Engineering construction material putting regulation and control system and method based on unmanned aerial vehicle
By establishing a delivery error model and positioning system, calculating the optimal delivery location, the problem of insufficient delivery accuracy of the drone is solved, and efficient, accurate and real-time material delivery is achieved.
Patent Information
- Application Number
- CN202411450716.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The accuracy of the drone's fixed-point delivery is insufficient, resulting in inaccurate delivery, and the existing technology has failed to effectively solve this problem.
By collecting the historical engineering construction material delivery data of the drone, the training is obtained, and the vertical error model and horizontal error model are obtained, combined with multiple information data for positioning, setting the construction material delivery point, calculating the delivery cost, and optimizing the algorithm Calculate the optimal placement position for regulation to ensure delivery accuracy.
It improves the accuracy and efficiency of drone delivery, ensures real-time delivery, and solves the problem of insufficient precision in fixed-point delivery.
Smart Images

Figure CN118966729A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of dispatching control, and in particular to a system and method for controlling the delivery of engineering construction materials based on an unmanned aerial vehicle. Background Art
[0002] With the development of communication science and technology and the development of drone manufacturing, drone fixed-point delivery technology has become a hot research topic. However, as the altitude of unmanned flights increases, the factors to be considered also increase, and the lack of accuracy in fixed-point delivery has become a current problem.
[0003] The existing Chinese patent application CN108107749A, the invention uses the environment simulation module to simulate the aircraft, output the aircraft's simulated flight data, simulated state data and simulated environment data; at the same time, the airborne delivery calculation module calculates the delivery waypoint sequence data, and marks it in the simulated environment based on the calculated delivery waypoint sequence data; at the same time, the original route data is planned through the task planning method; finally, the planned original route data and the delivery waypoint sequence data are integrated to generate complete route data and execute. However, since the position deviation generated during flight delivery is not taken into account, it will lead to inaccurate delivery, which has certain limitations. Summary of the invention
[0004] 1. Technical issues to be resolved In view of the shortcomings of the existing technology, the present invention provides a drone-based engineering construction material delivery control system and method, which has the advantages of accuracy, efficiency, real-time, and accurate positioning, and solves the problem of insufficient accuracy of drone fixed-point delivery.
[0005] (II) Technical solution In order to solve the technical problem of insufficient precision of fixed-point delivery by drones, the present invention provides the following technical solutions: This embodiment discloses a method for controlling the delivery of construction materials based on a drone, which specifically includes the following steps: S1. Collect historical engineering construction material delivery data of UAVs to establish a training set, and train the historical engineering construction material delivery data in the training set to obtain a UAV delivery vertical error model and a UAV horizontal delivery error model; S2. Collecting multi-information data of the drone, and performing positioning based on the collected multi-information data of the drone to determine the location information of the drone; S3. Set the construction material delivery point, calculate the distance between the construction material delivery point and the drone location, calculate the drone delivery cost, and dispatch the drone; S4. After the UAV dispatch is completed, the optimal UAV placement position is calculated through an optimization algorithm based on the obtained UAV placement vertical error model, the UAV horizontal placement error model, the set construction material placement point location and the placement cost; S5. Based on the calculated optimal placement position of the UAV, control the UAV to reach the corresponding position.
[0006] The present invention establishes a training set by collecting historical engineering construction material delivery data of unmanned aerial vehicles, and trains the historical engineering construction material delivery data in the training set to obtain a vertical error model for unmanned aerial vehicle delivery and a horizontal delivery error model for unmanned aerial vehicle, and locates the current position of the unmanned aerial vehicle by collecting multivariate information data of the unmanned aerial vehicle; and then dispatches the unmanned aerial vehicle by setting an engineering construction material delivery point and calculating the delivery cost. After the unmanned aerial vehicle is dispatched, the optimal delivery position of the unmanned aerial vehicle is calculated through an optimization algorithm based on the vertical error model for unmanned aerial vehicle delivery, the horizontal delivery error model for unmanned aerial vehicle delivery, the setting of the engineering construction material delivery point position and the delivery cost, and the unmanned aerial vehicle is regulated according to the optimal delivery position, thereby ensuring the accuracy of the unmanned aerial vehicle delivery.
