Waterproof structure for pile head of open-cut tunnel foundation treatment drilled pile and construction method

By fixing the pile cap on the outer periphery of the pile head and setting up a water-expanding water stop layer, combining the inverted cone-shaped post-pouring tape and steel plate pressing strip, the sealing stability and waterproofing effect of the pile head waterproof structure are improved, and surface settlement and horizontal displacement are solved The influence of the sealing effect of the waterproof plate achieves more stable waterproof performance.

CN118958381APending Publication Date: 2024-11-15ZHENGZHOU ENG CO LTD CHINA RAILWAY SEVENTH GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411130087.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the prior art, when the pile head waterproof structure faces surface settlement or horizontal displacement, it is easy to cause the loss of the sealing effect of the waterproof coil material, and cannot effectively prevent groundwater leakage.

Method used

Using a combined structure of pile cap and waterproof plate, by fixing pile caps on the outer periphery of pile head, extending the pile body and expanding the size of pile head, introducing waterproof plates, and setting a water-swelling water stop layer on the top of the pile head, further pressing with expansion force The waterproof plate is tightened, combined with inverted conical rear casting tape and steel plate pressing strips to improve the sealing stability and waterproof effect of the waterproof plate.

Benefits of technology

It effectively overcomes the impact of surface settlement and horizontal displacement on the sealing effect of waterproof board, improves waterproof performance, enhances the bearing capacity and load dispersion ability of pile foundations, reduces the damage to the sealing effect of waterproof boards, and achieves a more stable waterproof effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958381A_ABST
    Figure CN118958381A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel construction, in particular to an open cut tunnel foundation treatment drilled pile head waterproof structure and a construction method. The pile head waterproof structure comprises a pile cap and a waterproof plate. The pile cap comprises a connecting section and a large-diameter section; the large-diameter section is fixedly arranged in a tunnel bottom plate; one end of the connecting section fixedly sleeves the periphery of the pile head, and the other end of the connecting section upwards extends into the tunnel bottom plate and is fixedly connected with the large-diameter section; the tunnel bottom plate comprises a first bottom plate body and a second bottom plate body which are sequentially poured in the vertical direction. The top surface elevation of the first bottom plate is flush with the top surface elevation of the large-diameter section; the waterproof plates are continuously laid between the pile head and the connecting section, between the connecting section and the bottom plate cushion layer, between the connecting section and the first bottom plate, between the large-diameter section and the first bottom plate and on the top face of the first bottom plate. A gap is formed between the top face of the pile head and the bottom face of the waterproof plate at the corresponding position, and the gap is densely filled with a water swelling water stopping layer. Through the arrangement, the influence of ground surface settlement and horizontal displacement on the sealing effect of the waterproof plate can be effectively overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel construction, and in particular to a waterproof structure and construction method for bored pile heads in open-cut tunnel foundation treatment. Background Art

[0002] Pile head waterproofing is one of the important links in project quality assurance. Through effective waterproofing treatment, the maintenance cost and loss caused by leakage problems can be reduced, and the overall quality of the construction project can be improved. The existing technology often achieves the effect of sealing the gap between the pile head and the base plate by laying waterproof membrane on the top of the pile head, but with the occurrence of surface settlement or horizontal displacement, the sealing effect of the waterproof membrane is easily lost.

[0003] Therefore, it is necessary to provide an improved technical solution to address the above-mentioned deficiencies in the prior art. Summary of the invention

[0004] The purpose of the present application is to provide a bored pile head waterproof structure and construction method for open-cut tunnel foundation treatment, so as to solve or alleviate the problems existing in the above-mentioned prior art.

