Construction method of stand column type inspection pit

Through the combination of segmented columns and temporary rail brackets, the rail position is adjusted using stirrup system and rail bracket system, and the assembly of prefabricated columns and reserved columns and concrete pouring, the track accuracy and construction in column inspection pits are solved. The issue of efficiency has achieved high-quality and rapid construction results.

CN118958699APending Publication Date: 2024-11-15CHINA RAILWAY 24TH BUREAU GROUP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411338788.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

There are insufficient track line accuracy and construction efficiency of column inspection pits. The existing technology is difficult to meet the needs of high-precision and rapid construction, and the maintenance period of concrete components is relatively long, which affects the construction progress.

Method used

Using a combination of segmented columns and temporary rail brackets, the rail bracket system is used to adjust and support the rails through the 'support first and then stand' method to ensure the accuracy of the rail position, and through prefabricated columns and reserves The assembly of columns and concrete pouring achieve rapid construction of column structures.

Benefits of technology

It effectively improves the accuracy of the rail position, shortens the construction time, improves the construction quality and efficiency of the inspection pit, and simplifies the structural design and construction process of the columns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958699A_ABST
    Figure CN118958699A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method of a stand column type inspection pit. A reserved column part of a stand column is constructed on a structural foundation; the steel rail is transported to the site, a steel rail temporary support is adopted to temporarily support the steel rail, the steel rail temporary support comprises a stirrup system and a steel rail bracket system, the steel rail bracket system is installed above the stirrup system, the stirrup system is supported on the construction ground, and the steel rail is supported on the steel rail bracket system; the position of the steel rail is adjusted through the steel rail temporary support till the design standard is met; when the steel rail is stably supported by the steel rail temporary support, the prefabricated column part of the stand column is installed below the steel rail, and the prefabricated column and the reserved column are spliced and fixed to form an integral stand column structure; and the steel rails are installed on the prefabricated columns. The method has the advantages that the position precision of the steel rail can be effectively ensured, and then the construction quality of inspection pit construction is improved; rapid construction of the inspection pit stand column is achieved, and the structural performance and installation precision of the stand column can be further guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of inspection pit construction, in particular to a construction method of a column type inspection pit. Background Art

[0002] At present, in order to meet the maintenance needs of subway vehicles, inspection pit subway depots generally adopt the structural design of column-type inspection pits to provide sufficient space for maintenance at the bottom of subway vehicles.

[0003] Since subway vehicles are rail-based, that is, subway vehicles travel to the maintenance location via rails, whether the rail line accuracy meets the requirements is a technical issue that needs to be considered. Generally speaking, in order to meet the needs of maintenance space, the height difference between the top of the rail and the bottom plate of the inspection pit of the column-type trackbed structure is large. If the rail support is simply extended, its rigidity, stability and safety will be greatly reduced, and it will not be able to meet the construction requirements of high-precision quality control of the track. In addition, since the columns are generally constructed with cast-in-place concrete, operations such as formwork are required, but at this time the construction space is limited, and the maintenance cycle required for cast-in-place concrete components is long, so the construction progress is relatively slow. Summary of the invention

[0004] The purpose of the present invention is to provide a construction method for a column-type inspection pit based on the above-mentioned deficiencies of the prior art. By combining segmented columns and temporary rail brackets and adopting the method of "support first and then erect", the construction quality and efficiency of the inspection pit are improved.

[0005] The purpose of the present invention is achieved by the following technical solutions: A construction method for a pillar-type inspection pit, characterized in that the construction method comprises the following steps: A reserved column portion of a column is constructed on the structural foundation, wherein the reserved column is located above the structural foundation and adjacent to one side of the construction ground and higher than the elevation of the construction ground; Transporting the rails to the site, temporarily supporting the rails with temporary rail supports, wherein the temporary rail supports include a stirrup system and a rail bracket system, wherein the rail bracket system is installed above the stirrup system, the stirrup system is supported on the construction ground, and the rails are supported on the rail bracket system; The position of the rail is adjusted by the temporary rail support until the design standard is met; When the rail is stably supported by the temporary rail support, the prefabricated column part of the column is installed below the rail, and the prefabricated column and the reserved column are assembled and fixed to form an integral column structure; Steel rails are installed on the prefabricated columns.

[0006] The rail bracket system includes a rail bracket crossbeam, and support screw rods are arranged at both ends of the rail bracket crossbeam. The bottom of the support screw rod is arranged on the stirrup crossbeam of the stirrup system; the height of the rail bracket crossbeam is adjusted by the support screw rod, thereby adjusting the rail top surface elevation of the rail.

[0007] Stirrup legs are respectively arranged on both sides of the stirrup crossbeam, and the stirrup crossbeam is supported on the construction ground through the stirrup legs.

[0008] Rail-adjusting mandrels are arranged on both sides of the rail-supporting position of the rail bracket crossbeam; the horizontal position of the rail is adjusted by the rail-adjusting mandrels.