[0007] Preferably, the training of the historical engineering construction material delivery data in the training set to obtain the UAV delivery vertical error model and the UAV horizontal delivery error model comprises the following steps: S11, training the historical engineering construction material delivery data in the training set to obtain a UAV delivery vertical error model and a UAV delivery horizontal error model; S12, calculating the distance between the final drone delivery point and the designated landing point of the ground materials based on the obtained drone delivery vertical error model and the drone horizontal delivery error model; The distance between the final drone delivery point and the designated landing point of the ground materials is set as: vertical error model + horizontal delivery error model.
[0008] Release vertical error model: Assuming the direction of gravity is positive, the differential equation of the resultant force on the construction materials placed is: ; in, Indicates the weight of the construction materials put in. represents the acceleration due to gravity, represents the horizontal distance, represents the vertical distance, represents the differential symbol, represents the air resistance coefficient; Set the distance between the drone and the designated landing point of the ground materials when dropping materials to : ; Solve the differential equation of the resultant force on the placed construction materials and obtain the placement vertical error model: ; in, represents any constant, Indicates time, represents the vertical error model of the launch; Delivery level error model: Assuming the UAV flight direction is the positive direction, the differential equation of the resultant force on the dropped construction materials is: ; Solve the differential equation of the resultant force on the placed construction materials and obtain the placement level error model: ; in, represents a natural constant, Represents the delivery level error model.
[0009] The present invention trains on historical engineering construction material delivery data in a training set, calculates a vertical error model for drone delivery and a horizontal error model for drone delivery, and simultaneously calculates a total error distance based on the calculated vertical error model for drone delivery and the horizontal error model for drone delivery, thereby improving the accuracy of drone delivery.
[0010] Preferably, the method of performing positioning based on the collected multi-information data of the drone to determine the location information of the drone includes the following steps: The multi-information data of the drone includes: GPS positioning information and ultrasonic measurement information; S21, calculating the horizontal position information of the drone based on the received GPS positioning information; S22. Calculate the vertical height information of the drone based on the received ultrasonic measurement information.
[0011] Preferably, the calculating of the horizontal position information of the drone based on the received GPS positioning information comprises the following steps: Assuming the propagation speed of GPS positioning information is the speed of light, the formula for calculating the horizontal position information of the drone through the time difference between transmitting GPS positioning information and receiving GPS positioning information is as follows: ; in, Indicates the horizontal position information of the drone. represents the speed of light, Indicates the time of receiving GPS positioning information. Indicates the time when GPS positioning information is transmitted.
[0012] Preferably, the calculating of the vertical height information of the drone based on the received ultrasonic measurement information comprises the following steps: The formula for calculating the vertical height information of the drone based on the time difference between the drone transmitting the ultrasonic measurement information and receiving the ultrasonic measurement information bounced off the ground is as follows: ; in, Indicates the vertical height information of the drone. represents the speed of sound, Indicates the time of receiving ultrasonic measurement information. Indicates the time of transmitting ultrasonic measurement information.
[0013] The present invention is adopted.
[0014] Preferably, the steps of setting a construction material delivery point, calculating the distance between the set construction material delivery point and the drone position, calculating the drone delivery cost, and dispatching the drone include the following steps: S31. Set the location coordinates of the construction material delivery point and the current drone position coordinates , the distance between the location of the construction material delivery point and the location of the drone is calculated based on the distance formula; ; in, Indicates the distance between the construction material delivery point and the drone location; S32. Calculate the cost of deploying drones and dispatch the drones.
[0015] Preferably, the calculating of the drone delivery cost and the scheduling of the drone comprises the following steps: The energy equation for a drone is shown below: The energy required to provide services using the jth drone = the energy consumption of flight + the energy consumption of processing data + the energy consumption of data feedback; The equation for drone flight time is shown below: The time required to provide services using the jth drone = data feedback time + data processing time + network delay time; The drone energy and drone flight time are set to define the launch cost as follows: ; in, represents the launch cost of the jth drone, represents the energy required to provide services using the jth drone, represents the time required to provide services using the jth drone, represents the energy consumption weight of the jth UAV, represents the time weight of the jth UAV; Based on the size of the drone deployment cost, the drone with the lowest deployment cost is selected for deployment.
