Method and device for reducing contact resistance of GIS (Gas Insulated Switchgear) bus corrugated pipe diversion bar
By polishing and setting the GIS busbar corrugated tube flange and flow guide row with the same width of the contact surface, combined with the use of conductive fluid and copper-aluminum composite pads, the problem of high contact resistance of aluminum and copper materials in GIS equipment is solved, and the contact is reduced Resistance and performance improvement.
Patent Information
- Application Number
- CN202411086036.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-15
AI Technical Summary
In GIS equipment in high-voltage power systems, the difference in physical and chemical properties of aluminum and copper materials leads to excessive contact resistance of bus corrugated tube flow strips, increasing energy loss and possibly causing insulation damage or equipment failure, threatening system stability.
By polishing the contact surfaces of the GIS busbar bellows flange and the flow guide row, setting the contact surface width is consistent, and applying conductive liquid and copper-aluminum composite pads between the contact surfaces, and applying waterproof glue after tightening with elastic pads and fastening bolts , reduce electrochemical corrosion and reduce contact resistance.
It effectively reduces the contact resistance of the GIS busbar bellows guide plate, improves the conductivity, reduces electrochemical corrosion caused by different materials, and enhances the reliability and safety of the equipment.
Smart Images

Figure CN118970591A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of contact resistance, and in particular, relates to a method and device for reducing the contact resistance of a GIS busbar bellows guide bar. Background Art
[0002] In high-voltage power systems, gas insulated switchgear (GIS) is widely used due to its excellent insulation performance and compact structural design. In GIS equipment, busbar bellows is a key component for connecting different electrical equipment, and its electrical conductivity directly affects the operating efficiency, safety and stability of the entire system. Busbar bellows are usually made of aluminum alloy to take advantage of its light weight, high strength and corrosion resistance, while the guide bar is often made of copper with excellent electrical conductivity to meet the needs of large current transmission.
[0003] However, in practical applications, due to the large differences in the physical and chemical properties of aluminum and copper, such as thermal expansion coefficient and electrical conductivity, direct connection of these two metal materials is prone to high contact resistance. High contact resistance not only increases energy loss, but may also cause insulation damage or equipment failure due to local overheating, posing a threat to the stable operation of the GIS system. Summary of the invention
[0004] The purpose of the present application is to overcome the defects in the above-mentioned prior art and to provide a method and device for reducing the contact resistance of the guide bar of the GIS busbar bellows.
[0005] The present application provides a method for reducing the contact resistance of a GIS busbar corrugated pipe guide bar, comprising:
[0006] Polish the aluminum conductive surface of the GIS busbar bellows flange and the copper guide bar crimping surface;
[0007] Setting the contact surface widths of the conductive surface and the guide bar crimping surface to be consistent;
[0008] Applying conductive liquid between the conductive surface and the crimping surface of the guide bar;
[0009] A copper-aluminum composite pad is arranged between the conductive surface and the guide bar crimping surface, wherein the aluminum surface of the copper-aluminum composite pad corresponds to the conductive surface, and the copper surface of the copper-aluminum composite pad corresponds to the guide bar crimping surface;
[0010] Install the crimping surface of the guide bar on the flange surface of the bellows and fasten it using spring washers, flat washers and fastening bolts;
[0011] After fastening is completed, waterproof glue is applied to the edges of the conductive surface and the crimping surface of the guide bar.
[0012] Optionally, the conductive liquid is silver-based conductive paste, copper-based conductive oil or nano conductive liquid.
[0013] Optionally, the copper-aluminum composite pad is made by rolling composite, explosion composite or diffusion welding.
[0014] Optionally, during the tightening process, a torque wrench is used to control the torque.
[0015] Optionally, the method includes: before applying the waterproof glue, cleaning and drying the edge of the contact surface.
[0016] Optionally, the method includes: performing a resistance test on the contact surface after tightening.
[0017] The present application also provides a device for reducing the contact resistance of a GIS busbar bellows guide bar, comprising:
[0018] Polishing module, polishing aluminum conductive surface of GIS busbar bellows flange and copper guide bar crimping surface;
[0019] A setting module is used to set the contact surface widths of the conductive surface and the guide bar crimping surface to be consistent;
[0020] A coating module for coating a conductive liquid between the conductive surface and the crimping surface of the guide bar;
[0021] Install the module, arrange a copper-aluminum composite pad between the conductive surface and the guide bar crimping surface, wherein the aluminum surface of the copper-aluminum composite pad corresponds to the conductive surface, and the copper surface of the copper-aluminum composite pad corresponds to the guide bar crimping surface; install the guide bar crimping surface on the bellows flange surface, and fasten it with spring washers, flat washers and fastening bolts;
[0022] Gluing module, after fastening is completed, apply waterproof glue on the edges of the conductive surface and the crimping surface of the guide bar.
