By adopting odd and even branch lanes with jump mining methods and layered mining technology in the mine, the problem of improving efficiency and safety in traditional coal mining processes is solved, independent operations and closed filling space are realized, and coal mining is improved Efficiency and safety.
Patent Information
- Application Number
- CN202411195894.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-15
AI Technical Summary
Traditional coal mining processes have limited the improvement of coal mining efficiency and safety, especially in the development of intelligent and unmanned coal mining, and coal mining needs to be improved to improve efficiency and safety.
The first and second troughs are dug in the plane direction in the mine, and the coal mining sections are divided into units and branch tunnels. The jumping method of odd and even branch tunnels is adopted, and the excavation and filling is independent and does not affect each other. , combined with layered mining and support technology, a closed filling space is formed to improve efficiency and safety.
It realizes independent operation of each branch and tunnel, stabilizes space and long working time, reduces the centralized empty ceiling area, and improves the efficiency and safety of the coal mining section.
Smart Images

Figure CN118958978A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of mine filling coal mining, and in particular to a mine filling coal mining method. Background Art
[0002] As a basic resource and energy, coal occupies an important position in the development of the national economy. Coal mining refers to the process of extracting coal from underground or surface coal seams. With the advancement of technology, coal mining technology has gone through the development stage from mechanization to automation and informatization. At present, the coal mining face is developing in the direction of intelligence and unmanned operation, but the traditional coal mining process limits the improvement of coal mining efficiency and safety. Therefore, it is necessary to improve the coal mining process to further improve the efficiency and safety of coal mining. Summary of the invention
[0003] The present disclosure aims to solve one of the technical problems in the related art at least to some extent.
[0004] To this end, an object of the present disclosure is to provide a mine backfill coal mining method.
[0005] To achieve the above-mentioned purpose, the present disclosure provides a mine filling coal mining method, comprising: in a mining area, respectively excavating a first drift and a second drift along a first direction in a plane direction, and the first drift and the second drift are spaced apart along a second direction in a plane direction, wherein the first direction and the second direction are at a preset angle; the coal mining section between the first drift and the second drift is divided into A units in sequence along the first direction, and each of the units is divided into B branch tunnels in sequence along the first direction; the mth branch tunnel of the A units is excavated and filled in sequence along the first direction, wherein m is an odd number from 1 to B; the nth branch tunnel of the A units is excavated and filled in sequence along the first direction, wherein n is an even number from 1 to B.
[0006] Optionally, the method further includes: dividing each of the branch tunnels into an upper layer and a lower layer along the vertical direction; excavating and supporting the upper layer of the branch tunnel; mining and supporting the lower layer of the branch tunnel; and filling the branch tunnel.
[0007] Optionally, the method also includes: when the lower layer of the bth branch tunnel of the a+1th unit is mined and supported, the upper layer of the bth branch tunnel of the a+2th unit is excavated and supported; when the bth branch tunnel of the ath unit is filled, the lower layer of the bth branch tunnel of the a+1th unit is mined and supported; wherein a is an integer from 1 to A-2, and b is m or n.
[0008] Optionally, the method also includes: dividing the area between the first drift and the second drift into a first coal mining section and a second coal mining section along the second direction; excavating and filling the B branch tunnels of the A units in the first coal mining section; and excavating and filling the B branch tunnels of the A units in the second coal mining section.
[0009] Optionally, the method further includes: when the mth branch tunnel of A units is excavated and mined sequentially along the first direction, supporting the roof and side walls of the branch tunnel.
[0010] Optionally, the method further includes: supporting the roof of the branch tunnel when the nth branch tunnel of the A units is excavated and mined sequentially along the first direction.
[0011] Optionally, the method also includes: dividing the coal mining section into two reserved coal pillars along the first direction, and dividing A units in sequence along the first direction between the two reserved coal pillars; after mining and filling the nth branch tunnel of the A units in sequence along the first direction, excavating and filling the two reserved coal pillars along the first direction.
