Roof net rack construction method
Through the combination of the sliding support platform and follow-up structure, the problems of lifting difficulties and structural deformation in roof mesh construction are solved, and a more efficient and safe construction process is achieved, ensuring installation quality and reducing costs.
Patent Information
- Application Number
- CN202411301572.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-15
AI Technical Summary
The traditional roof mesh construction plan has difficulties in lifting, structural deformation and construction risks, especially the susceptible sinking of the suspended end, resulting in unqualified installation quality and short service life.
Using a sliding support platform and a follow-up structure, it is built with a rectangular support steel frame and guide rail. The sliding support platform is moved along the guide rail for small grid lifting and assembling, and a support structure is set at the suspended end to provide stable support force to ensure that the suspended end is not lowered. Deformation.
It improves the convenience and safety of roof mesh construction, reduces the risk of structural deformation, ensures installation quality and service life, and at the same time reduces construction materials and costs, shortens construction period, and improves construction efficiency and safety.
Smart Images

Figure CN118958698A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of roof grid construction, and in particular to a roof grid construction method. Background Art
[0002] The traditional roof grid construction plan usually involves hoisting the roof grid as a whole after it is assembled on the ground. This construction method will lead to difficulties in hoisting, construction difficulty, and prone to deformation of the grid structure and construction risks.
[0003] In addition, there is a traditional solution of building a construction platform on the supporting steel frame and building a roof grid above the construction platform. However, when building the roof grid, because the roof grid is built sequentially in one direction, during the building process, one end and both sides of the built grid part can be supported by supporting steel frames and other structures, but there is no relevant structure to support the other end of the grid close to the opposite direction of building, and because the lateral span of the grid structure is usually large, the end close to the opposite direction of building often forms an unsupported suspended state. As a result, this end is very likely to deform and sink, so after the entire grid is built, the overall structure of the grid is unqualified for installation quality, short service life, and very prone to deformation and damage. Summary of the invention
[0004] The purpose of the present invention is to solve at least one technical problem in the background technology and provide a roof grid construction method.
[0005] To achieve the above object, the present invention provides a roof grid construction method, wherein the roof grid is formed by assembling a plurality of small grids, and the method comprises:
[0006] Set up a rectangular support steel frame;
[0007] Guide rails are arranged on both sides of the top of the rectangular supporting steel frame;
[0008] A sliding support platform is installed on the guide rail and can reciprocate along the guide rail;
[0009] Along the direction of the guide rail, the small grids are hoisted and assembled in sequence from one end of the top of the rectangular support steel frame to the other end to form the roof grid;
[0010] When hoisting and assembling each of the small grids, the sliding support platform is supported below the small grid station to be hoisted and assembled. When the hoisting and assembly of the small grid to be hoisted and assembled is completed, the sliding support platform moves to the next small grid station to be hoisted and assembled;
[0011] When the hoisting and assembly of the previous small grid is completed, when the sliding support platform moves to the bottom of the next small grid to be hoisted and assembled, one end of the sliding support platform is supported under the hoisted and assembled small grid.
[0012] According to one aspect of the present invention, it also includes:
[0013] A support structure is arranged on a side of the sliding support platform away from the roof grid, wherein the support structure comprises a follower structure and a first support member;
[0014] One end of the follower structure is installed on the sliding support platform, and the other end has a gap with the ground. The follower structure moves with the sliding support platform. When the position of the sliding support platform is fixed, the other end of the follower structure is supported by the first support member to provide supporting force to the sliding support platform.
[0015] According to one aspect of the present invention, the follower structure includes: a plurality of support columns installed at intervals on the sliding support platform, and the spacing between the support columns located at the center of the sliding support platform is smaller than the spacing between the support columns at the eccentric position.
[0016] According to one aspect of the present invention, each of the supporting columns is located on the same straight line, and each of the supporting columns is located on a side of the sliding support platform close to the small grid that has been hoisted and assembled.
