Recoverable function wallboard structure system provided with energy consumption device and method

By introducing high-ductility energy-consuming devices into prefabricated concrete structures, the energy-consuming wall panel structure with multiple lines of defense is solved, and the traditional structure lacks energy consumption capacity under strong shocks is achieved, and rapid repair and cost control are achieved. It is suitable for Seismic design of high-rise buildings.

CN118958537APending Publication Date: 2024-11-15NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411327584.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing prefabricated shear wall structure has weak energy consumption capacity under strong shock and is difficult to repair quickly, resulting in high repair costs and long cycles. The traditional dry connection energy consumption form is single, limiting the structure's seismic performance and recovery.

Method used

Design a recoverable functional wall panel structure system with energy consumption devices. By introducing high-ductility, replaceable dry-connected energy consumption devices into concrete connecting beams, combining prefabricated foundations, wall panels, floor panels and connectors, multiple The energy-consuming structure of the defense line, the main structure can be detached and repaired after earthquake.

Benefits of technology

It improves the energy consumption capacity and post-seismic recovery capacity of the wall panel structure under earthquakes, realizes fast construction, controllable cost, environmentally friendly detachability and repairability, and is suitable for high-rise buildings, reducing the cost and time of restoration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958537A_ABST
    Figure CN118958537A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of fabricated buildings, and provides a recoverable function wallboard structure system and method provided with an energy consumption device. The recoverable function wallboard structure system comprises a prefabricated foundation, a prefabricated wallboard, a prefabricated floor slab, a transverse connecting piece, a vertical connecting piece and the energy consumption device; a vertical joint is formed between every two adjacent prefabricated wallboards, and the prefabricated wallboards on the two sides of the vertical joints are connected through the transverse connecting pieces. Transverse joints are formed between the prefabricated wallboards and the prefabricated floor slabs and between the prefabricated wallboards and the prefabricated foundations. The vertical connecting piece is connected with the prefabricated wall plate and the prefabricated floor or is connected with the prefabricated wall plate and the prefabricated foundation; a door opening, a connecting beam and an energy consumption device are further arranged between the prefabricated wallboards; the two ends of the energy dissipation device are connected with the connecting beams of the two prefabricated wall plates correspondingly. The high-ductility, replaceable and easy-to-repair energy consumption device is added into the concrete coupling beam in a dry connection mode, so that the energy consumption capacity of the coupling beam is improved; and the structural system has excellent life cycle detachable and repairable performance.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of prefabricated buildings, and in particular relates to a restorable functional wall panel structure system and method configured with an energy dissipation device. Background Art

[0002] Earthquakes are one of the common natural disasters in my country, which can cause varying degrees of damage to buildings. At present, the current seismic design principle of my country's building structures is "no damage in small earthquakes, repairable in medium earthquakes, and no collapse in large earthquakes". The seismic design concept is to ensure life safety as the design goal. Under the action of earthquakes of the design intensity, the structure can be repaired immediately without major damage, and under the action of rare earthquakes, the structure does not collapse, but ignores the cost and time of post-earthquake repair of buildings and the recoverability of building functions. Under the action of strong earthquakes, buildings often have to be overturned and rebuilt due to severe damage to the building structure, difficulty in post-earthquake repair, high repair costs, and long maintenance cycles. This not only causes huge economic losses and waste of resources, but also causes adverse social impacts due to the interruption of the building's use function. Therefore, the concept of recoverable functional structure was proposed, and the structural design changed from "anti-collapse design" to "recoverable functional design". It not only protects people's lives and safety during earthquakes, but also can be quickly repaired after the earthquake and put into daily use.

[0003] Prefabricated concrete structures have been widely used in my country due to their advantages such as energy saving and environmental protection, high construction quality, fast construction, and controllable costs. Under the action of an earthquake, the coupling beam, as the first line of defense of the prefabricated wall panel (or shear wall) structural system, is the first to undergo plastic deformation and consume energy. Ordinary reinforced concrete coupling beams are very prone to shear failure under the action of an earthquake. Not only are they weak in energy dissipation capacity, but they may also cause damage to the wall limbs, which is not conducive to rapid post-earthquake repair. The traditional dry-connected prefabricated shear wall structural system has a single form of energy dissipation, which is mainly achieved through wall swaying, internal steel yielding, and friction between dry connectors and concrete. Under the action of a strong earthquake, the main structure of the traditional dry-connected prefabricated shear wall structure is severely damaged, resulting in this type of system being mainly used in low-rise and multi-story structures. Therefore, how to improve the energy dissipation capacity and post-earthquake recovery capacity of the wall panel structural system under earthquakes is a problem that needs to be solved at present. Summary of the invention

