Dynamic construction control method for static pressure drilling casing pipe based on real-time pressure feedback

By employing a dynamic construction control method that combines real-time pressure feedback and finite element simulation optimization, the problems of soil damage and deformation control during casing construction were solved, achieving high-precision, low-cost casing construction and reducing the impact on the surrounding environment.

CN118958947APending Publication Date: 2024-11-15CCCC THIRD HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410826834.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During static pressure drilling casing construction, the soil inside the casing cannot withstand the shear force, leading to soil failure and blockage, which affects the surrounding environment. Furthermore, existing technologies are unable to effectively control the deformation of surrounding structures caused by casing construction.

Method used

A dynamic construction control method based on real-time pressure feedback is adopted. Through finite element simulation and optimization model, the mechanical static pressure is monitored in real time, and construction parameters are adjusted to ensure that the maximum mechanical static pressure is not exceeded during casing drilling. The construction process is optimized by combining real-time pressure feedback and dynamic control.

Benefits of technology

It effectively reduces the impact of casing construction on the surrounding environment, improves construction accuracy and ease of operation, reduces costs, has strong applicability, and meets deformation control requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958947A_ABST
    Figure CN118958947A_ABST
Patent Text Reader

Abstract

The invention discloses a dynamic construction control method for casing static pressure drilling based on real-time pressure feedback, which comprises the following steps of: before construction, simulating the construction process of a casing by establishing a finite element model, and calculating the maximum mechanical static pressure which can be adopted under the condition of meeting the deformation limiting condition of the existing surrounding structure through the finite element model; in the construction stage, whether the current working procedure needs to be adjusted or not is judged by reading the pressure monitoring value of static pressure drilling construction equipment; and when the pressure monitoring value of the static pressure drilling construction equipment in the construction process exceeds the maximum mechanical static pressure, drilling of the casing pipes is stopped, soil bodies in the casing pipes are removed, then construction continues, and the operation is repeated till all the casing pipes are constructed. According to the method, influences of factors such as geology, the distance from the sleeve to the surrounding existing structure and a deformation control threshold value are considered, the influence of the sleeve on the surrounding environment in the construction process can be effectively reduced, and assistance can be provided for measure adjustment, cost control, scientific research analysis and the like in the construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a dynamic construction control method for static pressure drilling casing based on real-time pressure feedback. Background Art

[0002] During the construction of pile foundation, the soil may be squeezed to a certain extent or collapse in the hole, causing horizontal displacement of the soil, which will have an adverse impact on the surrounding existing buildings, roads, underground pipe networks and other facilities. If relevant measures are not taken, there will be large deformations of structures with strict deformation control requirements such as key protected buildings and existing high-speed railways in the surrounding area. For this reason, steel casing is usually used as a means of deformation control, that is, before the formal construction of the pile foundation, an open casing is constructed to form a wall protection system, and then subsequent construction is carried out, thereby reducing the disturbance of the construction to the surrounding soil and structures. After the casing wall protection system is formed, the impact of subsequent construction on the surrounding environment is very small, so the main construction disturbance comes from the construction of the wall protection system (casing).

[0003] During the casing construction process, the open casing usually adopts the static pressure drilling process, which will help reduce the interference with the surrounding environment. Different from the static pressure pile construction, the casing is not only affected by pressure, but also by torque during the process of being pressed into the ground. Under the action of torque, if the soil in the casing cannot withstand the applied shear force, it will cause the soil to be destroyed. At this time, the soil in the casing and the casing will remain static. After continuing to drill, if the compressive stress at the bottom of the soil is the same as the bearing capacity of the foundation of the soil layer below, it will reach a critical state, that is, the soil in the casing will be blocked. With the further drilling of the casing, the compressive stress at the bottom of the soil in the casing will exceed the bearing limit of the foundation of the soil layer below, causing local shear failure of the soil layer. At this time, the casing and the soil inside it can be formed into an integral pile. With the continuous static pressure drilling of the casing, the soil below is squeezed, causing an impact on the surrounding environment. Summary of the invention

[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a static pressure drilling casing dynamic construction control method based on real-time pressure feedback, which has the advantages of high precision, convenient operation, low cost, strong applicability, etc.

