Method for measuring levelness of cyclone shaft wall in open caisson process
By setting the scale reference line and connecting pipe on the wall of the cyclone wellbore and measuring the horizontal deviation with a steel tape measure, the problem of horizontal monitoring and correction in the caissoning process of the cyclone wellbore wall is solved, and an efficient and low-cost construction method is realized , simplifies operations and improves security.
Patent Information
- Application Number
- CN202411134281.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-15
AI Technical Summary
In the process of cyclone wellbore wall caissoning, the prior art is difficult to efficiently and at low cost to monitor and correct horizontal deviations, especially when the caissoning depth increases, the difficulty of verticality detection increases and common measurement methods are costly.
Using the principle of communicator, by setting scale reference lines and communication pipes on the wall of the cyclone wellbore, the horizontal deviation is measured by using a steel tape measure to provide simple and fast deviation correction data, reducing the dependence on professional measurement equipment and personnel.
It realizes efficient and low-cost monitoring and deviation correction of the horizontality of the cyclone wellbore wall, simplifies the construction process, reduces costs, and improves construction safety and reliability.
Smart Images

Figure CN118960690A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vortex well construction, and in particular to a method for measuring the levelness of a vortex well barrel wall during a caisson sinking process. Background Art
[0002] In the field of metallurgical construction, the vortex well is an important building, which is indispensable as a public auxiliary water system for steel rolling and steelmaking. The vortex well is generally a circular reinforced concrete structure with a large diameter (about 18 to 35 meters), a thick wall (between 1 and 2 meters), and a deep burial (about 20 to 35 meters). It is the focus and difficulty in construction. Common construction methods include large excavation, reverse construction, caisson, etc. Among them, the caisson method is more commonly used. The soil below the blade foot at the bottom of the cylinder wall is excavated and hollowed out. When the deadweight of the caisson is greater than the friction between the caisson and the soil and the reaction force of the base blade foot, it can sink. Tilt often occurs during the sinking process, and then measures are taken to continuously correct the deviation to ensure its verticality. The caisson process is actually a process of continuous correction. When the wall of the cylinder is tilted, the horizontality will also deviate. The verticality is often measured by hanging a plumb line, while the horizontality is often measured by a level in combination with a tower ruler. The caisson process needs to be monitored at least twice a day and corrected in time. As the sinking depth of the caisson increases, the difficulty of detecting the verticality of the caisson body is also increasing, and it is becoming increasingly difficult to choose the location for setting up the instrument.
[0003] Patent CN116026291A discloses a method for detecting and controlling the verticality of a caisson. By setting a verticality detection device, real-time detection of the verticality data of the caisson can be achieved, which can quickly increase the speed of caisson construction while ensuring the quality of caisson construction. However, the verticality detection device used in this method is relatively expensive. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a method for measuring the horizontality of the swirl wellbore wall during the caisson process. By utilizing the principle of communicating vessels and in combination with a steel tape measure, it is possible to achieve monitoring at any time, and the construction is convenient and efficient.
[0005] To achieve this technical purpose, the present invention adopts the following scheme: A method for measuring the horizontality of a cyclone wellbore wall during a caisson sinking process comprises the following steps: Step 1: Marking the scale reference line After the first section of the vortex well is cast and prefabricated and the formwork is removed, 4 to 8 first scale reference lines of the same horizontal height are evenly set around the bottom of the vortex well wall; the first scale reference lines are evenly distributed around the vortex well wall; a second scale reference line is made below the construction joint of the first section of the wall, and the second scale reference line is at the same vertical position as the corresponding first scale reference line. One of the scale reference lines is selected as the original reference point, and the remaining scale reference lines are used as observation reference points; Step 2: Horizontal measurement of the first section of the caisson wall As the earthwork below the blade foot of the vortex shaft wall is excavated, the vortex shaft wall begins to slowly sink. During measurement, the connecting pipe is filled with water, one end of the connecting pipe is fixed at the original reference point, and the other end is moved to the observation reference point. The distance between the liquid level in the connecting pipe and the second scale reference line is measured at the original reference point, and the distance between the liquid level in the connecting pipe and the second scale reference line is measured at the observation reference point. The difference between the two is the horizontality deviation; the horizontality deviations at other observation reference points and the original reference point are measured in the same way, and appropriate correction measures are taken according to the measured horizontality deviations; Step 3: Horizontal measurement of the second section of the caisson wall When the first section of the cylinder wall is caissoned in place, the second section of the cylinder wall is constructed. According to the method of the first step, after the template is removed from the second section of the vortex well, the position of the scale reference line is transferred and extended upward, that is, the second scale reference line on the upper part of the original first section of the cylinder wall is used as the first scale reference line of the second section of the cylinder wall, and then the second scale reference line is set on the upper part of the second section of the cylinder wall; according to the method of the second step, the horizontal deviation between the original reference point and the observation reference point is measured to obtain the horizontal deviation of the vortex well cylinder wall, so as to provide data for timely correction of the vortex well cylinder wall caisson, and take appropriate correction measures; Step 4: Repeat step 3 until all sections of the cyclone shaft wall are sunk.
