Intelligent charging and discharging management method for energy storage equipment
Through intelligent charging and discharging management methods, the charging and discharging power of energy storage equipment is dynamically adjusted, and combined with the priority strategies of batteries and PCS, the problem of lack of accuracy and flexibility in the charging and discharging control strategies of traditional energy storage equipment is solved, and more efficient Energy utilization and battery life are extended.
Patent Information
- Application Number
- CN202411087622.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-09
AI Technical Summary
The charging and discharging control strategies of traditional energy storage equipment lack accuracy and flexibility, resulting in limited improvement in energy conversion efficiency, and may lead to unstable system operation and shortened battery life in complex industrial and commercial environments.
Using intelligent charging and discharging management methods, by obtaining operation logic and charging and discharging time intervals, dynamically adjusting the charging and discharging power, combining the priority strategies of batteries and PCS, refined management of the charging and discharging process to ensure that the battery and PCS achieve the highest efficiency in actual work .
It significantly improves energy utilization efficiency and energy storage system performance, extends battery life, and enhances system stability.
Smart Images

Figure CN118971272A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy storage technology, and in particular to an intelligent charging and discharging management method for energy storage equipment. Background Art
[0002] With the rapid development and popularization of renewable energy, wind, solar and energy storage systems, as an important part of the energy field, are becoming more and more widely used. As the core component of wind, solar and energy storage systems, the charging and discharging control strategy of energy storage equipment is of great significance for improving system operation efficiency, optimizing energy use and ensuring safe and stable operation of the system.
[0003] In current industrial and commercial energy storage systems, the optimization of charging and discharging strategies is mainly focused on demand response scheduling that meets the needs of the power grid and users. The efficiency optimization of the specific charging and discharging process of energy storage equipment is often overlooked. Traditional energy storage equipment charging and discharging control strategies are mostly based on simple rules or thresholds for decision-making, which makes it difficult to achieve the optimal battery charging and discharging efficiency. Since the working efficiency of batteries and PCS is directly related to the overall performance and energy utilization efficiency of the energy storage system, this neglect may result in suboptimal performance of the energy storage system in actual applications. Especially in complex industrial and commercial environments, batteries and PCS may face frequent and drastic changes in charging and discharging demand. The lack of efficiency optimization for these specific scenarios may lead to unstable system operation and even shorten the life of the equipment. Summary of the invention
[0004] The present application provides an intelligent charging and discharging management method for energy storage equipment, which solves the technical problem that the charging and discharging strategies of traditional industrial and commercial energy storage systems often focus on macro-level grid and user demand response, ignore the refined management at the energy storage device level, and the equipment charging and discharging control strategy lacks precision and flexibility, resulting in limited improvement in energy conversion efficiency, thereby achieving the technical effect of optimizing energy utilization efficiency and extending battery life.
[0005] In view of the above problems, the present application provides an intelligent charging and discharging management method for energy storage equipment, the method comprising: obtaining an operating logic, the operating logic comprising a first priority, a second priority, a third priority and a fourth priority; inputting a PCS rated power Pe based on the operating logic, setting an optimal power according to the PCS rated power Pe, taking the PCS rated power as Pmax, and taking the optimal power as Pmin; inputting a charging and discharging time interval, determining a charging time and a discharging time according to the charging and discharging time interval, and obtaining a system rated power E; when the charging stage logic is in place, performing a power calculation based on the Pmax, Pmin and the charging time to obtain a theoretical charging power; when the discharging stage logic is in place, performing a power calculation based on the Pmax, Pmin and the discharging time to obtain a theoretical discharging power; determining a theoretical charging and discharging power P based on the theoretical charging power and the theoretical discharging power; performing a charging and discharging power calculation on the theoretical charging and discharging power P, the Pmax and Pmin to obtain a target execution charging and discharging power P'.
[0006] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0007] Obtain an operation logic, wherein the operation logic includes a first priority, a second priority, a third priority, and a fourth priority; input a PCS rated power Pe based on the operation logic, set an optimal power according to the PCS rated power Pe, use the PCS rated power as Pmax, and use the optimal power as Pmin; input a charge and discharge time interval, determine a charging time and a discharging time according to the charge and discharge time interval, and obtain a system rated power E; when in the charging stage logic, perform a power calculation based on the Pmax, Pmin, and the charging time to obtain a theoretical charging power; when in the discharging stage logic, perform a power calculation based on the Pmax, Pmin, and the discharging time to obtain a theoretical discharging power; determine a theoretical charge and discharge power P according to the theoretical charging power and the theoretical discharging power; perform charge and discharge power calculations on the theoretical charge and discharge power P, the Pmax, and Pmin to obtain a target execution charge and discharge power P'.