[0005] The first technical solution to achieve the purpose of the present invention is: a finite element simulation method for casing static pressure drilling construction, comprising the following steps:

[0006] S1, establish a physical model of the soil structure at the construction site;

[0007] S2, establish a physical model of the surrounding existing structures;

[0008] S3, establishing a plate structure model of each section of the casing according to the length of the multiple sections of the casing constituting a single casing;

[0009] S4, performing Boolean operations according to the entity model of the soil structure at the construction site, the entity model of the surrounding existing structures, and the plate structure model of each section of the casing to obtain a coupled entity model;

[0010] S5, firstly input the physical and mechanical parameters of the soil layer according to the geotechnical laboratory test results in the investigation report, and then input the physical and mechanical parameters of the surrounding existing structures according to the materials used in the surrounding existing structures;

[0011] S6, setting groundwater level, boundary constraints and structure-soil interface;

[0012] S7, divide the structural grid, use solid elements for the soil layer and surrounding existing structures, and plate elements for the casing, and generate a finite element model for all casing static pressure drilling construction of the project;

[0013] S8, add gravity load to the finite element model of all casing hydrostatic drilling operations;

[0014] S9, input the set initial maximum mechanical static pressure: that is, the set initial mechanical static pressure surface load applied to the soil at the bottom of each casing section during static pressure drilling construction;

[0015] S10, simulates the static pressure drilling process of each casing section:

[0016] Activate the first section of casing unit and activate the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the first section of casing;

[0017] Activate the second section casing unit, cancel the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the first section casing, and then activate the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the second section casing;

[0018] Repeat the above operation until all single-section casing static drilling simulations are completed. Each time a casing unit is activated, the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the previous casing section is first canceled, and the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the current casing section is activated;

[0019] After the static pressure drilling construction simulation of the entire casing is completed, the static pressure drilling of the next casing is simulated in sequence until the static pressure drilling simulation of all casings is completed;

[0020] S11, output the calculated horizontal displacement value of the surrounding existing structures, and compare it with the displacement monitoring threshold of the surrounding existing structures:

[0021] When the calculated horizontal displacement of the surrounding existing structures is greater than the displacement monitoring threshold, reduce the mechanical static pressure surface load in the finite element model and re-run the model;

[0022] When the calculated value of the horizontal displacement of the surrounding existing structures is less than the displacement monitoring threshold, continue to increase the mechanical static pressure surface load in the finite element model, and recalculate the calculated value of the horizontal displacement of the surrounding existing structures until the calculated value of the horizontal displacement of the surrounding existing structures is close to but not greater than the displacement monitoring threshold, and convert the mechanical static pressure surface load at this time into a mechanical static pressure value according to the bottom area of ​​the casing as the initial maximum mechanical static pressure.

[0023] In the above-mentioned finite element simulation method for casing static pressure drilling construction, when performing step S1, the entity model of the soil layer structure is established based on the topography of the construction site, the stratification of the drilled soil body revealed in the survey report, and the physical and mechanical parameters of the soil layer.

[0024] In the above-mentioned finite element simulation method for casing static pressure drilling construction, when performing step S2, the solid model of the surrounding existing structures is established after determining the relative positions of each existing structure based on the design data of the surrounding existing structures.

[0025] The second technical solution to achieve the purpose of the present invention is: a method for optimizing a finite element model of casing static pressure drilling construction, comprising the following steps:

[0026] S1, establishing a finite element model of a single-tube static pressure drilling construction according to the finite element simulation method of the static pressure drilling construction of the casing of the present invention, and inputting the physical and mechanical parameters of the soil layer and the physical and mechanical parameters of the surrounding existing structures according to the survey report, and using the initial maximum mechanical static pressure obtained in claim 1, calculating the horizontal displacement value of the surrounding soil or the existing structure from the finite element model of the static pressure drilling construction of the single-tube;

[0027] S2, arrange horizontal displacement monitoring points on the surrounding soil or existing structures;

