Precise installation system and method for earth and rockfill dam monitoring and sensing equipment

By using a three-dimensional mesh structure and a unified and standardized installation mechanism in the anti-seepage wall of the earth and rock dam, the problems of inaccurate sensor installation and buoyancy are solved, and more efficient and flexible installation of monitoring equipment is achieved, and the reliability of monitoring data is improved. and construction efficiency.

CN118958305AInactive Publication Date: 2024-11-15NANJING HYDRAULIC RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411176321.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The installation method of existing earth and rock dam anti-seepage wall monitoring instruments has problems such as inaccurate installation of sensors due to buoyancy and poor contact between the soil pressure gauge and the upstream surface, which has affected the accuracy and reliability of the monitoring data.

Method used

A three-dimensional mesh structure is formed by multiple main ribs, first connecting ribs and secondary ribs, and fixed by binding parts, combined with a unified and standardized installation mechanism and positioning components to ensure the precise installation and fixation of the sensor, avoiding buoyancy and position deviation.

Benefits of technology

It improves the installation accuracy and system flexibility of the sensor, simplifies the installation process, reduces the manufacturing cost of fixed devices, reduces the waste of resources and rework caused by customized design, and improves the construction efficiency and sensor survival rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958305A_ABST
    Figure CN118958305A_ABST
Patent Text Reader

Abstract

The invention discloses a precise installation system and method for earth and rockfill dam monitoring and sensing equipment, and belongs to the technical field of earth and rockfill dam monitoring. Comprising a plurality of main ribs, a first connecting rib, a plurality of auxiliary ribs, a second connecting rib, a binding piece, a mounting mechanism and a fixing mechanism, the plurality of main reinforcements are arranged in an array; the first connecting rib wraps the main rib in the length direction of the main rib; a three-dimensional net-shaped structure is formed between the first connecting ribs and the main ribs; the auxiliary ribs are partially arranged in the three-dimensional net-shaped structure, and the rest of the auxiliary ribs extend out of the three-dimensional net-shaped structure. The second connecting ribs surround the auxiliary ribs; the binding pieces are used for binding the cross positions between the main reinforcements and the first connecting reinforcements, the cross positions between the auxiliary reinforcements and the second connecting reinforcements and the cross positions between the first connecting reinforcements and the second connecting reinforcements; the mounting mechanism comprises a mounting seat and a positioning assembly; the fixing mechanism is arranged on the surface of the earth and rockfill dam and connected to the auxiliary ribs in a sleeving mode. A unified and standardized mounting mechanism is adopted to adapt to sensors of various shapes and sizes, and the flexibility of the system is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of earth-rock dam monitoring, and in particular relates to a precise installation system and method for earth-rock dam monitoring sensing equipment. Background Art

[0002] The earth-rock dam anti-seepage wall is the key to the dam's anti-seepage. The stress monitoring inside the earth-rock dam anti-seepage wall and the monitoring of the soil pressure in contact with the upstream and downstream surfaces are very important. They can detect the deformation trend of the anti-seepage wall in advance and provide early warning. At present, strain gauges, soil pressure gauges, and stress-free gauges are mainly installed in the anti-seepage wall for monitoring.

[0003] According to the construction process of earth-rock dam anti-seepage wall, the dam is filled to the corresponding height, the anti-seepage wall groove is excavated, and then grouting backfill is performed. The existing installation method of monitoring instruments in the anti-seepage wall of earth-rock dam is usually: each sensor is tied to the steel cage, and a hanging gravity block is installed at the bottom of the steel cage to maintain the balance of the steel cage. During the grouting backfill, the sensor is easily affected by buoyancy and the elevation is not installed accurately, and the soil pressure gauge has poor contact with the upstream surface. Summary of the invention

[0004] Purpose of the invention: In order to solve the above problems, the present invention provides a precise installation system and method for earth-rock dam monitoring and sensing equipment.

