and fails to achieve the purpose of fully covering the road surface and driving lanes, resulting in a small amount of de-icing on the driving lanes, and fails to achieve the purpose of de-icing the driving lanes. On the other hand, the de-icing agent is only spread in solid form, and solid de-icing agent particles can only play a good role in melting ice and snow after dissolving with water. When encountering snow and ice on the road, because the solid de-icing agent has no process of mixing and dissolving with water, it cannot produce the effect of melting ice and snow in time. Thirdly, the existing deicing agent spreading vehicles can only spread larger granular deicing agents. For smaller granular or powdered deicing agents, due to the large bulk density per unit volume, the existing spreading equipment is very likely to be blocked and unable to spread; however, in actual projects, the smaller the deicing agent particle size, the easier it is to dissolve in water, and the better the deicing effect, which creates a great contradiction with the existing spreading equipment. That is, the inability of the existing deicing agent spreading equipment to spread finer granular or powdered deicing agents has also become an important factor restricting the function of deicing agent materials.
[0005] Existing deicing agent spreading equipment has many disadvantages, the most critical of which is that it cannot achieve the expected deicing effect. Whether it is solid particles or powder deicing agents, when they are not mixed and dissolved with water, the deicing agent materials cannot play their deicing effect, and cannot play the role of deicing, or the deicing effect is poor. In addition, due to the centrifugal force, solid particles are thrown on the road surface, which is very likely to accumulate on both sides of the road, and cannot achieve the purpose of uniform adhesion on the road surface. This is also an important factor that the existing deicing agent spreading equipment cannot achieve the expected deicing effect.
[0006] The drawbacks of existing deicing agent spreading equipment have also brought many engineering problems. First of all, the existing deicing agent spreading equipment cannot achieve the expected snow and ice removal effect, which increases the risk of safe traffic on winter roads. In addition, when there is a large area of snow and ice on the road surface in winter, especially on high-grade roads, the maintenance and management departments often adopt the method of spreading deicing agents. However, when solid granular deicing agents cannot play the role of deicing in time, it conflicts with open traffic and safe and smooth traffic. The management department will misunderstand that the amount of deicing agents spread is not enough, which eventually leads to an increasing amount of deicing agents spread, further exacerbating the corrosion and pollution of highway infrastructure and the surrounding environment.
[0007] Therefore, how to overcome the shortcomings of the existing technology is an urgent problem to be solved in the field of highway engineering technology. Summary of the invention
[0008] The purpose of the present invention is to solve the deficiencies of the prior art and to provide an intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device and method.
[0009] To achieve the above purpose, the technical solution adopted by the present invention is as follows: An intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device, comprising a hydraulic power system, a solid material storage bin, a screw feeder, a solid material regulator, an ultra-high voltage air delivery device, an air delivery regulator, a liquid storage device, a liquid regulator, a liquid booster device, a pressure regulator, a liquid material spraying device, a spraying regulator and a solid material cavity channel; The hydraulic power system is respectively connected with the screw feeder, the UHV air delivery device, the liquid pressurizing device, and the liquid material spraying device, and is used to provide power for the screw feeder, the UHV air delivery device, the liquid pressurizing device, and the liquid material spraying device; The solid material storage bin is connected to the middle of the solid material cavity channel through a screw feeder; The solid material regulator is connected to the screw feeder and is used to control the rotation speed of the screw feeder; The UHV air delivery device is connected to the front of the solid material cavity channel; The air delivery regulator is connected to the UHV air delivery device and is used to control the air delivery pressure of the UHV air delivery device; The liquid storage device is connected to the liquid material spraying device through the liquid boosting device; The liquid controller is connected to the liquid storage device and is used to control the liquid discharge flow rate of the liquid storage device; The pressure regulator is connected to the liquid pressurizing device and is used to control the pressure of the liquid pressurizing device; The liquid material spraying device is installed at the tail end of the solid material cavity channel; The spraying regulator is connected to the liquid material spraying device and is used for controlling the liquid material spraying amount of the liquid material spraying device.
[0010] Furthermore, preferably, it further comprises an integrated box; the screw feeder, the solid material regulator, the UHV air delivery device, the air delivery regulator, the liquid regulator, the liquid pressurizing device, the pressure regulator, the liquid material spraying device and the spraying regulator are all installed in the integrated box; Except for the feeding end of the solid storage bin which is located in the integrated box, the other parts are all located inside the solid storage bin; Except for the feed end of the liquid storage device which is located in the integrated box, the rest of the liquid storage device is located in the solid storage bin; Except for the discharge end of the solid material cavity channel which is arranged in the integrated box body, the other parts are arranged in the solid material storage bin.
[0011] Furthermore, preferably, a monitoring device is also included, which is installed outside the integrated box and is used to monitor the spreading of ice and snow removal materials on the road surface.