[0008] In summary, this application optimizes the charging and discharging process of secondary segmentation under the demand response scheduling strategy based on the battery principle and PCS principle. Through precise calculation and priority logic, it realizes the refined management of the charging and discharging process, reduces the excessive charging and discharging and uneven charging and discharging of the battery, and ensures that the battery and PCS achieve the highest efficiency in the actual working process. It not only significantly improves the energy utilization efficiency and performance of industrial and commercial energy storage systems, but also extends the equipment life and enhances the stability of the energy storage system.
[0009] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 A flow chart of an intelligent charging and discharging management method for an energy storage device provided in an embodiment of the present application;
[0011] Figure 2 A flowchart of specific execution steps of the second priority in a smart charge and discharge management method for energy storage equipment provided in an embodiment of the present application;
[0012] Figure 3 A schematic diagram of a flow chart of obtaining a target execution charging and discharging power P' in an intelligent charging and discharging management method for an energy storage device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0013] The embodiment of the present application provides an intelligent charging and discharging management method for energy storage equipment, which solves the technical problem that the charging and discharging strategies of traditional industrial and commercial energy storage systems often focus on macro-level grid and user demand response, ignores the refined management at the energy storage device level, and the equipment charging and discharging control strategy lacks precision and flexibility, resulting in limited improvement in energy conversion efficiency, thereby achieving the technical effect of optimizing energy utilization efficiency and extending battery life.
[0014] like Figure 1 As shown, an embodiment of the present application provides an intelligent charging and discharging management method for an energy storage device, the method comprising:
[0015] Step S1: Acquire an operation logic, where the operation logic includes a first priority, a second priority, a third priority, and a fourth priority.
[0016] Specifically, first, the operation logic is obtained, that is, a series of operation rules and priority orders that the energy storage device should follow during the charging and discharging process are determined. These rules and priorities are the basis of the intelligent charging and discharging management method, which is used to guide the system's behavioral decisions in different situations.
[0017] The operation logic includes four priorities: first priority, second priority, third priority and fourth priority. These priorities are used to distinguish the urgency and importance of different operations. The first priority is to determine demand management, that is, to respond to the demand of the power grid by intelligently scheduling the charging and discharging operations of energy storage equipment. It belongs to the macro-level regulation and control, which is not involved in this embodiment. The second priority is DOD interval setting, focusing on the health management and service life of the battery. The system will dynamically adjust the upper and lower limits of DOD according to the characteristics of the battery, such as chemical properties, design capacity, etc., and the current operating requirements. By setting a reasonable DOD interval, the battery can be avoided from being overcharged and discharged, thereby extending the cycle life and overall performance of the battery. The third priority is the end-of-charge and discharge current limiting, that is, when the battery charging and discharging process is close to the end, the charging current or discharge current is limited to prevent the battery from being overcharged or over-discharged, and further protect the health of the battery. The fourth priority is the intelligent charging and discharging strategy. The system will combine strategies such as demand management, DOD interval setting and end-of-charge current limiting to formulate the most appropriate charging and discharging plan. By setting the above four priorities, the energy storage system can realize intelligent charging and discharging management of energy storage equipment and improve energy utilization efficiency while meeting multiple requirements such as grid demand management, battery health management, charging and discharging safety, and system efficiency optimization.
[0018] Further, such as Figure 2 As shown, the specific execution steps of the second priority in step S1 of the embodiment of the present application are:
[0019] Determine whether to limit according to the DOD in the 5% to 100% SOC range; if so, according to the table of corresponding relationships between different SOCs and voltages, select the 5% SOC voltage value as the minimum voltage value and the 100% SOC voltage value as the maximum voltage value for limiting; if not, determine whether to limit according to the voltage value corresponding to the 2% to 100% SOC range; if yes, according to the table of corresponding relationships between different SOCs and voltages, select the 2% SOC voltage value as the minimum voltage value and the 100% SOC voltage value as the maximum voltage value for limiting; if not, define the SOC range and voltage value to limit the charging and discharging range.