[0012] Optionally, the width of the reserved coal pillar in the first direction is 1 to 2 times the width of the branch tunnel in the first direction.
[0013] Optionally, the method also includes: excavating a transport tunnel and a return air tunnel along the second direction in the mining area respectively, and the transport tunnel and the return air tunnel are spaced apart along the first direction; excavating a first drift along the first direction on a side of the transport tunnel away from the return air tunnel, and excavating a second drift along the first direction on a side of the return air tunnel close to the transport tunnel; excavating a cutting eye along the second direction between an end of the first drift away from the transport tunnel and an end of the second drift away from the return air tunnel, so that the transport tunnel, the first drift, the cutting eye, the second drift and the return air tunnel form an air duct.
[0014] Optionally, the method further includes: dividing the coal mining section into A units in sequence along the direction from the cutting eye to the transport tunnel, and dividing each unit into B branch tunnels in sequence along the direction from the cutting eye to the transport tunnel.
[0015] The technical solution provided by the present disclosure may have the following beneficial effects:
[0016] By coordinating the mining operations of odd-numbered branch tunnels in unit A and the mining operations of even-numbered branch tunnels in unit A, skip mining of branch tunnels B in unit A is achieved. As a result, not only are the excavation and filling operations of each branch tunnel independent of each other and do not affect each other, each branch tunnel has a stable working space and a longer working time, thereby effectively improving the coal mining efficiency of the coal mining section, but also the coal mining section has a smaller concentrated empty top area during the excavation and filling process, thereby effectively improving the coal mining safety of the coal mining section.
[0017] Additional aspects and advantages of the present disclosure will be given in part in the following description and in part will be obvious from the following description or learned through practice of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or additional aspects and advantages of the present disclosure will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:
[0019] Figure 1 It is a schematic flow chart of a mine filling coal mining method proposed in an embodiment of the present disclosure;
[0020] Figure 2 It is a structural schematic diagram of the mining area in the mine filling coal mining method proposed in one embodiment of the present disclosure;
[0021] As shown in the figure: 1. First drift, 2. Second drift, 3. Unit, 4. Branch lane, 5. Reserved coal pillar, 6. Transport lane, 7. Return air lane, 8. Cutting eye;
[0022] 100, first coal mining section, 200, second coal mining section. DETAILED DESCRIPTION
[0023] Embodiments of the present disclosure are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present disclosure, and are not to be construed as limitations of the present disclosure. On the contrary, the embodiments of the present disclosure include all changes, modifications, and equivalents that fall within the spirit and connotation of the appended claims.
[0024] like Figure 1 and Figure 2 As shown, the embodiment of the present disclosure provides a mine filling coal mining method, comprising:
[0025] S1: excavating a first drift 1 and a second drift 2 in a mining area along a first direction in a plane direction, respectively, and the first drift 1 and the second drift 2 are spaced apart along a second direction in a plane direction, wherein the first direction and the second direction form a preset angle;
[0026] S2: the coal mining section between the first drift 1 and the second drift 2 is divided into A units 3 in sequence along the first direction, and each unit 3 is divided into B branch lanes 4 in sequence along the first direction;
[0027] S3: excavating and filling the m-th branch tunnel 4 of A units 3 in sequence along the first direction, where m is an odd number from 1 to B;
[0028] S4: Excavate and fill the n-th branch tunnel 4 of A units 3 in sequence along the first direction, where n is an even number from 1 to B.
[0029] It can be understood that, since m is an odd number ranging from 1 to B, when the mth branch tunnel 4 of the A units 3 is excavated and filled in sequence along the first direction, the coal mining operation of the odd-numbered branch tunnels 4 arranged at intervals in the A units 3 can be completed. At the same time, since n is an even number ranging from 1 to B, when the nth branch tunnel 4 of the A units 3 is excavated and filled in sequence along the first direction, the coal mining operation of the even-numbered branch tunnels 4 arranged at intervals in the A units 3 can be completed.