[0005] In order to achieve the above objectives, this application provides the following technical solutions:

[0006] A bored pile head waterproof structure for open-cut tunnel foundation treatment, wherein the pile head waterproof structure comprises a pile cap and a waterproof board;

[0007] The pile cap comprises a connecting section and a large diameter section; the large diameter section is fixedly arranged inside the tunnel floor; one end of the connecting section is fixedly sleeved on the outer periphery of the pile head, and the other end extends upward into the tunnel floor and is fixedly connected to the large diameter section;

[0008] The tunnel floor comprises a first floor and a second floor cast vertically in sequence; the top surface elevation of the first floor is flush with the top surface elevation of the large diameter section;

[0009] The waterproof board is laid continuously between the pile head and the connecting section, between the connecting section and the bottom plate cushion layer, between the connecting section and the first bottom plate, between the large diameter section and the first bottom plate, and along the top surface of the first bottom plate;

[0010] A gap is provided between the top surface of the pile head and the bottom surface of the waterproof board at the corresponding position, and the gap is densely filled with a water-swellable water-stopping layer.

[0011] As described above, in the bored pile head waterproof structure for open-cut tunnel foundation treatment, preferably, an inverted cone-shaped post-cast strip is provided between the inner side of the first bottom plate and the waterproof plate at the corresponding position.

[0012] In the bored pile head waterproof structure for open-cut tunnel foundation treatment as described above, preferably, a steel plate strip is fixedly provided between the inner side of the inverted cone-shaped post-cast strip and the waterproof plate at the corresponding position.

[0013] In the bored pile head waterproof structure for open-cut tunnel foundation treatment as described above, preferably, the waterproof board is a double-sided reverse-adhesive EVA waterproof board.

[0014] In the bored pile head waterproof structure for open-cut tunnel foundation treatment as described above, preferably, the top surface elevation of the pile head is lower than the top surface elevation of the bottom plate cushion layer.

[0015] In the above-mentioned bored pile head waterproof structure for open-cut tunnel foundation treatment, preferably, the pile head is coated with cement-based penetrating crystallization coating.

[0016] The construction method of any of the above-mentioned bored pile head waterproof structures for open-cut tunnel foundation treatment preferably comprises:

[0017] Step S1: digging downward from the top surface of the bottom plate cushion layer to expose the pile head and reserve working space for the connection section;

[0018] Step S2: pouring the first bottom plate and reserving working space for the connecting section and the large diameter section;

[0019] Step S3: After the pile head is coated with cement-based penetrating crystallization coating, a water-swellable water-stop layer is arranged on the top of the pile head; a waterproof board is continuously laid from the top of the water-swellable water-stop layer to the inner wall of the reserved working space of the bottom plate cushion layer, the inner wall of the reserved working space of the first bottom plate, and the top surface of the first bottom plate;

[0020] Step S4: construct the pile cap and compact the waterproofing plates between the pile head and the connecting section, between the connecting section and the bottom plate cushion layer, between the connecting section and the first bottom plate, and between the large diameter section and the first bottom plate;

[0021] Step S5: pouring the second base plate and pressing the waterproof plate on the top surface of the first base plate.

[0022] The construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment as described above is preferably:

[0023] In step S2, the working space includes a post-cast strip arranged between the inner side of the first bottom plate and the corresponding waterproof plate;

[0024] Step S4 specifically includes:

[0025] Construct the pile cap and tighten the waterproofing plates between the pile head and the connecting section, between the connecting section and the bottom plate cushion, between the connecting section and the first bottom plate, and between the bottom surface of the large diameter section and the first bottom plate;

[0026] Pour waterproof mortar in the post-cast strip and press the waterproof board at the corresponding position onto the large diameter section.

[0027] The construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment as described above, preferably, step S4 further comprises:

[0028] Before pouring the waterproof mortar in the post-casting zone, the waterproof board at the corresponding position is pressed onto the large diameter section using a steel plate pressure strip.

[0029] In the construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment as described above, preferably, the post-cast strip is an inverted cone structure.