[0023] Optionally, the installation module includes using a torque wrench to control torque during the tightening process.
[0024] Optionally, the gluing module cleans and dries the edge of the contact surface before applying the waterproof glue.
[0025] Optionally include:
[0026] The test module is used to perform resistance test on the contact surface after tightening.
[0027] The beneficial effects of this application are:
[0028] The present application provides a method for reducing the contact resistance of the guide bar of the GIS busbar bellows, including: grinding the aluminum conductive surface of the GIS busbar bellows flange and the copper guide bar crimping surface; setting the contact surface width of the conductive surface and the guide bar crimping surface to be consistent; applying conductive liquid between the conductive surface and the guide bar crimping surface; setting a copper-aluminum composite pad between the conductive surface and the guide bar crimping surface, wherein the aluminum surface of the copper-aluminum composite pad corresponds to the conductive surface, and the copper surface of the copper-aluminum composite pad corresponds to the guide bar crimping surface; installing the guide bar crimping surface on the bellows flange surface, and fastening it with spring washers, flat washers and fastening bolts; after fastening, applying waterproof glue to the edges of the conductive surface and the guide bar crimping surface. The present application grinds the conductive surface and the crimping surface with sandpaper, and uses conductive liquid to further fill the tiny gap between the contact surfaces. At the same time, using a copper-aluminum composite pad between the conductive surface and the crimping surface can effectively reduce the electrochemical corrosion that may be caused by different materials under the action of current, protect the metal surface, and reduce the contact resistance. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 This is a schematic diagram of reducing the contact resistance of the GIS busbar bellows guide bar in this application;
[0030] Figure 2 This is a schematic diagram of the contact resistance of the GIS busbar bellows guide bar in this application. DETAILED DESCRIPTION
[0031] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that various forms of implementing the present disclosure should not be limited by the embodiments set forth herein. On the contrary, the embodiments are provided to more thoroughly understand the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0032] Please refer to Figure 1 As shown, a method for reducing the contact resistance of the GIS busbar corrugated pipe guide bar includes the following steps:
[0033] S101. Polish the aluminum conductive surface of the GIS busbar bellows 202 flange and the copper guide bar 201 crimping surface.
[0034] In the process of reducing the contact resistance of the GIS busbar bellows 202 and the guide bar 201, unfavorable factors on the contact surface of the two metals are removed by physical methods to ensure the effectiveness of subsequent steps and the reduction of the overall contact resistance.
[0035] Choose sandpaper with appropriate mesh size according to actual needs. Generally speaking, in order to effectively remove the oxide layer, oil stains and impurities on the metal surface and avoid excessive damage to the metal substrate, it is recommended to choose sandpaper between 240 mesh and 400 mesh. These sandpapers can provide sufficient grinding ability and maintain good surface flatness.
[0036] Fix the selected sandpaper on the grinding tool, or use manual method to carefully grind the aluminum conductive surface of the GIS busbar bellows 202 flange and the copper guide bar 201 crimping surface. When grinding, maintain uniform force and angle to ensure that the entire contact surface is evenly polished.
[0037] After polishing, the contact surface should be carefully inspected to confirm whether the surface meets the requirements. If necessary, the contact surface can be cleaned with solvents such as alcohol or acetone to further remove surface residues. After cleaning, wait for the contact surface to dry completely before proceeding to the next step.
[0038] S102, setting the width of the contact surface between the conductive surface and the crimping surface of the guide bar 201 to be consistent.
[0039] Ensure that the contact surface widths of the aluminum conductive surface of the GIS busbar bellows 202 flange and the copper guide bar 201 crimping surface are completely equal, so as to achieve the best contact effect and minimum contact resistance when the two are in contact.
[0040] Use a precise measuring tool, such as a vernier caliper or a laser distance meter, to measure the contact surface widths of the aluminum conductive surface of the bellows 202 flange and the copper crimping surface of the guide bar 201 respectively.
[0041] Record the width data of the two contact surfaces.
[0042] According to the measurement results, if the widths of the two are found to be inconsistent, take appropriate measures to adjust them.
[0043] For example: If the gap is small, fine-tune the contact surface on the wider side by hand grinding or scraping until the two widths are equal. If the gap is large, use mechanical processing methods such as milling, grinding, etc. to accurately adjust the width of the contact surface.
[0044] After the adjustment is completed, use the precision measuring tool to measure the width of the two contact surfaces again to confirm whether the two are completely consistent.