[0006] Compared with the prior art, the present invention has the following beneficial effects: The present invention utilizes the principle of communicating vessels, takes one point as the original reference point, and sequentially places the other end of the communicating pipe at each observation reference point, and measures the reading difference between the original reference point and the observation reference point to obtain the horizontal deviation. The construction method is simple and easy to operate. Compared with the measurement using a level meter in conjunction with a tower ruler, the construction is convenient, fast, and efficient; compared with the use of special measuring equipment, the operation is simple and the cost is low; using the principle of communicating vessels, no professional surveyors and measuring instruments are required, and general workers can achieve it; the operator works in the wall of the construction joint at the upper end of the cylinder wall, and the reserved steel bars inside and outside the wall act as guardrails, and the working conditions are good, safe and reliable.
[0007] Furthermore, the number of the first scale reference lines is 4, and the second scale reference lines are set upward at the same vertical position, which are respectively recorded as points "A", "B", "C", and "D", and are distributed in four directions around the vortex shaft wall, among which point "A" is used as the original reference point, and points "B", "C", and "D" are observation reference points; When measuring, fill the connecting tube with water, fix one end of the connecting tube at the original reference point "A", move the other end to "B", and measure the distance "L" between the liquid level in the connecting tube and the second scale reference line at "A". A”, measure the distance “L” between the liquid level in the connecting tube and the second scale reference line at “B” B ", the gap between the two AB =L A -L B That is the level deviation; the level deviation e at point "C" is measured in the same way. AC =L A -L C , horizontal deviation at "D" e AD =L A -L D ; When the horizontal deviation e AB When it is negative “-”, it means that the “B” sinks faster relative to the original reference point “A”. AB When it is positive "+", it indicates that "B" sinks slowly relative to the original reference point "A", and corrective measures need to be taken; using the same method, appropriate corrective measures should be taken in time at the remaining locations according to the horizontal deviation.
[0008] Furthermore, the scale reference line is arranged on the inner side or the outer side of the vortex shaft wall for easy operation.
[0009] Furthermore, the method for setting the first scale reference line is to use a level instrument set up on the wall of the vortex shaft, and use a rotating instrument to make the first scale reference line around the shaft wall with a marker; the scale reference lines are evenly distributed around the vortex shaft wall, and the number is 4 to 8.
[0010] Furthermore, the second scale reference line is located 100 to 300 mm below the construction joint position of the vortex shaft wall for easy operation.
[0011] Furthermore, the second scale reference line is set by using a ruler to measure the same length value upward from the first scale reference line, and marking the position with a marker pen, which is the second scale reference line.
[0012] Furthermore, the measuring ruler adopts a steel measuring tape or an ink line.
[0013] Furthermore, the connecting pipe adopts a transparent soft water pipe, and pigment is added into the water pipe to enhance the observation effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic elevation diagram of the first section of the cylinder wall caisson according to an embodiment of the present invention; Figure 2 This is a schematic elevation diagram of the second section of the cylinder wall caisson according to an embodiment of the present invention; Figure 3 It is a schematic diagram of the AA section of the cylinder wall; The markings in the figure are: 1. vortex shaft wall; 2. scale reference line; 3. measuring ruler; 4. connecting pipe; 5. observation reference point; 6. construction joint; 101. first section of shaft wall; 102. second section of shaft wall. DETAILED DESCRIPTION
[0015] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.