[0030] Compared with the closest prior art, the technical solution of the embodiment of the present application has the following beneficial effects:

[0031] By additionally fixing a pile cap on the outer periphery of the pile head to extend the pile body and expand the size of the pile head, the waterproof board can be introduced into the pile body, and the stability of the waterproof board sealing is improved by the staggered overlapping between the pile head and the pile cap, the pile cap and the bottom plate cushion layer, the pile cap and the first bottom plate, and the first bottom plate and the second bottom plate, which can effectively overcome the influence of surface settlement and horizontal displacement on the sealing effect of the waterproof board; in addition, by arranging a water-swellable waterstop layer on the top surface of the pile head and the bottom surface of the waterproof board at the corresponding position, when groundwater invades the top of the pile head, the water-swellable waterstop layer rapidly expands after contacting the groundwater, and can further compress the waterproof board to improve the waterproof effect. At the same time, the expansion of the water-swellable waterstop layer and the variable cross-section design of the pile cap can also improve the bearing capacity of the pile foundation and disperse the load, thereby slowing down the surface settlement and reducing the damage to the sealing effect of the waterproof board from the source. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. Among them:

[0033] Figure 1 A schematic diagram of a waterproof structure for bored pile heads in an open-cut tunnel foundation treatment according to some embodiments of the present application;

[0034] Figure 2 for Figure 1 A magnified view of the structure in the middle.

[0035] Description of reference numerals:

[0036] 1. First base plate; 2. Second base plate; 3. Pile head; 4. Large diameter section; 5. Connecting section; 6. Waterproof board; 7. Steel plate layer; 8. Post-casting strip; 9. Water-swelling water-stop layer; 10. Base plate cushion; 11. Two-component polysulfide sealant; 12. Cement nails. DETAILED DESCRIPTION

[0037] The present application will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present application and does not limit the present application. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present application without departing from the scope or spirit of the present application. For example, a feature shown or described as a part of an embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present application includes such modifications and variations within the scope of the appended claims and their equivalents.

[0038] In the following description, the terms "first / second / third" involved are merely used to distinguish similar objects and do not represent a specific ordering of the objects. It can be understood that "first / second / third" can be interchanged with a specific order or sequence where permitted, so that the embodiments of the present application described herein can be implemented in an order other than that illustrated or described herein.

[0039] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present disclosure belongs. The terms used herein are only for the purpose of describing the embodiments of the present disclosure and are not intended to limit the present disclosure.

[0040] In the description of the present application, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present application and do not require that the present application must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present application. The terms "connected", "connected", and "set" used in the present application should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component; it can be a wired electrical connection, a radio connection, or a wireless communication signal connection. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0041] The following will be combined with the attached Figure 1-2 The waterproof structure and construction method of the bored pile head 3 of the open-cut tunnel foundation treatment in the present application are further described in detail.

[0042] The waterproof structure of bored pile head 3 for open-cut tunnel foundation treatment includes a pile cap and a waterproof board 6;

[0043] The pile cap includes a connecting section 5 and a large diameter section 4; the large diameter section 4 is fixedly arranged inside the tunnel floor; one end of the connecting section 5 is fixedly sleeved on the outer periphery of the pile head 3, and the other end extends upward into the tunnel floor and is fixedly connected to the large diameter section 4;

[0044] The tunnel floor comprises a first floor slab 1 and a second floor slab 2 which are cast vertically in sequence; the top elevation of the first floor slab 1 is level with the top elevation of the large diameter section 4;

[0045] The waterproof board 6 is continuously laid along the space between the pile head 3 and the connecting section 5, between the connecting section 5 and the bottom plate cushion layer 10, between the connecting section 5 and the first bottom plate 1, between the large diameter section 4 and the first bottom plate 1, and the top surface of the first bottom plate 1;

[0046] A gap is provided between the top surface of the pile head 3 and the bottom surface of the waterproof board 6 at the corresponding position, and the gap is densely filled with a water-swellable waterproof layer 9.

[0047] In a specific embodiment of the present application, the pile cap as a whole is a T-shaped cast-in-place reinforced concrete structure, and the large diameter section 4, the connecting section 5 and the bored pile head 3 are coaxially arranged and the diameter values ​​decrease successively, wherein a cylindrical space is provided at the lower part of the connecting section 5 for accommodating the pile head 3.