[0020] Specifically, SOC, or state of charge, is a measure of the remaining power in a battery, usually expressed as a percentage, with 100% SOC meaning the battery is fully charged and 0% SOC meaning the battery is completely empty. DOD, or depth of discharge, refers to the discharge ratio of a battery relative to its maximum capacity when it is discharged to a certain state. For example, if a battery is discharged from 100% SOC to 50% SOC, its DOD is 50%. The SOC to voltage correspondence table is a data table that records the voltage values corresponding to the battery at different SOC levels. Since the voltage of the battery changes with the change of SOC, this correspondence is crucial for accurately monitoring the battery status and optimizing the charging and discharging strategy.
[0021] First, determine whether to limit the DOD in the 5% to 100% SOC range. This judgment is usually based on the system's operating logic and the current battery health status. If it is decided to limit the DOD in the 5% to 100% SOC range, the voltage value corresponding to 5% SOC is selected from the SOC and voltage correspondence table as the minimum voltage value, and the voltage value corresponding to 100% SOC is selected as the maximum voltage value to limit the charge and discharge operation to avoid excessive discharge or overcharge of the battery. That is, the system stops charging and discharging when the maximum voltage of the single cell is ≤ Vmax or the system discharges to the minimum voltage of the single cell ≥ Vmin.
[0022] If the result of the first step is negative, that is, the DOD of the 5% to 100% SOC interval is not limited, the second round of judgment is continued to inquire whether the voltage value corresponding to the 2% to 100% SOC interval is limited. If so, the voltage value corresponding to 2% SOC is selected as the minimum voltage value and the voltage value corresponding to 100% SOC is selected as the maximum voltage value from the SOC and voltage correspondence table to limit the charge and discharge interval.
[0023] If the judgment results of the first two rounds are negative, the system allows the operator to customize the SOC range and its corresponding voltage value to manage the charging and discharging operations more flexibly and adapt to specific operating requirements or battery characteristics.
[0024] Through the above steps, the energy storage system can intelligently limit the charging and discharging process according to the battery's SOC level, thereby protecting the battery, extending its service life, and ensuring the safe and stable operation of the system.
[0025] Furthermore, the specific execution steps of the third priority in step S1 of the embodiment of the present application are:
[0026] Determine whether the maximum real-time voltage Vmax of the battery charging is ≥ Vmax-20mV. If so, adjust the minimum power at the charging terminal to 10kW. If not, do nothing. Determine whether the maximum real-time voltage Vmin of the battery discharging is ≥ Vmin+20mV. If so, adjust the minimum power at the discharging terminal to 10kW. If not, do nothing.
[0027] Specifically, the low power at the end of charging and the low power at the end of discharging mean that when the battery is close to the end of charging or discharging, the system will reduce the charging or discharging power to a smaller level to prevent the battery from overcharging or over-discharging and protect the battery health. The low power at the end of charging and the low power at the end of discharging are usually set to a fixed value, i.e. 10kW, to ensure that the battery can complete the charging and discharging process in a smoother manner when it is close to full or empty.
[0028] The maximum real-time voltage Vmax (real-time) and the minimum real-time voltage Vmin (real-time) of the battery during the charging and discharging process are continuously monitored. These data are collected and processed in real time by the battery management system (BMS). During the charging process, it is determined whether the maximum real-time voltage Vmax (real-time) of the battery charging is greater than or equal to Vmax-20mV; during the discharging process, it is determined whether the minimum real-time voltage Vmin (real-time) of the battery discharging is greater than or equal to Vmin+20mV. Among them, Vmax and Vmin are the voltage thresholds preset by the system in the second priority, which are used to identify whether the battery is close to its charging and discharging end. If the judgment result is yes, it means that the battery is close to the charging and discharging end, and the system will automatically adjust the charging end low power or the discharging end low power to the preset value of 10kW. This adjustment is completed through communication and control between the battery management system and the PCS to achieve precise control of the charging and discharging power. If the judgment result is no, it means that the battery is not close to the charging and discharging end, and the system will maintain the current charging and discharging power level, that is, no operation.
[0029] In the above steps, by real-time monitoring of the battery voltage status and initiating current limiting protection measures when the battery is close to the end of its charge and discharge, the energy storage system can effectively protect the battery health and extend the battery life.
[0030] Step S2: Based on the operation logic, input the PCS rated power Pe, set the optimal power according to the PCS rated power Pe, and use the PCS rated power as Pmax and the optimal power as Pmin.
[0031] Specifically, the rated power Pe refers to the maximum power output capacity of the PCS (power conversion system) when it is designed, that is, the maximum power that the system can continuously provide. The optimal power Pmin refers to the optimal operating power set according to actual operating requirements while ensuring the efficient operation of the PCS. This power is usually lower than the rated power of the PCS to ensure that the system operates within an efficient and safe range.