[0012] Further, preferably, it also includes a visualization screen, a convenient air delivery control knob, a convenient solid material control knob, a convenient liquid material control knob, a convenient pressure control knob and a convenient spraying control knob; A visualization screen is connected to the monitor and is used to control the operation of the monitor and also to display the images monitored by the monitor; The convenient air delivery control knob is connected to the UHV air delivery device and the air delivery controller respectively, and is used to control the start and stop of the UHV air delivery device and the air delivery controller; it is also used to remotely control the adjustment button of the air delivery controller, thereby realizing the control of the air delivery pressure of the UHV air delivery device; The convenient solid material control knob is connected to the screw feeder and the solid material controller respectively, and is used to control the start and stop of the screw feeder and the solid material controller. It is also used to remotely control the adjustment button of the solid material controller, thereby controlling the rotation speed of the screw feeder; The convenient liquid material control knob is connected to the liquid controller and is used to control the start and stop of the liquid controller. It is also used to remotely control the adjustment button of the liquid controller, thereby controlling the liquid discharge flow rate of the liquid storage device. The convenient pressure control knob is connected to the liquid booster device and the pressure regulator respectively, and is used to control the start and stop of the liquid booster device and the pressure regulator, and is also used to remotely control the adjustment button of the pressure regulator, thereby realizing the control of the pressure of the liquid booster device; The convenient spray control knob is connected to the liquid spray device and the spray controller respectively, and is used to control the start and stop of the liquid spray device and the spray controller. It is also used to remotely control the adjustment button of the spray controller, so as to control the liquid spraying amount of the liquid spray device.
[0013] Further, preferably, it also includes a control room, in which the visualization screen, the convenient air delivery control knob, the convenient solid material control knob, the convenient liquid material control knob, the convenient pressure control knob and the convenient spraying control knob are all installed.
[0014] Further, preferably, the control room also includes a start-stop button and an emergency stop button; The start / stop button is used to control the start / stop of the intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device; The emergency stop button is used to control the immediate stop of the intelligent three-dimensional space synchronous pre-wet pre-mixed de-icing and snow material spreading device.
[0015] Further, preferably, the liquid material spraying device is a circular ring structure, the inner ring of which is fixed to the outer circumference of the solid material cavity channel; and a plurality of spray heads are provided on the circular ring structure.
[0016] The present invention also provides an intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading method, which uses the above-mentioned intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device, including the following steps: Adding solid deicing and snow removal material into the solid storage bin and adding liquid deicing and snow removal material into the liquid storage tank; Start the hydraulic power system; Turn on the UHV air delivery device and the air delivery regulator to adjust the air delivery pressure of the UHV air delivery device; turn on the spiral feeder and the solid material regulator to adjust the rotation speed of the spiral feeder; The solid deicing and snow removal material is transported into the solid material cavity channel to start the solid material transport operation; At the same time, the liquid controller, liquid increasing device and pressure controller are started, and the liquid material transportation operation is started by adjusting the liquid discharge flow rate of the liquid storage device and the pressure of the liquid boosting device; and the liquid material spraying device and the spraying controller are turned on, and the liquid material discharge speed and the shape of the thin layer of water film formed by the liquid are controlled by adjusting the liquid spraying amount of the liquid material spraying device, so that the solid deicing and snow removal material and the liquid deicing and snow removal material form a highly efficient pre-wetted premixed deicing and snow removal material, which is used for winter highway pavement deicing and snow removal operations.
[0017] In the present invention, the start-stop button is connected to the hydraulic power system to control the start and stop of the intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device, providing the whole machine with the function of starting and shutting down, and realizing the whole machine starting working mode and stopping working mode.
[0018] The emergency stop button is connected to the power supply line of the intelligent three-dimensional space synchronous pre-wet pre-mixed de-icing and snowing material spreading device, and is used to control the immediate stop of the intelligent three-dimensional space synchronous pre-wet pre-mixed de-icing and snowing material spreading device.
[0019] After the start-stop button is turned off, the device is still powered on, but it is not running. When the emergency stop button is pressed, the power supply is cut off, the entire device is not powered on, and all operations are stopped.
[0020] In view of the drawbacks of existing snow-melting agent spreading equipment and in combination with the development needs of safe, green and intelligent transportation, the present invention proposes an intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow-removing material spreading device and method, which is completely different from the existing snow-melting agent spreading equipment and methods, and can achieve uniform coverage of the entire road surface, spatial pre-wetting and pre-mixing of solid-liquid materials, and efficient spreading of fine materials and powders, so as to achieve a more uniform, fast, efficient, accurate and reduced spreading effect of snow-melting agents. The present invention can effectively solve the technical problems of de-icing and snow-removing on winter roads, is beneficial to improving the traffic capacity and service quality of winter roads, ensures the safety of winter road travel, enhances people's sense of security and happiness, and contributes to social and economic development.
[0021] The purpose of the present invention is to solve the engineering technical problems of spreading snow melting agent and removing ice and snow from highway pavement, and innovatively proposes an intelligent three-dimensional synchronous pre-wetting and pre-mixing snow and ice removal material spreading device and method, which has the following outstanding advantages: First, a creative snow-melting agent spreading method combining an ultra-high voltage air delivery system and a liquid high-pressure enhancement system is proposed. Among them, the ultra-high voltage air delivery system itself uses a high-speed rotating fan (i.e., an ultra-high voltage air delivery device) to generate wind power to blow out the solid snow-melting agent. The liquid high-pressure enhancement system uses the method of enhancing pressure to spray the liquid out. The combination of the two forms a new snow-melting agent spreading method; thereby achieving a more uniform spreading of ice and snow removal materials, achieving the effect of full coverage of the lane, preventing uneven spreading of ice and snow removal materials from causing poor or ineffective ice and snow removal effects, and effectively improving the effective area and overall effect of ice and snow removal on highway pavements. The more uniform spreading of ice and snow removal materials can quickly and effectively remove ice and snow within the road range, ensuring road safety.