[0016] The present invention sets a material delivery point for engineering construction, calculates the distance between the positioning of a drone and the set material delivery point for engineering construction, calculates the drone delivery cost based on the calculated distance, and dispatches the drone based on the calculated drone delivery cost, thereby improving the efficiency of drone delivery.
[0017] Preferably, the method of calculating the optimal placement position of the drone based on obtaining the drone placement vertical error model, the drone placement horizontal error model, setting the construction material placement point position and the placement cost through an optimization algorithm comprises the following steps: S41, particle swarm optimization algorithm parameter initialization; Set each particle to represent a group of drones to deliver construction materials, set the group size, and the maximum number of iterations , random position of particles , particle speed and the inertia factor ; S42, calculating the fitness of each particle; The fitness calculation formula for each particle is as follows: ; in, represents the particle fitness, represents the cost of launching the drone; S43, updating of the best position of a single particle; The formula for updating the velocity of a single particle is as follows: ; in, Represents particles In the The speed during the iteration, Represents particles In the The speed during the iteration, represents the inertia factor, Represents particles In the The position during the iteration, , is the acceleration constant, , represents a random number in the interval [0,1], Represents particles The individual extreme value of Represents the global extreme value of all particles; The formula for updating the position of a single particle is as follows: ; in, Represents particles In the The position during the iteration; For each particle calculated, the fitness of its current position is compared with the best position it has passed. If the fitness of the current position is greater than the best position it has passed, The current position is taken as the current best position. , if the fitness of the current position is less than or equal to the best position it has passed The fitness of , then the current best position will not be changed ; S44, updating of the optimal position of the group; For each particle calculated, the fitness of its current position is compared with the best position that the particle in its population has passed. If the fitness of the current position is greater than the best position that the particle in the population has passed through, The current position is taken as the current best position. , if the fitness of the current position is less than or equal to the best position that the particle in its population has passed The fitness of , then the current best position will not be changed ; S45, updating the inertia factor, and updating the positions and velocities of all particles based on the updated inertia factor; The inertia factor update formula is as follows: ; in, represents the inertia factor at the beginning of iteration, represents the inertia factor at the final iteration, Indicates the current iteration number, Indicates the maximum number of iterations; S46, repeating steps S42-S45 until the maximum number of iterations is reached, and outputting the inertia factor corresponding to the optimal position; The optimal position of the output is set to the calculated optimal drone placement position.
[0018] The present invention obtains a vertical error model for drone delivery, a horizontal error model for drone delivery, sets the location of engineering construction material delivery points, and the delivery cost, and calculates the optimal drone delivery position through an optimization algorithm, thereby ensuring the real-time performance of drone delivery.
[0019] This embodiment also discloses a drone-based engineering construction material delivery control system, including: a data acquisition module, an error model training module, a drone position positioning module, a drone scheduling module, and a delivery position calculation module; The data acquisition module is used to collect historical engineering construction material delivery data and multivariate information data of the drone in real time; The error model training module is used to establish a vertical error model for drone delivery and a horizontal error model for drone delivery based on historical engineering construction material delivery data collected from drones; The drone location positioning module is used to locate the drone based on the collected multivariate information data; The drone scheduling module is used to calculate the drone deployment cost and schedule the drone based on the scheduling cost; The placement position calculation module is used to calculate the placement position according to the UAV placement vertical error model, the UAV horizontal placement error model, the set engineering construction material placement point position and the placement cost.
[0020] (III) Beneficial effects Compared with the prior art, the present invention provides a construction material delivery control system and method based on drones, which has the following beneficial effects: 1. The invention establishes a training set by collecting historical engineering construction material delivery data of UAVs, and trains the historical engineering construction material delivery data in the training set to obtain the vertical error model of UAV delivery and the horizontal delivery error model of UAV, and locates the current UAV position by collecting multivariate information data of UAVs; and then dispatches the UAV by setting the engineering construction material delivery point and calculating the delivery cost. After the UAV is dispatched, the optimal delivery position of the UAV is calculated through an optimization algorithm based on the vertical error model of the UAV, the horizontal delivery error model of the UAV, the setting of the engineering construction material delivery point position and the delivery cost, and the UAV is regulated according to the optimal delivery position to ensure the accuracy of the UAV delivery.