[0032] First, obtain the rated power Pe of the PCS. This information usually comes from the manufacturer's technical specifications or system design documents of the PCS. Based on the operating logic, the rated power Pe of the PCS is used as the maximum power Pmax of the system's charging and discharging operations, which means the maximum power output that the system can achieve when necessary. Then, based on the operating logic and actual needs, calculate and set the optimal power Pmin. Through this step, the energy storage system can intelligently adjust its power output according to the actual operating needs to ensure operation under the premise of efficiency and safety.
[0033] Furthermore, the method described in the embodiment of the present application also includes:
[0034] It is determined whether the PCS rated power Pe is greater than the preset power. If so, Pmin is 0.3*Pe; if not, Pmin is 0.6*Pe.
[0035] Specifically, the preset power is a predefined threshold used for comparison and decision-making to determine the setting of the optimal power Pmin. It reflects the system designer's preset judgment or system requirements on the relationship between the PCS rated power Pe and the optimal power Pmin.
[0036] The process of determining the optimal power Pmin includes: comparing the PCS rated power Pe with the preset power. When the rated power Pe is greater than the preset power, the optimal power Pmin will be set to 0.3 times Pe; conversely, if Pe is less than or equal to the preset power, Pmin is set to 0.6 times Pe. This decision-making process aims to dynamically adjust the minimum power of system operation according to the actual capacity of the PCS and system requirements to achieve more efficient and safer energy management. Among them, 0.3 times and 0.6 times are recommended values for this embodiment. In the specific implementation process, technicians in this field can make adjustments based on the actual PCS used.
[0037] Step S3: input the charging and discharging time interval, determine the charging time and the discharging time according to the charging and discharging time interval, and obtain the system rated power E.
[0038] Specifically, the charging and discharging time interval refers to the time period when the system plans to charge or discharge, usually expressed as a specific time point or time period, such as "from 8 am to 10 am" or "every night from 10 pm to 2 am the next day". Charging time refers to the actual length of time the energy storage system is charged during the charging time interval. Discharging time refers to the actual length of time the energy storage system is discharged during the discharging time interval. System rated capacity E refers to the maximum capacity of the energy storage system, usually in kilowatt-hours (kWh).
[0039] The user or system inputs the charging and discharging time interval through the user interface or automatic scheduling system, and uses programming languages or time series analysis tools, such as Python's Datetime and Pandas libraries, R language's ts or xts packages, to analyze the input time interval, parse, convert and calculate the time data, calculate the actual charging time and discharging time, and ensure the accuracy and validity of the time information. The system obtains the rated power E from its configuration parameters. This parameter is usually determined in the system design phase and is an important reference for the performance of the energy storage system. For example, assume that the system plans to perform discharge operations from 4 pm to 8 pm every day to respond to the peak demand of the power grid. Analyze the time interval and determine that the discharge time is 4 hours. At the same time, the system rated power E is 1000kWh. Based on this information, the system formulates a discharge strategy.
[0040] This step obtains the specific charging and discharging time information and system rated capacity, providing necessary data support for the formulation of subsequent charging strategies.
[0041] Step S4: When the charging phase is in progress, power calculation is performed based on the Pmax, Pmin and the charging duration to obtain a theoretical charging power.
[0042] Specifically, when the energy storage device is in the charging stage, a mathematical formula is used to calculate the theoretical charging power according to Pmax and Pmin determined in step S2 and the charging time determined in step S3 to ensure that the system can operate efficiently and safely during the charging stage.
[0043] Furthermore, step S4 of the embodiment of the present application also includes:
[0044] If the battery power is judged to be less than 100%, then P = (E*1.2)*(1-SOC)* / charging time, where SOC is the starting SOC value before the system is charged, and 1.2 is the charging compensation coefficient; if P≥Pmax, then the theoretical charging power P = Pmax; if P≤Pmin, then the theoretical charging power P = Pmin; if Pmax>P>Pmin, then the theoretical charging power P = P.
[0045] Specifically, the specific process of calculating the theoretical charging power includes: first determine whether the current power of the battery is less than 100%, that is, whether the battery is not fully charged. This is the trigger condition for the calculation of the theoretical charging power P. When the battery power is less than 100%, the system calculates the theoretical charging power P based on the following formula: P = (E*1.2)*(1-SOC)* / charging time, where E is the rated power of the system, obtained in step S3, SOC is the starting SOC value before the system is charged, and 1.2 is the charging compensation coefficient, which is used to consider factors such as charging efficiency loss and battery health maintenance in the theoretical charging power calculation to ensure that the system can achieve the expected charging effect in actual operation.
