Battery electrode coating system and control method thereof
By designing the combination of integrated coating and recycling oven and heat pump module in lithium battery production, the problems of low space utilization and poor aesthetics caused by high-temperature waste gas treatment in lithium battery production are solved, and more efficient energy utilization and cost reduction are achieved .
Patent Information
- Application Number
- CN202411051619.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the existing lithium battery production and manufacturing technology, the high-temperature exhaust gas generated by the coating and drying process of the positive electrode coating machine leads to the problems of low space utilization and poor aesthetics.
Design a battery electrode coating system, including an integrated coating and recycling oven, heat pump module and exhaust gas treatment module, through the heat exchange and recovery module, the high-temperature exhaust gas is cooled twice and the input gas is heated twice to form an integrated equipment to reduce the Pipeline laying improves space utilization and aesthetics.
The space utilization and aesthetics of the battery electrode coating system are improved. At the same time, through the energy conversion of the heat pump module, the energy utilization rate is improved, energy savings and system energy consumption is reduced.
Smart Images

Figure CN118976669A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of waste gas recovery, and in particular to a battery electrode coating system and a control method thereof. Background Art
[0002] In the field of lithium battery manufacturing technology, a large amount of high-temperature waste gas is generated during the coating and drying process of the positive electrode coating machine. The waste gas contains harmful volatile organic compounds such as NMP, so an NMP recovery system is required to recover and treat NMP. The recovered NMP waste liquid is packaged and sent to a qualified chemical plant for processing. After processing, a high-purity NMP finished product is obtained. At the same time, the treated NMP waste gas is discharged into the air after meeting environmental protection requirements. The existing NMP waste gas recovery process usually connects a heat exchange system outside the coating oven to recover waste heat and exhaust gas treatment, resulting in pipes everywhere in the production site, reducing the space utilization and aesthetics of the production site. Summary of the invention
[0003] Based on this, it is necessary to provide a battery electrode coating system and a control method thereof to solve the technical problems of low space utilization and poor aesthetics of battery electrode production sites existing in the prior art.
[0004] To this end, according to one aspect of the present application, a battery electrode coating system is provided, the battery electrode coating system comprising:
[0005] The coating and recovery integrated oven includes a coating oven module and a heat exchange recovery module. The heat exchange recovery module is fixed on the top of the coating oven module. The coating oven module is used to dry the battery electrodes and discharge the high-temperature exhaust gas. The heat exchange recovery module is used to cool the high-temperature exhaust gas twice and heat the input gas flowing to the coating oven module twice. The heat exchange recovery module exchanges heat between the high-temperature exhaust gas and the input gas to achieve the first cooling of the high-temperature exhaust gas and the first heating of the input gas. The high-temperature exhaust gas is cooled twice to form low-temperature exhaust gas.
[0006] A heat pump module is used for heat conversion between the second cooling and the second heating; and an exhaust gas treatment module is used for receiving and treating the low-temperature exhaust gas discharged by the heat exchange recovery module.
[0007] Optionally, the heat exchange recovery module includes:
[0008] An air-to-air heat exchanger having a first gas channel and a second gas channel, wherein the high-temperature exhaust gas in the first gas channel exchanges heat with the input gas in the second gas channel to perform a first cooling of the high-temperature exhaust gas and a first heating of the input gas;
[0009] A condensing main unit connected to the outlet of the first gas channel, the condensing main unit is used to cool the high-temperature exhaust gas for a second time, and a first circulation flow path is formed between the condensing main unit and the heat pump module so that the refrigerant of the heat pump module can be transported to the condensing main unit; and
[0010] The first heater is connected to the outlet of the second gas channel and is used to heat the input gas for the second time. A second circulation flow path is formed between the first heater and the heat pump module so that the heat medium of the heat pump module can be transported to the first heater.
[0011] Optionally, the refrigerant in the first circulation flow path is chilled water.
[0012] Optionally, the heat medium in the second circulation flow path is heat transfer oil or high-temperature hot water.
[0013] Optionally, in each row of multiple coating oven modules, the temperatures of the multiple coating oven modules increase gradually from both ends to the middle.
[0014] Optionally, the heat exchange recovery module also includes a second heater, which is arranged in the middle coating oven module. The second heater is used to heat the input gas output by the first heater for a third time, or the second heater is used to heat the heat medium in the first heater.
[0015] Optionally, the second heater uses high-temperature steam or high-temperature heat-conducting oil to perform a third heating on the input gas output by the first heater, or the second heater uses electromagnetic heating to heat the heat medium in the first heater.
[0016] Optionally, a plurality of coating and recovery integrated ovens are provided, and the plurality of coating and recovery integrated ovens are arranged in multiple rows and columns.
[0017] Optionally, multiple coating and recycling integrated ovens are arranged in 2 rows and 12 columns.
[0018] Optionally, the heat pump module comprises:
[0019] Evaporative condenser;
[0020] The refrigerant preparation module includes a circulation evaporator, a first compressor and a first expansion valve, wherein a first circulation flow path is formed between the circulation evaporator and the condensing main unit, and the circulation evaporator, the first compressor, the evaporative condenser and the first expansion valve are sequentially connected to form a third circulation flow path;
[0021] The heat medium preparation module includes a circulating condenser, a second expansion valve and a second compressor. A second circulating flow path is formed between the circulating condenser and the first heater. The circulating condenser, the second expansion valve, the evaporative condenser and the second compressor are connected in sequence to form a fourth circulating flow path. The third circulating flow path and the fourth circulating flow path exchange heat through the evaporative condenser.