[0004] In response to the above-mentioned problems in the prior art, the present application proposes a restorable functional wall panel structure system equipped with an energy-absorbing device and a construction method thereof. By adding a high-ductility, replaceable and easy-to-repair energy-absorbing device to the concrete connecting beam through a dry connection, on the one hand, the energy-absorbing capacity of the connecting beam can be effectively improved; on the other hand, the damage can be controlled to be mainly concentrated in this part, ensuring that the main structure is elastic or low-damage, so that the shear wall structure system has excellent life cycle detachable and repairable performance.

[0005] In the first aspect, the present invention proposes a restorable functional wall panel structure system equipped with an energy dissipation device, comprising: a prefabricated foundation, a prefabricated wall panel, a prefabricated floor slab, a transverse connector, a vertical connector and an energy dissipation device; a plurality of the prefabricated wall panels are spliced ​​end to end in a transverse direction on the prefabricated foundation, a vertical joint is formed between two transversely adjacent prefabricated wall panels, and the transverse connector connects the two prefabricated wall panels on both sides of the vertical joint; the prefabricated floor slab is paved on the prefabricated wall panels; transverse joints are formed between the prefabricated wall panels and the prefabricated floor slabs and between the prefabricated wall panels and the prefabricated foundation; the vertical connector connects the prefabricated wall panels and the prefabricated floor slabs on both sides of the transverse joint, and the vertical connector connects the prefabricated wall panels and the prefabricated foundation on both sides of the transverse joint; a door opening is also provided between two transversely adjacent prefabricated wall panels, and a connecting beam and the energy dissipation device are provided above the door opening; the two ends of the energy dissipation device are respectively connected to the connecting beams of the two prefabricated wall panels located on both sides of the door opening.

[0006] Furthermore, the energy consumption device comprises:

[0007] Two end plates are respectively connected to the two connecting beams on both sides of the door opening;

[0008] An energy-absorbing web assembly connected between the two end plates, wherein the energy-absorbing web assembly is provided with slots; and

[0009] The flange plate assembly is connected between the two end plates and is located at the upper and lower ends of the energy-absorbing web assembly.

[0010] Furthermore, the energy-absorbing web assembly includes an inner web and outer webs arranged on both sides of the inner web; the inner web and the outer web are respectively provided with the slots; the yield strength of the inner web is less than the yield strength of the outer web.

[0011] Furthermore, the energy dissipation device also includes stiffening ribs; the upper end and the lower end of the energy dissipation web assembly are respectively connected to the stiffening ribs, and the stiffening ribs are also connected to the flange plate assembly.

[0012] Furthermore, the outer web is arranged vertically, and an auxiliary energy-absorbing part is also arranged in the slot hole of the outer web; the auxiliary energy-absorbing part includes an energy-absorbing steel plate assembly and a clamping connector; the energy-absorbing steel plate assembly is horizontally arranged in the slot hole of the outer web, and the upper and lower ends of the energy-absorbing steel plate assembly are respectively connected to the clamping connector, and the clamping connector is also connected to the outer web.

[0013] Furthermore, the energy-absorbing steel plate assembly includes a friction energy-absorbing soft steel plate and auxiliary energy-absorbing steel plates clamped at the upper and lower ends of the friction energy-absorbing soft steel plate; the clamping connection includes a connecting rod and a clamping plate; the clamping plate is clamped and connected to the outer web, one end of the connecting rod is connected to the clamping plate, and the other end is connected to the auxiliary energy-absorbing steel plate.

[0014] Furthermore, waist-shaped holes are arranged on the friction energy dissipation soft steel plate.

[0015] Furthermore, the opposite ends of the two end plates are respectively provided with quick-release components; the quick-release components connect the end plates and the connecting beam, or the quick-release components separate the end plates and the connection.

[0016] Furthermore, the quick-release assembly includes a connecting steel plate, a threaded sleeve arranged on the connecting steel plate, a high-strength bolt and a threaded steel bar connected to the threaded sleeve, the threaded steel bar is also connected to the connecting beam, and the high-strength bolt connects the end plate and the connecting steel plate.