[0046] The calculated theoretical charging power P needs to be further compared with the system maximum power Pmax and minimum power Pmin to ensure that the theoretical charging power P falls within the power range of safe operation of the system. If P is greater than or equal to Pmax, Pmax is set as the final theoretical charging power; if P is less than or equal to Pmin, Pmin is set as the final theoretical charging power; if P is between Pmin and Pmax, the theoretical charging power P remains unchanged and is the value calculated by the formula.
[0047] For example, the battery power is 80% (ie, SOC = 0.8), the system maximum power Pmax is 500kW, the minimum power Pmin is 100kW, and the planned charging time is 3 hours. According to the system rated power E = 1000kWh and the charging compensation coefficient 1.2, the theoretical charging power P is calculated: P = (1000×1.2)×(1-0.8) / 3 = 80kW. Since 80kW is between Pmin and Pmax, the theoretical charging power P remains at 80kW. Through this step, the energy storage system can dynamically adjust the theoretical charging power according to the actual state and charging conditions of the battery, providing accurate data support for subsequent actual operating power calculations.
[0048] Step S5: When the discharge phase is in progress, power calculation is performed based on the Pmax, Pmin and the discharge duration to obtain a theoretical discharge power.
[0049] Specifically, when the energy storage device is in the discharge stage, the theoretical discharge power is calculated using a mathematical formula according to Pmax and Pmin determined in step S2 and the discharge duration determined in step S3 to ensure that the system can operate efficiently and safely in the discharge stage.
[0050] Furthermore, step S5 of the embodiment of the present application further includes:
[0051] If it is determined that the battery power < 100%, then P = (E * 1.1) * (1 - SOC) / discharge duration, where SOC is the initial SOC value before system discharge, and 1.1 is the discharge compensation coefficient; if P > Pmax, then the theoretical discharge power P = Pmax; if P < Pmin, then the theoretical discharge power P = Pmin; if Pmax > P > Pmin, then the theoretical discharge power P = P.
[0052] Specifically, the specific process of calculating the theoretical discharge power includes: first, determining whether the current battery power is less than 100%, that is, whether the battery is in a non-full state. This is the trigger condition for calculating the theoretical discharge power P. When the battery power is less than 100%, the system calculates the theoretical discharge power P based on the following formula: P = (E * 1.1) * (1 - SOC) / discharge duration, where E is the rated battery capacity of the system, obtained in step S3, SOC is the initial SOC value before system discharge, and 1.1 is the discharge compensation coefficient. This coefficient is used to consider factors such as discharge efficiency loss and battery health maintenance in the calculation of the theoretical discharge power, ensuring that the system can achieve the expected discharge effect during actual operation.
[0053] The calculated theoretical discharge power P needs to be further compared with the system maximum power Pmax and the minimum power Pmin to ensure that the theoretical discharge power P falls within the power range for the safe operation of the system. If P is greater than or equal to Pmax, then Pmax is set as the final theoretical discharge power; if P is less than or equal to Pmin, then Pmin is set as the final theoretical discharge power; if P is between Pmin and Pmax, then the theoretical discharge power P remains unchanged, which is the value calculated by the formula. Through this step, the energy storage system can dynamically adjust the theoretical discharge power according to the actual state of the battery and the discharge conditions, providing accurate data support for the subsequent calculation of the actual operation power.
[0054] Step S6: Determine the theoretical charge-discharge power P according to the theoretical charge power and the theoretical discharge power.
[0055] Specifically, the theoretical charge-discharge power P is the theoretical operating power of the system during a specific charge-discharge cycle. It is one of the key indicators for formulating the operation strategy of the energy storage system. Analyze the charge-discharge requirements within a specific charge-discharge time interval. When the energy storage device is in the charging stage, the theoretical charge-discharge power is the theoretical charge power determined in step S4. When the energy storage device is in the discharging stage, the theoretical charge-discharge power is the theoretical discharge power determined in step S5. Calculate the target execution charge-discharge power based on the theoretical charge-discharge power.
[0056] Step S7: Perform charge-discharge power calculation on the theoretical charge-discharge power P, the Pmax, and the Pmin to obtain the target execution charge-discharge power P'.