[0048] By additionally fixing a pile cap on the outer periphery of the pile head 3 to extend the pile body and expand the size of the pile head 3, the waterproof board 6 can be introduced into the pile body, and the stability of the sealing of the waterproof board 6 is improved by the staggered overlap between the pile head 3 and the pile cap, the pile cap and the bottom plate cushion layer 10, the pile cap and the first bottom plate 1, and the first bottom plate 1 and the second bottom plate 2, which can effectively overcome the influence of surface settlement and horizontal displacement on the sealing effect of the waterproof board 6; in addition, a water-swellable waterproofing layer 9 is provided on the top surface of the pile head 3 and the bottom surface of the waterproof board 6 at the corresponding position. When groundwater invades the top of the pile head 3, the water-swellable waterproofing layer 9 rapidly expands after contacting the groundwater, and can further compress the waterproof board 6 to improve the waterproof effect. At the same time, the expansion of the water-swellable waterproofing layer 9 and the variable cross-section design of the pile cap can also improve the bearing capacity of the pile foundation and disperse the load, thereby counteracting surface settlement and reducing the damage to the sealing effect of the waterproof board 6 from the source.

[0049] An inverted cone-shaped post-cast strip 8 is provided between the inner side of the first bottom plate 1 and the waterproof plate 6 at the corresponding position.

[0050] In the specific embodiment of the present application, the post-cast strip 8 is specifically an inverted truncated cone structure with a cylindrical space inside, and the large diameter section 4, the connecting section 5, the bored pile head 3 and the post-cast strip 8 are coaxially arranged. The post-cast strip 8 is constructed after the construction of the first bottom plate 1, the large diameter section 4 and the waterproof board 6 is completed. The post-cast strip 8 is specifically located between the inner side of the first bottom plate 1 and the waterproof board 6 at the corresponding position. On the one hand, the first bottom plate 1, the large diameter section 4 and the waterproof board 6 can be connected as a whole; on the other hand, the waterproof board 6 is further pressed against the side wall of the large diameter section 4 by the normal force formed by the inverted conical side of the post-cast strip 8, thereby improving the sealing effect of the waterproof board 6.

[0051] A steel plate pressure strip 7 is fixedly provided between the inner side of the inverted cone-shaped post-cast strip 8 and the waterproof board 6 at the corresponding position.

[0052] In a specific embodiment of the present application, after the construction of the first base plate 1, the large diameter section 4 and the waterproof board 6 is completed, before the inverted cone-shaped post-cast strip 8 is constructed, the waterproof board 6 at the corresponding position is first pressed against the side wall of the large diameter section 4 by the steel plate strip 7, and the steel plate strip 7 is annularly fixed with cement nails 12, and a two-component polysulfide sealing paste 11 is applied to the fixing position of the cement nails 12. On the one hand, the waterproof board 6 at the corresponding position can be protected in advance to avoid damage to the waterproof board 6 during the construction of the post-cast strip 8; on the other hand, the sealing effect of the waterproof board 6 is further improved by adding the steel plate strip 7.

[0053] In order to further improve the sealing effect of the waterproof sheet 6, the waterproof sheet 6 is a double-sided reverse-adhesive EVA waterproof sheet 6. The double-sided reverse-adhesive EVA waterproof sheet 6 has strong adhesion and can be tightly adhered to various base materials to effectively prevent leakage. At the same time, the waterproof sheet 6 is made of polymer material, has good weather resistance and corrosion resistance, and can maintain stable waterproof performance for a long time in various complex environments.

[0054] The top surface elevation of the pile head 3 is lower than the top surface elevation of the bottom plate cushion layer 10 .

[0055] In a specific embodiment of the present application, the height at which the pouring of concrete for the pile foundation is stopped is 500 mm below the design elevation of the natural foundation. Pile cutting is not considered, but the pouring height is increased by installing a pile cap to insert it into the base plate. On the one hand, the pile cap steel bars replace the pile head 3 steel bars and extend into the base plate. The segmented design of the pile cap and the pile head 3 disperses the horizontal load and reduces the overall bending deformation of the pile body under the horizontal load. On the other hand, it can also avoid the influence of pile cutting after over-pouring of the pile foundation on the quality and bearing capacity of the pile foundation.