[0030] Among them, through the coordination of coal mining operations in odd-numbered branch tunnels 4 in A units 3 and coal mining operations in even-numbered branch tunnels 4 in A units 3, skip mining of B branch tunnels 4 in A units 3 is realized. Therefore, not only the excavation and filling operations of each branch tunnel 4 are independent of each other and do not affect each other, each branch tunnel 4 has a stable working space and a longer working time, thereby effectively improving the coal mining efficiency of the coal mining section, but also the coal mining section has a smaller concentrated empty top area during the excavation and filling process, thereby effectively improving the coal mining safety of the coal mining section.
[0031] It should be noted that a coal mining section is formed between the first chute 1 and the second chute 2. The first chute 1 and the second chute 2 are used for ventilation and coal transfer of coal mining operations. For example, the first chute 1 can be used as a transport chute, and the second chute 2 can be used as a return air chute. When coal mining operations are carried out in the next coal mining section, the first chute 1 can be used as a return air chute for the next coal mining section.
[0032] The first direction and the second direction are two directions in the plane direction, and the preset angle can be set according to actual needs, without limitation. For example, the preset angle can be 90 degrees.
[0033] In step S3, the mth branch tunnel 4 of A units 3 is excavated and filled in sequence along the first direction. Specifically, step S3 includes: S31: excavating and filling the mth branch tunnel 4 of the first unit 3; S32: excavating and filling the mth branch tunnel 4 of the second unit 3; S33: excavating and filling the mth branch tunnel 4 of the third unit 3; until, S3A: excavating and filling the mth branch tunnel 4 of the Ath unit 3. As m is taken as an odd number from 1 to B in sequence, S31 to S3A are repeated continuously, thereby realizing step S3.
[0034] In step S4, the nth branch tunnel 4 of A units 3 is excavated and filled in sequence along the first direction. Specifically, step S4 includes: S41: excavating and filling the nth branch tunnel 4 of the first unit 3; S42: excavating and filling the nth branch tunnel 4 of the second unit 3; S43: excavating and filling the nth branch tunnel 4 of the third unit 3; until, S4A: excavating and filling the nth branch tunnel 4 of the Ath unit 3. Among them, as n is successively taken as an even number from 1 to B, S41 to S4A are continuously repeated, thereby realizing step S4.
[0035] Among them, the specific values of A and B can be set according to actual needs without any limitation. For example, the width of the branch tunnel 4 in the first direction can be 3m-6m, and the width of the coal mining section in the second direction can be 75m-100m. According to the width of the branch tunnel 4 and the width of the coal mining section, the number of units 3, that is, the value of A, and the number of branch tunnels 4 of each unit 3, that is, the value of B, are determined.
[0036] For example: A takes the value of 3 and B takes the value of 4, then step S3 includes: excavating and filling the first branch tunnel 4 of the first unit 3, excavating and filling the first branch tunnel 4 of the second unit 3, and excavating and filling the first branch tunnel 4 of the third unit 3; excavating and filling the third branch tunnel 4 of the first unit 3, excavating and filling the third branch tunnel 4 of the second unit 3, and excavating and filling the third branch tunnel 4 of the third unit 3.
[0037] Step S4 includes: excavating and filling the second branch tunnel 4 of the first unit 3, excavating and filling the second branch tunnel 4 of the second unit 3, and excavating and filling the second branch tunnel 4 of the third unit 3; excavating and filling the fourth branch tunnel 4 of the first unit 3, excavating and filling the fourth branch tunnel 4 of the second unit 3, and excavating and filling the fourth branch tunnel 4 of the third unit 3.
[0038] Since each branch tunnel 4 is mined and filled at intervals in sequence, and the branch tunnels 4 with similar construction times are far apart, the mined and filled operations of each branch tunnel 4 are independent of each other and do not affect each other. In particular, the filling operation in the mined and filled process requires the filling and solidification of slurry. Therefore, the skipping operation method can provide a relatively closed filling space for the filling operation (the two sides of the branch tunnel 4 are coal bodies or filling bodies) and a longer solidification time, and at the same time does not affect the mined and filled operations of other branch tunnels 4, thereby ensuring a higher efficiency of the coal mining operation. In addition, during the mined and filled process, there is a concentrated empty top only at the position of the branch tunnel 4 in the coal mining section, and the two sides of the branch tunnel 4 are coal bodies or filling bodies, so that the concentrated empty top area is extremely small, thereby ensuring a higher safety of the coal mining operation.