[0057] Specifically, based on the theoretical charge-discharge power P, Pmax, and Pmin determined according to the foregoing steps, the target execution charge-discharge power P' is determined through comparison judgment and mathematical formula calculation. Among them, the target execution charge-discharge power P' refers to the actual execution power value of the system during the charge-discharge cycle.
[0058] Further, as Figure 3 shown, step S7 of the embodiment of the present application further includes:
[0059] Judge whether the theoretical charge-discharge power P satisfies P = Pmax. If it is satisfied, then P' = P * 1.05; if it is not satisfied, calculate according to the power interval where P is located to obtain a set of power calculation intervals. The set of power calculation intervals includes X * Pe > P ≥ (X - 0.1) * Pe, X * Pe ≤ P ≥ Pmin, P < Pmin, where X = 1 is the rated power coefficient, and loop X = (X - 0.1) until X = Pmin / Pe; according to the set of power calculation intervals, determine a set of charge-discharge power calculation formulas; based on the set of charge-discharge power calculation formulas, perform charge-discharge power calculations respectively to obtain the target execution charge-discharge power P'.
[0060] Specifically, the specific calculation process of the target execution charge-discharge power P' includes: First, judge whether the theoretical charge-discharge power is equal to the maximum charge-discharge power Pmax. If P is equal to Pmax, the target execution charge-discharge power P' is 1.05 times of Pmax, that is, P' = P * 1.05, that is, the actual power sent to the system for execution is 5% more than the power of the PCS, and full charge and full discharge are preferentially performed. During this process, it is necessary to determine that the PCS can operate overload for a long time, otherwise Pmax needs to be reset.
[0061] If P = Pmax is not satisfied, then according to the relationship between the theoretical charge-discharge power P, the rated power Pe, and the minimum power Pmin, a series of power calculation intervals are determined to obtain a set of power calculation intervals. The set of power calculation intervals includes X * Pe > P ≥ (X - 0.1) * Pe, X * Pe ≤ P ≥ Pmin, P < Pmin, where X = 1 is the rated power coefficient, and loop X = (X - 0.1) until X = Pmin / Pe, that is, the theoretical charge-discharge power is stepped at an interval of 0.1Pe to obtain multiple power calculation intervals such as (Pe, 0.9 * Pe], (0.9 * Pe, 0.8 * Pe], (0.8 * Pe, 0.7 * Pe], (0.7 * Pe, 0.6 * Pe], (0.6 * Pe, 0.5 * Pe], …, less than Pmin. According to the above set of power calculation intervals, corresponding charge-discharge power calculation formulas are defined. These formulas will calculate the target execution charge-discharge power P' according to the relationship between the theoretical power P and the system parameters.
[0062] Preferably, in step S7 of the embodiments of the present application, determining the set of charge-discharge power calculation formulas includes:
[0063] When the set of power calculation intervals is X*Pe > P ≥ (X - 0.1)*Pe or X*Pe ≤ P ≥ Pmin, determine SOC(0, 45], SOC(45, 60], and SOC(60, 100]; according to the SOC(0, 45], SOC(45, 60], and SOC(60, 100], respectively determine the set of charge-discharge power calculation formulas P' = P(2 - n), P' = P, P' = P*n, where n is the charge-discharge coefficient, selected according to actual test empirical values, and satisfying P*n ≤ Pmax*1.05.
[0064] Preferably, in step S7 of the embodiments of the present application, determining the set of charge-discharge power calculation formulas further includes:
[0065] When the set of power calculation intervals is P < Pmin, determine SOC[60, 100], SOC(45, 60), and SOC[0, 45]; according to the SOC[60, 100], SOC(45, 60), and SOC[0, 45], respectively determine the set of charge-discharge power calculation formulas P' = P*n, P' = P, and P' = P*(2 - n).
[0066] Specifically, according to the power calculation interval where the theoretical charge-discharge power P is located, and the SOC value of the battery, determine the corresponding charge-discharge power calculation formula in the set of charge-discharge power calculation formulas, and calculate the target execution charge-discharge power P'. The specific process includes:
[0067] First, according to the relationship between the theoretical charge-discharge power P and the system parameters, determine the SOC interval division. When X*Pe > P ≥ (X - 0.1)*Pe or X*Pe ≤ P ≥ Pmin, the SOC intervals are (0, 45], (45, 60], and (60, 100]; when the set of power calculation intervals is P < Pmin, the SOC intervals are [60, 100], (45, 60), and [0, 45].