[0022] Second, a three-dimensional synchronous pre-wetting and pre-mixing method is creatively proposed to achieve synchronous wetting, dissolution and rapid mixing of solid-liquid two-phase materials in three-dimensional space, so as to achieve the goal of rapid onset of de-icing materials (onset time is less than 1 minute), so that snow and ice on the road surface can be treated in time, and the safety hazards caused by ice and snow disasters can be reduced. This method is proposed for the first time at home and abroad, and has a groundbreaking creative significance. Among them, three-dimensional space refers to the spreading method formed in the three coordinate directions of X, Y, and Z. The snow-melting agent is sprayed out horizontally to form coverage in the X direction, and falls vertically under the action of gravity to form coverage in the Y direction. As the spreading vehicle moves longitudinally, it forms coverage in the Z direction, and finally forms a three-dimensional spreading method.
[0023] Third, a fusion mode of liquid surrounding solid is creatively designed, that is, liquid de-icing and snow removal materials are formed into a hollow cylindrical cavity structure mode through a high-pressure system (i.e., a liquid booster device and a liquid material spraying device), and solid de-icing and snow removal materials are transported to the hollow cylindrical cavity structure formed by liquid through the solid material cavity channel, so as to achieve the pre-wetting and dissolution and rapid mixing of solid-liquid two-phase materials in the three-dimensional structure of space, so that the solid-liquid two-phase materials have achieved the pre-wetting and pre-mixing effect when they land on the road surface. It should be pointed out that the solid de-icing and snow removal materials alone cannot achieve the effect of timely melting ice and snow, and when the liquid de-icing and snow removal materials are sprayed alone, the solubility of solids in water is limited (usually less than 30% under normal temperature conditions, and even lower under low temperature conditions in winter), resulting in the liquid de-icing and snow removal materials being diluted by melted snow water, ice water, precipitation, etc., and the corresponding de-icing and snow removal effect cannot be achieved, and even secondary freezing hazards may occur (generally, when the concentration of liquid de-icing and snow removal materials is reduced to below 5%, its de-icing and snow removal efficiency rapidly decays, and most of its de-icing and snow removal functions are lost). Therefore, a liquid-in-solid fusion mode of three-dimensional spatial synchronous pre-wetting and pre-mixing of solid-liquid two-phase materials is proposed, which avoids the disadvantage that pure solid de-icing and snow removal materials are ineffective. At the same time, since the liquid-in-solid fusion mode uses a small amount of liquid to pre-wet the solid, instead of dissolving all the solid in the liquid, it can not only achieve the purpose of rapid onset, but also can exert the effect of melting ice and snow for a long time. It has a fast onset and a long duration, and avoids the occurrence of secondary freezing after the melting of ice and snow.
[0024] Fourthly, the present invention realizes the effective spreading of solid de-icing and snow-removing materials of different particle sizes, such as granules, fine materials, and powders. The scope of use is wider, and the material exerts a more prominent effect, which solves the engineering problem that the existing spreading equipment cannot spread solid de-icing and snow-removing materials with smaller particle sizes.
[0025] Fifth, the present invention can realize the spreading of solid de-icing and snow material alone, and can also realize the spreading of liquid de-icing and snow material alone. At the same time, the more distinctive feature is that it can realize the synchronous spreading of two different forms of de-icing and snow material, solid and liquid, so as to achieve the purpose of uniform dissolution and mixing of solid-liquid two-phase materials, and realize the synchronous and more uniform spreading of solid de-icing and snow material of various particle sizes and liquid de-icing and snow material of various concentrations. Especially for powder materials with good de-icing and snow effect, the synchronous spreading of solid-liquid two-phase materials is more uniform, takes effect more quickly, and has a more obvious de-icing and snow effect.
[0026] Sixth, the present invention also creatively proposes to use low-concentration liquid de-icing and snow-removing materials to pre-wet and pre-mix with solid de-icing and snow-removing materials. Generally, the concentration of liquid de-icing and snow-removing materials is controlled at a minimum level close to engineering applications (generally controlled at 5%). This method avoids the freezing of a small amount of liquid de-icing and snow-removing materials when they are not effectively mixed with solid de-icing and snow-removing materials. If pure water or liquid de-icing and snow-removing materials with a concentration of less than 5% are used, they are prone to freezing in a low-temperature environment, and there is a risk of secondary freezing when sprayed on the road surface. At the same time, low-concentration liquid de-icing and snow-removing materials are easy to obtain and prepare, and have a low cost, have good promotion value and social and economic benefits, and are easily accepted by project managers.
[0027] Seventh, the present invention creatively realizes the dynamic adjustment of the use ratio of solid de-icing and snow-removing materials and liquid de-icing and snow-removing materials. The ratio of solid and liquid can be dynamically adjusted according to the different particle sizes, different solubilities, different types and other characteristics of de-icing and snow-removing materials to achieve the best pre-wetting effect. At the same time, in actual engineering, in addition to the performance of different materials, the solid-liquid ratio used varies greatly according to different snowfall amounts, ice thicknesses, and other natural environmental influences. Therefore, the present invention provides a dynamic adjustment function of solid-liquid two-phase materials in engineering, which provides technical support for achieving the best ice-melting chemical purpose, and is a unique performance of the present invention for solving actual engineering problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of the intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow material spreading device of the present invention; Among them, 1. Control room; 2. Hydraulic power system; 3. Integrated box; 4. Solid storage bin; 5. Screw loader; 6. Solid material regulator; 7. UHV air delivery device; 8. Air delivery regulator; 9. Liquid storage tank; 10. Liquid regulator; 11. Liquid booster device; 12. Pressure regulator; 13. Liquid spraying device; 14. Spraying regulator; 15. Solid cavity channel; 16. Pre-wetted and pre-mixed de-icing and snowing materials; 17. Monitoring instrument; 18. Visual screen; 19. Convenient air delivery control knob; 20. Convenient solid material control knob; 21. Convenient liquid material control knob; 22. Convenient pressure control knob; 23. Convenient spraying control knob; 24. Start and stop button; 25. Emergency stop button. DETAILED DESCRIPTION
[0029] The present invention is further described in detail below in conjunction with embodiments.