[0021] 2. The invention trains on historical engineering construction material delivery data in the training set, calculates the vertical error model of drone delivery and the horizontal error model of drone delivery, and calculates the total error distance based on the calculated vertical error model of drone delivery and the horizontal error model of drone delivery, thereby improving the accuracy of drone delivery.
[0022] 3. The invention calculates the horizontal position information and vertical height information of the UAV through the received GPS positioning information and ultrasonic measurement information, and completes the positioning of the UAV through the calculated horizontal position information and vertical height information of the UAV, thereby ensuring the accurate positioning of the UAV.
[0023] 4. The invention sets a material delivery point for engineering construction, calculates the distance between the drone positioning and the set material delivery point for engineering construction, calculates the drone delivery cost based on the calculated distance, and dispatches the drone based on the calculated drone delivery cost, thereby improving the efficiency of drone delivery.
[0024] 5. The invention calculates the best delivery position of the drone by optimizing the algorithm based on the vertical error model of the drone delivery, the horizontal error model of the drone delivery, the location of the construction material delivery point, and the delivery cost, thereby ensuring the real-time delivery of the drone. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the structure of the engineering construction material delivery control process of the UAV of the present invention. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] Example 1: Please refer to Figure 1 This embodiment discloses a method for controlling the delivery of construction materials based on a drone, which specifically includes the following steps: S1. Collect historical engineering construction material delivery data of UAVs to establish a training set, and train the historical engineering construction material delivery data in the training set to obtain a UAV delivery vertical error model and a UAV horizontal delivery error model; Collecting historical engineering construction material delivery data of UAVs to establish a training set, and training the historical engineering construction material delivery data in the training set to obtain the UAV delivery vertical error model and the UAV horizontal delivery error model includes the following steps: S11, training the historical engineering construction material delivery data in the training set to obtain a UAV delivery vertical error model and a UAV delivery horizontal error model; Release vertical error model: Assuming the direction of gravity is positive, the differential equation of the resultant force on the construction materials placed is: ; in, Indicates the weight of the construction materials put in. represents the acceleration due to gravity, represents the horizontal distance, represents the vertical distance, represents the differential symbol; Set the distance between the drone and the designated landing point of the ground materials when dropping materials to : ; Furthermore, the differential equation of the resultant force on the placed construction materials is solved to obtain the placement vertical error model: ; in, represents any constant, Indicates time, represents the vertical error model of the launch; Delivery level error model: Assuming the UAV flight direction is the positive direction, the differential equation of the resultant force on the dropped construction materials is: ; Furthermore, the differential equation of the resultant force on the placed construction materials is solved to obtain the placement level error model: ; in, represents a natural constant, represents the delivery level error model; S12, calculating the distance between the final drone delivery point and the designated landing point of the ground materials based on the obtained drone delivery vertical error model and the drone horizontal delivery error model; The distance between the final drone delivery point and the designated landing point of the ground materials is set as: vertical error model + horizontal delivery error model; S2. Collecting multi-information data of the drone, and performing positioning based on the collected multi-information data of the drone to determine the location information of the drone; Collecting multi-information data of the drone, and positioning based on the collected multi-information data of the drone, and determining the location information of the drone includes the following steps: The multi-information data of the drone includes: GPS positioning information and ultrasonic measurement information; S21, calculating the horizontal position information of the drone based on the received GPS positioning information; Assuming the propagation speed of GPS positioning information is the speed of light, the formula for calculating the horizontal position information of the drone through the time difference between transmitting GPS positioning information and receiving GPS positioning information is as follows: ; in, Indicates the horizontal position information of the drone. represents the speed of light, Indicates the time of receiving GPS positioning information. Indicates the time when GPS positioning information is transmitted; S22, calculating the vertical height information of the UAV based on the received ultrasonic measurement information; The formula for calculating the vertical height information of the drone based on the time difference between the drone transmitting the ultrasonic measurement information and receiving the ultrasonic measurement information bounced off the ground is as follows: ; in, Indicates the vertical height information of the drone. represents the speed of sound, Indicates the time of receiving ultrasonic measurement information. Indicates the time of transmitting ultrasonic measurement information; S3. Set the construction material delivery point, calculate the distance between the construction material delivery point and the drone location, calculate the drone delivery cost, and dispatch the drone; Setting the construction material delivery point, calculating the distance between the construction material delivery point and the drone location, calculating the drone delivery cost, and dispatching the drone includes the following steps: S31. Set the location coordinates of the construction material delivery point and the current drone position coordinates , the distance between the location of the construction material delivery point and the location of the drone is calculated based on the distance