[0068] Next, based on the determined SOC intervals, define different charge-discharge power calculation formulas. The specific formulas include: when X*Pe > P ≥ (X - 0.1)*Pe or X*Pe ≤ P ≥ Pmin, when SOC is in the interval (0, 45], the calculation formula is P' = P*(2 - n); when SOC is in the interval (45, 60], the calculation formula is P' = P; when SOC is in the interval (60, 100], the calculation formula is P' = P*n.
[0069] When P < Pmin, when the SOC is in the range of [60, 100], the calculation formula is P' = P * n; when the SOC is in the range of (45, 60), the calculation formula is P' = P; when the SOC is in the range of [0, 45], the calculation formula is P' = P * (2 - n).
[0070] Among them, n is the charge-discharge coefficient. Based on the actual test experience value, when adjusting the charge-discharge coefficient n, it is necessary to satisfy P * n ≤ Pmax * 1.05. To ensure that the adjusted theoretical charge-discharge power P * n does not exceed 1.05 times the maximum power Pmax. This is to ensure that the system operates within a safe range while considering the battery state and system efficiency.
[0071] Through the above steps, the energy storage system can dynamically adjust the charge-discharge power according to the relationship between the theoretical charge-discharge power P and the maximum power Pmax, so as to ensure that the total power output during the charge-discharge process of the system is both efficient and safe, and improve the energy utilization efficiency.
[0072] In summary, the intelligent charge-discharge management method of an energy storage device provided by the embodiment of the present application has the following technical effects:
[0073] Obtain the operation logic, where the operation logic includes the first priority, the second priority, the third priority, and the fourth priority; based on the operation logic, input the rated power Pe of the PCS, set the optimal power according to the rated power Pe of the PCS, use the rated power of the PCS as Pmax, and the optimal power as Pmin; input the charge-discharge time interval, determine the charge duration and discharge duration according to the charge-discharge time interval, and obtain the rated power E of the system; when the charge stage logic is in effect, perform power calculation based on Pmax, Pmin, and the charge duration to obtain the theoretical charge power; when the discharge stage logic is in effect, perform power calculation based on Pmax, Pmin, and the discharge duration to obtain the theoretical discharge power; determine the theoretical charge-discharge power P according to the theoretical charge power and the theoretical discharge power; perform charge-discharge power calculation on the theoretical charge-discharge power P, Pmax, and Pmin to obtain the target execution charge-discharge power P'.
[0074] Overall, the embodiment of the present application optimizes the charge-discharge process with secondary subdivision under the demand response scheduling strategy based on the battery principle and the PCS principle. Through precise calculation and priority logic, it realizes the refined management of the charge-discharge process, reduces the overcharge, over-discharge, and uneven charge-discharge of the battery, and ensures that the battery and PCS reach the highest efficiency during the actual operation process. It not only significantly improves the energy utilization efficiency and performance of the industrial and commercial energy storage system, but also extends the equipment life and enhances the stability of the energy storage system.
[0075] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. An intelligent charging and discharging management method for energy storage equipment, characterized in that: The method comprises: Acquire an operation logic, wherein the operation logic includes a first priority, a second priority, a third priority, and a fourth priority; Inputting a PCS rated power Pe based on the operation logic, setting an optimal power according to the PCS rated power Pe, taking the PCS rated power as Pmax and the optimal power as Pmin; Input a charging and discharging time interval, determine the charging time and the discharging time according to the charging and discharging time interval, and obtain the system rated power E; When the charging phase is in logic, power calculation is performed based on the Pmax, Pmin and the charging duration to obtain a theoretical charging power; When the discharge phase is in logic, power calculation is performed based on the Pmax, Pmin and the discharge duration to obtain a theoretical discharge power; Determine a theoretical charging and discharging power P according to the theoretical charging power and the theoretical discharging power; The theoretical charge and discharge power P, the Pmax, and the Pmin are calculated to obtain the target execution charge and discharge power P'.
2. The intelligent charging and discharging management method of an energy storage device according to claim 1, characterized in that: The specific execution steps of the second priority level are: Determine whether to limit according to the DOD in the 5% to 100% SOC range; If yes, according to the corresponding relationship table between different SOC and voltage, select the 5% SOC voltage value as the minimum voltage value and the 100% SOC voltage value as the maximum voltage value for limitation; If not, determine whether to limit the voltage according to the voltage value corresponding to the SOC interval of 2% to 100%; If yes, according to the corresponding relationship table between different SOC and voltage, select 2% SOC voltage value as the minimum voltage value and 100% SOC voltage value as the maximum voltage value for limitation. If no, define the SOC interval and voltage value to limit the charging and discharging interval.