[0005] Technical solution: A precise installation system for monitoring and sensing equipment of earth-rock dams, applied to the construction of earth-rock dam anti-seepage walls, including: A plurality of main ribs are arranged in an array and extend in a straight line parallel to each other; A first connecting rib is wrapped around the main rib along the length direction of the main rib; a three-dimensional mesh structure is formed between the first connecting rib and the main rib; A plurality of auxiliary ribs, some of which are disposed in the three-dimensional mesh structure and the rest of which extend out of the three-dimensional mesh structure; second connecting ribs, which surround the secondary ribs and are arranged at intervals and parallel to each other along the length direction of the secondary ribs; the second connecting ribs are located in the three-dimensional mesh structure; A binding piece is used to bind the intersection between the main reinforcement and the first connecting reinforcement, the secondary reinforcement and the second connecting reinforcement, and the first connecting reinforcement and the second connecting reinforcement; The mounting mechanism comprises a mounting seat detachably connected to the main rib, and a positioning assembly disposed on the mounting seat and used for positioning sensors of different shapes; The fixing mechanism is arranged on the surface of the earth-rock dam and sleeved on the secondary reinforcement; the fixing mechanism is used to limit the top of the main reinforcement.

[0006] In a further embodiment, the mounting base comprises: A seat body, in which an assembly cavity is arranged; the top surface and the bottom surface of the seat body are both provided with a groove body of a predetermined width; A first clamping block is installed in the assembly cavity; A second clamping block is connected to the first clamping block; the main rib is accommodated between the first clamping block and the second clamping block; The assembly part is clamped in the seat body and has an acting force between the assembly part and the second clamping block.

[0007] In a further embodiment, the positioning assembly comprises: The positioning seat comprises a first mounting portion and a second mounting portion which are connected; An adjusting member is rotatably disposed in the first mounting portion; an external thread is disposed in the length of the upper portion of the adjusting member; A positioning belt, one end of which is connected to the inner wall of the second mounting portion; the other end of the positioning belt passes through the second mounting portion so that the positioning belt itself forms a positioning space; the positioning belt is provided with a slot hole engaged with the external thread.

[0008] In a further embodiment, a plurality of clamping portions for connecting to the mounting seat are provided on the outer wall of the first mounting portion.

[0009] In a further embodiment, the fixing mechanism comprises: A frame is fixed to the surface of the earth-rock dam; Support members of different sizes are arranged at the top and the bottom; the top surface of the support member is provided with a plurality of vertical members; the vertical members are connected to the secondary reinforcement; A connecting line, used to connect to the vertical members arranged above and below; The lifting member is arranged between the frame and the supporting member adjacent to the frame.

[0010] In a further embodiment, the predetermined width is greater than the outer diameter of the main rib and less than the width of the second clamping block.

[0011] In a further embodiment, an elastic layer is provided on one end of the second clamping block close to the first clamping block.

[0012] In another technical solution, a method for accurately installing earth-rock dam monitoring sensing equipment is provided, based on the above-mentioned accurate installation system for earth-rock dam monitoring sensing equipment, comprising the following steps: Determine the design position of the cut-off wall based on the geographical location of the earth-rock dam, and excavate the cut-off wall based on the design position; Assembling a plurality of main ribs and a first connecting rib into a three-dimensional mesh structure, and installing secondary ribs and a second connecting rib on the three-dimensional mesh structure to form a supporting mechanism; Determine the number of mounting mechanisms based on the shape of the sensor; clamp the mounting seat onto the main rib, and position the sensor in the positioning assembly; assemble the positioning assembly onto the mounting seat; The supporting mechanism is placed vertically in the anti-seepage wall, and the frame is fixed on the surface of the earth-rock dam; the vertical member is fixedly connected to the secondary reinforcement by using a binding piece, and the upper and lower vertical members are connected by a connecting wire, and the connecting wire is kept in a tensioned state by using a lifting piece; Pour concrete into the anti-seepage wall and cover the supporting mechanism and the sensor; after pouring, remove the fixing mechanism.