[0039] In some embodiments, the method further comprises:
[0040] S10: Divide each branch tunnel 4 into an upper layer and a lower layer along the vertical direction;
[0041] S20: excavation of the upper layer of the supporting branch tunnel 4;
[0042] S30: lower layer of mining support branch tunnel 4;
[0043] S40: Filling branch tunnel 4.
[0044] It can be understood that each branch tunnel 4 is divided into an upper layer and a lower layer in the vertical direction, and the upper layer and the lower layer of the branch tunnel 4 are mined in turn, thereby realizing split coal mining of the branch tunnel 4 and ensuring high-efficiency operation of the branch tunnel 4.
[0045] It should be noted that the vertical direction is the direction perpendicular to the plane direction. Dividing the branch tunnel 4 into upper and lower layers along the vertical direction can orderly excavate the coal in the branch tunnel 4, while avoiding problems such as omission and collapse of coal in the branch tunnel 4. Specifically, the excavation of the upper and lower layers of the branch tunnel 4 can be achieved by using a tunnel boring machine. The tunnel boring machine first excavates the upper layer, and then performs backward undercover mining on the lower layer. Finally, the branch tunnel 4 where excavation is completed is filled.
[0046] In some embodiments, the method further comprises:
[0047] When the lower layer of the b-th branch tunnel 4 of the a+1-th unit 3 is mined and supported, the upper layer of the b-th branch tunnel 4 of the a+2-th unit 3 is excavated and supported;
[0048] When filling the b-th branch tunnel 4 of the a-th unit 3, the lower layer of the b-th branch tunnel 4 of the a+1-th unit 3 is mined and supported;
[0049] Here, a is an integer from 1 to A-2, and b is m or n.
[0050] It can be understood that, since when the lower layer of the bth branch tunnel 4 of the a+1th unit 3 is mined and supported, the upper layer of the bth branch tunnel 4 of the a+2th unit 3 is excavated and supported, and when the bth branch tunnel 4 of the ath unit 3 is filled, the lower layer of the bth branch tunnel 4 of the a+1th unit 3 is mined and supported, the filling operation of the bth branch tunnel 4 in the a+1th unit 3, the lower layer mining and support operation of the bth branch tunnel 4 in the a+1th unit 3 and the lower layer mining and support operation of the bth branch tunnel 4 in the a+2th unit 3 can be carried out simultaneously, thereby effectively improving the coal mining efficiency of the coal mining section and reducing the coal mining cost of the coal mining section.
[0051] It should be noted that the specific values of a and b can be set according to actual needs and are not limited to this.
[0052] For example, a takes the value of 1, b takes the value of 1, and specifically, the filling operation of the first branch tunnel 4 in the first unit 3, the lower layer mining and support operation of the first branch tunnel 4 in the second unit 3, and the upper layer excavation and support operation of the first branch tunnel 4 in the third unit 3 are carried out simultaneously.
[0053] In normal coal mining operations, it is first necessary to sequentially carry out excavation support for the upper layer of the 1st branch tunnel 4 of the 1st unit 3, the upper layer of the 1st branch tunnel 4 of the 2nd unit 3, and the upper layer of the 1st branch tunnel 4 of the 3rd unit 3; thereafter, it is necessary to sequentially carry out mining support for the lower layer of the 1st branch tunnel 4 of the 1st unit 3, the lower layer of the 1st branch tunnel 4 of the 2nd unit 3, and the lower layer of the 1st branch tunnel 4 of the 3rd unit 3; finally, it is necessary to fill the 1st branch tunnel 4 of the 1st unit 3, the 1st branch tunnel 4 of the 2nd unit 3, and the 1st branch tunnel 4 of the 3rd unit 3.