[0030] Those skilled in the art will appreciate that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.
[0031] Those skilled in the art will appreciate that, unless expressly stated, the singular forms "a", "an", "said" and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present invention refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" to another element, it may be directly connected to the other element, or there may be intermediate elements. In addition, the "connection" used here may include wireless connections. The term "and / or" used here includes any unit and all combinations of one or more associated listed items.
[0032] In the description of the present invention, unless otherwise specified, "plurality" means two or more than two. The terms "inside", "upper", "lower", etc., indicating positions or state relationships, are based on the positions or state relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operate in a specific position, and therefore cannot be understood as limiting the present invention.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "provided with" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention will be understood according to specific circumstances.
[0034] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as generally understood by those skilled in the art in the field to which the present invention belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.
[0035] like Figure 1 As shown, the intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device includes a hydraulic power system 2, a solid material storage bin 4, a spiral feeder 5, a solid material regulator 6, an ultra-high voltage air delivery device 7, an air delivery regulator 8, a liquid storage 9, a liquid regulator 10, a liquid booster 11, a pressure regulator 12, a liquid material spraying device 13, a spraying regulator 14 and a solid material cavity channel 15; The hydraulic power system 2 is respectively connected to the screw feeder 5, the UHV air delivery device 7, the liquid pressurizing device 11, and the liquid material spraying device 13, and is used to provide power for the screw feeder 5, the UHV air delivery device 7, the liquid pressurizing device 11, and the liquid material spraying device 13; The solid material storage bin 4 is connected to the middle of the solid material cavity channel 15 through a screw feeder 5; The solid material regulator 6 is connected to the screw feeder 5 and is used to control the rotation speed of the screw feeder 5; The UHV air delivery device 7 is connected to the front of the solid material cavity channel 15; The air delivery regulator 8 is connected to the UHV air delivery device 7 and is used to control the air delivery pressure of the UHV air delivery device 7; The liquid storage device 9 is connected to the liquid material spraying device 13 through the liquid pressurizing device 11; The liquid controller 10 is connected to the liquid storage 9 and is used to control the liquid discharge flow rate of the liquid storage 9; The pressure regulator 12 is connected to the liquid pressurizing device 11 and is used to control the pressure of the liquid pressurizing device 11; The liquid material spraying device 13 is installed at the tail end of the solid material cavity channel 15; The spraying regulator 14 is connected to the liquid material spraying device 13 and is used to control the liquid material spraying amount of the liquid material spraying device 13 .
[0036] Specifically, it also includes an integrated box 3; a screw feeder 5, a solid material regulator 6, an ultra-high voltage air delivery device 7, an air delivery regulator 8, a liquid regulator 10, a liquid pressurizing device 11, a pressure regulator 12, a liquid material spraying device 13 and a spraying regulator 14 are all installed in the integrated box 3; Except for the feeding end of the solid material storage bin 4 which is arranged in the integrated box body 3, the other parts are arranged in the solid material storage bin 4; Except for the feed end of the liquid storage 9 which is arranged in the integrated box 3, the rest of the liquid storage 9 is arranged in the solid storage bin 4; Except for the discharge end of the solid material cavity channel 15 which is arranged in the integrated box 3 , the other parts are arranged in the solid material storage bin 4 .
[0037] Specifically, it also includes a monitoring device 17, which is installed outside the integrated box 3 and is used to monitor the spreading of ice and snow removal materials on the road surface.
[0038] Specifically, it also includes a visualization screen 18, a convenient air delivery control knob 19, a convenient solid material control knob 20, a convenient liquid material control knob 21, a convenient pressure control knob 22 and a convenient spraying control knob 23; A visualization screen 18 is connected to the monitor 17 and is used to control the operation of the monitor 17 and to display the images monitored by the monitor 17; The convenient air delivery control knob 19 is connected to the UHV air delivery device 7 and the air delivery controller 8, respectively, and is used to control the start and stop of the UHV air delivery device 7 and the air delivery controller 8; it is also used to remotely control the adjustment button of the air delivery controller 8, so as to realize the control of the air delivery pressure of the UHV air delivery device 7; The convenient solid material regulating knob 20 is connected to the screw feeder 5 and the solid material regulator 6 respectively, and is used to control the start and stop of the screw feeder 5 and the solid material regulator 6, and is also used to remotely control the adjustment button of the solid material regulator 6, so as to realize the control of the rotation speed of the screw feeder 5; The convenient liquid material regulating knob 21 is connected to the liquid regulator 10 and is used to control the start and stop of the liquid regulator 10 and is also used to remotely control the regulating button of the liquid regulator 10, thereby realizing the control of the liquid discharge flow rate of the liquid storage device 9; The convenient pressure regulating knob 22 is connected to the liquid boosting device 11 and the pressure regulator 12 respectively, and is used to control the start and stop of the liquid boosting device 11 and the pressure regulator 12, and is also used to remotely control the adjustment button of the pressure regulator 12, so as to realize the control of the pressure of the liquid boosting device 11; The convenient spray control knob 23 is connected to the liquid spray device 13 and the spray controller 14 respectively, and is used to control the start and stop of the liquid spray device 13 and the spray controller 14, and is also used to remotely control the adjustment button of the spray controller 14, so as to control the liquid spray amount of the liquid spray device 13.