[0017] According to one aspect of the present invention, the small truss and the sliding support platform are both formed by connecting a plurality of bolt balls and a plurality of support rods, the top end of the support column is supported on four bolt balls arranged at intervals at the bottom of the sliding support platform through four support rods, and the extension line of the support column is located at the center of the four bolt balls, and the top end of the support column is located on the same straight line as a bolt ball at the top of the sliding support platform and the bolt ball at the end of the small truss that has been hoisted and assembled.
[0018] According to one aspect of the present invention, it also includes: a plurality of second support members are arranged at intervals on the top of the sliding support platform, each of the second support members supports each bolt ball at the end of the small grid that has been hoisted and assembled, and each of the second support members is located on the same straight line as each of the supporting columns.
[0019] According to one aspect of the present invention, it also includes: laying cross beams and longitudinal beams at intervals on the top of the sliding support platform, and after the cross beams and longitudinal beams are welded, laying support plates on the basis of the cross beams and longitudinal beams.
[0020] According to one aspect of the present invention, the first supporting member and the second supporting member are screw jacks.
[0021] According to one scheme of the present invention, a roof grid construction method, wherein the roof grid is formed by assembling a plurality of groups of small grids, comprises: setting a rectangular support steel frame; setting guide rails on both sides of the top of the rectangular support steel frame; installing a sliding support platform on the guide rails that can reciprocate along the guide rails; hoisting and assembling each small grid in sequence from one end of the top of the rectangular support steel frame to the other end along the direction of the guide rails to form a roof grid; when hoisting and assembling each small grid, the sliding support platform is supported under the small grid station to be hoisted and assembled, and when the hoisting and assembly of the small grid to be hoisted and assembled is completed, the sliding support platform moves to the next small grid station to be hoisted and assembled; when the hoisting and assembly of the current small grid is completed, when the sliding support platform moves to the next small grid station to be hoisted and assembled, one end of the sliding support platform is supported under the hoisted and assembled small grid. Such a setting allows construction workers to hoist and assemble the roof grid through the sliding support platform, making the process of installing the roof grid more convenient and quick and ensuring construction safety. In addition, the sliding support platform can also support the suspended end of the small grid that has been hoisted and assembled (i.e., the end close to the erection and assembly direction), which can effectively reduce the risk of sinking and deformation of the suspended end of the small grid, thereby ensuring the installation quality of the roof grid.
[0022] According to one solution of the present invention, the roof grid construction method of the present invention also includes: a support structure is arranged on the side of the sliding support platform away from the roof grid, the support structure includes a follower structure and a first support member; one end of the follower structure is installed on the sliding support platform, and the other end has a gap with the ground, the follower structure moves with the sliding support platform, and when the position of the sliding support platform is fixed, the other end of the follower structure is supported by the first support member to provide support force for the sliding support platform. In this way, the sliding support platform can be supported by the support structure to provide support force for the sliding support platform, so that when the sliding support platform supports the suspended end of the small grid, sufficient support force can be provided to ensure that the suspended end of the small grid will not sink and deform, and at the same time, the stability of the sliding support platform can be ensured, and the sliding support platform can be ensured to have a high support strength to avoid deformation and damage. Moreover, when the sliding support platform needs to be moved to the next workstation, the follower structure and the first support member in the support structure can be separated, and then the sliding support platform can be moved. During the movement, the follower structure follows the sliding support platform to move to the next workstation, and then the first support member is connected to the follower structure for support. This process greatly reduces the difficulty of installation and disassembly, reduces the construction workload, is convenient and quick to operate, can quickly provide support for the sliding support platform, effectively ensures support efficiency, and reduces the probability of damage and deformation.
[0023] According to one solution of the present invention, the follower structure includes support columns, wherein the spacing between the two support columns located in the center is small, while the spacing between the two support columns located outside the center is large. In this arrangement, because the sliding support platform spans the guide rails on both sides of the top of the rectangular support steel frame, the force on the center of the sliding support platform is large, and the force decreases toward the sides. Therefore, by arranging the support columns in the above manner, the stability, safety and support strength of the sliding support platform can be effectively guaranteed, and the risk of local deformation of the sliding support platform during construction can be effectively avoided.