[0022] The beneficial effect of the battery electrode coating system provided by the present application is that compared with the prior art, the battery electrode coating system of the present application includes an integrated coating and recovery oven, a heat pump module and an exhaust gas treatment module. The integrated coating and recovery oven includes a coating oven module and a heat exchange recovery module. The coating oven module is used to dry the battery electrodes and discharge high-temperature exhaust gas. The heat exchange recovery module is used to cool the high-temperature exhaust gas twice and heat the input gas flowing to the coating oven module twice. The heat exchange recovery module is fixed to the top of the coating oven module to form an integrated device, which reduces the laying of pipes between the coating oven module and the heat exchange recovery module, and improves space utilization and aesthetics; at the same time, the pipeline between the coating oven module and the heat exchange recovery module is short, and the fan can be installed only in the coating oven module, and there is no need to set a fan in the heat exchange recovery module, which further improves space utilization and reduces costs.
[0023] According to another aspect of the present application, a battery electrode coating system control method is provided. The control method is applied to the battery electrode coating system as described above. The control method comprises the following steps:
[0024] Real-time monitoring of the operating parameters of each coating and recovery integrated oven and heat pump module, including the inlet temperature, exhaust temperature and NMP gas concentration of the coating oven module, the exhaust temperature of the heat exchange recovery module, and the heat medium input temperature, heat medium output temperature, refrigerant input temperature and refrigerant output temperature of the heat pump module;
[0025] The coating and recovery integrated oven and the heat pump module adjust their working status according to the monitoring data. The coating and recovery integrated oven and the heat pump module determine whether there is an abnormality by comparing the monitored value and the preset value of the working parameters. If there is an abnormality, the working status of the coating and recovery integrated oven and / or the heat pump module is adjusted accordingly to make the working parameters of the coating and recovery integrated oven and / or the heat pump module tend to the preset values.
[0026] The beneficial effect of the battery electrode coating system control method provided in the present application is that compared with the prior art, the battery electrode coating system control method of the present application monitors the working parameters of each coating and recovery integrated oven and heat pump module in real time. If there is an abnormality, the working parameters are adjusted accordingly to make the working parameters tend to the preset values, thereby ensuring the drying effect and working stability of the battery electrode coating system. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1 A schematic diagram of the structure of a battery electrode coating system provided in an embodiment of the present application;
[0029] Figure 2 A schematic diagram of the structure of a coating and recycling integrated oven having only a first heater for a battery electrode coating system provided in an embodiment of the present application;
[0030] Figure 3 Schematic diagram of the structure of the coating and recycling integrated oven with the first heater and the second heater of the battery electrode coating system provided in the embodiment of the present application Figure 1 ;
[0031] Figure 4 Schematic diagram of the structure of the coating and recycling integrated oven with the first heater and the second heater of the battery electrode coating system provided in the embodiment of the present application Figure 2 ;
[0032] Figure 5 A schematic structural diagram of a heat pump module of a battery electrode coating system provided in an embodiment of the present application.
[0033] Description of reference numerals:
[0034] 1. Coating and recycling integrated oven; 110. Coating oven module; 111. Oven body; 1111. First exhaust port; 1112. Second exhaust port; 1113. Air inlet; 112. Exhaust fan; 113. Circulation fan; 114. Air valve; 115. First temperature sensor; 116. First pressure sensor; 117. Concentration sensor; 118. First electric regulating valve; 120. Heat exchange recovery module; 121. Air-to-air heat exchanger; 122. Condensing host; 1221. Refrigeration surface cooler; 1222. Demister; 123. First heater; 124. Second heater; 125. Medium efficiency filter; 126. Waste liquid temporary storage tank; 127. High-temperature steam system; 128. Second temperature sensor; 129. Second electric regulating valve;
[0035] 2. Heat pump module; 210. Evaporative condenser; 220. Refrigerant preparation module; 221. Circulating evaporator; 222. First compressor; 223. First expansion valve; 224. Refrigerant circulation pump; 225. Third temperature sensor; 226. Second pressure sensor; 230. Heat medium preparation module; 231. Circulating condenser; 232. Second expansion valve; 233. Second compressor; 234. Heat medium circulation pump; 235. Fourth temperature sensor; 236. Third pressure sensor; 240. High temperature buffer tank; 250. Liquid replenishing device; 260. Low temperature buffer tank; 270. Auxiliary refrigeration unit;
[0036] 3. Exhaust gas treatment module. DETAILED DESCRIPTION
[0037] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.
[0038] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0039] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0040] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0041] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0042] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.
