Multi-crane matching type wind power construction method

By using a combination of support trucks and main cranes in wind power construction, the stability problem caused by lateral shaking of the tower during wind power equipment construction is solved, the safety and flexibility of the lifting process are improved, and more efficient construction operations are achieved.

CN118978094APending Publication Date: 2024-11-19HENAN JINLI HEAVY IND TECH CO LTD

Patent Information

Application Number
CN202410973148.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

During wind power equipment construction, vehicle-mounted cranes are prone to unstable vehicle due to the lateral shaking of the tower when lifting large and heavy parts, causing boom breakage accidents. They are poor in flexibility and cannot effectively solve the stability of the tower in the lateral direction. .

Method used

By installing a support vehicle on the main crane, forming a vehicle set, using the track differential operation of the support vehicle and the rotation of the main crane, the stable support and flexible movement of the crane arm are achieved, the overall stability and flexibility are improved, and the ground anchorage is reduced. demand.

Benefits of technology

It enhances the stability of the main crane, improves the flexibility of the lifting process, reduces the risk of crane breakage, and improves the efficiency and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118978094A_ABST
    Figure CN118978094A_ABST
Patent Text Reader

Abstract

The invention belongs to the field of wind power, and particularly relates to a multi-crane matching type wind power construction method which comprises the steps that a main crane is included, the main crane supports a main suspension arm of the main crane through at least one supporting vehicle, the main crane and the supporting vehicle are connected to form a vehicle set, and the vehicle set synchronously operates and moves to the position of a to-be-hoisted component for hoisting. Compared with the prior art, the main crane is supported through the supporting vehicle, on one hand, the stability of the main crane is enhanced, on the other hand, due to the fact that the stability is enhanced, the main crane does not need to be anchored to the ground and can move together with the supporting vehicle, and the flexibility is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of wind power, and belongs to the catalogue of strategic emerging industries, 6 new energy industries, 6.2 wind energy industry, 6.2.5 wind power generation technical services, specifically wind farm design and construction services, and specifically involves a wind power construction method using multiple cranes. Background Art

[0002] During the construction of wind power equipment, the tower, hub blades and other components of the wind power equipment are heavy, which places high demands on lifting equipment. Most of the time, super-large tower cranes are built on site, which have high strength and good stability, but are expensive.

[0003] In recent years, in order to save costs, businesses often use vehicle-mounted cranes, especially crawler cranes. They are low-cost, easy to transport, and have better flexibility at construction sites. However, the disadvantage is that when lifting large and heavy components such as towers, boom breakage accidents occur frequently. The fundamental reason is partly due to the strength of the boom itself (improvements in materials in recent years have made the strength of the boom sufficient to cope with heavy lifting conditions), but more because of the lateral shaking of the tower, which leads to unstable center of the vehicle, and ultimately causes the vehicle to collapse sideways or the boom to break. Therefore, if the boom itself can be stabilized, this problem can be well solved. On the other hand, when facing heavy lifting conditions, vehicle-mounted cranes are often anchored to the ground through vehicle-mounted ground anchors to stabilize the vehicle. The disadvantage is poor flexibility.

[0004] The application later proposes a structure that supports the main crane and can accompany it, so a corresponding supporting working method is proposed. Summary of the invention

[0005] In order to solve the above problems, the present invention provides a wind power construction method using multiple cranes.

[0006] The objective of the present invention is achieved in the following manner: a wind power construction method using multiple cranes, the method comprising a main crane 1, the main crane 1 supporting a main boom 12 of the main crane 1 through at least one supporting vehicle 2, the main crane 1 and the supporting vehicle 2 being connected to form a vehicle group, the vehicle group synchronously moves to the position of the component to be hoisted for hoisting, and the vehicle group synchronously moves to the installation position for assembling the component.

[0007] Furthermore, the method comprises the following steps: S1. Use the main crane 1 to complete the foundation construction and hoist the foundation ring 5. Use the main crane 1 to hoist the tower bottom equipment to the top of the foundation ring 5 and perform installation and commissioning. S2. The main crane 1 is used to complete the hoisting and installation operation of the hub 7 and the blades in the wind power equipment at a position far away from the foundation ring 5; S3. Install the fixed support member 3 on the main boom 12 of the main crane 1, drive the two support vehicles 2 to the two sides of the main boom 12 respectively, extend the auxiliary boom 22 to the corresponding height of the support member 3, extend the spherical support block 221 into the spherical groove, fix the limit plate 35 and the flange surface 34, and complete the installation; S4, installing a truss 4 between the main crane 1 and the support vehicle 2 to form a crane assembly; S5. Adjust so that the crawler tracks of the main crane 1 and the support vehicle 2 are parallel, and the crane assembly moves forward and backward along the crawler tracks; S6. Adjust so that the crawler tracks of the support vehicle 2 are tangent to the arc with the rotation axis of the upper body of the main crane 1 as the center; the two crawler tracks of the support vehicle 2 run at a differential speed, and at the same time, the upper body of the main crane 1 rotates, so that the crane assembly rotates as a whole along the rotation axis of the upper body of the main crane 1; S7, adjusting the main boom 12 toward the component to be hoisted through S6, and moving the hoisting device on the main boom 12 to above the component to be hoisted through S5, and performing the hoisting operation; S8, through S6, adjust the main boom 12 toward the foundation ring 5, through S5, so that the lifting device on the main boom 12 is moved above the foundation ring 5 to perform the lifting operation; S9, repeat S7-S8, and sequentially hoist the multi-section tower 6 and the wind power equipment cabin 8; S10, through S6, adjusting the main boom 12 toward the hub 7 of the wind turbine, through S5, the hoisting device on the main boom 12 is moved to the top of the hub 7, and the hoisting operation is performed, and the hub 7 and the blades are transformed from the horizontal to the vertical posture during the hoisting process; through S6, adjusting the main boom 12 toward the nacelle 8, so that the hub 7 and the nacelle 8 are aligned and installed in coordination; S11, dismantle the truss 4 and the limit plate 35 in sequence, disengage the support vehicle 2, dismantle the support member 3, retract the main boom 12, and clear the site.