[0054] In the coal mining operation in this embodiment, when the upper layer excavation support is performed for the first branch tunnel 4 of the second unit 3, the lower layer mining support is performed for the first branch tunnel 4 of the first unit 3, and when the upper layer excavation support is performed for the first branch tunnel 4 of the third unit 3, the lower layer mining support is performed for the first branch tunnel 4 of the second unit 3; when the lower layer mining support is performed for the first branch tunnel 4 of the second unit 3, the first branch tunnel 4 of the first unit 3 is filled, and when the lower layer mining support is performed for the first branch tunnel 4 of the third unit 3, the first branch tunnel 4 of the second unit 3 is filled. It can be seen that the synchronous operation method in this embodiment saves a lot of operation time and effectively improves the coal mining efficiency.
[0055] like Figure 2 As shown, in some embodiments, the method further includes:
[0056] S100: Dividing the area between the first drift 1 and the second drift 2 into a first coal mining section 100 and a second coal mining section 200 along a second direction;
[0057] S200: excavating and filling B branch tunnels 4 of A units 3 in the first coal mining section 100;
[0058] S300: Excavate and fill the B branch tunnels 4 of the A units 3 in the second coal mining section 200.
[0059] It can be understood that dividing the area between the first drift 1 and the second drift 2 into the first coal mining section 100 and the second coal mining section 200 along the second direction, and carrying out coal mining operations in the first coal mining section 100 and the second coal mining section 200 in sequence, can avoid the first drift 1 and the second drift 2 being connected by the branch tunnel 4. This not only avoids the confusion of the air duct, which is beneficial to the ventilation management, but also ensures that the branch tunnel 4 has a relatively closed filling space after excavation, thereby further improving the coal mining efficiency.
[0060] It should be noted that the first coal mining section 100 and the second coal mining section 200 are both coal mining sections, and excavation and filling operations are carried out in sequence using steps S2, S3 and S4, wherein the first coal mining section 100 may be a coal mining section close to the first drift 1, and the second coal mining section 200 may be a coal mining section close to the second drift 2. The branch tunnel 4 in the first coal mining section 100 carries out excavation and filling operations along the direction from the first drift 1 to the second drift 2, and the branch tunnel 4 in the second coal mining section 200 carries out excavation and filling operations along the direction from the second drift 2 to the first drift 1.
[0061] When the branch tunnel 4 in the first coal mining section 100 is excavated and filled in the direction from the first drift 1 to the second drift 2, the filling operation of the branch tunnel 4 only involves the blocking operation of the branch tunnel 4 near the end of the first drift 1, and there is no need to block the branch tunnel 4 near the end of the second drift 2. Correspondingly, when the branch tunnel 4 in the second coal mining section 200 is excavated and filled in the direction from the second drift 2 to the first drift 1, the filling operation of the branch tunnel 4 only involves the blocking operation of the branch tunnel 4 near the end of the second drift 2, and there is no need to block the branch tunnel 4 near the end of the first drift 1. This effectively improves the underground coal mining efficiency. At the same time, no matter whether it is the operation of the branch tunnel 4 in the first coal mining section 100 or the operation of the branch tunnel 4 in the second coal mining section 200, the first drift 1 and the second drift 2 cannot be connected by the branch tunnel 4, thereby avoiding the confusion of the underground air duct and facilitating the underground ventilation management.
[0062] Among them, after the excavation of each branch tunnel 4 is completed, the port of the branch tunnel 4 is sealed with a template, and a single hydraulic support is supported on the outside of the sealing plate.
[0063] In some embodiments, the method further comprises:
[0064] When the m-th branch tunnel 4 of A units 3 is excavated and mined in sequence along the first direction, the roof and side walls of the branch tunnel 4 are supported.