[0056] In order to further improve the waterproof effect of the pile head 3, the pile head 3 is coated with a cement-based penetrating crystallization coating. The cement-based penetrating crystallization coating has a strong penetrating ability and can penetrate into the microscopic pores of concrete and cement substrates, tightly combined with the concrete structure, and form a deep waterproof layer. The unique crystallization performance of the cement-based penetrating crystallization coating can also form a water-insoluble crystal structure inside the concrete, further blocking the pores of the base layer, improving the waterproof performance of the concrete, and cooperating with the waterproof structure of the outer layer, achieving waterproof protection from multiple angles from slowing down surface settlement, improving the external sealing effect of the pile head 3, and blocking the internal pores of the pile head 3.

[0057] The construction method of the bored pile head 3 waterproof structure for open-cut tunnel foundation treatment comprises:

[0058] Step S1: digging downward from the top surface of the bottom plate cushion layer 10 to expose the pile head 3 and reserve working space for the connecting section 5;

[0059] Step S2: pouring the first base plate 1 and reserving working space for the connecting section 5 and the large diameter section 4;

[0060] Step S3: After the pile head 3 is coated with cement-based penetrating crystallization coating, a water-swellable waterproofing layer 9 is arranged on the top of the pile head 3; a waterproofing board 6 is continuously laid from the top of the water-swellable waterproofing layer 9 to the inner wall of the reserved working space of the bottom plate cushion layer 10, the inner wall of the reserved working space of the first bottom plate 1, and the top surface of the first bottom plate 1;

[0061] Step S4: construct the pile cap and compact the waterproof board 6 between the pile head 3 and the connecting section 5, between the connecting section 5 and the bottom plate cushion 10, between the connecting section 5 and the first bottom plate 1, and between the large diameter section 4 and the first bottom plate 1;

[0062] Step S5: pouring the second base plate 2 and pressing the waterproof plate 6 on the top surface of the first base plate 1 .

[0063] In a specific embodiment of the present application, the construction method further includes:

[0064] Step S0: When the pile foundation is constructed to 500 mm below the design elevation of the natural foundation, pouring is stopped.

[0065] Step S1 also includes: after the pile head 3 is exposed, chiseling away the floating slurry on the top of the pile head 3 .

[0066] Step S3: Continuously apply cement-based penetrating crystallization coating from the pile head 3 to the bottom and inner wall of the working space of the outer connecting section 5, and perform mortar finishing on the bottom and inner wall of the working space of the connecting section 5.

[0067] In step S2, the working space includes a post-cast strip 8 provided between the inner side of the first base plate 1 and the corresponding waterproof plate 6;

[0068] Step S4 specifically includes:

[0069] Construct the pile cap and compact the waterproofing board 6 between the pile head 3 and the connecting section 5, between the connecting section 5 and the bottom plate cushion 10, between the connecting section 5 and the first bottom plate 1, and between the bottom surface of the large diameter section 4 and the first bottom plate 1;

[0070] Waterproof mortar is poured in the post-cast strip 8 , and the waterproof board 6 at the corresponding position is pressed onto the large-diameter section 4 .

[0071] In a specific embodiment of the present application, the waterproof board 6 between the large diameter section 4 and the first bottom plate 1 includes the waterproof board 6 between the bottom surface of the large diameter section 4 and the first bottom plate 1, and the waterproof board 6 between the side surface of the large diameter section 4 and the first bottom plate 1. The waterproof mortar poured in the post-cast zone 8 is used to press the waterproof board 6 between the side surface of the large diameter section 4 and the first bottom plate 1 onto the side wall of the large diameter section 4.

[0072] Step S4 also includes:

[0073] Before pouring the waterproof mortar in the post-casting strip 8, the waterproof board 6 at the corresponding position is pressed onto the large-diameter section 4 using a steel plate pressure strip 7.