[0024] According to one solution of the present invention, each support column is located on the same straight line, and each support column is located on one side of the sliding support platform close to the small grid that has been assembled. That is, each support column is arranged side by side with a spacing from each other along one direction, and each support column is not supported on the center of the sliding support platform, but on one side of the sliding support platform (i.e., close to the side of the small grid that has been assembled). With such an arrangement, the sliding support platform and the corresponding suspended ends of the small grid can be supported in a targeted manner through the support columns and the first support members respectively connected to each support column, ensuring that the suspended ends of each small grid can be supported with sufficient strength, effectively preventing the suspended ends from sinking and deformation.
[0025] According to one solution of the present invention, the small grid and the sliding support platform are both formed by connecting a plurality of bolt balls and a plurality of support rods, the top of the support column is supported on four bolt balls arranged at intervals at the bottom of the sliding support platform through four support rods, and the extension line of the support column is located at the center of the four bolt balls, and the top of the support column is located on the same straight line as a bolt ball at the top of the sliding support platform and the bolt ball at the end of the small grid assembled by hoisting. Such an arrangement can make the support center of gravity correspond to the concentrated force position of the suspended end, so that the support effect is better, ensure that the support will not be eccentric or shifted, and effectively improve the stability and safety of the support.
[0026] According to one solution of the present invention, the roof grid construction method of the present invention further includes: arranging a plurality of second support members at intervals on the top of the sliding support platform, each second support member supports each bolt ball at the end of the small grid that has been hoisted and assembled, and each second support member is located on the same straight line with each support column. With such an arrangement, the roof grid can be supported by the sliding support platform and the second support members thereon, and the support forms a vertical state, and the support center of gravity and the main force point of the suspended end are located on the same straight line, so that the support is more stable and reliable, ensuring that the suspended end will not deviate, sink or deform.
[0027] According to one solution of the present invention, the present invention further includes: laying cross beams and longitudinal beams at intervals on the top of the sliding support platform, and laying support plates on the basis of the cross beams and longitudinal beams after the cross beams and longitudinal beams are welded. Such an arrangement can enable construction personnel and related construction equipment to be carried on the top of the sliding support platform, effectively improving the convenience and safety of construction.
[0028] According to one solution of the present invention, the first support member and the second support member are screw jacks. With such a configuration, the first support member and the second support member can provide a support force of sufficient strength, and the support height can be adjusted according to construction requirements, ensuring that the sliding support platform and the roof grid are always in the correct posture, and even if deformation occurs, the first support member and the second support member can be used for local adjustment, which can effectively correct the deviation and effectively prevent the sliding support platform and the roof grid from irreversible sinking deformation.
[0029] According to the solution of the present invention, the present invention can utilize, for example, a crane beam structure as a support point and a sliding track of a sliding support platform, and assemble the roof grid in bulk or in small units on the sliding support platform, and complete the installation of the roof grid by sliding the grid sliding platform on the crane beam in sequence.
[0030] The present invention does not require the erection of large-scale assembly brackets, can reduce a large amount of grid assembly platform materials, reduce the rental fee of full-frame materials, and reduce costs.
[0031] The present invention installs the grid on the sliding support platform, which is convenient for workers to construct and can shorten the corresponding construction period.
[0032] The present invention uses a sliding support platform to install the grid, which is convenient for inspection and acceptance during the construction process and ensures the construction quality of the grid.
[0033] The present invention can reduce high-altitude operations and ensure construction safety by using a sliding support platform to install the grid.
[0034] The sliding support platform of the present invention adopts a bolt ball grid structure of the same structural type as that of this project. After the grid structure of the sliding support platform is dismantled, it can be used for the grid construction of the second phase factory roof. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A schematic diagram showing a front view of the structure arrangement of a roof grid construction process according to an embodiment of the present invention;
[0036] Figure 2 A side view schematically shows the structural arrangement of a roof grid construction process according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] The present invention will now be discussed with reference to exemplary embodiments. It should be understood that the embodiments discussed are only to enable those skilled in the art to better understand and thus implement the present invention, rather than implying any limitation on the scope of the present invention.