[0065] It can be understood that when the mth branch tunnel 4 of the A unit 3 is excavated and mined in sequence along the first direction, the two sides of the mth branch tunnel 4 are still coal body structures, and the coal body structure is relatively low in strength compared to rock mass, backfill and other structures. Therefore, while supporting the top plate of the branch tunnel 4, it is also necessary to support the side walls of the branch tunnel 4, thereby ensuring a higher safety of the coal mining operation.
[0066] It should be noted that the branch tunnel 4 has a roof and a bottom plate as well as two side walls located between the roof and the bottom plate and arranged opposite to each other. When the mth branch tunnel 4 of the A units 3 is excavated and mined in sequence along the first direction, the two sides of the mth branch tunnel 4 are the nth branch tunnel 4 that has not been excavated and filled. Therefore, it is necessary to support the roof and side walls of the branch tunnel 4.
[0067] In some embodiments, the method further comprises:
[0068] When the n-th branch tunnel 4 of the A units 3 is excavated and mined in sequence along the first direction, the roof of the branch tunnel 4 is supported.
[0069] It can be understood that when the nth branch tunnel 4 of the A units 3 is excavated and mined in sequence along the first direction, the two sides of the nth branch tunnel 4 are filling body structures, and the filling body has a high structural strength. Therefore, only the top plate of the branch tunnel 4 needs to be supported, and the support operation of the side walls of the branch tunnel 4 is omitted, thereby ensuring the high safety of the coal mining operation while effectively improving the efficiency of the coal mining operation.
[0070] It should be noted that when the nth branch tunnel 4 of A units 3 is excavated and mined in sequence along the first direction, both sides of the nth branch tunnel 4 are the mth branch tunnel 4 that have been mined and filled. Therefore, only the roof of the branch tunnel 4 needs to be supported.
[0071] Among them, support includes: temporary support and permanent support.
[0072] Temporary support can be achieved by using a combination of single hydraulic props and square timbers. The single hydraulic props and square timbers form a one-beam-one-column support form in the branch tunnel 4, and the rated working pressure of the single hydraulic prop can be 3.8MPa, and the initial support force can be 30KN.
[0073] During permanent support, both the roof and the side walls can be supported by anchor mesh belts. The anchor mesh belts are composed of metal mesh, multiple anchor rods and multiple anchor rods. When the nth branch tunnel 4 of A units 3 is excavated and mined in sequence along the first direction, both sides of the branch tunnel 4 are not only filling body structures, but also have supported anchor mesh belts on both sides, which also strengthen the structure of the nth branch tunnel 4.
[0074] like Figure 2 As shown, in some embodiments, the method further includes:
[0075] S1000: Divide the coal mining section into two reserved coal pillars 5 along a first direction, and divide A units 3 in sequence between the two reserved coal pillars 5 along the first direction;
[0076] S2000: After the n-th branch tunnel 4 of A units 3 is excavated and filled in sequence along the first direction, two reserved coal pillars 5 are excavated and filled along the first direction.
[0077] It can be understood that two reserved coal pillars 5 are divided out before A units 3 are divided out, and the two reserved coal pillars 5 are excavated and filled after all the branch tunnels 4 in the A units 3 are filled. Thus, while achieving high-quality and high-efficiency coal mining in the coal mining section, the two reserved coal pillars 5 can also be used to ensure the structural stability of the branch tunnels 4, thereby ensuring a higher safety of the coal mining operation.
[0078] It should be noted that the two reserved coal pillars 5 are used to increase the structural strength of the coal mining area to ensure higher safety of the branch tunnel 4 during excavation and filling operations. The specific type of the reserved coal pillars 5 can be set according to actual needs and is not limited to this.
[0079] In some embodiments, the width of the reserved coal pillar 5 in the first direction is 1 to 2 times the width of the branch roadway 4 in the first direction.
[0080] It can be understood that setting the width of the reserved coal pillar 5 in the first direction to 1 to 2 times the width of the branch tunnel 4 in the first direction not only avoids the width of the reserved coal pillar 5 being too large and affecting the coal mining quality and efficiency of the coal mining section, but also avoids the width of the reserved coal pillar 5 being too small and affecting the supporting function of the reserved coal pillar 5.