[0013] Beneficial effects: (1) The present invention adopts a unified and standardized installation mechanism to accommodate sensors of various shapes and sizes, thereby improving the flexibility of the system. When the sensor is updated or changed, there is no need to redesign the fixture, thereby reducing resource waste. The unified installation method and interface design simplify the installation process and improve work efficiency. The manufacturing cost of a single fixture is reduced, and the R&D and production costs caused by customized design are reduced.

[0014] (2) The fixing mechanism in the present invention can ensure that the main reinforcement is positioned accurately in the anti-seepage wall, thereby preventing the sensor from deviating from the installation position due to the main reinforcement floating up or shifting due to buoyancy during concrete pouring. By fixing the main reinforcement, the rework required due to the displacement of the main reinforcement position is reduced, thereby improving construction efficiency. After pouring, the secondary reinforcement is cut and the fixing mechanism is removed to avoid obstacles to subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is an enlarged view of the main reinforcement and the secondary reinforcement; Figure 3 yes Figure 1 A magnified view of the structure at center; Figure 4 It is the assembly drawing of the mounting seat and the main reinforcement; Figure 5 It is a schematic diagram of the structure of the positioning component; Figure 6 yes Figure 1 A magnified view of the structure at B in the middle; Figure 7 It is a top view of the fixing mechanism.

[0016] Figures 1 to 7The labels are: main reinforcement 1, first connecting reinforcement 2, auxiliary reinforcement 3, second connecting reinforcement 4, installation mechanism 5, mounting seat 51, seat body 511, slot body 512, first clamping block 513, second clamping block 514, assembly part 515, positioning assembly 52, positioning seat 521, first mounting part 5211, second mounting part 5212, clamping part 5213, adjustment part 522, positioning belt 523, slot hole 5231, fixing mechanism 6, frame 61, support part 62, vertical part 63, connecting line 64, lifting part 65, earth-rock dam 7, strain gauge 8, earth pressure gauge 9, stress-free gauge 10. DETAILED DESCRIPTION

[0017] Example 1 The traditional method of installing earth-rock dam monitoring and sensing equipment is generally to tie the sensor directly to the steel cage with a binding tape. Each sensor needs to be tied separately and firmly. Due to the complex conditions on the construction site and the influence of factors such as weather, the lines are prone to cross and confusion during the binding process, and it is difficult to ensure the accurate position of each sensor. Moreover, when the binding tape is hoisted and connected together with the steel cage, it is easy to cause damage to the sensor due to friction, impact and other factors. In addition, during the pouring of concrete, large deformation during concrete mixing, impact and solidification may also cause sensor damage.

[0018] In order to solve the above problems, this embodiment provides a precise installation system for earth-rock dam monitoring and sensing equipment, which is applied to the construction of earth-rock dam anti-seepage walls, including: multiple main reinforcements 1, first connecting reinforcements 2, multiple secondary reinforcements 3, second connecting reinforcements 4, binding parts, installation mechanisms 5, and fixing mechanisms 6.

[0019] like Figure 1 , Figure 2 As shown, the main reinforcements 1 are arranged in an array, and at least four are set. The main reinforcements 1 extend in a straight line parallel to each other. The main reinforcements 1 have a certain rigidity, such as steel bars. When the main reinforcements 1 are placed in the anti-seepage wall, the main reinforcements 1 are suspended or not suspended based on the needs. The first connecting reinforcement 2 wraps the main reinforcement 1 along the length direction of the main reinforcement 1, and a three-dimensional mesh structure is formed between the first connecting reinforcement 2 and the main reinforcement 1. In this example, the first connecting reinforcement 2 is spiraled along the length direction of the main reinforcement 1. The first connecting reinforcement 2 is spiraled on the main reinforcement 1 and tied and fixed with a binding piece, so that the main reinforcement 1 can be firmly fixed in the anti-seepage wall to prevent displacement during the construction process. When pouring concrete into the anti-seepage wall, the setting of the first connecting reinforcement 2 enhances the bonding force between the main reinforcement 1 and the concrete; when the concrete is poured and hardened, a tight bonding interface is formed between the first connecting reinforcement 2 and the concrete, which improves the integrity and durability of the structure and prevents the sensor position from shifting.