[0039] Specifically, it also includes a control room 1, in which a visualization screen 18, a convenient air delivery control knob 19, a convenient solid material control knob 20, a convenient liquid material control knob 21, a convenient pressure control knob 22 and a convenient spraying control knob 23 are all installed.
[0040] Specifically, the control room 1 also includes a start-stop button 24 and an emergency stop button 25; The start / stop button 24 is used to control the start / stop of the intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow material spreading device; The emergency stop button 25 is used to control the immediate stop of the intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device.
[0041] Specifically, the liquid material spraying device 13 is a circular ring structure, the inner ring of which is fixed to the outer circumference of the solid material cavity channel 15; and a plurality of spray heads are arranged on the circular ring structure.
[0042] The intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow material spreading method adopts the above-mentioned intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow material spreading device, and comprises the following steps: Adding solid deicing and snow removal material into the solid storage bin and adding liquid deicing and snow removal material into the liquid storage tank; Start the hydraulic power system; Turn on the UHV air delivery device and the air delivery regulator to adjust the air delivery pressure of the UHV air delivery device; turn on the spiral feeder and the solid material regulator to adjust the rotation speed of the spiral feeder; The solid deicing and snow removal material is transported into the solid material cavity channel to start the solid material transport operation; At the same time, the liquid controller, liquid increasing device and pressure controller are started, and the liquid material transportation operation is started by adjusting the liquid discharge flow rate of the liquid storage device and the pressure of the liquid boosting device; and the liquid material spraying device and the spraying controller are turned on, and the liquid material discharge speed and the shape of the thin layer of water film formed by the liquid are controlled by adjusting the liquid spraying amount of the liquid material spraying device, so that the solid deicing and snow removal material and the liquid deicing and snow removal material form a highly efficient pre-wetted premixed deicing and snow removal material, which is used for winter highway pavement deicing and snow removal operations.
[0043] In the present invention, the control room 1 provides a space for personnel to control equipment and a storage space for various convenient control components, as well as a monitoring position for a visualization screen.
[0044] The hydraulic power system 2 provides the whole machine hydraulic power system and is the power source of the whole machine.
[0045] The integrated box 3 provides a placement space for each component of the whole machine, has sufficient bearing capacity, strength and rigidity, and can run on a road surface under the traction of the power system.
[0046] The solid storage bin 4 provides space for storing solid de-icing and snow removal materials and is resistant to chemical corrosion. Its space is a conical structure with a circular discharge port at the bottom to facilitate the solid de-icing and snow removal materials to slide downward under the action of gravity.
[0047] The spiral feeder 5 provides a feeding path for solid de-icing and snow removal materials, and adopts a spiral feeding method inside. This method can effectively prevent the solid de-icing and snow removal materials from being blocked in the pipeline, avoiding the disadvantage of the traditional mode of feeding only by gravity, which is prone to blockage. In addition, the spiral feeding method is adopted, which is convenient for controlling the amount of solid de-icing and snow removal materials, making the discharge amount control more precise.
[0048] The solid material controller 6 is used to control the amount of solid de-icing and snow-removing material. The amount of solid de-icing and snow-removing material is controlled by adjusting the rotation speed of the spiral feeder 5. This method can achieve the purpose of accurately controlling the amount of solid de-icing and snow-removing material.
[0049] The ultra-high voltage air delivery device 7 is used to provide high-pressure air delivery power for solid deicing and snow removal materials, so that the solid deicing and snow removal materials enter the solid material cavity channel 15 at high speed, and are mixed with the hollow cavity columnar structure formed by the liquid material spraying device 13 to form pre-wet pre-mixed deicing and snow removal materials 16, which are then spread on the road surface.
[0050] The air delivery regulator 8 is used to control the UHV air delivery device 7. The air delivery pressure is controlled to adjust the running speed of the solid deicing and snow removal material, so as to achieve the width of the road lane covered by the solid deicing and snow removal material. The maximum spreading width of the solid deicing and snow removal material is usually set to be not less than 12m, and it runs synchronously with the liquid deicing and snow removal material.
[0051] The liquid storage tank 9 is used for storing liquid deicing and snow removing materials, has chemical corrosion resistance, and has sufficient rigidity, strength and high pressure resistance.
[0052] The liquid controller 10 is used to control the discharge amount of the liquid deicing material, and controls the liquid flow rate in the liquid storage 9 to achieve the purpose of controlling the amount of the liquid deicing material.
[0053] The liquid booster 11 is used to increase the output pressure of the liquid deicing material, and accelerate the flow rate of the liquid by increasing the pressure value of the liquid deicing material, so that the liquid deicing material is sprayed in a high-speed, uniform mist form, thereby achieving the purpose of long-distance spraying of the liquid deicing material.