[0081] It should be noted that the width of the reserved coal pillar 5 can be set according to actual needs and is not limited to this. For example, the width of the reserved coal pillar 5 can be 1 times, 1.5 times, 1.7 times, 2 times, etc., of the width of the branch tunnel 4.
[0082] like Figure 2 As shown, in some embodiments, the method further includes:
[0083] S10000: excavating a transport tunnel 6 and a return air tunnel 7 in the mining area respectively along the second direction, and the transport tunnel 6 and the return air tunnel 7 are spaced apart along the first direction;
[0084] S20000: excavating a first drift 1 along a first direction on a side of the transport lane 6 away from the return air lane 7, and excavating a second drift 2 along the first direction on a side of the return air lane 7 close to the transport lane 6;
[0085] S30000: Dig a cutting eye 8 along a second direction between one end of the first drift 1 away from the transport tunnel 6 and one end of the second drift 2 away from the return air tunnel 7, so that the transport tunnel 6, the first drift 1, the cutting eye 8, the second drift 2 and the return air tunnel 7 form an air duct.
[0086] It can be understood that the transport tunnel 6 and the return air tunnel 7 are excavated in the mining area in turn, and the transport tunnel 6 is used to excavate the first drift 1, the return air tunnel 7 is used to excavate the second drift 2, and the first drift 1 and the second drift 2 are used to excavate the cutting eye 8, thereby realizing the formation of underground air ducts, so that the underground air can flow stably along the transport tunnel 6, the first drift 1, the cutting eye 8, the second drift 2 and the return air tunnel 7, thereby ensuring the safety of underground coal mining operations.
[0087] It should be noted that the transport tunnel 6 is used for the flow of air, for the transportation of coal, for the arrangement of equipment, etc. For example: the transport tunnel 6, the first chute 1, the second chute 2, etc. are arranged with a belt conveyor for transporting coal, a filling pipeline system for filling the branch tunnel 4, etc. The return air tunnel 7 is used for the flow of air, for example: the transport tunnel 6, the first chute 1, the second chute 2, etc. are arranged with fan equipment for ventilation, etc., so that the underground air can flow unidirectionally along the transport tunnel 6, the first chute 1, the cut eye 8, the second chute 2 and the return air tunnel 7.
[0088] When excavating branch tunnel 4, local fans can be used to supply air. The distance between the wind duct and the head shall not exceed the requirements of the operating procedures. The methane sensor shall be hung at the head as required. At the same time, wind control curtains with special adjustable wind windows can be used to control the wind to meet the wind speed and volume requirements during the undercover mining of branch tunnel 4, and at the same time meet the wind speed and volume requirements of eye cutting 8. In addition, during grouting and filling, local fans are used to ventilate the filling branch tunnel 4.
[0089] like Figure 2 As shown, in some embodiments, the method further includes:
[0090] The coal mining section is divided into A units 3 in sequence along the direction from the cutting eye 8 to the transport tunnel 6, and each unit 3 is divided into B branch tunnels 4 in sequence along the direction from the cutting eye 8 to the transport tunnel 6.
[0091] It can be understood that the coal mining section is divided into A units 3 in sequence along the direction from the cutting eye 8 to the transport tunnel 6, and each unit 3 is divided into B branch tunnels 4 in sequence along the direction from the cutting eye 8 to the transport tunnel 6, so that the coal mining operation in the coal mining section can be carried out along the direction from the cutting eye 8 to the transport tunnel 6, so that the equipment, pipelines, etc. of the operation can be arranged in an orderly manner, thereby ensuring a higher coal mining efficiency.
[0092] It should be noted that the first direction can be the direction from the cutting eye 8 to the transport tunnel 6, or the direction from the transport tunnel 6 to the cutting eye 8, and the second direction can be the direction from the first chute 1 to the second chute 2, or the direction from the second chute 2 to the first chute 1, and there is no limitation on this.