formula; ; in, Indicates the distance between the construction material delivery point and the drone location; S32, calculating the cost of deploying drones and dispatching drones; The energy equation for a drone is shown below: The energy required to provide services using the jth drone = the energy consumption of flight + the energy consumption of processing data + the energy consumption of data feedback; The equation for drone flight time is shown below: The time required to provide services using the jth drone = data feedback time + data processing time + network delay time; The drone energy and drone flight time are set to define the launch cost as follows: ; in, represents the launch cost of the jth drone, represents the energy required to provide services using the jth drone, represents the time required to provide services using the jth drone, represents the energy consumption weight of the jth UAV, represents the time weight of the jth UAV; Furthermore, based on the size of the drone deployment cost, the drone with the lowest deployment cost is selected for deployment; S4. After the UAV dispatch is completed, the optimal UAV placement position is calculated through an optimization algorithm based on the obtained UAV placement vertical error model, the UAV horizontal placement error model, the set construction material placement point location and the placement cost; S41, particle swarm optimization algorithm parameter initialization; Set each particle to represent a group of drones to deliver construction materials, set the group size, and the maximum number of iterations , random position of particles , particle speed and the inertia factor ; S42, calculating the fitness of each particle; The fitness calculation formula for each particle is as follows: ; in, represents the particle fitness, represents the cost of launching the drone; S43, updating of the best position of a single particle; The formula for updating the velocity of a single particle is as follows: ; in, Represents particles In the The speed during the iteration, Represents particles In the The speed during the iteration, represents the inertia factor, Represents particles In the The position during the iteration, , is the acceleration constant, , represents a random number in the interval [0,1], Represents particles The individual extreme value of Represents the global extreme value of all particles; The formula for updating the position of a single particle is as follows: ; in, Represents particles In the The position during the iteration; For each particle calculated, the fitness of its current position is compared with the best position it has passed. If the fitness of the current position is greater than the best position it has passed, The current position is taken as the current best position. , if the fitness of the current position is less than or equal to the best position it has passed The fitness of , then the current best position will not be changed ; S44, updating of the optimal position of the group; For each particle calculated, the fitness of its current position is compared with the best position that the particle in its population has passed. If the fitness of the current position is greater than the best position that the particle in the population has passed through, The current position is taken as the current best position. , if the fitness of the current position is less than or equal to the best position that the particle in its population has passed The fitness of , then the current best position will not be changed ; S45, updating the inertia factor, and updating the positions and velocities of all particles based on the updated inertia factor; The inertia factor update formula is as follows: ; in, represents the inertia factor at the beginning of iteration, represents the inertia factor at the final iteration, Indicates the current iteration number, Indicates the maximum number of iterations; S46, repeating steps S42-S45 until the maximum number of iterations is reached, and outputting the inertia factor corresponding to the optimal position; The optimal position of the output is set to the calculated optimal placement position of the drone; S5. Based on the calculated optimal placement position of the UAV, control the UAV to reach the corresponding position; Embodiment 2: This embodiment also discloses a drone-based engineering construction material delivery control system, including: a data acquisition module, an error model training module, a drone location positioning module, a drone scheduling module, and a delivery position calculation module; The data acquisition module is used to collect historical engineering construction material delivery data and multivariate information data of the drone in real time; The error model training module is used to establish a vertical error model for drone delivery and a horizontal error model for drone delivery based on historical engineering construction material delivery data collected from drones; The drone location positioning module is used to locate the drone based on the collected multivariate information data; The drone scheduling module is used to calculate the drone deployment cost and schedule the drone based on the scheduling cost; The placement position calculation module is used to calculate the placement position according to the UAV placement vertical error model, the UAV horizontal placement error model, the set engineering construction material placement point position and the placement cost.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for controlling the delivery of construction materials based on drones, characterized in that: The following steps are involved: S1. Collect historical engineering construction material delivery data of UAVs to establish a training set, and train the historical engineering construction material delivery data in the training set to obtain a UAV delivery vertical error model and a UAV horizontal delivery error model; S2. Collecting multi-information data of the drone, and performing positioning based on the collected multi-information data of the drone to determine the location information of the drone; S3. Set the construction material delivery point, calculate the distance between the construction material delivery point and the drone location, calculate the drone delivery cost, and dispatch the drone; S4. After the UAV dispatch is completed, the optimal UAV placement position is calculated through an optimization algorithm based on the obtained UAV placement vertical error model, the UAV horizontal placement error model, the set construction material placement point location and the placement cost; S5. Based on the calculated optimal placement position of the UAV, control the UAV to reach the corresponding position.