[0017] Furthermore, the prefabricated foundation includes a plurality of strip foundations, and the plurality of strip foundations are horizontally spliced; a vertical joint is formed between two horizontally adjacent strip foundations, and the horizontal connecting piece connects the two strip foundations on both sides of the vertical joint.

[0018] In a second aspect, the present invention provides a construction method for the above-mentioned restorable functional wall panel structure system equipped with an energy dissipation device, comprising the following steps:

[0019] Hoist and place the prefabricated foundation on the foundation;

[0020] Splicing a plurality of prefabricated wall panels end to end transversely on the prefabricated foundation;

[0021] Connecting two of the prefabricated wall panels that are adjacent to each other in the transverse direction by using a transverse connecting member; connecting the prefabricated wall panel and the prefabricated foundation by using a vertical connecting member;

[0022] Laying the prefabricated floor slab on the prefabricated wall panel;

[0023] Connecting the prefabricated floor slab and the prefabricated wall slab using vertical connectors;

[0024] The energy dissipation device is installed above the door opening, and the two ends of the energy dissipation device are respectively connected to the connecting beams of the two prefabricated wall panels on both sides of the door opening.

[0025] The beneficial effects of the present invention include: the present invention combines the advantages of both the restorable functional structural system and the dry-connected assembled wall panel structural system, applies the dry-connected assembled construction technology to the restorable functional wall panel structural system with replaceable energy-consuming devices, and forms a new type of assembled concrete wall panel restorable functional structural system with replaceable energy-consuming devices. The system has the advantages of fast construction, environmental friendliness, detachability, replaceability, and cost control. At the same time, through reasonable design and calculation, the structural damage under the action of the earthquake is mainly concentrated in the energy-consuming device. After the earthquake, the energy-consuming device is replaced, the local components are repaired, and the overall structure is quickly maintained and put into normal use. In addition, compared with the traditional dry-connected assembled structural system, the new structural system consumes energy through multiple lines of defense, has a more excellent energy-consuming capacity, and has a market prospect of being promoted to high-rise structures in the future. From the perspective of the entire life cycle, the structural system can bring better economic effects, conform to my country's new development concept of innovation and greenness, and promote high-quality development of the construction industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a front view of the restorable functional wall panel structure system equipped with an energy dissipation device according to the present invention.

[0027] Figure 2 for Figure 1 Side view of.

[0028] Figure 3 for Figure 1 Schematic diagram of the connection node between the connecting beam and the energy dissipation device between two prefabricated wall panels.

[0029] Figure 4 for Figure 1 Schematic diagram of the enlarged structure of the medium energy consumption device.

[0030] Figure 5 for Figure 4 Schematic diagram of the explosion of the energy dissipation device.

[0031] Figure 6 It is a structural schematic diagram of the auxiliary energy-absorbing parts provided at the slot holes of the outer web of the present invention.

[0032] Figure 7 for Figure 6 Schematic diagram of the top view structure of the auxiliary energy absorbing parts.

[0033] Figure 8 for Figure 6 Schematic diagram of the side structure of the outer web and auxiliary energy absorbing parts.

[0034] Fig. 9 It is a schematic diagram of a node of two strip foundations of the prefabricated foundation of the present invention being horizontally spliced.

[0035] Fig.10It is a schematic diagram of the node at the transverse joint of the prefabricated foundation and the prefabricated wall panel of the present invention.

[0036] Fig.11 It is a schematic diagram of the node at the transverse joint of the prefabricated floor slab and the prefabricated wall panel of the present invention.

[0037] Fig.12 This is a schematic diagram of a node in which two prefabricated wall panels are connected by a transverse connector at a corner of the structural system of the present invention.

[0038] Fig.13 It is a schematic diagram of a node in which a non-corner transverse connector of the structural system of the present invention connects two prefabricated wall panels.

[0039] Fig.14 This is a schematic diagram of the connection node of two prefabricated floor slabs of the present invention.