[0043] According to one aspect of the present application, an embodiment of the present application provides a battery electrode coating system, please refer to Figures 1 to 5 The battery electrode coating system includes a coating and recovery integrated oven 1, a heat pump module 2 and an exhaust gas treatment module 3. The coating and recovery integrated oven 1 includes a coating oven module 110 and a heat exchange recovery module 120. The heat exchange recovery module 120 is fixed to the top of the coating oven module 110. The coating oven module 110 is used to dry the battery electrodes and discharge high-temperature exhaust gas. The heat exchange recovery module 120 is used to cool the high-temperature exhaust gas twice and heat the input gas flowing to the coating oven module 110 twice. The heat exchange recovery module 120 exchanges heat between the high-temperature exhaust gas and the input gas to achieve the first cooling of the high-temperature exhaust gas and the first heating of the input gas. After the high-temperature exhaust gas is cooled twice, a low-temperature exhaust gas is formed. The heat pump module 2 is used to convert heat between the second cooling and the second heating. The exhaust gas treatment module 3 is used to receive and process the low-temperature exhaust gas discharged by the heat exchange recovery module 120.
[0044] In an embodiment of the present application, the battery electrode coating system includes a coating and recovery integrated oven 1, a heat pump module 2 and an exhaust gas treatment module 3. The coating and recovery integrated oven 1 includes a coating oven module 110 and a heat exchange recovery module 120. The coating oven module 110 is used to dry the battery electrodes and discharge high-temperature exhaust gas. The heat exchange recovery module 120 is used to cool the high-temperature exhaust gas twice and heat the input gas flowing to the coating oven module 110 twice. The heat exchange recovery module 120 is fixed to the top of the coating oven module 110 to form an integrated device, which reduces the laying of pipes between the coating oven module 110 and the heat exchange recovery module 120, and improves space utilization and aesthetics; at the same time, the pipeline between the coating oven module 110 and the heat exchange recovery module 120 is short, and a fan can be installed only in the coating oven module 110, and there is no need to set a fan in the heat exchange recovery module 120, which further improves space utilization and reduces costs.
[0045] At the same time, compared with the prior art of burning natural gas to generate steam for heating and equipping a special refrigeration unit to provide chilled water for cooling, the heat pump module 2 can convert heat between the second cooling and the second heating, realize low-temperature and high-temperature energy conversion, improve energy utilization, save energy, and reduce system energy consumption.
[0046] In one embodiment, please refer to Figure 2 and Figure 3 The coating oven module 110 includes an oven body 111, an exhaust fan 112 and a circulation fan 113. The oven body 111 has a first exhaust port 1111, a second exhaust port 1112 and an air inlet 1113. The first heater 123 is arranged between the circulation fan 113 and the air inlet 1113. The air inlet 1113 is connected to the second exhaust port 1112 and the heat recovery module 120 at the same time, thereby improving the gas utilization rate; the exhaust fan 112 is used to transport the high-temperature exhaust gas discharged from the first exhaust port 1111 to the heat recovery module 120; the circulation fan 113 is used to transport the gas discharged from the second exhaust port 1112 and the input gas discharged from the heat recovery module 120 to the air inlet 1113.
[0047] Furthermore, each ventilation duct of the coating oven module 110 is also provided with a first air valve 114 for controlling the air volume.
[0048] In one embodiment, please refer to Figures 2 to 4The heat recovery module 120 includes an air-to-air heat exchanger 121, a condensing main unit 122 and a first heater 123. The air-to-air heat exchanger 121 has a first gas channel and a second gas channel. The high-temperature exhaust gas in the first gas channel exchanges heat with the input gas in the second gas channel to cool the high-temperature exhaust gas for the first time and heat the input gas for the first time; the condensing main unit 122 is connected to the outlet of the first gas channel, and the condensing main unit 122 is used to cool the high-temperature exhaust gas for the second time. A first circulation flow path is formed between the condensing main unit 122 and the heat pump module 2 so that the refrigerant of the heat pump module 2 can be transported to the condensing main unit 122; the first heater 123 is connected to the outlet of the second gas channel, and the first heater 123 is used to heat the input gas for the second time. A second circulation flow path is formed between the first heater 123 and the heat pump module 2 so that the heat medium of the heat pump module 2 can be transported to the first heater 123.
[0049] In this way, the heat recovery module 120 heats the input gas twice to ensure that the temperature of the input gas meets the standard and improve the drying effect.
[0050] For details, please refer to Figures 2 to 4 The condensing main unit 122 includes a refrigerating surface cooler 1221 and a demister 1222. The high-temperature exhaust gas is liquefied into NMP waste liquid in the refrigerating surface cooler 1221. The heat exchange recovery module 120 also includes a waste liquid temporary storage tank 126 connected to the refrigerating surface cooler 1221. The waste liquid temporary storage tank 126 is used to store waste liquid. The demister 1222 is used to absorb part of the NMP waste liquid mixed in the low-temperature exhaust gas, and minimize the content of the NMP waste liquid in the low-temperature exhaust gas discharged from the condensing main unit 122.
[0051] Furthermore, the condensing main unit 122 of each coating and recovery integrated oven 1 is connected to a waste liquid temporary storage tank 126 .
[0052] Please also refer to Figures 2 to 4 The heat recovery module 120 further includes a medium efficiency filter 125, which is disposed between the gas-to-gas heat exchanger 121 and the first heater 123 to filter the input gas, improve the gas quality, and thus improve the drying effect.