[0045] If there is still a slight gap, repeat the above adjustment steps until the ideal width consistency is achieved.
[0046] When adjusting the width of the contact surface, you should also pay attention to maintaining the flatness and smoothness of the contact surface. Use sandpaper or other grinding tools to grind the contact surface to remove surface roughness and improve the flatness and contact quality of the contact surface.
[0047] After adjusting and confirming that the contact surface width is consistent, the contact surface should be thoroughly cleaned.
[0048] Use detergent or solvents such as alcohol to remove impurities, grease, oxides, etc. on the contact surface to ensure the purity and conductivity of the contact surface.
[0049] S103, applying conductive liquid between the conductive surface and the crimping surface of the guide bar 201.
[0050] It is very important to select a suitable conductive liquid. The optional conductive liquids mentioned in this application include silver-based conductive paste, copper-based conductive oil or nano conductive liquid. Preferably, silver-based conductive paste is selected as the conductive liquid because it has excellent conductive properties and stability, can maintain stable conductive properties under various environmental conditions, reduce resistance, and improve conductive efficiency.
[0051] Use a special coating tool, such as a brush or coating gun, to evenly coat the selected silver-based conductive paste on the contact area between the polished and cleaned conductive surface (flange surface of the aluminum bellows 202) and the crimping surface of the guide bar 201 (copper). When coating, ensure that the conductive paste covers the entire surface without omissions and has a uniform thickness. The uniform coating of the conductive paste can fill the tiny gaps between the metal contact surfaces and form a well-conductive film, thereby reducing the contact resistance and improving the conductive performance.
[0052] When applying the conductive liquid, avoid excessive use to avoid waste or contamination of other parts. At the same time, the subsequent installation steps should be carried out in time after the application is completed to ensure that the conductive liquid forms a stable conductive layer between the contact surfaces.
[0053] S104, using a copper-aluminum composite gasket 203 between the conductive surface and the crimping surface of the guide bar 201.
[0054] The purpose of using the copper-aluminum composite gasket 203 is to reduce the electrochemical corrosion caused by the material difference between the flange (aluminum) of the GIS busbar bellows 202 and the crimping surface (copper) of the guide bar 201, and to improve the conductivity of the contact surface of the two metals.
[0055] A copper-aluminum composite gasket 203 made by explosive composite technology is selected. This technology can tightly combine copper and aluminum metals at the molecular level under extremely high pressure and speed to form a non-porous, high-strength bonding interface, thereby ensuring that the conductivity and mechanical properties of the composite material are superior to traditional mechanical connection or welding methods.
[0056] The explosively composite copper-aluminum composite gasket 203 not only has high conductivity, but also can effectively prevent mutual corrosion between copper and aluminum under the action of electric current, thereby extending the service life of the equipment. At the same time, its high strength characteristics can withstand the mechanical stress and thermal stress generated by the guide bar 201 during operation.
[0057] Place the copper-aluminum composite pad between the polished and conductive surface and the crimping surface of the guide bar 201. Make sure that the copper-aluminum composite pad completely covers the contact surface without leaving any gaps to improve the conductivity efficiency. (The aluminum surface of the copper-aluminum composite pad contacts the conductive surface, and the copper surface of the copper-aluminum composite pad contacts the guide bar)
[0058] Sufficient thickness should be reserved to cope with the possible expansion difference between the two metals when the temperature changes in the future, to prevent poor contact or damage caused by thermal expansion and contraction.
[0059] By using the copper-aluminum composite gasket 203, the contact resistance between the GIS busbar corrugated pipe 202, the guide bar 201 and the flange can be significantly reduced, the overall conductivity can be improved, the temperature rise phenomenon can be reduced, and the service life of the equipment can be extended. At the same time, this method can also effectively prevent electrochemical corrosion problems caused by material differences and improve the reliability and safety of the equipment.
[0060] S105, installing the crimping surface of the guide bar 201 on the flange surface of the bellows 202, and fastening it with spring washers, flat washers and fastening bolts.
[0061] like Figure 2 The reduction in contact resistance of the GIS busbar bellows 202 and the guide bar 201 is caused by the different metal materials of the copper guide bar 201 and the aluminum bellows 202, which in turn causes electrical corrosion.
[0062] First, ensure that all parts such as the guide bar 201 crimping surface, the bellows 202 flange surface, the copper-aluminum composite gasket 203, the conductive liquid, etc. are ready and the surface is clean and free of impurities. Check whether the special spring washers, flat washers and M12×40 fastening bolts are complete and undamaged.