[0028] S3, using the initial maximum mechanical static pressure to start the casing drilling construction, and obtain the horizontal displacement monitoring value of the surrounding soil or existing structure;

[0029] S4, determine whether the horizontal displacement monitoring value is consistent with the calculated horizontal displacement value of the surrounding soil or structure:

[0030] If the horizontal displacement monitoring value is consistent with the horizontal displacement value calculated in the finite element model of the single-casing static pressure drilling construction, it is judged that the calculated horizontal displacement value is accurate, the finite element model of the single-casing static pressure drilling construction is optimized, and the initial maximum mechanical static pressure is used as the maximum mechanical static pressure;

[0031] If the horizontal displacement monitoring value is inconsistent with the calculated horizontal displacement value, follow the following procedures:

[0032] S41, adjusting the soil calculation parameters in the finite element model of the single-casing static pressure drilling construction, recalculating the horizontal displacement value of the surrounding soil or the existing structure, until the calculated horizontal displacement value is consistent with the horizontal displacement monitoring value, and outputting the corrected soil calculation parameters at this time;

[0033] S42, first adjust the finite element model of the single casing static pressure drilling construction according to the corrected soil calculation parameters, and then recalculate the horizontal displacement value of the surrounding soil or existing structure according to the initial maximum mechanical static pressure

[0034] S43, judging whether the calculated horizontal displacement value meets the requirement of deformation monitoring threshold:

[0035] If the calculated horizontal displacement value is greater than the deformation monitoring threshold, reduce the initial maximum mechanical static pressure, and recalculate the horizontal displacement value of the surrounding soil or existing structure until the calculated horizontal displacement value is close to but not greater than the deformation monitoring threshold, that is, the reduced mechanical static pressure is used as the maximum mechanical static pressure;

[0036] If the calculated horizontal displacement value is much smaller than the deformation monitoring threshold, increase the initial maximum mechanical static pressure and recalculate the horizontal displacement value of the surrounding soil or existing structure until the calculated horizontal displacement value is close to but not greater than the deformation monitoring threshold. That is, the increased mechanical static pressure is used as the maximum mechanical static pressure.

[0037] The third technical solution for achieving the purpose of the present invention is: a dynamic construction control method for casing static pressure drilling based on real-time pressure feedback, comprising the following steps:

[0038] S1, start construction, use lifting equipment to accurately position the static pressure drilling construction equipment at the pile position, and check the position, horizontality and verticality of the static pressure drilling construction equipment;

[0039] S2, firstly hoist a single section of casing into the static pressure drilling construction equipment, then press the casing into the ground, and make the casing in a vertical state through a two-way artificial theodolite and a drilling rig attitude adjustment system;

[0040] S3, start the static pressure drilling construction equipment, first clamp the casing by lifting the clamping mechanism through the oil cylinder, then open the rotary bearing to put the casing in a rotating state, and press the casing downward while rotating the casing;

[0041] S4, using the maximum mechanical static pressure obtained by the optimization method of the finite element model of the casing static pressure drilling construction of the present invention to perform static pressure drilling construction of the casing, and controlling the verticality of the casing in the horizontal and vertical directions during the drilling process;

[0042] S5, real-time recording of mechanical pressure monitoring values ​​during casing drilling;

[0043] S6, when the mechanical pressure monitoring value is greater than the maximum mechanical static pressure, the static pressure drilling construction equipment alarms due to excessive pressure, stops the static pressure drilling construction, and clears the soil in the casing;

[0044] S7, repeat steps S4 to S6 until the static pressure drilling construction of all casings is completed.

[0045] In the above-mentioned dynamic construction control method of casing static pressure drilling based on real-time pressure feedback, when performing step S6, the soil in the casing is removed by using a grab bucket excavation method or a rotary drilling method.