[0016] See also Figures 1 to 3 The present invention provides a technical solution: a method for measuring the horizontality of a cyclone shaft wall during a caisson sinking process, comprising the following steps: Step 1: Marking the scale reference line 2 After the first section of the vortex well is cast and prefabricated and the formwork is removed, a level is set up on the inner side of the vortex well wall 1, and the rotating instrument is used to make the first scale reference line 2 around the wall with a marker. The first scale reference line 2 is evenly distributed around the inner side of the vortex well wall 1. In this embodiment, the number of the first scale reference lines 2 is 4, which are evenly distributed in four directions around the vortex well wall 1.
[0017] At the first scale reference line 2, use a ruler 3 to measure the same length upwards, and use a marker to mark the position, which is the second scale reference line 2. The second scale reference line 2 is located 100-300 mm below the construction joint 6 of the first section of the cylinder wall 101. The second scale reference line 2 is at the same vertical position as the corresponding first scale reference line 2, and is respectively marked as "A", "B", "C", and "D" points, distributed in four directions around the vortex shaft wall 1, among which "A" point is used as the original reference point, and "B", "C", and "D" points are used as observation reference points 5.
[0018] Step 2: Horizontal measurement of the first section of the cylinder wall 101 caisson As the earthwork below the blade foot of the vortex shaft wall 1 is excavated, the vortex shaft wall 1 begins to slowly sink. When measuring, the connecting pipe 4 is filled with water. One end of the connecting pipe 4 is fixed at the original reference point "A", and the other end is moved to "B". At "A", the distance "L" between the liquid level in the connecting pipe 4 and the second scale reference line 2 is measured. A ”, measure the distance “L” between the liquid level in the connecting tube 4 and the second scale reference line 2 at “B” B ", the gap between the two AB =(L A -L B ) is the level deviation; the level deviation e at point "C" is measured in the same way AC =(L A -L C ), horizontal deviation at "D" e AD =(LA -L D ); When the horizontal deviation e AB When it is negative “-”, it means that the “B” sinks faster relative to the original reference point “A”. AB When it is positive "+", it indicates that "B" sinks slowly relative to the original reference point "A", and corrective measures need to be taken; using the same method, appropriate corrective measures should be taken in time at the remaining locations according to the horizontal deviation.
[0019] Step 3: Measure the horizontality of the second section of the cylinder wall 102 caisson When the first section of the cylinder wall 101 is caissoned in place, the second section of the cylinder wall 102 is constructed. According to the method of the first step, after the template is removed from the second section of the vortex well, the position of the scale reference line 2 is transferred and extended upward, that is, the second scale reference line 2 on the upper part of the original first section of the cylinder wall 101 is used as the first scale reference line 2 of the second section of the cylinder wall 102, and then the second scale reference line 2 is set on the upper part of the second section of the cylinder wall 102; according to the method of the second step, the horizontal deviation between the original reference point and the observation reference point 5 is measured to obtain the horizontal deviation of the vortex well cylinder wall 1, so as to provide data for timely correction of the caisson of the vortex well cylinder wall 1, and take appropriate correction measures; The fourth step is to repeat the third step until all sections of the cyclone shaft wall 1 are sunk.
[0020] In the present invention, the measuring ruler 3 is a steel tape measure or an ink line, and the connecting pipe 4 is a transparent soft water pipe, and pigment is added into the water pipe to enhance the observation effect.
[0021] In the present invention, the scale reference line 2 can also be arranged outside the vortex shaft wall 1 to facilitate operation.
[0022] In the present invention, the number of the same horizontal height scale reference lines 2 can also be 6, 8 or other numbers, and the specific number is determined according to actual conditions.
[0023] The present invention utilizes the principle of communicating vessels, takes one point as the original reference point, and sequentially places the other end of the communicating pipe 4 at each observation reference point 5, respectively, and measures the reading difference between the original reference point 5 and the observation reference point to obtain the horizontal deviation, and the construction method is simple and easy to operate. Compared with the measurement using a level meter in conjunction with a tower ruler, the construction is convenient, fast, and efficient; compared with the use of special measuring equipment, the operation is simple and the cost is low; using the principle of communicating vessels, no professional surveyors and measuring instruments are required, and ordinary workers can achieve it; the operator works in the wall of the construction joint 6 at the upper end of the cylinder wall, and the reserved steel bars inside and outside the wall act as guardrails, and the working conditions are good, safe and reliable.