[0053] In one embodiment, the refrigerant in the first circulation flow path is chilled water.
[0054] In one embodiment, the heat medium in the second circulation flow path is heat transfer oil or high-temperature hot water. High-temperature hot water has low cost, while heat transfer oil has the advantages of uniform heating and high temperature control accuracy.
[0055] In one embodiment, the outlet of the condensing main unit 122 is respectively connected to the inlet of the second gas channel and the exhaust gas treatment module 3 , part of the low-temperature exhaust gas is transported to the inlet of the second gas channel to form the input gas, and the remaining low-temperature exhaust gas is transported to the exhaust gas treatment module 3 .
[0056] Exemplarily, 90%-95% of the low-temperature exhaust gas is transported back to the gas-to-gas heat exchanger 121 for reuse, thereby improving gas utilization, and 5%-10% of the low-temperature exhaust gas is transported to the exhaust gas treatment module 3 for purification and then discharged into the air.
[0057] In one embodiment, please refer to Figure 2 and Figure 3 The first heater 123 is disposed in the coating oven module 110, specifically, near the air inlet 1113 of the oven body 111, so as to reduce the distance that the heated conveying gas is conveyed in the pipeline and reduce heat loss.
[0058] In one embodiment, in each row of the plurality of coating oven modules 110 , the temperature of the plurality of coating oven modules 110 increases gradually from both ends to the middle.
[0059] Exemplarily, 12 coating oven modules 110 form a row, and the six coating oven modules 110 on one half are used as an example for explanation. The temperature of the input gas at the air inlet 1113 of each coating oven module 110 is 100° C., 110° C., 120° C., 130° C., 140° C., and 140° C. from the end to the middle. It is understood that in other embodiments, the specific temperature of each coating oven module 110 is selected according to the actual drying requirements of the battery electrode, and is not limited here.
[0060] Exemplarily, the plurality of coating oven modules 110 are distributed in two rows, and the two rows of coating oven modules 110 are arranged vertically up and down.
[0061] In one embodiment, please refer to Figures 1 to 4 The heat exchange recovery module 120 also includes a second heater 124, which is arranged in the middle coating oven module 110. The second heater 124 is used to heat the input gas output by the first heater 123 for a third time, or the second heater 124 is used to heat the heat medium in the first heater 123.
[0062] Specifically, the two coating oven modules 110 at each end of the 12 coating oven modules 110 are only provided with the first heater 123. These coating oven modules 110 are only provided with the first heater 123 to meet the temperature requirements and avoid energy waste; the eight coating oven modules 110 in the middle are simultaneously provided with the first heater 123 and the second heater 124, ensuring that the temperature of the coating oven modules 110 in the middle can be higher than the temperature of the coating oven modules 110 at the end, thereby ensuring a better drying effect.
[0063] In one embodiment, see Figure 3 The second heater 124 uses high-temperature steam or high-temperature heat-conducting oil to heat the input gas output by the first heater 123 for the third time. Compared with traditional electric heating or gas heating methods, the heating speed using high-temperature steam is faster and more efficient; the heating method using high-temperature heat-conducting oil has the advantages of uniform heating and high temperature control accuracy.
[0064] Correspondingly, the second heaters 124 are heated by high-temperature steam, and the heat recovery module 120 further includes a high-temperature steam system 127 , which is used to provide high-temperature steam for all the second heaters 124 .
[0065] Alternatively, see Figure 4 The second heater 124 uses electromagnetic heating to heat the heat medium in the first heater 123. Electromagnetic heating does not require laying a large number of pipelines, and battery heating has many advantages such as high thermal efficiency, fast heating speed, energy saving and environmental protection, high temperature control accuracy, safety and reliability, and simple maintenance.
[0066] In summary, since the heat medium in the second circulation flow circuit is heat transfer oil or high-temperature hot water, the second heater 124 adopts high-temperature steam heating or electromagnetic heating; then the heat medium in the second circulation flow circuit of the present application is heat transfer oil, and the second heater 124 adopts high-temperature steam heating; or, the heat medium in the second circulation flow circuit of the present application is heat transfer oil, and the second heater 124 adopts electromagnetic heating; or, the heat medium in the second circulation flow circuit of the present application is high-temperature hot water, and the second heater 124 adopts high-temperature steam heating; or, the heat medium in the second circulation flow circuit of the present application is high-temperature hot water, and the second heater 124 adopts electromagnetic heating. It can be understood that the heating method of the heat medium in the second circulation flow circuit and the second heater 124 can be flexibly selected according to the actual drying needs, and is not limited here.
[0067] In one embodiment, see Figure 1 A plurality of coating and recovery integrated ovens 1 are provided, and the plurality of coating and recovery integrated ovens 1 are arranged in multiple rows and columns.
[0068] In one embodiment, a plurality of coating and recycling integrated ovens 1 are arranged in 2 rows and 12 columns.
[0069] It is understandable that the number and arrangement of the coating and recycling integrated ovens 1 are flexibly designed according to the actual site conditions and are not limited here.