[0046] The construction control method of static pressure drilling casing based on real-time pressure feedback of the present invention has the following characteristics: before construction, the construction process of the casing is simulated by finite element method, and the maximum mechanical static pressure that can be used under the deformation restriction condition of the surrounding existing structures is calculated; during the construction stage, the pressure monitoring value of the static pressure drilling construction equipment is read to determine whether the current process needs to be adjusted; when the pressure monitoring value of the static pressure drilling construction equipment exceeds the maximum mechanical static pressure, the casing drilling is stopped, and the construction is continued after the soil in the casing is cleared. The present invention fully considers the influence of factors such as geology, the distance from the casing to the surrounding existing structures, and the deformation control threshold, which can effectively reduce the impact of the casing on the surrounding environment during the construction process, and can also provide assistance for the adjustment of measures, cost control, scientific research analysis, etc. during the construction process. The present invention has the advantages of high construction accuracy, convenient operation, low cost, and strong applicability. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a flow chart of the dynamic construction control method of static pressure drilling casing based on real-time pressure feedback of the present invention;

[0048] Figure 2 It is a finite element model diagram of all casing drilling constructions obtained by using the dynamic construction control method of static pressure drilling casing of the present invention;

[0049] Figure 3 It is a finite element model diagram of a single casing obtained by using the dynamic construction control method of static pressure drilling casing of the present invention;

[0050] Figure 4 This is a calculation result diagram obtained by using the dynamic construction control method of static pressure drilling casing of the present invention;

[0051] Figure 5 The present invention is a curve diagram of monitoring the horizontal displacement value of an existing high-speed railway bridge during the construction process using the dynamic construction control method of the static pressure drilling casing of the present invention. DETAILED DESCRIPTION

[0052] The present invention will be further described below in conjunction with the accompanying drawings.

[0053] The finite element simulation method of casing static pressure drilling construction of the present invention comprises the following steps:

[0054] S1, according to the topography of the construction site, the stratification of the drilled soil revealed in the survey report, and the physical and mechanical parameters of the soil layer, a solid model of the soil layer structure at the construction site is established; the stress-strain relationship of the soil layer adopts the Moore-Coulomb constitutive model;

[0055] S2, according to the design data of the surrounding existing structures, determine the relative positions of each structure and establish the entity model of the surrounding existing structures; the stress-strain relationship of the surrounding existing structures adopts the elastic structure model;

[0056] S3, establishing a plate structure model of each section of the casing according to the length of the multiple sections of the casing constituting a single casing;

[0057] S4, performing Boolean operations according to the entity model of the soil layer structure, the entity model of the surrounding existing structures and the plate structure model of each section of the casing to obtain a coupled entity model;

[0058] S5, firstly input the physical and mechanical parameters of the soil layer according to the indoor geotechnical test results in the investigation report, and then input the physical and mechanical parameters of the surrounding existing structures according to the materials used in the surrounding existing structures;

[0059] S6, setting groundwater level, boundary constraints and structure-soil interface;

[0060] S7, divide the structural grid, use solid elements for the soil layer and surrounding existing structures, and plate elements for the casing, and generate a finite element model for all casing static pressure drilling construction (see Figure 2 );

[0061] S8, add gravity load to the finite element model of all casing hydrostatic drilling operations;

[0062] S9, input the set initial maximum mechanical static pressure: that is, the set initial mechanical static pressure surface load applied to the soil at the bottom of each casing section during drilling construction;

[0063] S10, simulates the static pressure drilling process of each casing section:

[0064] Activate the first section of casing unit and activate the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the first section of casing;

[0065] Activate the second section casing unit, cancel the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the first section casing, and then activate the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the second section casing;

[0066] Repeat the above operation until all single-section casing static drilling simulations are completed. Each time a casing unit is activated, the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the previous casing section is first canceled, and the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the current casing section is activated;

[0067] After the static pressure drilling simulation of the entire casing is completed, the static pressure drilling of the next casing is simulated in sequence until the static pressure drilling simulation of all casings is completed;

[0068] S11, output the calculated horizontal displacement value of the surrounding existing structures, and compare it with the displacement monitoring threshold of the surrounding existing structures:

[0069] When the calculated horizontal displacement of the surrounding existing structures is greater than the displacement monitoring threshold, reduce the mechanical static pressure surface load in the finite element model and re-run the model;

[0070] When the calculated value of the horizontal displacement of the surrounding existing structures is less than the displacement monitoring threshold, continue to increase the mechanical static pressure surface load in the finite element model, and recalculate the calculated value of the horizontal displacement of the surrounding existing structures until the calculated value of the horizontal displacement of the surrounding existing structures is close to but not greater than the displacement monitoring threshold. The mechanical static pressure surface load at this time is converted into a mechanical static pressure value according to the casing bottom area as the initial maximum mechanical static pressure.