[0054] The pressure regulator 12 is used to adjust the pressure value of the liquid booster device 11. By adjusting the pressure, the flow rate of the liquid de-icing and snow removing material is controlled, thereby controlling the spraying distance of the liquid de-icing and snow removing material. It is usually required that the maximum spraying distance of the liquid de-icing and snow removing material sprayed by the liquid spraying device 13 is not less than 12m.
[0055] The liquid spraying device 13 is used to spray the liquid de-icing and snow-removing material on the road surface. The device is arranged in a circular ring shape, and a plurality of liquid spraying heads are arranged around the circle. Each spraying head can be physically closed and opened individually, and the shape and size of the liquid spraying can be adjusted. The liquid spraying device 13 is usually required to spray the liquid de-icing and snow-removing material in a cylindrical hollow structure mode so as to be mixed with the solid de-icing and snow-removing material in advance, and the sprayed liquid is generally required to be in a mist state to control the uniformity of the liquid de-icing and snow-removing material. The mist-like liquid de-icing and snow-removing material is conducive to wrapping the solid de-icing and snow-removing material, and is more conducive to pre-wetting and pre-mixing of the two solid-liquid de-icing and snow-removing materials.
[0056] The spraying regulator 14 is used to control the liquid flow rate of the liquid spraying device 13. By adjusting the liquid flow rate, the amount of liquid sprayed on the road surface is controlled, so as to adjust the pre-wetting and pre-mixing effect of the liquid and solid de-icing materials to achieve the best de-icing effect. In actual engineering applications, the ratio of liquid to solid materials is very important. It is not easy to have too much liquid, but too little liquid will affect the effect of the de-icing material after pre-wetting and pre-mixing. Therefore, for each de-icing material, the amount of liquid should be adjusted according to the test data, and the spraying regulator 14 plays a regulatory role.
[0057] The solid material cavity channel 15 provides a high-speed running channel for the solid deicing material. The solid deicing material passes through the channel and reaches the hollow cavity structure formed by the spraying of the liquid deicing material, achieving the effect of pre-wetting and pre-mixing with the liquid deicing material. The channel has sufficient strength and rigidity, can withstand high pressure, and has chemical corrosion resistance.
[0058] The pre-wetted and pre-mixed de-icing and snow-removing material 16 is a de-icing and snow-removing material formed by synchronously pre-wetting and pre-mixing solid and liquid de-icing and snow-removing materials within a spatial range. The material has a fast-acting and long-lasting de-icing and snow-removing effect.
[0059] The monitoring device 17 is used to monitor the spreading of de-icing and snow removal materials on the road surface, provide visual on-site image data for operators, and observe the spreading uniformity and coverage area of de-icing and snow removal materials in real time, so that operators can adjust the spreading amount, running speed, etc. at any time. At the same time, foreign objects that may appear on the working surface during the operation can be discovered in time, and unnecessary risks can be avoided in time, such as sudden intrusion of personnel or vehicles into the working area.
[0060] The visualization screen 18 is used to start and stop the control monitor 17 in the control room 1, and to observe the images monitored by the monitor 17 in real time, so as to provide a visualization image information basis for dynamically adjusting the control operation.
[0061] The convenient air delivery control knob 19 is used to remotely control the start and stop of the ultra-high voltage air delivery device 7 and the air-saving air delivery controller 8 in the control room 1, and to remotely control the adjustment button of the air delivery controller 8, so as to provide different conveying speeds for solid de-icing and snow removal materials, achieve different operating speeds and coverage distances, and realize a convenient control mode in the control room 1.
[0062] The convenient solid material control knob 20 is used to remotely control the start and stop of the spiral feeder 5 and the solid material controller 6 in the control room 1, as well as to remotely control the adjustment button of the solid material controller 6. The amount of solid de-icing and snow removing material is controlled by adjusting the rotation speed, so as to achieve the purpose of regulating the solid feed amount and realize a convenient control mode in the control room 1.
[0063] The convenient liquid material control knob 21 is used to remotely control the start and stop of the liquid controller 10 in the control room 1. The amount of liquid material can be controlled by remotely controlling the adjustment button of the liquid controller 10 to achieve the best pre-wetting effect, providing a convenient control mode in the control room 1.
[0064] The convenient pressure control knob 22 is used to remotely control the start and stop of the liquid boosting device 11 and the pressure regulator 12 in the control room 1, as well as the adjustment button of the pressure regulator 12. By controlling the pressure of the liquid boosting device 11, the liquid material discharge speed is controlled, thereby adjusting the liquid material pre-wetting effect and the spraying distance, thereby realizing a convenient control mode in the control room 1.
[0065] The convenient spray control knob 23 is used to remotely control the liquid spraying device 13 and adjust the start and stop of the spraying controller 14 in the control room 1, and remotely control the adjustment button of the spraying controller 14. By adjusting the amount of liquid spraying, the effect of spraying a thin layer of water film of different areas and shapes is formed, thereby achieving the best pre-wetting and pre-mixing goals with solid de-icing and snow removal materials, and realizing a convenient control mode in the control room 1.
[0066] The start / stop button 24 provides the whole machine with the functions of starting and stopping, so as to realize the whole machine starting working mode and stopping working mode.
[0067] The emergency stop button 25 provides a function for stopping the entire machine from working in an emergency. This function key is set to prevent accidents. When the button is pressed, the entire machine stops working immediately.