2. The method for controlling the delivery of construction materials based on an unmanned aerial vehicle according to claim 1, characterized in that: The training of the historical engineering construction material delivery data in the training set to obtain the UAV delivery vertical error model and the UAV horizontal delivery error model includes the following steps: S11, training the historical engineering construction material delivery data in the training set to obtain a UAV delivery vertical error model and a UAV delivery horizontal error model; S12, calculating the distance between the final drone delivery point and the designated landing point of the ground materials based on the obtained drone delivery vertical error model and the drone horizontal delivery error model; The distance between the final drone delivery point and the designated landing point of the ground materials is set as: vertical error model + horizontal delivery error model.
3. The method for controlling the delivery of construction materials based on an unmanned aerial vehicle according to claim 2, characterized in that: The training of the historical engineering construction material delivery data in the training set to obtain the UAV delivery vertical error model and the UAV delivery horizontal error model includes the following steps: Release vertical error model: Assuming the direction of gravity is positive, the differential equation of the resultant force on the construction materials placed is: ; in, Indicates the weight of the construction materials put in. represents the acceleration due to gravity, represents the horizontal distance, represents the vertical distance, represents the differential symbol, represents the air resistance coefficient; Set the distance between the drone and the designated landing point of the ground materials when dropping materials to : ; Solve the differential equation of the resultant force on the placed construction materials and obtain the placement vertical error model: ; in, represents any constant, Indicates time, represents the vertical error model of the launch; Delivery level error model: Assuming the UAV flight direction is the positive direction, the differential equation of the resultant force on the dropped construction materials is: ; Solve the differential equation of the resultant force on the placed construction materials and obtain the placement level error model: ; in, represents a natural constant, Represents the delivery level error model.
4. The method for controlling the delivery of construction materials based on an unmanned aerial vehicle according to claim 1, characterized in that: The method of determining the location information of the drone based on the collected multi-information data of the drone comprises the following steps: The multi-information data of the drone includes: GPS positioning information and ultrasonic measurement information; S21, calculating the horizontal position information of the drone based on the received GPS positioning information; S22. Calculate the vertical height information of the drone based on the received ultrasonic measurement information.
5. The method for controlling the delivery of construction materials based on an unmanned aerial vehicle according to claim 4, characterized in that: The method of calculating the horizontal position information of the drone based on the received GPS positioning information includes the following steps: Assuming the propagation speed of GPS positioning information is the speed of light, the formula for calculating the horizontal position information of the drone through the time difference between transmitting GPS positioning information and receiving GPS positioning information is as follows: ; in, Indicates the horizontal position information of the drone. represents the speed of light, Indicates the time of receiving GPS positioning information. Indicates the time when GPS positioning information is transmitted.
6. The method for controlling the delivery of construction materials based on drones according to claim 4 is characterized in that: The vertical height information of the drone is calculated based on the received ultrasonic measurement information. The following steps are involved: The formula for calculating the vertical height information of the drone based on the time difference between the drone transmitting the ultrasonic measurement information and receiving the ultrasonic measurement information bounced off the ground is as follows: ; in, Indicates the vertical height information of the drone. represents the speed of sound, Indicates the time of receiving ultrasonic measurement information. Indicates the time of transmitting ultrasonic measurement information.
7. The method for controlling the delivery of construction materials based on drones according to claim 1, characterized in that: The steps of setting a construction material delivery point, calculating the distance between the set construction material delivery point and the drone location, calculating the drone delivery cost, and dispatching the drone include the following steps: S31. Set the location coordinates of the construction material delivery point and the current drone position coordinates , the distance between the location of the construction material delivery point and the location of the drone is calculated based on the distance formula; ; in, Indicates the distance between the construction material delivery point and the drone location; S32. Calculate the cost of deploying drones and dispatch the drones.