[0071] The optimization method of the finite element model of casing static pressure drilling construction of the present invention comprises the following steps:

[0072] S1, establishing a finite element model of a single-tube static pressure drilling construction according to the finite element simulation method of the static pressure drilling construction of the casing of the present invention, and inputting the physical and mechanical parameters of the soil layer and the physical and mechanical parameters of the surrounding existing structures according to the survey report, and using the initial maximum mechanical static pressure obtained in the finite element simulation method of the static pressure drilling construction of the casing of the present invention, calculating the horizontal displacement value of the surrounding soil or the existing structure from the finite element model of the static pressure drilling construction of the single-tube;

[0073] S2, arrange horizontal displacement monitoring points on the surrounding soil or existing structures;

[0074] S3, using the initial maximum mechanical static pressure to start the casing drilling construction, and obtain the horizontal displacement monitoring value of the surrounding soil or existing structure;

[0075] S4, judging whether the horizontal displacement monitoring value is consistent with the calculated horizontal displacement value:

[0076] If the horizontal displacement monitoring value is consistent with the calculated horizontal displacement value obtained by the finite element model of the single-casing static pressure drilling construction, it is judged that the calculated horizontal displacement value is accurate, the finite element model of the single-casing static pressure drilling construction is optimized, and the initial maximum mechanical static pressure is used as the maximum mechanical static pressure;

[0077] If the horizontal displacement monitoring value is inconsistent with the calculated horizontal displacement value, follow the following procedures:

[0078] S41, adjusting the soil calculation parameters in the finite element model of the single-casing static pressure drilling construction, recalculating the horizontal displacement value of the surrounding soil or the existing structure, until the calculated horizontal displacement value is consistent with the horizontal displacement monitoring value, and outputting the corrected soil calculation parameters at this time;

[0079] S42, firstly adjusting the finite element model of all casing static pressure drilling construction according to the corrected soil calculation parameters, and then recalculating the horizontal displacement value of the surrounding soil or existing structure according to the initial maximum mechanical static pressure;

[0080] S43, judging whether the calculated horizontal displacement value meets the requirement of deformation monitoring threshold:

[0081] If the calculated horizontal displacement value is greater than the deformation monitoring threshold, reduce the initial maximum mechanical static pressure, and recalculate the horizontal displacement value of the surrounding soil or existing structure until the calculated horizontal displacement value is close to but not greater than the deformation monitoring threshold, that is, the reduced mechanical static pressure is used as the maximum mechanical static pressure; if the calculated horizontal displacement value is much smaller than the deformation monitoring threshold, increase the initial maximum mechanical static pressure, and recalculate the horizontal displacement value of the surrounding soil or existing structure until the calculated horizontal displacement value is close to but not greater than the deformation monitoring threshold, that is, the increased mechanical static pressure is used as the maximum mechanical static pressure.

[0082] See also Figure 1 The dynamic construction control method of casing static pressure drilling based on real-time pressure feedback of the present invention comprises the following steps:

[0083] S1, start construction, use lifting equipment to accurately position the static pressure drilling construction equipment at the pile position, and check the position, horizontality and verticality of the mechanical construction equipment;

[0084] S2, firstly hoist a single section of casing into the pressing part of the static pressure drilling construction equipment, then press the section of casing into the ground, and make the casing in a vertical state through a bidirectional artificial theodolite and a drilling rig attitude adjustment system;

[0085] S3, start the static pressure drilling construction equipment, first clamp the casing by lifting the clamping mechanism through the oil cylinder, then open the rotary bearing to put the casing in a rotating state, and press the casing downward while rotating the casing;