[0093] In the description of the present disclosure, the terms "first", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, in the description of the present disclosure, unless otherwise specified, "plurality" means two or more.
[0094] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code that includes one or more executable instructions for implementing the steps of a specific logical function or process, and the scope of the preferred embodiments of the present disclosure includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by those skilled in the art to which the embodiments of the present disclosure belong.
[0095] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0096] Although the embodiments of the present disclosure have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present disclosure. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present disclosure.
Claims
1. A mine filling coal mining method, characterized in that: include: In the mining area, a first drift and a second drift are excavated along a first direction in a plane direction, respectively, and the first drift and the second drift are spaced apart along a second direction in the plane direction, wherein the first direction and the second direction form a preset angle; Divide the coal mining section between the first drift and the second drift into A units in sequence along the first direction, and divide each of the units into B branch lanes in sequence along the first direction; Excavating and filling the m-th branch tunnels of A units in sequence along the first direction, wherein m is an odd number from 1 to B; The nth branch tunnels of the A units are mined and filled in sequence along the first direction, wherein n is an even number from 1 to B.
2. The mine filling coal mining method according to claim 1, characterized in that: The method further comprises: Dividing each of the branch lanes into an upper layer and a lower layer along the vertical direction; Excavating and supporting the upper layer of the branch tunnel; Mining and supporting the lower layer of the branch tunnel; Fill the branch lane.
3. The mine filling coal mining method according to claim 2, characterized in that: The method further comprises: When the lower layer of the b-th branch tunnel of the a+1-th unit is mined and supported, the upper layer of the b-th branch tunnel of the a+2-th unit is excavated and supported; When the b-th branch tunnel of the a-th unit is filled, the lower layer of the b-th branch tunnel of the a+1-th unit is mined and supported; Here, a is an integer from 1 to A-2, and b is m or n.
4. The mine filling coal mining method according to claim 1, characterized in that: The method further comprises: Dividing the area between the first drift and the second drift into a first coal mining section and a second coal mining section along the second direction; Excavating and filling the B branch tunnels of the A units in the first coal mining section; Excavate and fill the B branch tunnels of the A unit in the second coal mining section.
5. The mine filling coal mining method according to claim 1, characterized in that: The method further comprises: When the m-th branch tunnel of the A units is excavated and mined in sequence along the first direction, the roof and side walls of the branch tunnel are supported.
6. The mine filling coal mining method according to claim 5, characterized in that: The method further comprises: When the n-th branch tunnels of the A units are excavated and mined in sequence along the first direction, the roof of the branch tunnel is supported.
7. The mine filling coal mining method according to claim 1, characterized in that: The method further comprises: Divide the coal mining section into two reserved coal pillars along the first direction, and divide A units in sequence between the two reserved coal pillars along the first direction; After the nth branch tunnels of the A units are mined and filled in sequence along the first direction, the two reserved coal pillars are mined and filled along the first direction.
8. The mine filling coal mining method according to claim 7, characterized in that: The width of the reserved coal pillar in the first direction is 1 to 2 times the width of the branch roadway in the first direction.
9. The mine filling coal mining method according to claim 1, characterized in that: The method further comprises: In the mining area, a transport tunnel and a return air tunnel are respectively excavated in and out along the second direction, and the transport tunnel and the return air tunnel are spaced apart along the first direction; Excavating a first drift along the first direction on a side of the transport lane away from the return air lane, and excavating a second drift along the first direction on a side of the return air lane close to the transport lane; A cutting eye is excavated along the second direction between one end of the first drift away from the transport tunnel and one end of the second drift away from the return air tunnel, so that the transport tunnel, the first drift, the cutting eye, the second drift and the return air tunnel form an air duct.
10. The mine filling coal mining method according to claim 9, characterized in that: The method further comprises: The coal mining section is divided into A units in sequence along the direction from the cutting eye to the transport lane, and each unit is divided into B branch lanes in sequence along the direction from the cutting eye to the transport lane.