8. The method for controlling the delivery of construction materials based on an unmanned aerial vehicle according to claim 7, characterized in that: The calculation of the drone delivery cost and the dispatching of the drones include the following steps: The energy equation for a drone is shown below: The energy required to provide services using the jth drone = the energy consumption of flight + the energy consumption of processing data + the energy consumption of data feedback; The equation for drone flight time is shown below: The time required to provide services using the jth drone = data feedback time + data processing time + network delay time; The drone energy and drone flight time are set to define the launch cost as follows: ; in, represents the launch cost of the jth drone, represents the energy required to provide services using the jth drone, represents the time required to provide services using the jth drone, represents the energy consumption weight of the jth UAV, represents the time weight of the jth UAV; Based on the size of the drone deployment cost, the drone with the lowest deployment cost is selected for deployment.
9. The method for controlling the delivery of construction materials based on drones according to claim 1, characterized in that: The method of calculating the optimal placement position of the drone based on obtaining the drone placement vertical error model, the drone placement horizontal error model, setting the placement point position of the construction material and the placement cost through an optimization algorithm includes the following steps: S41, particle swarm optimization algorithm parameter initialization; Set each particle to represent a group of drones to deliver construction materials, set the group size, and the maximum number of iterations , random position of particles , particle speed and the inertia factor ; S42, calculating the fitness of each particle; The fitness calculation formula for each particle is as follows: ; in, represents the particle fitness, represents the cost of launching the drone; S43, updating of the optimal position of a single particle; The update formula for a single particle velocity is as follows: ; in, Represents particles In the The speed during the iteration, Represents particles In the The speed during the iteration, represents the inertia factor, Represents particles In the The position during the iteration, , is the acceleration constant, , represents a random number in the interval [0,1], Represents particles The individual extreme value of Represents the global extreme value of all particles; The formula for updating the position of a single particle is as follows: ; in, Represents particles In the The position during the iteration; For each particle calculated, the fitness of its current position is compared with the best position it has passed. If the fitness of the current position is greater than the best position it has passed, The current position is taken as the current best position. , if the fitness of the current position is less than or equal to the best position it has passed The fitness of , then the current best position will not be changed ; S44, updating of the optimal position of the group; For each particle calculated, the fitness of its current position is compared with the best position that the particle in its population has passed. If the fitness of the current position is greater than the best position that the particle in the population has passed through, The current position is taken as the current best position. , if the fitness of the current position is less than or equal to the best position that the particle in its population has passed The fitness of , then the current best position will not be changed ; S45, updating the inertia factor, and updating the positions and velocities of all particles based on the updated inertia factor; The inertia factor update formula is as follows: ; in, represents the inertia factor at the beginning of iteration, represents the inertia factor at the final iteration, Indicates the current iteration number, Indicates the maximum number of iterations; S46, repeating steps S42-S45 until the maximum number of iterations is reached, and outputting the inertia factor corresponding to the optimal position; The optimal position of the output is set to the calculated optimal drone placement position.
10. A system for implementing the method for controlling the delivery of construction materials based on an unmanned aerial vehicle according to any one of claims 1 to 9, characterized in that: include: Data acquisition module, error model training module, drone location positioning module, drone scheduling module and delivery location calculation module; The data acquisition module is used to collect historical engineering construction material delivery data and multivariate information data of the drone in real time; The error model training module is used to establish a vertical error model for drone delivery and a horizontal error model for drone delivery based on historical engineering construction material delivery data collected from drones; The drone location positioning module is used to locate the drone based on the collected multivariate information data; The drone scheduling module is used to calculate the drone deployment cost and schedule the drone based on the scheduling cost; The placement position calculation module is used to calculate the placement position according to the UAV placement vertical error model, the UAV horizontal placement error model, the set engineering construction material placement point position and the placement cost.
Citation Information
Patent Citations
High-altitude throwing and aiming method and system for unmanned aerial vehicle and storage medium
CN111544797A
Emergency material delivery method and system based on unmanned aerial vehicle and readable storage medium
CN112947549A
Unmanned aerial vehicle scheduling method and system
CN113064449A
Unmanned aerial vehicle sea rescue method and device, unmanned aerial vehicle and ship
CN115367077A
Unmanned parafoil sectional type route planning method based on particle swarm optimization algorithm
CN117148851A