3. The intelligent charging and discharging management method of an energy storage device according to claim 1, characterized in that: The specific execution steps of the third priority are: Determine whether the maximum real-time voltage Vmax of the battery charging is ≥ Vmax-20mV. If so, adjust the minimum power of the charging terminal to 10kW. If not, no operation is performed. Determine whether the maximum real-time voltage Vmin of the battery discharge is ≥ Vmin+20mV. If so, adjust the minimum power at the end of discharge to 10kW. If not, do nothing.
4. The intelligent charging and discharging management method of an energy storage device according to claim 1, characterized in that: The method comprises: It is determined whether the PCS rated power Pe is greater than the preset power. If so, Pmin is 0.3*Pe; if not, Pmin is 0.6*Pe.
5. The intelligent charging and discharging management method of energy storage equipment according to claim 1, characterized in that: The obtaining of the theoretical charging power comprises: If the battery power is less than 100%, then P = (E*1.2)*(1-SOC)* / charging time, where SOC is the starting SOC value before the system is charged, and 1.2 is the charging compensation coefficient; If P≥Pmax, then the theoretical charging power P=Pmax; if P≤Pmin, then the theoretical charging power P=Pmin; if Pmax>P>Pmin, then the theoretical charging power P=P.
6. The intelligent charging and discharging management method of energy storage equipment according to claim 1, characterized in that: The obtaining of the theoretical discharge power comprises: If the battery power is judged to be less than 100%, then P = (E*1.1)*(1-SOC)* / discharge duration, where SOC is the starting SOC value before the system is discharged, and 1.1 is the discharge compensation coefficient; If P > Pmax, then the theoretical discharge power P = Pmax; if P < Pmin, then the theoretical discharge power P = Pmin; if Pmax > P > Pmin, then the theoretical discharge power P = P.
7. The intelligent charging and discharging management method of energy storage equipment according to claim 1, characterized in that: The obtaining of the target execution charge-discharge power P' includes: Judging whether the theoretical charge-discharge power P satisfies P = Pmax. If it is satisfied, then P' = P * 1.05; If it is not satisfied, then calculate according to the power interval where P is located to obtain a set of power calculation intervals. The set of power calculation intervals includes X * Pe > P ≥ (X - 0.1) * Pe, X * Pe ≤ P ≥ Pmin, and P < Pmin, where X = 1 is the rated power coefficient, and cycle X = (X - 0.1) until X = Pmin / Pe; Determine a set of charge-discharge power calculation formulas according to the set of power calculation intervals; Based on the set of charge-discharge power calculation formulas, perform charge-discharge power calculations respectively to obtain the target execution charge-discharge power P'.
8. The intelligent charging and discharging management method of energy storage equipment according to claim 7, characterized in that: The determination of the set of charge-discharge power calculation formulas includes: When the set of power calculation intervals is X * Pe > P ≥ (X - 0.1) * Pe or X * Pe ≤ P ≥ Pmin, determine SOC(0, 45], SOC(45, 60], and SOC(60, 100]; According to the SOC(0, 45], SOC(45, 60], and SOC(60, 100], determine the set of charge-discharge power calculation formulas P' = P(2 - n), P' = P, and P' = P * n respectively, where n is the charge-discharge coefficient and is selected according to actual test experience values, satisfying P * n ≤ Pmax * 1.
05.
9. The intelligent charging and discharging management method of energy storage equipment according to claim 8, characterized in that: The determination of the set of charge-discharge power calculation formulas includes: When the set of power calculation intervals is P < Pmin, determine SOC[60, 100], SOC(45, 60), and SOC[0, 45]; According to the SOC[60, 100], SOC(45, 60), and SOC[0, 45], determine the set of charge-discharge power calculation formulas P' = P * n, P' = P, and P' = P * (2 - n) respectively.
Citation Information
Patent Citations
Comprehensive energy system planning method considering photovoltaic and hybrid energy storage
CN109615193A
Battery energy storage energy management method and system
CN115833296A
Power management method and system of centralized energy storage system and storage medium
CN117293870A
Cited By
Industrial and commercial energy storage system charging and discharging decision-making method based on GRU optimization model
CN119891286A
Industrial and commercial energy storage system charging and discharging decision method based on GRU optimization model
CN119891286B