[0086] S4, using the maximum mechanical static pressure obtained by the optimization method of the finite element model of the casing static pressure drilling construction of the present invention to perform static pressure drilling construction of the casing, and controlling the verticality of the casing in the horizontal and vertical directions during the drilling process;

[0087] S5, real-time recording of mechanical pressure monitoring values ​​during casing drilling;

[0088] S6, when the mechanical pressure monitoring value is greater than the maximum mechanical static pressure, the static pressure drilling construction equipment alarms due to excessive pressure, stops the static pressure drilling construction, and uses a grab bucket excavation method or a rotary excavation method to remove the soil in the casing;

[0089] S7, repeat steps S4 to S6 until the static pressure drilling construction of all casings is completed.

[0090] The present invention is now explained by taking a river widening project as an example. The project is adjacent to an existing high-speed railway bridge. The horizontal displacement monitoring alarm threshold of the existing high-speed railway bridge is 2mm, and the displacement control is very strict. In order to protect the impact of earth excavation on the existing high-speed railway bridge, a circle of bored retaining piles with a diameter of φ1.0m is set around the existing high-speed railway bridge. The retaining piles use steel casing to protect the hole mouth and hole wall. The length of the casing is 30m. The steel casing is constructed by static pressure drilling technology to reduce the disturbance to the existing high-speed railway bridge.

[0091] The dynamic construction control method of casing static pressure drilling based on real-time pressure feedback of the present invention comprises the following steps:

[0092] Step 1: Analyze the existing structures that have an impact on the surrounding area and determine the position relationship between the existing structures and the construction steel casing;

[0093] Step 2: Select the most unfavorable borehole in the construction area as the soil layer structure of the finite element model, and determine the initial calculation parameters of each soil layer based on the survey information;

[0094] Step 3: Use entity units to establish a solid model of the soil structure; use entity units to establish a solid model of the existing bridge; use plate units to establish a plate structure model of a single steel casing; the model size is 140m×140m×170m (depth), using tetrahedral units, and a total of 380,000 grid units are divided. Considering that the distance from the retaining pile to the existing bridge is relatively close and it is the main calculation object, the existing bridge uses 2m units, and the length of each steel casing is 2m;

[0095] Step 4: Set the model boundary constraints. The surface boundary is the free boundary, the vertical truncation boundary is the normal horizontal displacement constraint, and the bottom constraint is the fixed end.

[0096] Step 5, input the Mohr-Coulomb model of the soil structure, the elastic structure model of the existing bridge, the elastic structure model of the single-section steel casing and the calculation parameters;

[0097] Step 6: Apply the initial maximum mechanical static pressure, activate the first section of the steel casing unit, and apply a uniform mechanical static pressure surface load to the soil at the bottom of the steel casing. The deadweight of the soil in the steel casing is automatically calculated by the model after the deadweight is applied. After the construction of this section of the steel casing is completed, cancel the mechanical static pressure surface load applied to the soil at the bottom of the steel casing, activate the next section of the steel casing unit, and repeat the mechanical static pressure surface load applied to the soil at the bottom of the next section of the steel casing until the construction of the 30m (a total of 15 sections of steel casing) steel casing is completed.

[0098] Step 7: After calculation, when the mechanical static pressure reaches 300kN, the horizontal displacement value of the existing bridge is close to 2mm, but it does not exceed the limit, so 300kN is used as the initial maximum mechanical static pressure;

[0099] Step 8: Establish a finite element model of a single steel casing (see Figure 3 ) is used to optimize the finite element calculation model. The mechanical static pressure takes the initial maximum mechanical static pressure, and the remaining finite element model parameters are consistent with the finite element model parameters of the above-mentioned single-section steel casing.

[0100] Step 9: Calculate the results of the finite element model of a single steel casing (see Figure 4 ) It can be seen that after the construction of a single steel casing, the surrounding soil underwent a horizontal displacement of about 0.5 mm, which is consistent with the monitoring results. Therefore, the finite element model of a single steel casing is reasonable, and the initial maximum mechanical static pressure is taken as the maximum mechanical static pressure.