[0038] As used herein, the term “including” and variations thereof are to be interpreted as open-ended terms meaning “including, but not limited to.” The term “based on” is to be interpreted as “based, at least in part, on.” The terms “one embodiment” and “an embodiment” are to be interpreted as “at least one embodiment.”
[0039] Figure 1 A schematic diagram showing a front view of the structure arrangement of a roof grid construction process according to an embodiment of the present invention; Figure 2 A schematic diagram of a side view of the structure arrangement of a roof grid construction process according to an embodiment of the present invention. Figure 1 and Figure 2 As shown, in this embodiment, a roof grid construction method, wherein the roof grid is formed by assembling a plurality of small grids, comprises:
[0040] Set up a rectangular support steel frame 1;
[0041] Guide rails 2 are arranged on both sides of the top of the rectangular support steel frame 1;
[0042] A sliding support platform 3 is installed on the guide rail 2 and can reciprocate along the guide rail;
[0043] Along the direction of the guide rail 2, the small grids 4 are hoisted and assembled in sequence from one end of the top of the rectangular support steel frame 1 to the other end to form a roof grid 5;
[0044] When hoisting and assembling each small grid frame 4, the sliding support platform 3 is supported under the small grid frame 4 to be hoisted and assembled. When the hoisting and assembly of the small grid frame 4 to be hoisted and assembled is completed, the sliding support platform 3 moves to the next small grid frame 4 to be hoisted and assembled.
[0045] After the previous small grid 4 is hoisted and assembled, when the sliding support platform 3 moves to the bottom of the next small grid 4 to be hoisted and assembled, one end of the sliding support platform 3 is supported below the small grid 4 that has been hoisted and assembled. Such arrangement allows construction personnel to hoist and assemble the roof grid 5 through the sliding support platform 3, making the process of installing the roof grid 5 more convenient and quick and ensuring construction safety. In addition, the sliding support platform 3 can also support the suspended end (i.e., the end close to the erection and assembly direction) of the small grid 4 that has been hoisted and assembled, which can effectively reduce the risk of sinking and deformation of the suspended end of the small grid 4, thereby ensuring the installation quality of the roof grid 5.
[0046] Furthermore, if Figure 1 and Figure 2 As shown, in this embodiment, the roof grid construction method of the present invention also includes:
[0047] A support structure 6 is arranged on the side of the sliding support platform 3 away from the roof grid 5, and the support structure 6 includes a follower structure 7 and a first support member 8;
[0048] One end of the follower structure 7 is installed on the sliding support platform 3, and the other end has a gap with the ground. The follower structure 7 moves with the sliding support platform 3. When the position of the sliding support platform 3 is fixed, the other end of the follower structure 7 is supported by the first support member 8 to provide support force for the sliding support platform 3. In this way, the sliding support platform 3 can be supported by the support structure 6 to provide support force for the sliding support platform 3. In this way, when the suspended end of the small grid 4 is supported by the sliding support platform 3, sufficient support force can be provided to ensure that the suspended end of the small grid 4 will not sink and deform, and at the same time, the stability of the sliding support platform 3 can be ensured, and the sliding support platform 3 can be ensured to have a high support strength to avoid deformation and damage. Moreover, when the sliding support platform 3 needs to be moved to the next workstation, the follower structure 7 and the first support member 8 in the support structure 6 can be separated, and then the sliding support platform 3 can be moved. During the movement, the follower structure 7 follows the sliding support platform 3 to move to the next workstation, and then the first support member 8 is connected to the follower structure 7 for support. This process greatly reduces the difficulty of installation and disassembly, reduces the construction workload, is convenient and quick to operate, can quickly provide support for the sliding support platform 3, effectively ensures the support efficiency, and reduces the probability of damage and deformation.
[0049] Furthermore, the follower structure 7 includes: a plurality of support columns 9 installed at intervals on the sliding support platform 3, and the spacing between the support columns 9 located at the center of the sliding support platform 3 is smaller than the spacing between the support columns 9 at the eccentric position.