[0024] Finally, it should be noted that the above are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and variations fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.
Claims
1. A method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process. It is characterized in that The steps include: Step 1: Marking the scale reference line After the first section of the vortex well is cast and prefabricated and the formwork is removed, 4 to 8 first scale reference lines of the same horizontal height are evenly set around the bottom of the vortex well wall; the first scale reference lines are evenly distributed around the vortex well wall; a second scale reference line is made below the construction joint of the first section of the wall, and the second scale reference line is at the same vertical position as the corresponding first scale reference line. One of the scale reference lines is selected as the original reference point, and the remaining scale reference lines are used as observation reference points; Step 2: Horizontal measurement of the first section of the caisson wall As the earthwork below the blade foot of the vortex shaft wall is excavated, the vortex shaft wall begins to slowly sink. During measurement, the connecting pipe is filled with water, one end of the connecting pipe is fixed at the original reference point, and the other end is moved to the observation reference point. The distance between the liquid level in the connecting pipe and the second scale reference line is measured at the original reference point, and the distance between the liquid level in the connecting pipe and the second scale reference line is measured at the observation reference point. The difference between the two is the horizontality deviation; the horizontality deviations at other observation reference points and the original reference point are measured in the same way, and appropriate correction measures are taken according to the measured horizontality deviations; Step 3: Horizontal measurement of the second section of the caisson wall When the first section of the cylinder wall is caissoned in place, the second section of the cylinder wall is constructed. According to the method of the first step, after the template is removed from the second section of the vortex well, the position of the scale reference line is transferred and extended upward, that is, the second scale reference line on the upper part of the original first section of the cylinder wall is used as the first scale reference line of the second section of the cylinder wall, and then the second scale reference line is set on the upper part of the second section of the cylinder wall; according to the method of the second step, the horizontal deviation between the original reference point and the observation reference point is measured to obtain the horizontal deviation of the vortex well cylinder wall, so as to provide data for timely correction of the vortex well cylinder wall caisson, and take appropriate correction measures; The fourth step is to repeat the third step until all sections of the cyclone shaft wall are sunk.
2. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 1, It is characterized in that There are 4 first scale reference lines. The second scale reference lines are set upward at the same vertical position, which are marked as "A", "B", "C", and "D" points, distributed in four directions around the vortex shaft wall. Point "A" is used as the original reference point, and points "B", "C", and "D" are used as observation reference points. When measuring, fill the connecting tube with water, fix one end of the connecting tube at the original reference point "A", move the other end to the observation reference point "B", and measure the distance "L" between the liquid level in the connecting tube and the second scale reference line at "A". A ”, measure the distance "L" between the liquid level in the connecting tube and the second scale reference line at "B" B ", the gap between the two AB =L A -L B This is the level deviation; the level deviation at "C" is measured in the same way. AC =L A -L C , horizontal deviation at "D" e AD =L A -L D ; When the horizontal deviation e AB When it is negative "-", it means that the "B" sinks faster relative to the original reference point "A". AB When it is positive "+", it indicates that "B" sinks slowly relative to the original reference point "A", and corrective measures need to be taken; using the same method, appropriate corrective measures should be taken in time at the remaining locations according to the horizontal deviation.
3. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 1, It is characterized in that The scale reference line is arranged on the inner side or the outer side of the vortex shaft wall.
4. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 1, It is characterized in that The method for setting the first scale reference line is to use a level instrument set up on the wall of the vortex shaft, and use a marking pen to make the first scale reference line around the wall of the shaft with a rotating instrument; the scale reference lines are evenly distributed around the wall of the vortex shaft, and the number is 4 to 8.
5. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 1, It is characterized in that The second scale reference line is located 100~300mm below the construction joint of the vortex shaft wall.
6. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 1, It is characterized in that The method for setting the second scale reference line is to use a ruler to measure the same length value upwards from the first scale reference line, and mark the position with a marker pen, which is the second scale reference line.
7. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 6, It is characterized in that The measuring ruler shall be a steel tape measure or an ink line.
8. The method for measuring the horizontality of the swirl wellbore wall during the caisson sinking process according to claim 1, It is characterized in that The connecting pipe is a transparent soft water pipe with pigment added into it.