[0101] Step 10: Start the construction of the remaining steel casing and monitor the static pressure value of the static pressure drilling construction equipment in real time (see Figure 5 ); When the static pressure monitoring value of the static pressure drilling construction equipment is greater than the maximum mechanical static pressure of 300kN, the static pressure drilling construction equipment starts to alarm and stop the static pressure drilling construction. After the soil in the steel casing is cleared, the construction will continue until all the steel casing construction is completed.

[0102] After the construction of this project was completed according to the dynamic construction control method of casing static pressure drilling based on real-time pressure feedback of the present invention, the maximum cumulative horizontal displacement of the existing high-speed railway bridge was 1.7 mm, meeting the deformation control requirements.

[0103] The above embodiments are only used to illustrate the present invention, rather than to limit the present invention. Those skilled in the relevant technical field may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.

Claims

1. A finite element simulation method for casing static pressure drilling construction, characterized in that: The finite element simulation method comprises the following steps: S1, establish a physical model of the soil structure at the construction site; S2, establish a physical model of the surrounding existing structures; S3, establishing a plate structure model of each section of the casing according to the length of the multiple sections of the casing constituting a single casing; S4, performing Boolean operations according to the entity model of the soil structure at the construction site, the entity model of the surrounding existing structures, and the plate structure model of each section of the casing to obtain a coupled entity model; S5, first input the physical and mechanical parameters of the soil layer according to the geotechnical laboratory test results in the investigation report, and then input the physical and mechanical parameters of the surrounding existing structures according to the materials used in the surrounding existing structures; S6, setting groundwater level, boundary constraints and structure-soil interface; S7, divide the structural grid, use solid elements for the soil layer and surrounding existing structures, and plate elements for the casing, and generate a finite element model of all casing static pressure drilling construction in the project; S8, add gravity load to the finite element model of all casing hydrostatic drilling operations; S9, input the set initial maximum mechanical static pressure: that is, the set initial mechanical static pressure surface load applied to the soil at the bottom of each casing section during static pressure drilling construction; S10, simulates the static pressure drilling process of each casing section: Activate the first section of casing unit and activate the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the first section of casing; Activate the second section casing unit, cancel the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the first section casing, and then activate the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the second section casing; Repeat the above operation until all single-section casing static drilling simulations are completed. Each time a casing unit is activated, the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the previous casing section is first canceled, and the set initial maximum mechanical static pressure surface load applied to the soil at the bottom of the current casing section is activated; After the static pressure drilling construction simulation of the entire casing is completed, the static pressure drilling of the next casing is simulated in sequence until the static pressure drilling simulation of all casings is completed; S11, output the calculated horizontal displacement value of the surrounding existing structures, and compare it with the displacement monitoring threshold of the surrounding existing structures: When the calculated horizontal displacement of the surrounding existing structures is greater than the displacement monitoring threshold, reduce the mechanical static pressure surface load in the finite element model and re-run the model; When the calculated value of the horizontal displacement of the surrounding existing structures is less than the displacement monitoring threshold, continue to increase the mechanical static pressure surface load in the finite element model, and recalculate the calculated value of the horizontal displacement of the surrounding existing structures until the calculated value of the horizontal displacement of the surrounding existing structures is close to but not greater than the displacement monitoring threshold, and convert the mechanical static pressure surface load at this time into a mechanical static pressure value according to the bottom area of ​​the casing as the initial maximum mechanical static pressure.

2. The finite element simulation method for casing static pressure drilling construction according to claim 1 is characterized in that: When performing step S1, the entity model of the soil layer structure is established based on the topography of the construction site, the stratification of the drilled soil body revealed in the survey report, and the physical and mechanical parameters of the soil layer.

3. The finite element simulation method for casing static pressure drilling construction according to claim 1 is characterized in that: When performing step S2, the entity model of the surrounding existing structures is established after determining the relative positions of the existing structures according to the design data of the surrounding existing structures.