[0009] A rail-adjusting oblique support is arranged between the rail bracket crossbeam and the stirrup crossbeam, one end of the rail-adjusting oblique support abuts against the rail, and the other end is connected to a stopper arranged on the stirrup crossbeam; the position of the rail is adjusted by the rail-adjusting oblique support.

[0010] A steel sleeve connector is arranged at the bottom of the prefabricated column, and the upper part of the steel sleeve connector is connected to the longitudinal steel bars inside the prefabricated column. A reserved steel bar is arranged at the top of the reserved column, and the reserved steel bar is connected to the lower part of the steel sleeve connector, so that the internal longitudinal steel bars of the prefabricated column and the reserved steel bars of the reserved column are connected as a whole through the steel sleeve connector.

[0011] The bottom surface of the prefabricated column is a rough surface, and the bottom surface of the prefabricated column and the top surface of the reserved column are connected and sealed by pouring concrete.

[0012] An embedded sleeve is provided on the top of the prefabricated column, and the rail is installed to the embedded sleeve through a fastener.

[0013] The advantages of the present invention are: it can effectively ensure the position accuracy of the rails, thereby improving the construction quality of the inspection pit construction; it can realize the rapid construction of the inspection pit columns, and can further ensure the structural performance and installation accuracy of the columns; the structure is simple and reasonable, the manufacture is convenient and easy to disassemble, transport and reuse, and it is suitable for promotion. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the present invention. DETAILED DESCRIPTION

[0015] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art: like Figure 1As shown, the marks 1-12 in the figure respectively represent: rail bracket crossbeam 1, support screw 2, track adjustment oblique support 3, limit groove 4, block 5, track adjustment top rod 6, stirrup crossbeam 7, stirrup leg 8, prefabricated column 9, reserved column 10, reserved steel bar 11, steel sleeve connector 12.

[0016] Example: Figure 1 As shown, the construction method of the column type inspection pit in this embodiment includes the following steps: 1) A reserved column 10 for erecting a column is constructed on the structural foundation 1. The reserved column 10 is located on the structural foundation 1 and is adjacent to one side of the construction ground and is higher than the construction ground elevation.

[0017] 2) Transport the rails to the site and use temporary rail supports to temporarily support the rails. The temporary rail supports include a stirrup system and a rail bracket system. The rail bracket system is installed above the stirrup system. The stirrup system is supported on the construction ground, and the rails are supported on the rail bracket system. Among them, the rail bracket system is mainly used to support the rails and adjust the position of the rails, while the stirrup system installed under the rail bracket system is used to support the rail bracket system and the rails above it to ensure the overall structural strength and stability of the temporary rail bracket.

[0018] Specifically, the stirrup system includes a stirrup cross beam 7 and stirrup legs 8, wherein the stirrup legs 8 are arranged on both sides of the stirrup cross beam 7, and the distance between the stirrup legs 8 on both sides meets the requirements of spanning the inspection pit and being located outside the design position of the column, and the stirrup cross beam 7 can be connected to the stirrup legs 8 on both sides thereof through channel steel.

[0019] The rail bracket system includes a rail bracket crossbeam 1, at both ends of which are respectively provided with support screws 2, the bottom of which is arranged in a limit groove 4 provided on a stirrup crossbeam 7, so that the height of the rail bracket crossbeam 1 can be adjusted through the support screw 2, thereby adjusting the rail top surface elevation of the rail supported on the rail bracket crossbeam 1.

[0020] In this embodiment, the limit groove 4 set on the stirrup crossbeam 7 can be formed by setting a reserved tube at the corresponding position of its crossbeam. The middle hole of the reserved tube serves as the limit groove 4 and matches the shape and size of the bottom end of the support screw rod 2, so that the support screw rod 2 can be effectively and stably supported in the middle hole of the reserved tube, and further prevent the support screw rod 2 from being displaced in the horizontal direction.

[0021] Two rail support positions are reserved on the rail bracket crossbeam 1, and rail adjusting push rods 6 are respectively provided on both sides of the rail support positions. The rail adjusting push rods 6 can be pushed to adjust the horizontal position of the rails, especially the gauge between the rails on both sides.

[0022] An obliquely arranged rail adjustment support 3 is provided between the rail bracket cross beam 1 and the stirrup cross beam 7. The two rail adjustment supports 3 correspond to a rail on one side, respectively. One end of each rail adjustment support 3 abuts against the corresponding rail, and the other end is fixedly connected to a stopper 5 provided on the stirrup cross beam 7 to prevent the rail adjustment support 3 from being displaced in the horizontal direction. The rail position can be adjusted by the rail adjustment support 3 to ensure that the size of the left and right rail assemblies meets the design standard.

[0023] In this embodiment, the stopper 5 can be made of a steel plate.

[0024] 3) Adjust the position of the rails through temporary rail supports until the design standards are met, including: The height of the rail bracket crossbeam 1 is adjusted by the support screw 2, thereby adjusting the rail top surface elevation of the rail supported on the rail bracket crossbeam 1; the horizontal position of the rail is adjusted by pushing the rail adjusting push rod 6, especially the track gauge between the rails on both sides; the position of the rail is adjusted by the rail adjusting inclined support 3 to ensure that the combined size of the left and right rails meets the design standards.