[0020] The secondary ribs 3 are arranged in an array, and at least four are provided. Part of the secondary ribs 3 is located in the three-dimensional mesh structure and the rest of the secondary ribs extend out of the three-dimensional mesh structure. The second connecting ribs 4 are surrounded by the secondary ribs 3 and are arranged at intervals and parallel to each other along the length direction of the secondary ribs 3. The second connecting ribs 4 are located in the three-dimensional mesh structure.

[0021] The tying piece is used to tie the intersections between the main reinforcement 1 and the first connecting reinforcement 2, the secondary reinforcement 3 and the second connecting reinforcement 4, and the first connecting reinforcement 2 and the second connecting reinforcement 4, so as to form a stable overall structure of the main reinforcement 1, the secondary reinforcement 3, the first connecting reinforcement 2, and the second connecting reinforcement 4. The tying piece is set as a tying steel wire.

[0022] Different sensors used for monitoring have different shapes and different installation requirements. For example, the strain gauge 8 is cylindrical and requires vertical installation; the earth pressure gauge 9 is disc-shaped and requires the circular surface to be parallel to the front and back of the steel cage; the stress-free gauge 10 is truncated cone-shaped and requires vertical installation. In order to replace the binding tape, an installation device is required to fix the sensor. Since each sensor has a different shape and different installation requirements, different installation devices can be used to install the sensor.

[0023] However, designing a special fixture for each sensor will significantly increase manufacturing costs and R&D cycles. When the sensor selection changes or is updated, the original fixture may need to be redesigned, resulting in waste of resources and poor flexibility. Complex customized devices may increase installation difficulty and time, affect work efficiency, and complicate the installation process. Non-standardized fixtures may encounter compatibility issues when maintaining and replacing sensors. It can only be applied to sensors of specific shapes or sizes and cannot adapt to diverse sensor requirements. In order to solve this problem, this embodiment provides a unified and standardized installation mechanism 5, and the technical solution is as follows: The mounting mechanism 5 includes a mounting seat 51 and a positioning assembly 52. ​​The mounting seat 51 is detachably connected to the main rib 1. The positioning assembly 52 is assembled on the mounting seat 51. Figure 3 As shown, the positioning assembly 52 can realize the positioning of sensors of different shapes.

[0024] The mounting base 51 includes a base body 511, a first clamping block 513, a second clamping block 514, and an assembly part 515. Figure 4 As shown, an assembly cavity is provided in the seat body 511. The top and bottom surfaces of the seat body 511 are both provided with a groove body 512 of a predetermined width. The predetermined width is greater than the outer diameter of the main rib 1 and less than the width of the second clamping block 514.

[0025] The first clamping block 513 is installed in the assembly cavity, and the first clamping block 513 is fixed in the assembly cavity. The second clamping block 514 is an independent block. The second clamping block 514 is connected with the first clamping block 513; the main rib 1 is accommodated between the first clamping block 513 and the second clamping block 514, that is, through the assembly of the first clamping block 513, the second clamping block 514 and the main rib 1, the mounting seat 51 is installed on the main rib 1.

[0026] An elastic layer is provided at one end of the second clamping block 514 close to the first clamping block 513. The assembly part 515 is clamped in the seat body 511. The assembly part 515 is a cover body, which is partially clamped in the seat body 511 and abuts against the inner wall of the seat body 511. There is a large damping force between the assembly part 515 and the seat body 511 to ensure stable assembly between the assembly body and the seat body 511. The assembly part 515 has an acting force on the second clamping block 514, compressing the elastic layer, so that the second clamping block 514 is firmly clamped on the main rib 1.

[0027] During installation, the main rib 1 is passed through the upper groove 512 of the seat body 511 and abutted against the first clamping block 513, and then the second clamping block 514 is placed in the assembly cavity, and then the cover body is installed to complete the installation of the mounting seat 51, which is convenient and quick.