4. A method for optimizing a finite element model of casing static pressure drilling construction, characterized in that: The optimization method comprises the following steps: S1, establishing a finite element model of a single-tube static pressure drilling construction according to the finite element simulation method of casing static pressure drilling construction described in claim 1, and inputting the physical and mechanical parameters of the soil layer and the physical and mechanical parameters of the surrounding existing structures according to the survey report, and using the initial maximum mechanical static pressure obtained in claim 1, calculating the horizontal displacement value of the surrounding soil or the existing structure from the finite element model of the single-tube static pressure drilling construction; S2, arrange horizontal displacement monitoring points on the surrounding soil or existing structures; S3, using the initial maximum mechanical static pressure to start the casing drilling construction, and obtain the horizontal displacement monitoring value of the surrounding soil or existing structure; S4, determine whether the horizontal displacement monitoring value is consistent with the calculated horizontal displacement value of the surrounding soil or structure: If the horizontal displacement monitoring value is consistent with the horizontal displacement value calculated in the finite element model of the single-casing static pressure drilling construction, it is judged that the calculated horizontal displacement value is accurate, the finite element model of the single-casing static pressure drilling construction is optimized, and the initial maximum mechanical static pressure is used as the maximum mechanical static pressure; If the horizontal displacement monitoring value is inconsistent with the calculated horizontal displacement value, follow the following procedures: S41, adjusting the soil calculation parameters in the finite element model of the single-casing static pressure drilling construction, recalculating the horizontal displacement value of the surrounding soil or the existing structure, until the calculated horizontal displacement value is consistent with the horizontal displacement monitoring value, and outputting the corrected soil calculation parameters at this time; S42, first adjust the finite element model of the single casing static pressure drilling construction according to the corrected soil calculation parameters, and then recalculate the horizontal displacement value of the surrounding soil or existing structure according to the initial maximum mechanical static pressure S43, judging whether the calculated horizontal displacement value meets the requirement of deformation monitoring threshold: If the calculated horizontal displacement value is greater than the deformation monitoring threshold, reduce the initial maximum mechanical static pressure, and recalculate the horizontal displacement value of the surrounding soil or existing structure until the calculated horizontal displacement value is close to but not greater than the deformation monitoring threshold, that is, the reduced mechanical static pressure is used as the maximum mechanical static pressure; If the calculated horizontal displacement value is much smaller than the deformation monitoring threshold, increase the initial maximum mechanical static pressure and recalculate the horizontal displacement value of the surrounding soil or existing structure until the calculated horizontal displacement value is close to but not greater than the deformation monitoring threshold. That is, the increased mechanical static pressure is used as the maximum mechanical static pressure.

5. A dynamic construction control method for casing static pressure drilling based on real-time pressure feedback, characterized in that: The dynamic construction control method comprises the following steps: S1, start construction, use lifting equipment to accurately position the static pressure drilling construction equipment at the pile position, and check the position, horizontality and verticality of the static pressure drilling construction equipment; S2, firstly hoist a single section of casing into the static pressure drilling construction equipment, then press the casing into the ground, and make the casing in a vertical state through a two-way artificial theodolite and a drilling rig attitude adjustment system; S3, start the static pressure drilling construction equipment, first clamp the casing by lifting the clamping mechanism through the oil cylinder, then open the rotary bearing to put the casing in a rotating state, and press the casing downward while rotating the casing; S4, using the maximum mechanical static pressure obtained in claim 4 to perform static pressure drilling of the casing, and during the drilling process, controlling the verticality of the casing in the horizontal and vertical directions; S5, real-time recording of mechanical pressure monitoring values ​​during casing drilling; S6, when the mechanical pressure monitoring value is greater than the maximum mechanical static pressure, the static pressure drilling construction equipment alarms due to excessive pressure, stops the static pressure drilling construction, and clears the soil in the casing; S7, repeat steps S4 to S6 until the static pressure drilling construction of all casings is completed.

6. The dynamic construction control method of casing static pressure drilling based on real-time pressure feedback according to claim 5 is characterized in that: When performing step S6, the soil in the casing is removed by using a grab bucket excavation method or a rotary excavation method.