[0040] In the figure: 10-prefabricated foundation; 20-prefabricated wall panel; 21-connecting beam; 22-connecting steel plate; 23-threaded sleeve; 24-threaded steel bar; 30-prefabricated floor slab; 40-transverse connecting piece; 41-transverse straight steel plate; 42-transverse L-shaped steel plate; 50-vertical connecting piece; 51-vertical straight steel plate; 52-vertical L-shaped steel plate; 60-high-strength bolt; 70-energy dissipation device; 71-end plate; 72-flange plate assembly; 73-stiffening rib; 74-outer web; 75-inner web; 76-slot hole; 80-auxiliary energy dissipation part; 81-friction energy dissipation soft steel plate; 82-auxiliary energy dissipation steel plate; 83-connecting rod; 84-plywood; 85-waist-shaped hole. DETAILED DESCRIPTION

[0041] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0042] like Figure 1 As shown, the restorable functional wall panel structure system equipped with an energy dissipation device includes: a prefabricated foundation 10, a prefabricated wall panel 20, a prefabricated floor slab 30, a horizontal connection member 40, a vertical connection member 50 and an energy dissipation device 70.

[0043] The structural system of this embodiment takes a two-story building as an example.

[0044] The prefabricated foundation 10 includes a plurality of strip foundations, which are horizontally spliced; Fig. 9 As shown, a vertical joint is formed between two strip foundations adjacent to each other in the horizontal direction, and a horizontal connector 40 connects the two strip foundations on both sides of the vertical joint. The strip foundation can be an L-shaped prefabricated concrete foundation, and four strip foundations can be spliced ​​end to end to form a prefabricated foundation 10 of a frame structure.

[0045] The structural system of this embodiment has four sides, and each side of each floor is provided with two prefabricated wall panels 20, and at least one side of each floor is provided with a door opening, which is arranged between two prefabricated wall panels 20 on the same side. The prefabricated wall panels 20 on both sides of the door opening are provided with cantilevered connecting beams 21 above the door opening, and the cantilevered connecting beams 21 of the two prefabricated wall panels 20 are kept at a distance, and the energy dissipation device 70 is installed at the distance, and the two ends of the energy dissipation device 70 are respectively connected to the connecting beams 21 at both ends thereof. The connecting beams 21 can be prefabricated structures on the prefabricated wall panels 20 on both sides of the door opening.

[0046] like Figure 1 , Figure 2 , Fig.12 and Fig.13 As shown, eight prefabricated wall panels 20 are spliced ​​end to end on the prefabricated foundation 10 in the horizontal direction, and a vertical joint is formed between two adjacent prefabricated wall panels 20 in the horizontal direction. The horizontal connector 40 connects the two prefabricated wall panels 20 on both sides of the vertical joint. The structural system of this embodiment has four sides and four corners, such as Fig.13 As shown, a vertical joint is formed between two laterally adjacent prefabricated wall panels 20 on the side. Fig.12 A vertical joint is also formed between two transversely adjacent prefabricated wall panels 20 at the corner. In this embodiment, a transverse connector 40 connects two prefabricated wall panels 20 on both sides of the vertical joint. The transverse connector 40 includes a transverse straight steel plate 41, a transverse L-shaped steel plate 42, and a high-strength bolt 60. Fig.12 The prefabricated wall panels 20 at the corner shown in the figure use a transverse L-shaped steel plate 42 in conjunction with high-strength bolts 60 to achieve the connection between the two prefabricated wall panels 20 at the corner. Fig.13 The vertical joint shown uses a horizontal straight steel plate 41 and high-strength bolts 60 to connect the two prefabricated wall panels 20 at the vertical joint.

[0047] like Fig.10 As shown, a transverse joint is formed between the lower end of the prefabricated wall panel 20 and the prefabricated foundation 10, and a vertical connector 50 is used to connect the prefabricated wall panel 20 and the prefabricated foundation 10 at the transverse joint. In this embodiment, the vertical connector 50 includes a vertical straight steel plate 51, a vertical L-shaped steel plate 52 and a high-strength bolt 60.

[0048] Fig.10 In the figure, the foot of the prefabricated wall panel 20 is connected to the prefabricated foundation 10 by a vertical L-shaped steel plate 52 and a high-strength bolt 60. The vertical L-shaped steel plates 52 are arranged on both sides of the prefabricated wall panel 20, and the vertical L-shaped steel plates 52 on both sides are respectively connected to the prefabricated foundation 10 by the high-strength bolts 60, and the vertical L-shaped steel plates 52 on both sides are also connected by the high-strength bolts 60.