[0070] In one embodiment, see Figure 5 The heat pump module 2 includes an evaporative condenser 210, a refrigerant preparation module 220 and a heat medium preparation module 230. The refrigerant preparation module 220 includes a circulating evaporator 221, a first compressor 222 and a first expansion valve 223. A first circulation flow path is formed between the circulating evaporator 221 and the condensing host 122. The circulating evaporator 221, the first compressor 222, the evaporative condenser 210 and the first expansion valve 223 are connected in sequence to form a third circulation flow path; the heat medium preparation module 230 includes a circulating condenser 231, a second expansion valve 232 and a second compressor 233. A second circulation flow path is formed between the circulating condenser 231 and the first heater 123. The circulating condenser 231, the second expansion valve 232, the evaporative condenser 210 and the second compressor 233 are connected in sequence to form a fourth circulation flow path. The third circulation flow path and the fourth circulation flow path exchange heat through the evaporative condenser 210.
[0071] Through the above arrangement, the refrigerant preparation module 220 and the heat medium preparation module 230 share an evaporative condenser 210, and there is no need to equip the coating and recovery integrated oven 1 with a separate refrigerant preparation device and a separate heat medium preparation device, thereby improving the integration and aesthetics of the battery electrode coating system, minimizing the laying of pipelines, improving space utilization and reducing costs.
[0072] In the first circulation flow path, the low-temperature and low-pressure refrigerant gas flowing out of the circulation evaporator 221 is compressed into a high-temperature and high-pressure refrigerant gas by the first compressor 222. The high-temperature and high-pressure refrigerant gas exchanges heat with the medium in the first circulation flow path through the evaporative condenser 210 to form a medium-temperature and high-pressure liquid refrigerant. The first expansion valve 223 then throttles the medium-temperature and high-pressure liquid refrigerant to become a low-temperature and low-pressure mist refrigerant. The mist refrigerant then absorbs heat in the circulation evaporator 221 to achieve a refrigeration effect. The principle of the second circulation flow path is similar to that of the first circulation flow path. The difference is that the heat medium in the circulation condenser 231 of the second circulation flow path is supplied to the heat exchange recovery module 120, which will not be repeated here.
[0073] In other implementations, an evaporative condenser 210, a refrigerant preparation module 220 and a heat medium preparation module 230 form a heat pump unit, and the heat pump module 2 is provided with multiple heat pump units to provide refrigerant and heat medium to ensure the supply of refrigerant and heat medium.
[0074] For example, the coating oven modules 110 of the present application are provided with 24, and the heat pump module 2 of the present application is provided with 6 sets of heat pump units to meet the heat exchange demand. It is understandable that in other embodiments, the number of heat pump units is designed according to the number of coating oven modules 110, and is not limited here.
[0075] In other embodiments, the heat pump module 2 also includes a high-temperature cache tank 240, which is disposed between the inlet of the heat medium preparation module 230 and the heat exchange recovery module 120. The high-temperature cache tank 240 is used to cache and insulate the heat medium in the second circulation flow path, and plays a role in transfer, storage and insulation.
[0076] In other embodiments, the heat pump module 2 further includes a fluid replenishing device 250 connected to the high-temperature cache tank 240, and the fluid replenishing device 250 is used to replenish heat medium into the high-temperature cache tank 240 in a timely manner to ensure stable operation of the system.
[0077] In other embodiments, the heat pump module 2 also includes a low-temperature cache tank 260, which is disposed between the inlet of the refrigerant preparation module 220 and the heat exchange recovery module 120. The low-temperature cache tank 260 is used to cache and insulate the refrigerant in the first circulation flow path, and also serves as a transfer, storage and insulation function.
[0078] In other embodiments, the heat pump module 2 also includes an auxiliary refrigeration unit 270, which is arranged between the outlet of the refrigerant preparation module 220 and the heat exchange recovery module 120. Since the heat exchange recovery module 120 is fixed to the top of the coating oven module 110, the pipeline between the refrigerant preparation module 220 and the condensing host 122 may be too long, and the refrigerant in the pipeline may be affected by the environment, causing the temperature of the refrigerant in the pipeline to rise. The auxiliary refrigeration unit 270 can assist in cooling the refrigerant in the pipeline after detecting that the temperature of the refrigerant passing through its position rises to a preset value, thereby ensuring that the temperature of the refrigerant meets the standard.
[0079] In other embodiments, both the first circulation flow path and the second circulation flow path are provided with a pump body, so that both the first circulation flow path and the second circulation flow path can run smoothly.
[0080] According to another aspect of the present application, an embodiment of the present application further provides a battery electrode coating system control method, which is applied to the battery electrode coating system as described above, and the control method comprises the following steps:
[0081] Step S1: Real-time monitoring of the operating parameters of each coating and recovery integrated oven 1 and the heat pump module 2, the operating parameters including the inlet temperature, exhaust temperature and NMP gas concentration of the coating oven module 110, the exhaust temperature of the heat exchange recovery module 120, and the heat medium input temperature, heat medium output temperature, refrigerant input temperature and refrigerant output temperature of the heat pump module 2;
[0082] Step S2: The coating and recovery integrated oven 1 and the heat pump module 2 adjust their working states according to the monitoring data. The coating and recovery integrated oven 1 and the heat pump module 2 determine whether there is an abnormality by comparing the monitoring value and the preset value of the working parameters. If there is an abnormality, the working states of the coating and recovery integrated oven 1 and / or the heat pump module 2 are adjusted accordingly to make the working parameters of the coating and recovery integrated oven 1 and / or the heat pump module 2 approach the preset values.