[0025] 4) When the rails are stably supported by the temporary rail brackets, the prefabricated columns 9 of the columns are installed below the rails, and the prefabricated columns 9 and the reserved columns 10 are assembled and fixed to form an integral column structure.

[0026] Specifically, the precast column 9 is precast by pouring C60 concrete. A plurality of structural steel bars including longitudinal steel bars are arranged inside the precast column 9, and a steel sleeve connector 12 is arranged at the bottom of each longitudinal steel bar. The upper part of each steel sleeve connector 12 is connected to the longitudinal steel bar, and the bottom opening of each steel sleeve connector 12 is exposed on the bottom surface of the precast column 9.

[0027] When the prefabricated column 9 is installed above the reserved column 10, the steel sleeve connector 12 located on the bottom surface of the prefabricated column 9 and the reserved steel bars 11 extending from the top surface of the reserved column 10 form a one-to-one match, and each reserved steel bar 11 is connected to the corresponding steel sleeve connector 12.

[0028] After the prefabricated column 9 is hoisted, the contact surfaces of the prefabricated column 9 and the reserved column 10 are connected and fixed by pouring concrete, so that the prefabricated column 9 and the reserved column 10 are connected and fixed to form an integral structure. In this embodiment, the bottom surface of the prefabricated column 9 is a rough surface to improve the connection performance between it and the poured concrete, and further enhance the connection strength and integrity between the prefabricated column 9 and the reserved column 10.

[0029] 5) Install the rails on the prefabricated column 9. During the prefabrication process, the prefabricated column 9 has a pre-buried sleeve on its top for connecting with the fasteners of the rails, so that the rails can be installed on the top of the prefabricated column 9 through the fasteners.

[0030] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A construction method for a pillar-type inspection pit, characterized in that: The construction method comprises the following steps: A reserved column portion of a column is constructed on the structural foundation, wherein the reserved column is located above the structural foundation and adjacent to one side of the construction ground and higher than the elevation of the construction ground; Transporting the rails to the site, temporarily supporting the rails with temporary rail supports, wherein the temporary rail supports include a stirrup system and a rail bracket system, wherein the rail bracket system is installed above the stirrup system, the stirrup system is supported on the construction ground, and the rails are supported on the rail bracket system; The position of the rail is adjusted by the temporary rail support until the design standard is met; When the rail is stably supported by the temporary rail support, the prefabricated column part of the column is installed below the rail, and the prefabricated column and the reserved column are assembled and fixed to form an integral column structure; Steel rails are installed on the prefabricated columns.

2. The construction method of a pillar-type inspection pit according to claim 1 is characterized in that: The rail bracket system includes a rail bracket crossbeam, and support screw rods are arranged at both ends of the rail bracket crossbeam. The bottom of the support screw rod is arranged on the stirrup crossbeam of the stirrup system; the height of the rail bracket crossbeam is adjusted by the support screw rod, thereby adjusting the rail top surface elevation of the rail.

3. The construction method of a pillar-type inspection pit according to claim 2 is characterized in that: Stirrup legs are respectively arranged on both sides of the stirrup crossbeam, and the stirrup crossbeam is supported on the construction ground through the stirrup legs.

4. The construction method of a pillar-type inspection pit according to claim 2 is characterized in that: Rail-adjusting mandrels are arranged on both sides of the rail-supporting position of the rail bracket crossbeam; the horizontal position of the rail is adjusted by the rail-adjusting mandrels.

5. The construction method of a pillar-type inspection pit according to claim 2, characterized in that: A rail-adjusting oblique support is arranged between the rail bracket crossbeam and the stirrup crossbeam, one end of the rail-adjusting oblique support abuts against the rail, and the other end is connected to a stopper arranged on the stirrup crossbeam; the position of the rail is adjusted by the rail-adjusting oblique support.

6. The construction method of a pillar-type inspection pit according to claim 1, characterized in that: A steel sleeve connector is arranged at the bottom of the prefabricated column, and the upper part of the steel sleeve connector is connected to the longitudinal steel bars inside the prefabricated column. A reserved steel bar is arranged at the top of the reserved column, and the reserved steel bar is connected to the lower part of the steel sleeve connector, so that the internal longitudinal steel bars of the prefabricated column and the reserved steel bars of the reserved column are connected as a whole through the steel sleeve connector.

7. The construction method of a pillar-type inspection pit according to claim 6, characterized in that: The bottom surface of the prefabricated column is a rough surface, and the bottom surface of the prefabricated column and the top surface of the reserved column are connected and sealed by pouring concrete.

8. A method for constructing a pillar-type inspection pit according to claim 1 or 6, characterized in that: An embedded sleeve is provided on the top of the prefabricated column, and the rail is installed to the embedded sleeve through a fastener.

Citation Information

Patent Citations

  • Metro depot reserved stand column inspection pit rail construction method

    CN107313314A

  • Prefabricated inspection pit stand column and construction method thereof

    CN111706128A

  • Reverse construction method for prefabricated column type maintenance pit of rail transit vehicle depot

    CN117145274A