[0049] like Fig.11As shown, the upper end of the prefabricated wall panel 20 is paved with a prefabricated floor 30. The structural system of this embodiment is a two-layer structure, so a prefabricated wall panel 20 is also arranged on the upper end of the prefabricated floor 30. A transverse joint is formed between the upper and lower layers or two vertically adjacent prefabricated wall panels 20, and a vertical straight steel plate 51 is used in conjunction with a high-strength bolt 60 to connect the upper and lower layers or two vertically adjacent prefabricated wall panels 20. A tongue and groove is provided at the upper end of the prefabricated wall panel 20 to facilitate the laying of the prefabricated floor 30. A transverse joint is formed between the prefabricated floor 30 and the prefabricated wall panel 20, and a vertical L-shaped steel plate 52 is used in conjunction with a high-strength bolt 60 to connect the prefabricated floor 30 and the prefabricated wall panel 20. The high-strength bolt 60 also connects the vertical L-shaped steel plate 52 and the vertical straight steel plate 51.

[0050] like Fig.14 As shown, there may be multiple prefabricated floor slabs 30 , and a vertical joint is formed between two transversely adjacent prefabricated floor slabs 30 , and a transverse connector 40 connects the two prefabricated floor slabs 30 on both sides of the vertical joint. Fig.14 The transverse connecting member 40 uses a transverse straight steel plate 41 and high-strength bolts 60 to connect the two prefabricated floor slabs 30.

[0051] like Figure 3-Figure 5 As shown, the energy dissipation device 70 includes: two end plates 71 , an energy dissipation web assembly, a flange plate assembly 72 and stiffening ribs 73 .

[0052] The two end plates 71 are respectively connected to the two connecting beams 21 on both sides of the door opening.

[0053] The energy dissipation web assembly is connected between the two end plates 71, and a slot 76 is provided on the energy dissipation web assembly. A plurality of slots 76 can be provided, and the length direction of the slots 76 is horizontally arranged.

[0054] The flange plate assembly 72 is connected between the two end plates 71 and is located at the upper and lower ends of the energy dissipation web assembly.

[0055] The energy dissipation web assembly includes an inner web 75 and outer webs 74 disposed on both sides of the inner web 75; slots 76 are disposed on the inner web 75 and the outer web 74 respectively; the yield strength of the inner web 75 is less than the yield strength of the outer web 74. The energy dissipation device 70 also includes a stiffening rib 73; the upper end and the lower end of the energy dissipation web assembly are respectively connected to the stiffening rib 73, and the stiffening rib 73 is also connected to the flange plate assembly 72.

[0056] The flange plate assembly 72 includes an upper flange plate and a lower flange plate. The upper flange plate is welded and fixed to the upper end of the energy dissipation web assembly, and the lower flange plate is welded and fixed to the lower end. A stiffening rib 73 is welded at a right angle between the upper flange plate and the upper end of the energy dissipation web assembly, and a stiffening rib 73 is welded at a right angle between the lower flange plate and the lower end of the energy dissipation web assembly. The stiffening rib 73 is distributed at the vertical centerline position of the slot 76. Two slots 76 are provided on the inner web 75 and the outer web 74 of the energy dissipation web assembly. The two slots 76 are spaced apart in the vertical direction and are arranged in parallel.

[0057] The opposite ends of the two end plates 71 are respectively provided with quick-release components; the quick-release components connect the end plates 71 and the connecting beam 21, or the quick-release components separate the end plates 71 and the connection. The quick-release components include a connecting steel plate 22, a threaded sleeve 23 provided on the connecting steel plate 22, a high-strength bolt 60, and a threaded steel bar 24 connected to the threaded sleeve 23, the threaded steel bar 24 is also connected to the connecting beam 21, and the high-strength bolt 60 connects the end plate 71 and the connecting steel plate 22.

[0058] The energy dissipation web assembly mainly bears shearing action, forms plasticity around the slot 76, and dissipates structural energy by up and down deformation. The flange assembly 72 mainly bears bending action, and the whole bears axial action. The outer web 74 is made of Q235 steel, and the inner web 75 is made of low yield steel. At the same time, the damage area and damage sequence of the energy dissipation device 70 are controlled by changing the opening size and opening form of the slot 76 and the thickness of the energy dissipation web assembly.

[0059] A double-layer bidirectional steel grid is arranged at the connecting beam 21, and a small amount of stirrups are arranged at the node connected to the energy dissipation device 70 to enhance the shear bearing capacity of the node and avoid premature shear failure of the node concrete. At the same time, it can greatly reduce the workload and steel consumption and save costs.