[0068] The present invention adopts liquid de-icing and snow removal materials that meet the actual needs of the project, preferably low-concentration liquid de-icing and snow removal materials; low-concentration liquid de-icing and snow removal materials are proposed to prevent the occurrence of secondary icing. For example, when pure water is used as a liquid spraying agent, it is inevitable that a small amount of pure water liquid will not be fused with the solid de-icing agent in the project. Then, under low temperature conditions, the pure water liquid may be re-iced. Therefore, in order to avoid this situation, a low-concentration solution that ensures that the liquid does not freeze at -15°C is used, and 5% of the solid de-icing agent material is usually added. The purpose of this is to prevent the liquid from freezing when it is sprayed alone. However, low-concentration liquids can only keep themselves from freezing, and will not have a good de-icing and snow removal effect. In general, the phenomenon of liquid and solid not mixing will not occur on a large scale. It only prevents the occurrence of a small amount of liquid freezing events and increases safety.
[0069] The spreading process of the present invention is as follows:
[0070] When the equipment is used on a road section where de-icing materials need to be spread, first add solid de-icing materials that meet the actual needs of the project to the solid storage bin 4 in the integrated box 3, and at the same time add liquid de-icing materials that meet the actual needs of the project to the liquid storage tank 9 for actual spreading. Turn on the start / stop button 24 to start the overall equipment operation mode, then turn on the hydraulic power system 2 to start the whole machine power system. Turn on the monitor start / stop and visualization screen 18, turn on the monitor 17, and transmit the on-site operation image information to the monitor start / stop and visualization screen 18 in real time, so that on-site operators can dynamically observe the image information.
[0071] The UHV air delivery device 7 and the air delivery regulator 8 are turned on through the convenient air delivery start and stop and control knob 19, and the adjustment button of the air delivery regulator 8 is remotely controlled to control the air delivery pressure of the UHV air delivery device 7 to meet actual engineering needs.
[0072] Turn on the convenient solid material start / stop and control knob 20, turn on the spiral feeder 5 and the solid material controller 6, and remotely control the adjustment button of the solid material controller 6 according to actual engineering needs, so as to control the rotation speed of the spiral feeder 5 to meet the operating speed required by the actual engineering project, and transport the solid deicing and snow removal materials to the solid material cavity channel 15 to start the solid material transportation operation.
[0073] At the same time, turn on the convenient liquid start / stop and control knob 21 and the convenient pressure start / stop and control knob 22, start the liquid controller 10, the liquid increasing device 11 and the pressure controller 12, and remotely control the adjustment button of the liquid controller 10 to control the liquid discharge flow rate of the liquid storage device 9; remotely control the adjustment button of the pressure controller 12 to control the pressure of the liquid boosting device 11; and finally achieve the actual required amount of liquid.
[0074] Turn on the convenient spray start / stop and control knob 23, turn on the liquid spraying device 13 and the spraying controller 14, remotely control the adjustment button of the spraying controller 14, control the liquid discharge speed and the shape of the thin layer of water film formed by the liquid, so as to achieve the best engineering effect and form a highly efficient pre-wetted pre-mixed deicing and snow removal material 16 for winter highway pavement deicing and snow removal operations.
[0075] When the snow and ice removal operation is completed, turn off the convenient spraying start and stop and control knob 23, the convenient pressure start and stop and control knob 22, the convenient liquid material start and stop and control knob 21, the convenient solid material start and stop and control knob 20, the convenient air delivery start and stop and control knob 19, turn off the hydraulic power system 2, turn off the monitoring start and stop and visualization screen 18, and turn off the start and stop button 24. In an emergency, turn off the emergency stop button 25 to stop the operation of all parts of the equipment to prevent accidents.
[0076] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. Intelligent three-dimensional synchronous pre-wetting and pre-mixing de-icing and snow material spreading device, characterized in that: It comprises a hydraulic power system (2), a solid material storage bin (4), a screw feeder (5), a solid material regulator (6), an ultra-high pressure air delivery device (7), an air delivery regulator (8), a liquid storage device (9), a liquid regulator (10), a liquid pressurizing device (11), a pressure regulator (12), a liquid material spraying device (13), a spraying regulator (14) and a solid material cavity channel (15); The hydraulic power system (2) is respectively connected to the screw feeder (5), the ultra-high pressure air delivery device (7), the liquid pressurizing device (11), and the liquid material spraying device (13), and is used to provide power for the screw feeder (5), the ultra-high pressure air delivery device (7), the liquid pressurizing device (11), and the liquid material spraying device (13); The solid material storage bin (4) is connected to the middle of the solid material cavity channel (15) via a screw feeder (5); The solid material controller (6) is connected to the screw feeder (5) and is used to control the rotation speed of the screw feeder (5); The ultra-high voltage air delivery device (7) is connected to the front of the solid material cavity channel (15); The air delivery regulator (8) is connected to the ultra-high voltage air delivery device (7) and is used to control the air delivery pressure of the ultra-high voltage air delivery device (7); The liquid storage device (9) is connected to the liquid material spraying device (13) via the liquid pressurizing device (11); The liquid controller (10) is connected to the liquid storage device (9) and is used to control the liquid discharge flow rate of the liquid storage device (9); The pressure regulator (12) is connected to the liquid pressurizing device (11) and is used to control the pressure of the liquid pressurizing device (11); The liquid material spraying device (13) is installed at the rear of the solid material cavity channel (15); The spraying regulator (14) is connected to the liquid material spraying device (13) and is used to control the amount of liquid material sprayed by the liquid material spraying device (13).
