Mining method for gently inclined thin vein gold deposit
Through the comprehensive mining method and filling mining method, the tailings sand after smelting is used to form paste filling goaf, which solves the problems of thin ore vein mining and goaf management, and realizes ore recycling and effective utilization of tailings waste stone. Reduced tailings emissions and met the requirements of green mine construction.
Patent Information
- Application Number
- CN202411326368.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-11-15
AI Technical Summary
The existing technology is difficult to effectively utilize thin ore veins with smaller thickness, and goaf management and tailings reduction have become problems, and there is a lack of mining plans that meet the construction of green mines.
The comprehensive mining method and subsequent filling mining method are adopted to form paste filling goafs through the smelting tailings sand, and the ore is recycled and tailings waste stone is used to reduce tailings emissions, and ground pressure is managed through the paste filling.
It has achieved efficient ore recycling and goaf treatment, reduced tailings emissions, and is in line with the concept of green mine development, and has played a role in treating two harms with one waste.
Smart Images

Figure CN118958981A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, in particular to a method for mining a gently inclined thin-veined gold deposit. Background Art
[0002] my country is rich in mineral resources, but there are relatively few large or super-large gold deposits, and small gold deposits account for a relatively large proportion. The development and utilization of thin veins with smaller thickness has always attracted much attention. Generally speaking, gently inclined thin veins mainly refer to ore bodies with an inclination of 5-30° and a thickness of less than 4 meters. They are mainly mined by the full mining method or the room-and-pillar mining method. With the promotion and development of green mine construction, goaf management and tailings pond reduction have become unavoidable topics. In order to truly realize green mining, it is particularly important to urgently seek a more suitable mining and utilization plan. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the existing defects and provide a method for mining gently inclined thin-vein gold deposits, which combines the advantages of comprehensive mining and subsequent backfill mining, uses tailings after beneficiation to fill the goaf with paste, recovers a large amount of ore, and at the same time, the tailings and waste rock are effectively utilized and the goaf is treated, reducing tailings emissions and playing a role in ground pressure management, achieving the effect of curing two harms with one waste, which is more in line with the concept of green mine development and can effectively solve the problems in the background technology.
[0004] To achieve the above object, the present invention provides the following technical solution: a method for mining a gently inclined thin vein gold deposit, comprising dividing an ore body into ore blocks along the strike, a lower horizontal transport lane being provided at the bottom of the ore block, and an upper horizontal transport lane being provided at the top of the ore block, and the mining method of the ore block comprising the following steps: S1. Dig a ventilation pedestrian skylight from the bottom of the ore block to the upper part, and dig a bottom cutting tunnel and a ventilation filling tunnel at the lower end and upper end of the side of the ventilation pedestrian skylight respectively, and make the ore at the bottom of the bottom cutting tunnel become the bottom pillar, and the ore on the upper side of the ventilation filling tunnel become the top pillar; S2. A mine electric rake passage connected to the lower horizontal transport tunnel is excavated in the middle of the reserved bottom pillar, and a mine electric rake chamber is arranged at the bottom of the mine electric rake passage; S3, digging a filling well connected with the ventilation filling tunnel on the reserved top pillar; S4. Use the bottom cutting tunnel as the free surface to carry out down-the-hole blasting to strip the ore in the ore block, use electric rakes to remove the ore, rake the ore through the mine electric rake channel to the chute above the lower horizontal transport tunnel, and transport it by the mine car in the lower horizontal transport tunnel. During the mining process, reserve ore pillars for support, and then mine the ore to be mined; S5. After mining, tailings recovered by smelting are mixed with cementitious materials in appropriate proportions to form paste filling material. The empty space is filled through the filling well to form a mine room paste filling body with certain mechanical properties to support the upper and lower plates, ensure the stability of the surrounding rock, and then create conditions for the next mining block.
[0005] As a preferred technical solution of the present invention, in S1, a connecting road is excavated in the middle of the side of the ventilation pedestrian skylight.
[0006] As a preferred technical solution of the present invention, in S1, the thickness of the bottom column is set to be 3-5 meters.
[0007] As a preferred technical solution of the present invention, in S1, the thickness of the top column is 3-5 meters.
[0008] As a preferred technical solution of the present invention, in S5, after the empty space is filled, the top pillar is mined and recovered, and after the top pillar is mined, the method in S5 is used to fill the empty space with the top pillar to form a top pillar filling body.
[0009] Compared with the prior art, the present invention has the following beneficial effects: The method for mining a gently inclined, thin-veined gold deposit exemplified in the present invention combines the advantages of comprehensive mining and subsequent backfill mining, uses tailings after smelting to fill the goaf with paste, recovers a large amount of ore, and at the same time, the tailings and waste rock are effectively utilized and the goaf is treated, reducing tailings emissions while playing a role in ground pressure management, achieving the effect of curing two harms with one waste, and is more in line with the concept of green mine development. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 It is a side view schematic diagram of the present invention.