[0060] When the prefabricated wall panel 20 is cast, a connecting steel plate 22 is installed in advance at the end of the connecting beam 21, and the connecting steel plate 22 is used to connect with the end plate 71 of the energy dissipation device 70. For example, a connecting steel plate 22 is arranged between the end plate 71 of the energy dissipation device 70 and the connecting beam 21, and a threaded sleeve 23 is welded to the end face of the connecting steel plate 22 facing away from the end plate 71, and the threaded sleeve 23 is connected to the threaded steel bar 24 in the connecting beam 21, and the high-strength bolt 60 connects the end plate 71 and the connecting steel plate 22. Under the action of an earthquake, the energy dissipation device 70 dissipates energy by plastic deformation, and the energy dissipation device 70 is disassembled and replaced after serious damage after the earthquake.

[0061] like Figure 6-Figure 8As shown, the outer web 74 is arranged vertically, and an auxiliary energy-absorbing part 80 is also arranged in the slot 76 of the outer web 74; the auxiliary energy-absorbing part 80 includes an energy-absorbing steel plate assembly and a clamping connector; the energy-absorbing steel plate assembly is horizontally arranged in the slot 76 of the outer web 74, and the upper and lower ends of the energy-absorbing steel plate assembly are respectively connected to the clamping connector, and the clamping connector is also connected to the outer web 74.

[0062] The energy dissipation steel plate assembly includes a friction energy dissipation soft steel plate 81 and auxiliary energy dissipation steel plates 82 clamped at the upper and lower ends of the friction energy dissipation soft steel plate 81; the clamping connector includes a connecting rod 83 and a clamping plate 84; the clamping plate 84 is clamped and connected to the outer web 74, one end of the connecting rod 83 is connected to the clamping plate 84, and the other end is connected to the auxiliary energy dissipation steel plate 82. The friction energy dissipation soft steel plate 81 is provided with a waist-shaped hole 85. Figure 8 As shown, the outer web 74 is a vertical plate structure, while the friction energy dissipation soft steel plate 81 is a horizontal plate structure, so that the energy dissipation device 70 has energy dissipation effects in different directions.

[0063] Since the inner web 75 yields before the outer web 74, after the inner web 75 yields, the energy dissipation steel plate assembly first dissipates energy by friction to achieve energy dissipation in the horizontal direction. In this process, the friction energy dissipation soft steel plate 81 and the auxiliary energy dissipation steel plate 82 dissipate energy by friction, and then the friction energy dissipation soft steel plate 81 yields. Since the auxiliary energy dissipation member 80 is arranged in the slot 76 of the outer web 74, it will not affect the yield of the outer web 74, so that the energy dissipation device 70 has a good multi-stage and multi-directional energy dissipation effect.

[0064] Based on the same inventive concept, the construction method of the recoverable functional wall panel structure system equipped with the energy dissipation device 70 proposed by the present invention comprises the following steps:

[0065] The prefabricated foundation 10 is hoisted and placed on the foundation;

[0066] Splice multiple prefabricated wall panels 20 end to end on the prefabricated foundation 10 in the transverse direction;

[0067] Two prefabricated wall panels 20 adjacent to each other in the transverse direction are connected by a transverse connecting member 40; and the prefabricated wall panels 20 and the prefabricated foundation 10 are connected by a vertical connecting member 50;

[0068] Laying the prefabricated floor slab 30 on the prefabricated wall slab 20;

[0069] Connecting the prefabricated floor slab 30 and the prefabricated wall slab 20 using a vertical connector 50;

[0070] The energy dissipation device 70 is installed above the door opening, and both ends of the energy dissipation device 70 are respectively connected to the connecting beams 21 of the two prefabricated wall panels 20 on both sides of the door opening.

[0071] Under the action of earthquake load, the structural system bends and deforms, thereby generating a corresponding inter-story displacement angle. The shear walls (i.e., prefabricated wall panels 20) on the same floor shift up and down, and the connecting beams 21 are subjected to the combined action of bending and shearing. The bending moment on the connecting beams 21 is anti-symmetrically distributed, and the bending moment on the mid-span is zero, and the shear force is evenly distributed along the connecting beams 21. The mid-span concrete area with small bending moment and large deformation is replaced with a detachable energy dissipation device 70 (also called a damper) with strong energy dissipation capacity, large ductility coefficient, so that the system has strong earthquake resistance and can be disassembled and repaired after the earthquake.