2. The intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device according to claim 1 is characterized in that: It also includes an integrated box (3); a screw feeder (5), a solid material regulator (6), an ultra-high voltage air delivery device (7), an air delivery regulator (8), a liquid regulator (10), a liquid pressurizing device (11), a pressure regulator (12), a liquid material spraying device (13) and a spraying regulator (14) are all installed in the integrated box (3); The solid material storage bin (4) has a feed end which is arranged in the integrated box body (3), and the other parts are arranged in the solid material storage bin (4); The liquid storage device (9) is provided in the solid storage bin (4), except that the feed end of the liquid storage device (9) is provided in the integrated box (3); The solid material cavity channel (15) is provided in the solid material storage bin (4), except for the discharge end thereof which is provided in the integrated box (3).
3. The intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device according to claim 2 is characterized in that: It also includes a monitoring device (17), which is installed outside the integrated box (3) and is used to monitor the spreading of ice and snow removal materials on the road surface.
4. The intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device according to claim 3 is characterized in that: It also includes a visual screen (18), a convenient air delivery control knob (19), a convenient solid material control knob (20), a convenient liquid material control knob (21), a convenient pressure control knob (22) and a convenient spray control knob (23); A visualization screen (18) is connected to the monitoring device (17) and is used to control the operation of the monitoring device (17) and to display the images monitored by the monitoring device (17); The convenient air delivery control knob (19) is respectively connected to the UHV air delivery device (7) and the air delivery controller (8) and is used to control the start and stop of the UHV air delivery device (7) and the air delivery controller (8); and is also used to remotely control the adjustment button of the air delivery controller (8), thereby realizing control of the air delivery pressure of the UHV air delivery device (7); The convenient solid material regulating knob (20) is connected to the screw feeder (5) and the solid material regulator (6) respectively, and is used to control the start and stop of the screw feeder (5) and the solid material regulator (6), and is also used to remotely control the regulating button of the solid material regulator (6), thereby realizing the control of the rotation speed of the screw feeder (5); A convenient liquid material regulating knob (21) is connected to the liquid regulator (10) and is used to control the start and stop of the liquid regulator (10), and is also used to remotely control the regulating button of the liquid regulator (10), thereby achieving control of the liquid discharge flow rate of the liquid storage device (9); A convenient pressure regulating knob (22) is connected to the liquid pressurizing device (11) and the pressure regulator (12) respectively, and is used to control the start and stop of the liquid pressurizing device (11) and the pressure regulator (12), and is also used to remotely control the regulating button of the pressure regulator (12), thereby realizing the control of the pressure of the liquid pressurizing device (11); The convenient spraying control knob (23) is connected to the liquid material spraying device (13) and the spraying control device (14) respectively, and is used to control the start and stop of the liquid material spraying device (13) and the spraying control device (14), and is also used to remotely control the adjustment button of the spraying control device (14), thereby realizing control of the liquid material spraying amount of the liquid material spraying device (13).
5. The intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device according to claim 3 is characterized in that: It also includes a control room (1), in which a visual screen (18), a convenient air delivery control knob (19), a convenient solid material control knob (20), a convenient liquid material control knob (21), a convenient pressure control knob (22) and a convenient spray control knob (23) are all installed.
6. The intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device according to claim 5 is characterized in that: The control room (1) also includes a start / stop button (24) and an emergency stop button (25); The start / stop button (24) is used to control the start / stop of the intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device; The emergency stop button (25) is used to control the intelligent three-dimensional synchronous pre-wet pre-mixed deicing and snow material spreading device to immediately stop working.
7. The intelligent three-dimensional synchronous pre-wet pre-mixed de-icing and snow material spreading device according to claim 1 is characterized in that: The liquid material spraying device (13) is a circular ring structure, the inner ring of which is fixed to the outer circumference of the solid material cavity channel (15); and a plurality of spray heads are provided on the circular ring structure.
8. An intelligent three-dimensional synchronous pre-wetted pre-mixed de-icing and snowing material spreading method, using the intelligent three-dimensional synchronous pre-wetted pre-mixed de-icing and snowing material spreading device according to any one of claims 1 to 7, characterized in that: The steps include: Adding solid deicing and snow removal material into the solid storage bin and adding liquid deicing and snow removal material into the liquid storage tank; Start the hydraulic power system; Turn on the UHV air delivery device and the air delivery regulator to adjust the air delivery pressure of the UHV air delivery device; turn on the spiral feeder and the solid material regulator to adjust the rotation speed of the spiral feeder; The solid deicing and snow removal material is transported into the solid material cavity channel to start the solid material transport operation; At the same time, the liquid controller, liquid increasing device and pressure controller are started, and the liquid material transportation operation is started by adjusting the liquid discharge flow rate of the liquid storage device and the pressure of the liquid boosting device; and the liquid material spraying device and the spraying controller are turned on, and the liquid material discharge speed and the shape of the thin water film formed by the liquid are controlled by adjusting the liquid spraying amount of the liquid material spraying device, so that the solid deicing and snow removal material and the liquid deicing and snow removal material form a highly efficient pre-wetted premixed deicing and snow removal material, which is used for winter highway pavement deicing and snow removal operations.