[0050] like Figure 1 and Figure 2 As shown, in this embodiment, the follower structure 7 includes 4 support columns 9, wherein the spacing between the two support columns 9 located in the center is small, while the spacing between the two support columns 9 located outside the center is large. In this arrangement, because the sliding support platform 3 spans the guide rails 2 on both sides of the top of the rectangular support steel frame 1, the force on the center of the sliding support platform 3 is large, and the force on both sides is smaller. Therefore, by arranging the support columns 9 in the above manner, the stability, safety and support strength of the sliding support platform 3 can be effectively guaranteed, and the risk of local deformation of the sliding support platform 3 during construction can be effectively avoided.
[0051] Furthermore, if Figure 1 and Figure 2As shown in FIG. 1 , in this embodiment, each support column 9 is located on the same straight line, and each support column 9 is located on one side of the sliding support platform 3 close to the small grid 4 that has been assembled and hoisted. That is, each support column 9 is arranged side by side with a spacing from each other along one direction, and as shown in FIG. Figure 2 As shown, each support column 9 is not supported at the center of the sliding support platform 3, but is supported at the left side of the sliding support platform 3 (i.e., the side close to the assembled small grid 4). In this way, the sliding support platform 3 and the corresponding suspended ends of the small grid 4 can be supported in a targeted manner through the support columns 9 and the first support members 8 respectively connected to each support column 9, ensuring that the suspended ends of each small grid 4 can be supported with sufficient strength, effectively preventing the suspended ends from sinking and deformation.
[0052] Furthermore, if Figure 1 and Figure 2 As shown, in this embodiment, the small grid 4 and the sliding support platform 3 are both formed by connecting a plurality of bolt balls 10 and a plurality of support rods 11. The top of the support column 9 is supported on four bolt balls arranged at intervals at the bottom of the sliding support platform through four support rods, and the extension line of the support column is located at the center of the four bolt balls. The top of the support column 9 is located on the same straight line as a bolt ball 10 at the top of the sliding support platform 3 and the bolt ball 10 at the end of the small grid assembled by hoisting. Such an arrangement can make the support center of gravity correspond to the concentrated force position of the suspended end, so that the support effect is better, ensure that the support will not be eccentric or shifted, and effectively improve the stability and safety of the support.
[0053] Furthermore, if Figure 2 As shown, in this embodiment, the roof grid construction method of the present invention also includes: arranging a plurality of second support members 12 at intervals on the top of the sliding support platform 3, each second support member 12 supports each bolt ball 10 at the end of the small grid 4 that is hoisted and assembled, and each second support member 12 is located on the same straight line with each support column 9. In this way, the roof grid 5 can be supported by the sliding support platform 3 and the second support members 12 thereon, and the support forms a vertical state, and the support center of gravity and the main force point of the suspended end are located on the same straight line, so that the support is more stable and reliable, ensuring that the suspended end will not deviate, sink or deform.
[0054] Furthermore, in this embodiment, the present invention further comprises: laying cross beams and longitudinal beams (not shown in the figure) at intervals on the top of the sliding support platform 3, and laying support plates 13 on the basis of the cross beams and longitudinal beams after the cross beams and longitudinal beams are welded. Such an arrangement enables construction personnel and related construction equipment to be carried on the top of the sliding support platform 3, effectively improving the convenience and safety of construction.
[0055] Furthermore, in this embodiment, the first support member 8 and the second support member 12 are screw jacks. With such a configuration, the first support member 8 and the second support member 12 can provide a support force of sufficient strength, and the support height can be adjusted according to construction requirements, ensuring that the sliding support platform 3 and the roof grid 5 can always be in the correct posture, and even if deformation occurs, the first support member 8 and the second support member 12 can be used for local adjustment, so that the deviation can be effectively corrected and the sliding support platform 3 and the roof grid 5 can be effectively prevented from irreversible sinking deformation.
[0056] According to the above scheme of the present invention, the present invention can utilize, for example, a crane beam structure as a support point and a sliding track of the sliding support platform 3, and adopt bulk or small unit assembly on the sliding support platform 3, and complete the installation of the roof grid by sliding the grid sliding platform on the crane beam in sequence.
[0057] The present invention does not require the erection of large-scale assembly brackets, can reduce a large amount of grid assembly platform materials, reduce the rental fee of full-frame materials, and reduce costs.