[0072] The connections between the above-mentioned components are safe and reliable, the force paths are clear and definite, and the internal forces of the structure can be effectively transmitted. The force transmission components in the horizontal direction of the structural system mainly include the connecting beam 21 and the prefabricated floor slab 30, and the vertical force transmission components include the prefabricated floor slab 30 and the prefabricated wall panel 20. Among them, the connection nodes at the transverse joints of the prefabricated wall panel 20 mainly bear vertical tension and horizontal shear force; the connection nodes at the vertical joints of the prefabricated wall panel 20 mainly bear vertical shear force; the connection nodes between the prefabricated wall panel 20 and the prefabricated floor slab 30 mainly bear horizontal shear force and out-of-plane shear force.

[0073] Under the action of a small earthquake, the structural system and the energy dissipation device 70 are in an elastic stage, and the energy dissipation device 70 mainly plays a role in providing lateral stiffness and transmitting seismic force.

[0074] Under the action of a moderate earthquake, the slot 76 of the energy dissipation device 70 begins to undergo plastic deformation to dissipate the earthquake energy. The connecting beam 21 and the prefabricated wall panel 20 are in the elastic stage. After the earthquake, the energy dissipation web assembly of the energy dissipation device 70 or the auxiliary energy dissipation parts 80 on the energy dissipation web assembly are replaced, and the building can be put into use soon.

[0075] Under the action of a strong earthquake, the remaining positions of the energy dissipation device 70 begin to undergo plastic deformation and continue to dissipate the earthquake energy. The concrete on the connecting beam 21 has a few cracks, and the prefabricated wall panels 20 are still in the elastic stage. After the earthquake, the energy dissipation device 70 can be replaced, and the connecting beam 21 can be slightly repaired or not repaired, and the building can be put into use.

[0076] Under the action of the ultimate load, cracks appear in the concrete on the prefabricated wall panel 20, the energy dissipation device 70 yields severely, and the connecting beam 21 is damaged, but the structure does not collapse. According to the development of the cracks in the prefabricated wall panel 20, the energy dissipation device 70 and the connecting beam 21 are replaced after the earthquake, and the prefabricated wall panel 20 is slightly repaired or not repaired, and the building can be put into use. Under the action of an earthquake, the energy dissipation device 70 is mainly subjected to bending, shear and axial forces. The bending moment and axial force near the energy dissipation device 70 are relatively small, and the energy dissipation web assembly is mainly subjected to shearing. The two ends of the energy dissipation web assembly are displaced and deformed, and the bending moment distribution is large at the two ends and zero in the middle. The slot 76 of the energy dissipation web assembly yields on both sides, forming a plastic hinge, and the energy dissipation web assembly displaces up and down to dissipate energy by shear yielding. Since the inner web 75 and the outer web 74 are made of different materials, the yield strength of the inner web 75 is much smaller than that of the outer web 74. Therefore, the energy dissipation device 70 can yield in stages under different earthquakes. Similarly, under medium earthquakes, by changing the size of the energy dissipation web assembly and the size of the slot 76 opening, the bearing capacity and stiffness are changed, so that the inner web 75 yields first and then the outer web 74 yields; under large earthquakes, the inner web 75 and the outer web 74 yield at the same time. At the same time, the stiffening ribs 73 can effectively improve the out-of-plane buckling of the inner web 75 and the outer web 74, avoiding out-of-plane instability and a significant decrease in bearing capacity. Since the mid-span area of ​​the connecting beam 21 is subjected to a small bending moment, the energy dissipation device 70 is subjected to very small pure bending action, which is basically due to the bending deformation caused by the shear deformation of the energy dissipation device 70. The bending action of this part is mainly borne by the flange plate assembly 72. Under earthquake action, it is basically in elasticity and no damage occurs. During post-earthquake repair, the high-strength bolts 60 are removed, the energy-absorbing web assembly is taken down, the original welding points can be removed by cutting with protective gas, the energy-absorbing web assembly is replaced or only the inner web 75 is replaced, or the energy-absorbing device 70 is replaced as a whole to complete the structural repair process.