[0028] The positioning assembly 52 includes: a positioning seat 521, an adjusting member 522, and a positioning belt 523. Figure 5 As shown, the positioning seat 521 includes a first mounting portion 5211 and a second mounting portion 5212 that are connected. The adjusting member 522 is installed in the first mounting portion 5211, and the adjusting member 522 is rotatably connected to the first mounting portion 5211. An external thread is provided in the upper portion of the adjusting member 522.

[0029] One end of the positioning belt 523 is fixed to the inner wall of the second mounting portion 5212, and the other end passes through the second mounting portion 5212 so that the positioning belt 523 itself forms a positioning space, such as Figure 5 The positioning belt 523 is provided with a slot 5231 that engages with the external thread. The positioning space is adjusted by rotating the adjusting member 522, which engages with the positioning belt 523 for transmission, thereby driving the positioning belt 523 to move, thereby controlling the size of the positioning space to meet the positioning requirements of sensors of different sizes.

[0030] After the main ribs 1, the secondary ribs 3, the first connecting ribs 2, and the second connecting ribs 4 form a stable overall structure, the mounting seat 51 is assembled on the main ribs 1 based on actual needs, and then the positioning space size of the positioning assembly 52 is adjusted, the sensor is clamped in the positioning assembly 52, and the positioning assembly 52 is fixed on the connecting seat. The fixing method can be welding or clamping. In order to simplify the fixing process, a plurality of clamping parts 5213 for connecting the mounting seat 51 are provided on the outer wall of the first mounting part 5211, and a plurality of clamping grooves are provided on the mounting seat 51. By clamping, the positioning assembly 52 and the mounting seat 51 can be installed and unloaded.

[0031] The mounting seat 51 in the mounting mechanism 5 is combined with the steel cage in a detachable connection manner, without the need for a complicated binding process, which can significantly improve the installation efficiency and reduce human errors; when the sensor type is installed incorrectly and needs to be replaced, the operation can be performed conveniently and quickly, reducing maintenance costs and time. Based on the shape and installation method of the sensor, the corresponding number of mounting mechanisms 5 is selected to achieve stable positioning of the sensor, reduce the risk of damage to the sensor during hoisting, pipe connection and concrete pouring, and improve the survival rate of the sensor.

[0032] The fixing mechanism 6 is installed on the surface of the earth-rock dam 7 and sleeved on the secondary reinforcement 3. The fixing mechanism 6 is used to limit the top of the main reinforcement 1. The fixing mechanism 6 includes: a frame 61, support members 62 of different sizes, a connecting line 64, and a lifting member 65.

[0033] like Figure 6 , Figure 7 As shown, the frame 61 is fixed to the surface of the earth-rock dam 7 and can be fixed by bolts. In this example, two support members 62 are provided. The diameters of the two groups of support members 62 are different, and the support members 62 with a small diameter are arranged on the top and the support members 62 with a large diameter are arranged on the bottom. A plurality of vertical members 63 are fixed to the top surface of each support member 62. The vertical members 63 are connected to the secondary reinforcement 3 through binding belts. The upper and lower vertical members 63 are connected by a connecting line 64. The connecting line 64 is made of steel wire. The lifting member 65 is arranged between the frame 61 and the support member 62 below. Through the adjustment hole of the lifting member 65, the connecting member is always kept in a tensioned state, so that the entire fixing mechanism 6 is firmly connected to the secondary reinforcement 3.

[0034] One end of the secondary reinforcement 3 forms an integral structure with the main reinforcement 1 to ensure overall stability; the other end of the secondary reinforcement 3 is connected to the vertical member 63 in the fixing mechanism 6. Through this connection relationship, the fixing mechanism 6 can position the main reinforcement 1 at a predetermined position in the anti-seepage wall.

[0035] The secondary reinforcement 3 serves as a connecting bridge, so that the fixing mechanism 6 can accurately control the position of the main reinforcement 1 to avoid problems such as deviation or floating during the concrete pouring process.

[0036] After pouring, the fixing mechanism 6 can be disassembled by cutting the secondary reinforcement 3. Since the connection between the secondary reinforcement 3 and the fixing mechanism 6 is relatively simple and clear, the disassembly process is quick and convenient; and the method of cutting the secondary reinforcement 3 will not cause damage to the main reinforcement 1 or the first connecting reinforcement 2.