[0058] The present invention installs the grid on the sliding support platform 3, which is convenient for workers to construct and can shorten the corresponding construction period.
[0059] The present invention uses the sliding support platform 3 to install the grid, which is convenient for inspection and acceptance during the construction process, thereby ensuring the quality of grid construction.
[0060] The present invention can reduce high-altitude operations and ensure construction safety by using the sliding support platform 3 to install the grid.
[0061] The sliding support platform of the present invention adopts a bolt ball grid structure of the same structural type as that of this project. After the grid structure of the sliding support platform is dismantled, it can be used for the grid construction of the second phase factory roof.
[0062] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A roof grid construction method, wherein the roof grid is formed by assembling a plurality of small grids, characterized in that: The method comprises: Set up a rectangular support steel frame; Guide rails are arranged on both sides of the top of the rectangular supporting steel frame; A sliding support platform is installed on the guide rail and can reciprocate along the guide rail; Along the direction of the guide rail, the small grids are hoisted and assembled in sequence from one end of the top of the rectangular support steel frame to the other end to form the roof grid; When hoisting and assembling each of the small grids, the sliding support platform is supported below the small grid station to be hoisted and assembled. When the hoisting and assembly of the small grid to be hoisted and assembled is completed, the sliding support platform moves to the next small grid station to be hoisted and assembled; When the hoisting and assembly of the previous small grid is completed, when the sliding support platform moves to the bottom of the next small grid to be hoisted and assembled, one end of the sliding support platform is supported under the hoisted and assembled small grid.
2. The roof grid construction method according to claim 1, characterized in that: Also includes: A support structure is arranged on a side of the sliding support platform away from the roof grid, wherein the support structure comprises a follower structure and a first support member; One end of the follower structure is installed on the sliding support platform, and the other end has a gap with the ground. The follower structure moves with the sliding support platform. When the position of the sliding support platform is fixed, the other end of the follower structure is supported by the first support member to provide supporting force to the sliding support platform.
3. The roof grid construction method according to claim 2, characterized in that: The follower structure includes: a plurality of support columns installed at intervals on the sliding support platform, and the spacing between the support columns located at the center of the sliding support platform is smaller than the spacing between the support columns at the eccentric position.
4. The roof grid construction method according to claim 3, characterized in that: The supporting columns are located on the same straight line, and the supporting columns are located on one side of the sliding support platform close to the small grid that has been hoisted and assembled.
5. The roof grid construction method according to claim 4, characterized in that: The small truss and the sliding support platform are both formed by connecting a plurality of bolt balls and a plurality of support rods. The top end of the support column is supported on four bolt balls arranged at intervals at the bottom of the sliding support platform through four support rods, and the extension line of the support column is located at the center of the four bolt balls. The top end of the support column is located on the same straight line as a bolt ball on the top of the sliding support platform and the bolt ball at the end of the small truss that has been hoisted and assembled.
6. The roof grid construction method according to claim 5, characterized in that: Also includes: A plurality of second support members are arranged at intervals on the top of the sliding support platform, each of the second support members supports each bolt ball at the end of the small grid that has been hoisted and assembled, and each of the second support members is located on the same straight line as each of the support columns.
7. The roof grid construction method according to claim 6, characterized in that: The first support member and the second support member are screw jacks.
8. The roof grid construction method according to any one of claims 1 to 7, characterized in that: Also includes: Cross beams and longitudinal beams are laid at intervals on the top of the sliding support platform, and after the cross beams and longitudinal beams are welded, support plates are laid on the basis of the cross beams and longitudinal beams.
Citation Information
Patent Citations
Method for mounting plate type steel net racks with T-shaped support net rack in sliding mode and T-shaped support net rack structure
CN103343626A
Scaffold with supporting and sliding functions and net rack mounting method
CN105672638A
Installation method of long-span welded ball net rack
CN109812021A
Method for suspended accumulative slippage of rectangular roof truss
CN115726586A
Reinforcing method for rigidity of front end of sliding construction of flat plate net rack
CN116575730A