[0063] Place the crimping surface of the guide bar 201 accurately on the flange surface of the bellows 202, ensuring that the contact surfaces between the two are completely aligned without misalignment or offset. If conductive liquid has been applied and the copper-aluminum composite gasket 203 has been used before, the copper-aluminum composite gasket should be located between the two to play a conductive and buffering role.
[0064] A flat washer is first placed at the position where the crimping surface of the guide bar 201 contacts the fastening bolt to increase the contact area, disperse the pressure, and prevent the bolt from directly crushing the metal surface. Then, a spring washer is placed above the flat washer. The spring washer can provide a certain elasticity during the fastening process to prevent the bolt from loosening and absorb some vibration and impact.
[0065] Use M12×40 fastening bolts to fix the crimping surface of the guide bar 201 to the flange surface of the bellows 202. During the fastening process, a torque wrench should be used to fasten according to the predetermined torque value to ensure that the fastening torque of each bolt is within the range of 24-30N·m. This torque range is verified by calculation and experiment, which can not only ensure the firmness of the fastening, but also avoid bolt breakage or metal surface damage caused by over-tightening, and poor contact or looseness caused by over-loosening.
[0066] After tightening, all bolts should be checked one by one to confirm whether they are fully tightened and not loose. At the same time, check the contact between the crimping surface of the guide bar 201 and the flange surface of the bellows 202 to ensure good contact without gaps or misalignment.
[0067] Finally, record the tightening torque value and mark the bolt or nearby location if necessary to facilitate subsequent maintenance and inspection.
[0068] S106, after the fastening is completed, apply waterproof glue on the edges of the conductive surface and the crimping surface of the guide bar 201.
[0069] After the tightening work is completed, the first task is to ensure the cleanliness and dryness of the conductive surface and the edges of the crimping surface of the guide bar 201. Use a clean cloth or dust-free paper with an appropriate cleaning agent (such as alcohol or acetone) to carefully wipe the edges of the contact surface to remove any impurities such as dust, oil, and moisture that may remain.
[0070] Choose a high-performance waterproof glue suitable for electrical equipment and outdoor environments. This waterproof glue should have good weather resistance, chemical corrosion resistance, electrical insulation and strong adhesion, and can maintain waterproof effect for a long time under harsh environmental conditions.
[0071] Use a special application tool (such as a brush, glue gun, etc.) to evenly apply the selected waterproof glue on the edges of the conductive surface and the crimping surface of the guide bar 201. When applying, care should be taken to control the thickness and uniformity of the glue layer, to ensure that an effective waterproof barrier is formed, and to avoid waste and possible curing problems caused by excessive thickness. At the same time, ensure that the waterproof glue completely covers all gaps and holes on the edge of the contact surface to prevent external factors such as water vapor, sand and dust from invading through these tiny channels.
[0072] After application, perform curing according to the instructions of the waterproof glue. Usually, it takes a certain amount of time for the waterproof glue to fully dry and cure. During the curing process, avoid touching or applying external force to the applied area to avoid affecting the curing effect of the waterproof glue. After curing, check the applied area to confirm whether the waterproof glue has been fully cured and has no defects such as cracks or shedding.
[0073] During the operation of the equipment, check the status of the waterproof glue regularly. If aging, cracking or falling off is found, it should be repaired or replaced in time to ensure the continued effectiveness of the waterproof effect.
[0074] Furthermore, choose a high-precision, high-sensitivity resistance tester.
[0075] According to the tester's manual, correctly connect the test circuit between the tester and the contact surface to be tested.
[0076] Set the tester's measurement parameters, including measurement range, accuracy level, test current, etc.
[0077] Start the tester according to the tester's instructions and wait for it to warm up to a stable state.
[0078] Connect the test line of the tester to both ends of the contact surface to be tested and start the measurement program. The tester will automatically apply a certain test current to the contact surface and measure the resulting voltage drop to calculate the contact resistance value.
[0079] Compare the measured contact resistance value with the design requirements. If the resistance value meets the design requirements, it means that the installation process is qualified and the contact surface has good conductivity.
[0080] If the resistance value is found to be too high and exceeds the design requirements, the installation process needs to be rechecked and adjusted. Possible reasons include incomplete contact between the contact surfaces, the presence of impurities or oxide layers, and loose tightening of the fastening bolts. For these problems, check them one by one and take corresponding treatment measures, such as re-grinding the contact surfaces, cleaning impurities, tightening bolts, etc.
[0081] After adjusting the installation process, it is necessary to use a resistance tester to test the contact surface again to verify whether the adjustment effect meets the requirements. If the resistance value is still high, it is necessary to continue to check and adjust until it meets the design requirements.