[0011] In the figure: 1 bottom pillar, 2 top pillar, 3 ventilation pedestrian skylight, 4 mine electric rake passage, 5 mine electric rake chamber, 6 bottom cutting tunnel, 7 ventilation filling tunnel, 8 connecting road, 9 filling shaft, 10 lower horizontal transport tunnel, 11 mine pillar, 12 ore to be mined, 13 mine room paste filling body, 14 upper horizontal transport tunnel, 15 top pillar filling body. DETAILED DESCRIPTION
[0012] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0013] See also Figure 1-2 The present invention provides a technical solution: a method for mining a gently inclined thin vein gold deposit, comprising dividing the ore body into ore blocks along the strike, a lower horizontal transport tunnel 10 is provided at the bottom of the ore block, and an upper horizontal transport tunnel 14 is provided at the top of the ore block. The mining method of the ore block comprises the following steps: S1, excavating a ventilation pedestrian skylight 3 from the bottom of the ore block to the upper part, and excavating a bottom cutting tunnel 6 and a ventilation filling tunnel 7 at the lower end and upper end of the side of the ventilation pedestrian skylight 3 respectively, and making the ore at the bottom of the bottom cutting tunnel 6 become a reserved bottom pillar 1, the thickness of the reserved bottom pillar 1 is 3-5 meters, and the ore on the upper side of the ventilation filling tunnel 7 becomes a reserved top pillar 2, the thickness of the reserved top pillar 2 is 3-5 meters; excavating a connecting road 8 in the middle of the side of the ventilation pedestrian skylight 3; S2, digging a mining electric rake passage 4 in communication with the lower horizontal transport tunnel 10 in the middle of the reserved bottom pillar 1, and a mining electric rake chamber 5 is provided at the bottom of the mining electric rake passage 4; S3, excavating a filling well 9 connected to the ventilation filling tunnel 7 on the reserved top pillar 2; S4, in the ore block, using the bottom cutting tunnel 6 as the free surface to carry out down-the-hole blasting to strip the ore, using an electric rake to remove the ore, rake the ore through the mine electric rake channel 4 to the chute above the lower horizontal transport tunnel 10, and transport it by the mine car in the lower horizontal transport tunnel 10. During the mining process, a ore pillar 11 is reserved for support, and then the ore 12 to be mined is mined; S5. After mining is completed, tailings recovered by beneficiation and smelting are appropriately mixed with cementitious materials to form a paste filling material. The empty space is filled through the filling well 9 to form a mine room paste filling body 13 with certain mechanical properties to support the upper and lower plates, ensure the stability of the surrounding rock, and then create conditions for the next ore block recovery.
[0014] Furthermore, in S5, after the empty space is filled, the top pillar 2 is mined and recovered, and after the top pillar 2 is mined, the method in S5 is used to fill the empty space where the top pillar 2 is left to form a top pillar filling body 15.
[0015] The present invention combines the advantages of comprehensive mining method and subsequent filling mining method, uses tailings after beneficiation to fill the goaf with paste, recovers a large amount of ore, and at the same time the tailings and waste rock are effectively utilized and the goaf is treated, reducing tailings discharge and playing a role in ground pressure management, achieving the effect of curing two harms with one waste, and is more in line with the concept of green mine development.
[0016] The undisclosed parts in the present invention are all prior art, and their specific structures, materials and working principles are not described in detail. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for mining a gently inclined thin-vein gold deposit, characterized in that: The method includes dividing the ore body into ore blocks along the strike direction, a lower horizontal transport tunnel (10) is provided at the bottom of the ore block, and an upper horizontal transport tunnel (14) is provided at the top of the ore block. The mining method of the ore block includes the following steps: S1, excavating a ventilation pedestrian skylight (3) from the bottom of the ore block to the upper part, and excavating a bottom cutting tunnel (6) and a ventilation filling tunnel (7) at the lower end and upper end of the side of the ventilation pedestrian skylight (3), respectively, and making the ore at the bottom of the bottom cutting tunnel (6) become a retained bottom column (1), and the ore on the upper side of the ventilation filling tunnel (7) become a retained top column (2); S2. A mining electric rake passage (4) connected to the lower horizontal transport tunnel (10) is excavated in the middle of the reserved bottom pillar (1), and a mining electric rake chamber (5) is provided at the bottom of the mining electric rake passage (4); S3, excavating a filling well (9) on the reserved top pillar (2) and connected to the ventilation filling tunnel (7); S4, using the bottom cutting tunnel (6) as a free surface in the ore block to perform down-the-hole blasting to strip the ore, using an electric rake to remove the ore, rake the ore through the mining electric rake channel (4) to the chute above the lower horizontal transport tunnel (10), and transport it by a mine car in the lower horizontal transport tunnel (10). During the mining process, a ore pillar (11) is reserved for support, and then the ore to be mined (12) is mined; S5. After mining is completed, tailings recovered by beneficiation and smelting are mixed with cementitious materials in an appropriate ratio to form a paste filling material. The empty space is filled through the filling well (9) to form a mine room paste filling body (13) with certain mechanical properties to support the upper and lower plates, ensure the stability of the surrounding rock, and then create conditions for the recovery of the next ore block.
2. The method for mining a gently inclined thin vein gold deposit according to claim 1, characterized in that: In S1, a connecting road (8) is excavated in the middle of the side of the ventilation pedestrian skylight (3).
3. The method for mining a gently inclined thin vein gold deposit according to claim 1, characterized in that: In S1, the bottom column (1) is set to have a thickness of 3-5 meters.
4. The method for mining a gently inclined thin vein gold deposit according to claim 1, characterized in that: In S1, the top column (2) is left with a thickness of 3-5 meters.
5. The method for mining a gently inclined thin vein gold deposit according to claim 1, characterized in that: In S5, after the empty space is filled, the top pillar (2) is mined and recovered, and after the top pillar (2) is mined, the method in S5 is used to fill the empty space where the top pillar (2) is left to form a top pillar filling body (15).