[0074] In a specific embodiment of the present application, the steel plate strip 7 is fixed in a ring shape using cement nails 12, and the cement nails 12 are arranged at a spacing of 300 mm in a ring shape, so as to fix and press the waterproof board 6 between the side of the large diameter section 4 and the first bottom plate 1 onto the side wall of the large diameter section 4. After fixation, a two-component polysulfide sealant 11 is used to wrap the fixing position of the cement nails 12.

[0075] The post-casting strip 8 is an inverted cone structure.

[0076] In a specific embodiment of the present application, the post-cast zone 8 is specifically an inverted truncated cone structure with a cylindrical space provided inside.

[0077] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. Open-cut tunnel foundation treatment and bored pile head waterproof structure, It is characterized in that The pile head waterproof structure includes a pile cap and a waterproof board; The pile cap comprises a connecting section and a large diameter section; the large diameter section is fixedly arranged inside the tunnel floor; one end of the connecting section is fixedly sleeved on the outer periphery of the pile head, and the other end extends upward into the tunnel floor and is fixedly connected to the large diameter section; The tunnel floor comprises a first floor and a second floor cast vertically in sequence; the top surface elevation of the first floor is flush with the top surface elevation of the large diameter section; The waterproof board is laid continuously between the pile head and the connecting section, between the connecting section and the bottom plate cushion layer, between the connecting section and the first bottom plate, between the large diameter section and the first bottom plate, and along the top surface of the first bottom plate; A gap is provided between the top surface of the pile head and the bottom surface of the waterproof board at the corresponding position, and the gap is densely filled with a water-swellable water-stopping layer.

2. The bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 1, It is characterized in that An inverted cone-shaped post-cast strip is provided between the inner side of the first bottom plate and the waterproof plate at the corresponding position.

3. The bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 2, It is characterized in that A steel plate strip is fixedly provided between the inner side of the inverted cone-shaped post-cast strip and the waterproof board at the corresponding position.

4. The bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 1, It is characterized in that The waterproof board is a double-sided reverse-adhesive EVA waterproof board.

5. The bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 1, It is characterized in that The top surface elevation of the pile head is lower than the top surface elevation of the bottom plate cushion layer.

6. The bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 1, It is characterized in that The pile head is coated with cement-based penetrating crystallization coating.

7. The construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment according to any one of claims 1 to 6, It is characterized in that include: Step S1: digging downward from the top surface of the bottom plate cushion layer to expose the pile head and reserve working space for the connection section; Step S2: pouring the first bottom plate and reserving working space for the connecting section and the large diameter section; Step S3: After the pile head is coated with cement-based penetrating crystallization coating, a water-swellable water-stop layer is arranged on the top of the pile head; a waterproof board is continuously laid from the top of the water-swellable water-stop layer to the inner wall of the reserved working space of the bottom plate cushion layer, the inner wall of the reserved working space of the first bottom plate, and the top surface of the first bottom plate; Step S4: construct the pile cap and compact the waterproofing plates between the pile head and the connecting section, between the connecting section and the bottom plate cushion layer, between the connecting section and the first bottom plate, and between the large diameter section and the first bottom plate; Step S5: pouring the second base plate and pressing the waterproof plate on the top surface of the first base plate.

8. The construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 7, It is characterized in that In step S2, the working space includes a post-cast strip arranged between the inner side of the first bottom plate and the corresponding waterproof plate; Step S4 specifically includes: Construct the pile cap and tighten the waterproofing plates between the pile head and the connecting section, between the connecting section and the bottom plate cushion, between the connecting section and the first bottom plate, and between the bottom surface of the large diameter section and the first bottom plate; Pour waterproof mortar in the post-cast strip and press the waterproof board at the corresponding position onto the large diameter section.

9. The construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 8, It is characterized in that Step S4 also includes: Before pouring the waterproof mortar in the post-casting zone, the waterproof board at the corresponding position is pressed onto the large diameter section using a steel plate pressure strip.

10. The construction method of the bored pile head waterproof structure for open-cut tunnel foundation treatment according to claim 9, It is characterized in that The post-casting strip is an inverted cone structure.