[0083] The beneficial effect of the battery electrode coating system control method provided in the present application is that: compared with the prior art, the battery electrode coating system control method of the present application monitors the working parameters of each coating and recovery integrated oven 1 and the heat pump module 2 in real time. If there is an abnormality, the working parameters are adjusted accordingly to make the working parameters tend to the preset values, thereby ensuring the drying effect and working stability of the battery electrode coating system.
[0084] For details, please refer to Figures 2 to 4 The coating oven module 110 further includes a first temperature sensor 115, a first pressure sensor 116, a concentration sensor 117 and a first electric regulating valve 118. The first temperature sensor 115 is arranged between the second exhaust port 1112 and the circulating fan 113, between the air-to-air heat exchanger 121 and the circulating fan 113, between the circulating fan 113 and the first heater 123, and between the first heater 123 and the air inlet 1113. The first temperature sensor 115 can monitor the temperature of each part of the coating oven module 110. The temperature of the gas in the section pipeline, the first pressure sensor 116 is arranged between the circulation fan 113 and the first heater 123, the concentration sensor 117 is arranged at the first exhaust port 1111, the concentration sensor 117 is used to monitor the content of NMP in the gas discharged from the first exhaust port 1111, the first electric regulating valve 118 is connected to the first temperature sensor 115 between the first heater 123 and the air inlet 1113, and the first electric regulating valve 118 is used to adjust the flow rate of the heat medium in the first heater 123.
[0085] The heat recovery module 120 also includes a second temperature sensor 128 and a second electric regulating valve 129. The second temperature sensor 128 is arranged between the outlet of the condensing main unit 122 and the inlet of the gas-to-gas heat exchanger 121. The second electric regulating valve 129 is connected to the second temperature sensor 128. The second electric regulating valve 129 is used to adjust the flow rate of the refrigerant in the condensing main unit 122.
[0086] For example, see Figure 2 Taking the coating and recycling integrated oven 1 having only the first heater 123 as an example, the control principle of the coating and recycling integrated oven 1 is explained:
[0087] On the one hand, the first preset value of the gas temperature at the first exhaust port 1111 is set to 96°C, and the second preset value is set to 98°C. When the monitoring value of the temperature sensor therein exceeds 98°C, the control system controls the first electric regulating valve 118 to close, reduces the flow rate of the heat medium in the first heater 123, thereby reducing the gas temperature in the oven body 111, and thereby reducing the gas temperature at the first exhaust port 1111; when the monitoring value of the temperature sensor therein is lower than 96°C, the control system controls the first electric regulating valve 118 to open, increases the flow rate of the heat medium in the first heater 123, thereby increasing the gas temperature in the oven body 111, and thereby increasing the gas temperature at the first exhaust port 1111; when the monitoring value of the temperature sensor therein is between 96°C and 98°C, the control system controls the first electric regulating valve 118 to automatically adjust the valve opening according to the corresponding proportion, thereby reducing the fluctuation of the heating temperature in the oven body 111 and achieving the function of stable heating.
[0088] On the other hand, the operating frequency of the circulating fan 113 can be changed in real time according to the first pressure sensor 116, so that the circulating fan 113 can achieve the best operating effect while ensuring the electrode drying process and achieve energy saving while meeting the coating process.
[0089] On the other hand, the operating frequency of the exhaust fan 112 is adjusted by the NMP gas concentration in the oven body 111. When the concentration sensor 117 detects that the NMP gas concentration exceeds a preset value, the control system issues an alarm and increases the operating frequency of the exhaust fan 112, thereby increasing the exhaust volume and achieving the purpose of reducing the NMP gas concentration.
[0090] On the other hand, when the monitoring value of the second temperature sensor 128 of the heat recovery module 120 exceeds its preset upper temperature limit, the control system controls the second electric regulating valve 129 to be fully opened; when the monitoring value of the second temperature sensor 128 is lower than the preset lower temperature limit, the control system controls the second electric regulating valve 129 to be fully closed; when the monitoring value of the second temperature sensor 128 is between its preset upper and lower limits, the control system controls the second electric regulating valve 129 to automatically adjust the valve opening according to the corresponding proportion, so as to reduce the fluctuation of the cooling temperature in the condensing host 122 and achieve the function of stable condensation.
[0091] See also Figure 4It can be understood that, for the coating and recycling integrated oven 1 having both the first heater 123 and the second heater 124 using electromagnetic heating, its control principle is similar to that of the above-mentioned coating and recycling integrated oven 1 having only the first heater 123, and only the first temperature sensor 115 is added to the second heater 124 to monitor the temperature, which will not be repeated here.