[0082] The present application also provides a device for reducing the contact resistance of the GIS busbar corrugated pipe 202 and the guide bar 201, comprising:
[0083] Grinding module: This module includes an automatic or manual sandpaper grinding device, which can accurately grind the aluminum conductive surface of the GIS busbar bellows 202 flange and the copper guide bar 201 crimping surface according to the preset program or the operator's manual control.
[0084] Setting module: This module ensures that the contact surface widths of the conductive surface and the crimping surface of the guide bar 201 are completely consistent through precise measurement and adjustment mechanisms. It may include auxiliary tools such as vernier calipers and fine-tuning devices.
[0085] Coating module: This module is equipped with a conductive liquid storage tank, a coating gun or a brush, etc., and is used to evenly coat the conductive liquid (such as silver-based conductive paste) on the contact surface.
[0086] Installation module: This module integrates the placement mechanism of the copper-aluminum composite gasket 203, the installation device of the crimping surface of the guide bar 201, and the tightening mechanism of the fastening bolt. During the tightening process, it can also achieve precise torque control through a torque wrench.
[0087] Gluing module: Before applying waterproof glue, this module first cleans and dries the edge of the contact surface. Then, the waterproof glue is evenly applied to the edge of the contact surface through a precise glue coating device to form a waterproof barrier.
[0088] Test module: This module contains a resistance tester, which is used to test the resistance of the contact surface after tightening. It can automatically record and display the test results so that the operator can find problems and make adjustments in time.
Claims
1. A method for reducing the contact resistance of the GIS busbar bellows guide bar. It is characterized in that include: Polish the aluminum conductive surface of the GIS busbar bellows flange and the copper guide bar crimping surface; Setting the contact surface widths of the conductive surface and the guide bar crimping surface to be consistent; Applying conductive liquid between the conductive surface and the crimping surface of the guide bar; A copper-aluminum composite pad is arranged between the conductive surface and the guide bar crimping surface, wherein the aluminum surface of the copper-aluminum composite pad corresponds to the conductive surface, and the copper surface of the copper-aluminum composite pad corresponds to the guide bar crimping surface; Install the crimping surface of the guide bar on the flange surface of the bellows and fasten it using spring washers, flat washers and fastening bolts; After fastening is completed, waterproof glue is applied to the edges of the conductive surface and the crimping surface of the guide bar.
2. The method for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 1, It is characterized in that The conductive liquid is silver-based conductive paste, copper-based conductive oil or nano conductive liquid.
3. The method for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 1, It is characterized in that The copper-aluminum composite pad is made by rolling composite, explosion composite or diffusion welding.
4. The method for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 1, It is characterized in that During the tightening process, torque control is performed using a torque wrench.
5. The method for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 1, It is characterized in that include: Before applying waterproof glue, clean and dry the edges of the contact surface.
6. The method for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 1, It is characterized in that Also includes: Conduct a resistance test on the contact surfaces after tightening.
7. A device for reducing the contact resistance of the GIS busbar bellows guide bar, It is characterized in that include: Polishing module, polishing aluminum conductive surface of GIS busbar bellows flange and copper guide bar crimping surface; A setting module is used to set the contact surface widths of the conductive surface and the guide bar crimping surface to be consistent; A coating module for coating a conductive liquid between the conductive surface and the crimping surface of the guide bar; Install the module, arrange a copper-aluminum composite pad between the conductive surface and the guide bar crimping surface, wherein the aluminum surface of the copper-aluminum composite pad corresponds to the conductive surface, and the copper surface of the copper-aluminum composite pad corresponds to the guide bar crimping surface; install the guide bar crimping surface on the bellows flange surface, and fasten it with spring washers, flat washers and fastening bolts; Gluing module, after fastening is completed, apply waterproof glue on the edges of the conductive surface and the crimping surface of the guide bar.
8. The device for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 6, It is characterized in that The installation module includes using a torque wrench to control torque during the tightening process.
9. The device for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 6, It is characterized in that include: The glue applying module cleans and dries the edge of the contact surface before applying the waterproof glue.
10. The device for reducing the contact resistance of the GIS busbar bellows guide bar according to claim 6, It is characterized in that include: The test module is used to perform resistance test on the contact surface after tightening.
Citation Information
Patent Citations
Copper-aluminum transition electric connection method
CN101394028A
Press bonding method and structure of different electro-conductive metal of aluminium electrolyte tank
CN1843678A
Pressure balancing corrugated pipe used for GIS equipment
CN201478730U
Electrodeposition is with electrically conductive head of novel complex
CN205398745U
Gas insulating bus, and gas insulating switchgear using it
JP1998341518A