[0037] Example 2 This embodiment provides a method for accurately installing an earth-rock dam monitoring sensing device, based on an accurate installation system for an earth-rock dam monitoring sensing device as described in Embodiment 1, including the following steps: Determine the design position of the cut-off wall based on the geographical location of the earth-rock dam 7, and excavate the cut-off wall based on the design position; Assemble a plurality of main ribs 1 and first connecting ribs 2 into a three-dimensional mesh structure, and install secondary ribs 3 and second connecting ribs 4 on the three-dimensional mesh structure to form a supporting mechanism; Determine the number of mounting mechanisms 5 based on the shape of the sensor; clamp the mounting seat 51 on the main rib 1, and position the sensor in the positioning assembly 52; assemble the positioning assembly 52 on the mounting seat 51; The support mechanism is placed vertically in the anti-seepage wall, and the frame 61 is fixed on the surface of the earth-rock dam 7; the vertical member 63 is fixedly connected to the secondary reinforcement 3 by a binding member, and the upper and lower vertical members 63 are connected by a connecting wire 64, and the connecting wire 64 is kept in a tensioned state by a lifting member 65; Pour concrete into the anti-seepage wall and cover the supporting mechanism and the sensor; after pouring, remove the fixing mechanism 6.

[0038] The specific instructions are as follows: Excavation of anti-seepage wall: the earth-rock dam 7 is divided into the main earth dam and the auxiliary dam, the location of the anti-seepage wall is arranged based on the geographical location of the main earth dam and the auxiliary dam, and the anti-seepage wall is excavated; Support mechanism manufacturing: multiple main reinforcements 1 are arranged in an array, and the first connecting reinforcement 2 is wrapped around the main reinforcement 1 along the length direction of the main reinforcement 1, so that a three-dimensional mesh structure is formed between the main reinforcement 1 and the first connecting reinforcement 2; multiple secondary reinforcements 3 are partially placed in the three-dimensional mesh structure and the rest of them extend outside the three-dimensional mesh structure, and second connecting reinforcements 4 are arranged to surround the secondary reinforcements 3; and the crossing parts between the main reinforcement 1 and the first connecting reinforcement 2, the secondary reinforcement 3 and the second connecting reinforcement 4, and the first connecting reinforcement 2 and the second connecting reinforcement 4 are tied with tying pieces; Sensor installation: Determine the number of installation mechanisms 5 based on the shape of the sensor; pass the main rib 1 through the groove 512 of the seat body 511, so that the main rib 1 contacts the first clamping block 513, place the second clamping block 514 in the assembly cavity and abut against the main rib 1, clamp the assembly part 515 in the seat body 511, and squeeze the second clamping block 514; rotate the adjustment member 522 based on the size of the sensor, the adjustment member 522 adjusts the length of the positioning belt 523, place the sensor in the positioning belt 523, and the positioning belt 523 positions the sensor; based on the arrangement requirements of the sensor, assemble the positioning belt 523 on the mounting seat 51; Fixing the top of the supporting mechanism: vertically place the supporting mechanism in the anti-seepage wall, fix the fixing mechanism 6 on the surface of the earth-rock dam 7 and sleeve it on the secondary reinforcement 3; use a binding piece to fix the vertical member 63 to the secondary reinforcement 3, and use a connecting wire 64 to connect the upper and lower vertical members 63, and use a lifting member 65 to keep the connecting wire 64 in a tensioned state; Concrete pouring: pour concrete into the anti-seepage wall and cover the supporting mechanism and the sensor; after pouring, remove the fixing mechanism 6.