[0092] Specifically, see Figure 5 The heat pump module 2 also includes a refrigerant circulation pump 224, a third temperature sensor 225, a second pressure sensor 226, a heat medium circulation pump 234, a fourth temperature sensor 235 and a third pressure sensor 236. The refrigerant circulation pump 224 is arranged between the low-temperature cache tank 260 and the refrigerant preparation module 220. A third temperature sensor 225 is arranged at the inlet and outlet of each refrigerant preparation module 220. A third temperature sensor 225 is also arranged between the low-temperature cache tank 260 and the condensing host 122. A third temperature sensor 225 is also arranged between the auxiliary refrigeration unit 270 and the condensing host 122, and between the auxiliary refrigeration unit 270 and the refrigerant preparation module 220. A third temperature sensor 225 is also arranged between the low-temperature cache tank 260 and the condensing host 122, and between the auxiliary refrigeration unit 270 and the refrigerant preparation module 220. A second pressure sensor 226 is provided between the auxiliary refrigeration unit 270 and the condensing main unit 122; the heat medium circulation pump 234 is provided between the high-temperature cache tank 240 and the heat medium preparation module 230, and a fourth temperature sensor 235 is provided at the inlet and outlet of each heat medium preparation module 230, and a fourth temperature sensor 235 is also provided in the high-temperature cache tank 240 and between the outlet of the heat medium preparation module 230 and the heat medium inlet of the first heater 123; a third pressure sensor 236 is provided in the high-temperature cache tank 240, between the high-temperature cache tank 240 and the heat medium circulation pump 234, between the high-temperature cache tank 240 and the first heater 123, between the heat medium circulation pump 234 and the heat medium preparation module 230, and between the outlet of the heat medium preparation module 230 and the heat medium inlet of the first heater 123.
[0093] For example, see Figure 5 , the control principle of the heat pump module 2 is explained:
[0094] On the one hand, the temperature of the refrigerant in the refrigerant outlet main pipeline of the refrigerant preparation module 220 is monitored by the third temperature sensor 225. When the monitored value exceeds its preset value, the control system will automatically control the auxiliary refrigeration unit 270 to start, so as to reduce the temperature of the refrigerant in the main pipeline and ensure the condensation effect of the condensing main unit 122; when the monitored value is lower than its preset value, the control system will automatically control the auxiliary refrigeration unit 270 to shut down.
[0095] On the other hand, a chilled water pressure differential bypass regulating valve is also connected between the refrigerant outlet main pipeline of the refrigerant preparation module 220 and the refrigerant inlet main pipeline of the refrigerant preparation module 220 to monitor the pressure in the refrigerant outlet main pipeline and the pressure in the refrigerant inlet main pipeline of the refrigerant preparation module 220. When the pressure difference between the two is greater than the set value, the control system automatically controls the chilled water pressure differential bypass regulating valve to open; when the pressure difference is less than the set value, the control system automatically controls the chilled water pressure differential bypass regulating valve to close, so as to ensure the supply and return water pressure balance between the refrigerant preparation module 220 and the condensing host 122.
[0096] On the other hand, water flow switches are provided on the refrigerant outlet branch of the refrigerant preparation module 220 and the heat medium outlet branch of the heat medium preparation module 230, which respectively monitor the water flow switch of the refrigerant outlet branch and the water flow switch status of the refrigerant outlet branch. When the water flow switch contacts are in the on state, that is, the chilled water and hot water are in circulation, the first compressor 222 and the second compressor 233 will be started to avoid the problem of malfunction and damage of the heat pump unit when it is turned on without external circulation.
[0097] On the other hand, the pressure in the high-temperature cache tank 240, the pressure of the heat medium inlet main pipeline of the heat medium preparation module 230, the inlet pressure of the heat medium circulation pump 234, etc. are monitored. When the pressure is lower than the set pressure value, the control system will control the liquid replenishment device 250 to replenish the liquid and increase the pressure. The circulation flow path between the heat medium preparation module 230 and the first heater 123 is also provided with a pressure relief electric regulating valve. When the pressure in the high-temperature cache tank 240, the pressure of the heat medium inlet main pipeline of the heat medium preparation module 230, and the inlet pressure of the heat medium circulation pump 234 are monitored to be higher than the set pressure upper limit, the control system opens the pressure relief electric regulating valve to discharge the liquid and relieve the pressure. When the pressure in the circulation flow path is lower than the set value, the pressure relief electric regulating valve is normally closed.
[0098] On the other hand, a heat medium pressure difference bypass regulating valve is also connected between the heat medium outlet main pipeline of the heat medium preparation module 230 and the heat medium inlet main pipeline of the heat medium preparation module 230 to monitor the pressure in the heat medium outlet main pipeline and the pressure in the heat medium inlet main pipeline of the heat medium preparation module 230. When the pressure difference between the two is greater than the set value, the control system automatically controls the heat medium pressure difference bypass regulating valve to open; when the pressure difference is less than the set value, the control system automatically controls the heat medium pressure difference bypass regulating valve to close, so as to ensure the supply and return water pressure balance between the heat medium preparation module 230 and the first heater 123.
[0099] On the other hand, the temperature of the heat medium in the heat medium outlet main pipeline and the heat medium inlet main pipeline of the heat medium preparation module 230 is monitored. When the temperatures of both have reached the set value stably for a long time, the control system will intermittently start according to the operation time of each heat medium preparation module 230, keep the operation time of multiple heat medium preparation modules 230 similar, and realize the intermittent shutdown of each heat medium preparation module 230 in turn. Similarly, the control principle of multiple refrigerant preparation modules 220 is the same as the control principle of the above-mentioned heat medium preparation module 230, which will not be repeated here.