[0077] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A restorable functional wall panel structure system equipped with an energy dissipation device, characterized in that: include: Precast foundations, precast wall panels, precast floor slabs, horizontal connectors, vertical connectors and energy dissipation devices; A plurality of the prefabricated wall panels are spliced ​​end to end in a transverse direction on the prefabricated foundation, a vertical joint is formed between two transversely adjacent prefabricated wall panels, and the transverse connecting piece connects the two prefabricated wall panels on both sides of the vertical joint; The prefabricated floor slab is paved on the prefabricated wall panel; a transverse joint is formed between the prefabricated wall panel and the prefabricated floor slab and between the prefabricated wall panel and the prefabricated foundation; the vertical connector connects the prefabricated wall panel and the prefabricated floor slab on both sides of the transverse joint, and the vertical connector connects the prefabricated wall panel and the prefabricated foundation on both sides of the transverse joint; A door opening is also arranged between two laterally adjacent prefabricated wall panels, and a connecting beam and the energy dissipation device are arranged above the door opening; two ends of the energy dissipation device are respectively connected to the connecting beams of the two prefabricated wall panels located on both sides of the door opening.

2. A restorable functional wall panel structure system equipped with an energy dissipation device according to claim 1, characterized in that: The energy consumption device comprises: Two end plates are respectively connected to the two connecting beams on both sides of the door opening; An energy-absorbing web assembly connected between the two end plates, wherein the energy-absorbing web assembly is provided with slots; and The flange plate assembly is connected between the two end plates and is located at the upper and lower ends of the energy-absorbing web plate assembly.

3. A restorable functional wall panel structure system equipped with an energy dissipation device according to claim 2, characterized in that: The energy dissipation web assembly comprises an inner web and outer webs arranged on both sides of the inner web; the inner web and the outer web are respectively provided with the slots; the yield strength of the inner web is less than the yield strength of the outer web.

4. A restorable functional wall panel structure system equipped with an energy dissipation device according to claim 3, characterized in that: The energy dissipation device further comprises stiffening ribs; the upper end and the lower end of the energy dissipation web assembly are respectively connected with the stiffening ribs, and the stiffening ribs are also connected with the flange plate assembly.

5. The recoverable functional wall panel structure system equipped with an energy dissipation device according to claim 3 is characterized in that: The outer web is arranged vertically, and an auxiliary energy-absorbing part is also arranged in the slot hole of the outer web; the auxiliary energy-absorbing part includes an energy-absorbing steel plate assembly and a clamping connector; the energy-absorbing steel plate assembly is arranged horizontally in the slot hole of the outer web, and the upper and lower ends of the energy-absorbing steel plate assembly are respectively connected to the clamping connector, and the clamping connector is also connected to the outer web.

6. A restorable functional wall panel structure system equipped with an energy dissipation device according to claim 5, characterized in that: The energy-absorbing steel plate assembly includes a friction energy-absorbing soft steel plate and auxiliary energy-absorbing steel plates clamped at the upper and lower ends of the friction energy-absorbing soft steel plate; the clamping connection includes a connecting rod and a clamping plate; the clamping plate is clamped and connected to the outer web, one end of the connecting rod is connected to the clamping plate, and the other end is connected to the auxiliary energy-absorbing steel plate.

7. A restorable functional wall panel structure system equipped with an energy dissipation device according to claim 6, characterized in that: The friction energy dissipation soft steel plate is provided with waist-shaped holes.

8. The recoverable functional wall panel structure system equipped with an energy dissipation device according to claim 2 is characterized in that: The opposite ends of the two end plates are respectively provided with quick-release components; the quick-release components connect the end plates and the connecting beam, or the quick-release components separate the end plates and the connection.

9. The recoverable functional wall panel structure system equipped with energy dissipation device according to claim 1 is characterized in that: The prefabricated foundation includes a plurality of strip foundations, which are horizontally spliced; a vertical joint is formed between two horizontally adjacent strip foundations, and the horizontal connecting piece connects the two strip foundations on both sides of the vertical joint.

10. A construction method for a restorable functional wall panel structure system equipped with an energy dissipation device as claimed in claim 1, characterized in that: The following steps are involved: Hoist and place the prefabricated foundation on the foundation; Splicing a plurality of prefabricated wall panels end to end transversely on the prefabricated foundation; Connecting two of the prefabricated wall panels that are adjacent to each other in the transverse direction by using a transverse connecting member; connecting the prefabricated wall panel and the prefabricated foundation by using a vertical connecting member; Laying the prefabricated floor slab on the prefabricated wall panel; Connecting the prefabricated floor slab and the prefabricated wall slab using vertical connectors; The energy dissipation device is installed above the door opening, and the two ends of the energy dissipation device are respectively connected to the connecting beams of the two prefabricated wall panels on both sides of the door opening.