Claims

1. A precise installation system for earth-rock dam monitoring and sensing equipment, characterized in that: Applied to earth-rock dam anti-seepage wall construction projects, including: A plurality of main ribs are arranged in an array and extend in a straight line parallel to each other; A first connecting rib is wrapped around the main rib along the length direction of the main rib; a three-dimensional mesh structure is formed between the first connecting rib and the main rib; A plurality of auxiliary ribs, some of which are disposed in the three-dimensional mesh structure and the rest of which extend out of the three-dimensional mesh structure; second connecting ribs, which surround the secondary ribs and are arranged at intervals and parallel to each other along the length direction of the secondary ribs; the second connecting ribs are located in the three-dimensional mesh structure; A binding piece is used to bind the intersection between the main reinforcement and the first connecting reinforcement, the secondary reinforcement and the second connecting reinforcement, and the first connecting reinforcement and the second connecting reinforcement; The mounting mechanism comprises a mounting seat detachably connected to the main rib, and a positioning assembly disposed on the mounting seat and used for positioning sensors of different shapes; The fixing mechanism is arranged on the surface of the earth-rock dam and sleeved on the secondary reinforcement; the fixing mechanism is used to limit the top of the main reinforcement.

2. The precise installation system for monitoring and sensing equipment of earth-rock dam according to claim 1, characterized in that: The mounting base comprises: A seat body, in which an assembly cavity is arranged; the top surface and the bottom surface of the seat body are both provided with a groove body of a predetermined width; A first clamping block is installed in the assembly cavity; A second clamping block is connected to the first clamping block; the main rib is accommodated between the first clamping block and the second clamping block; The assembly part is clamped in the seat body and has an acting force between the assembly part and the second clamping block.

3. The precise installation system for monitoring and sensing equipment of earth-rock dam according to claim 1, characterized in that: The positioning component comprises: The positioning seat comprises a first mounting portion and a second mounting portion which are connected; An adjusting member is rotatably disposed in the first mounting portion; an external thread is disposed in the length of the upper portion of the adjusting member; A positioning belt, one end of which is connected to the inner wall of the second mounting portion; the other end of the positioning belt passes through the second mounting portion so that the positioning belt itself forms a positioning space; the positioning belt is provided with a slot hole engaged with the external thread.

4. The precise installation system for monitoring and sensing equipment of earth-rock dam according to claim 3, characterized in that: A plurality of clamping parts for connecting the mounting seat are arranged on the outer wall of the first mounting part.

5. The precise installation system for monitoring and sensing equipment of earth-rock dam according to claim 1, characterized in that: The fixing mechanism comprises: A frame is fixed to the surface of the earth-rock dam; Support members of different sizes are arranged at the top and the bottom; the top surface of the support member is provided with a plurality of vertical members; the vertical members are connected to the secondary reinforcement; A connecting line, used to connect to the vertical members arranged above and below; The lifting member is arranged between the frame and the supporting member adjacent to the frame.

6. The precise installation system for monitoring and sensing equipment of earth-rock dam according to claim 2, characterized in that: The predetermined width is greater than the outer diameter of the main rib and less than the width of the second clamping block.

7. The precise installation system for monitoring and sensing equipment of earth-rock dam according to claim 2, characterized in that: An elastic layer is disposed on one end of the second clamping block close to the first clamping block.

8. A precise installation method for earth-rock dam monitoring and sensing equipment, characterized in that: A precise installation system for earth-rock dam monitoring and sensing equipment according to any one of claims 1 to 7 comprises the following steps: Determine the design position of the cut-off wall based on the geographical location of the earth-rock dam, and excavate the cut-off wall based on the design position; Assembling a plurality of main ribs and a first connecting rib into a three-dimensional mesh structure, and installing secondary ribs and a second connecting rib on the three-dimensional mesh structure to form a supporting mechanism; Determine the number of mounting mechanisms based on the shape of the sensor; clamp the mounting seat onto the main rib, and position the sensor in the positioning assembly; assemble the positioning assembly onto the mounting seat; The supporting mechanism is placed vertically in the anti-seepage wall, and the frame is fixed on the surface of the earth-rock dam; the vertical member is fixedly connected to the secondary reinforcement by using a binding piece, and the upper and lower vertical members are connected by a connecting wire, and the connecting wire is kept in a tensioned state by using a lifting piece; Pour concrete into the anti-seepage wall and cover the supporting mechanism and the sensor; after pouring, remove the fixing mechanism.