[0100] On the other hand, a liquid level sensor is also provided in the high-temperature cache tank 240. When the liquid level in the high-temperature cache tank 240 is lower than a set value, the liquid replenishing device 250 is opened; when the liquid level is higher than the set liquid level value, the liquid replenishing device 250 is normally closed.
[0101] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0102] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.
Claims
1. A battery electrode coating system, characterized in that: include: A coating and recovery integrated oven, comprising a coating oven module and a heat exchange recovery module, wherein the heat exchange recovery module is fixed to the top of the coating oven module, the coating oven module is used to dry the battery electrodes and discharge high-temperature exhaust gas, the heat exchange recovery module is used to cool the high-temperature exhaust gas twice and heat the input gas flowing to the coating oven module twice, the heat exchange recovery module exchanges heat between the high-temperature exhaust gas and the input gas to achieve the first cooling of the high-temperature exhaust gas and the first heating of the input gas, and the high-temperature exhaust gas is cooled twice to form low-temperature exhaust gas; A heat pump module for heat conversion between the second cooling and the second heating; and The tail gas treatment module is used to receive and process the low-temperature exhaust gas discharged by the heat exchange recovery module.
2. The battery electrode coating system according to claim 1, characterized in that: The heat exchange recovery module comprises: an air-to-air heat exchanger having a first air channel and a second air channel, wherein the high-temperature exhaust gas in the first air channel exchanges heat with the input gas in the second air channel to first cool the high-temperature exhaust gas and first heat the input gas; A condensing main unit connected to the outlet of the first gas channel, the condensing main unit is used to perform a second cooling on the high-temperature exhaust gas, and a first circulation flow path is formed between the condensing main unit and the heat pump module so that the refrigerant of the heat pump module can be transported to the condensing main unit; and A first heater is connected to the outlet of the second gas channel. The first heater is used to heat the input gas for a second time. A second circulation flow path is formed between the first heater and the heat pump module so that the heat medium of the heat pump module can be transported to the first heater.
3. The battery electrode coating system according to claim 2, characterized in that: The refrigerant in the first circulation flow path is chilled water.
4. The battery electrode coating system according to claim 2, characterized in that: The heat medium in the second circulation flow path is heat transfer oil or high-temperature hot water.
5. The battery electrode coating system according to claim 2, characterized in that: In each row of the plurality of coating oven modules, the temperatures of the plurality of coating oven modules increase gradually from both ends to the middle.
6. The battery electrode coating system according to claim 5, characterized in that: The heat exchange recovery module also includes a second heater, which is arranged in the middle of the coating oven module. The second heater is used to heat the input gas output by the first heater for a third time, or the second heater is used to heat the heat medium in the first heater.
7. The battery electrode coating system according to claim 6, characterized in that: The second heater uses high-temperature steam or high-temperature heat-conducting oil to perform a third heating on the input gas output by the first heater, or the second heater uses electromagnetic heating to heat the heat medium in the first heater.
8. The battery electrode coating system according to any one of claims 1 to 7, characterized in that: The coating and recovery integrated ovens are provided in plurality, and the plurality of coating and recovery integrated ovens are arranged in multiple rows and columns.
9. The battery electrode coating system according to any one of claims 2 to 7, characterized in that: The heat pump module comprises: Evaporative condenser; A refrigerant preparation module, comprising a circulation evaporator, a first compressor and a first expansion valve, wherein the first circulation flow path is formed between the circulation evaporator and the condensing main unit, and the circulation evaporator, the first compressor, the evaporative condenser and the first expansion valve are sequentially connected to form a third circulation flow path; The heat medium preparation module includes a circulating condenser, a second expansion valve and a second compressor. The second circulating flow path is formed between the circulating condenser and the first heater. The circulating condenser, the second expansion valve, the evaporative condenser and the second compressor are connected in sequence to form a fourth circulating flow path. The third circulating flow path and the fourth circulating flow path exchange heat through the evaporative condenser.
10. A battery electrode coating system control method, characterized in that: Applied to the battery electrode coating system according to any one of claims 1 to 9, the control method comprises the following steps: Real-time monitoring of the operating parameters of each coating and recovery integrated oven and heat pump module, including the inlet temperature, exhaust temperature and NMP gas concentration of the coating oven module, the exhaust temperature of the heat exchange recovery module, and the heat medium input temperature, heat medium output temperature, refrigerant input temperature and refrigerant output temperature of the heat pump module; The coating and recovery integrated oven and the heat pump module adjust their working status according to the monitoring data. The coating and recovery integrated oven and the heat pump module determine whether there is an abnormality by comparing the monitored value and the preset value of the working parameters. If there is an abnormality, the working status of the coating and recovery integrated oven and / or the heat pump module is adjusted accordingly to make the working parameters of the coating and recovery integrated oven and / or the heat pump module tend to the preset values.
Citation Information
Patent Citations
Coating machine baking oven system
CN102824993A
Coating machine drying oven and coating machine waste gas recovery system
CN114798369A
Coating and recycling integrated system