[0008] Furthermore, the main crane 1 and the support vehicle 2 are both provided with sub-controllers, which control the operation of the entire vehicle. All sub-controllers are wirelessly connected to the main controller, and the main controller sends instructions to the sub-controllers to control the operation of the main crane 1 and / or the support vehicle 2.

[0009] Furthermore, the method of adjusting the track direction of S5 is as follows: the two tracks of the lower body of the main crane 1 and / or the support vehicle 2 rotate in opposite directions at the same speed, while the upper body is kept rotating relative to the lower body but stationary relative to the ground, and adjusted until the tracks of the main crane 1 and the support vehicle 2 are parallel.

[0010] Furthermore, the method for adjusting the direction of the crawler track of S6 is as follows: the two crawler tracks of the lower body of the main crane 1 and / or the support vehicle 2 rotate in opposite directions at the same speed, while the upper body is kept rotating relative to the lower body but stationary relative to the ground, and the crawler tracks of the support vehicle 2 are adjusted to be tangent to an arc with the rotation axis of the upper body of the main crane 1 as the center.

[0011] A method for wind power construction by multi-crane coordination as described in claim 2 is characterized in that: the differential operation means that the rotation speed of the vehicle body on the main crane 1 is n, and the running speed of one of the crawlers of the support vehicle 2 is 2πRxn, Rx is the radius of the arc tangent to the crawler and the rotation axis of the vehicle body on the main crane 1 as the center; the running speed of the other crawler is 2πRyn, Ry is the radius of the arc tangent to the crawler and the rotation axis of the vehicle body on the main crane 1 as the center; the two crawlers form a running speed difference of |2πRxn-2πRyn|.

[0012] Compared with the prior art, the present invention supports the main crane by means of a support vehicle, which on the one hand enhances the stability of the main crane, and on the other hand, due to the enhanced stability, the main crane no longer needs to be anchored to the ground and can move together with the support vehicle, thereby improving flexibility. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural diagram of the crane in the assembled state; Figure 2 It is a side view of the support parts in the assembled state of the crane; Figure 3 It is the main exploded view of the support; Figure 4 is the main view of the support; Figure 5 This is one of the top views of the crane assembly in working condition; Figure 6 This is the second top view of the crane assembly in working condition; Figure 7 This is the third top view of the crane assembly in working condition; Figure 8 This is the fourth top view of the crane assembly in working condition; Fig. 9 It is a schematic diagram of the crane assembly hoisting and installing the hub blades; Fig.10 yes Fig. 9 An enlarged view of the crane part.

[0014] Among them, the main crane 1, the main vehicle body 11, the main boom 12, the support vehicle 2, the auxiliary vehicle body 21, the auxiliary boom 22, the spherical support block 221, the support part 3, the upper fastener 31, the lower fastener 32, the support block 33, the flange surface 34, the limit plate 35, the truss 4, the foundation ring 5, the tower 6, the hub 7, and the nacelle 8. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0016] In the present invention, unless otherwise clearly stipulated and limited, the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0017] As attached Figure 1 As shown, a combined crane structure includes a main crane 1 and a support vehicle 2. The main crane 1 includes a main vehicle body 11, on which a main boom 12 is arranged; the support vehicle 2 includes an auxiliary vehicle body 21, on which an auxiliary boom 22 is arranged, and the auxiliary boom 22 is connected to the main boom 12 to support the main boom 12.

[0018] It should be noted that the support vehicle can also be improved based on a crane that is smaller than the main crane 1. The difference is that the lifting-related structure is removed, and a support structure that cooperates with the main crane 12 is set on the auxiliary boom 22.

[0019] The support vehicle 2 supports the main crane 1, which, on the one hand, enhances the stability of the main crane 1; on the other hand, due to the enhanced stability, the main crane 1 does not need to be anchored to the ground and can move together with the support vehicle 2, thereby improving flexibility.

[0020] Furthermore, the main boom 12 is fixedly connected to the support member 3, and the support member 3 is spherically connected to the auxiliary boom 22 on the side. In actual operation, it is impossible to keep the main crane 1 and the support vehicle 2 running absolutely at the same time, so a deflection margin is reserved for the auxiliary boom 22.

[0021] Further, as attached Figure 5 As shown, there are two support vehicles 2, and both sides of the support member 3 are respectively connected to the auxiliary booms 22 of the two support vehicles 2 by ball joints. The structure is more stable because it is supported on both sides.

[0022] Further, as attached Figure 2-4 As shown, the support member 3 includes an upper fastener 31 and a lower fastener 32. Preferably, the upper fastener 31 and the lower fastener 32 are both U-shaped plates and extend the flange outer edges outward on both sides. The flange outer edges between the upper fastener 31 and the lower fastener 32 are fixed by bolts, wherein the top of the upper fastener 31 is provided with more than two fixing holes, and is fixed to the main boom 12 through the fixing holes. The upper fastener 31 and the lower fastener 32 are buckled and clamped on the main boom 12. The lower fastener 32 is fixedly connected to the support block 33, and the two sides of the support block 33 are respectively A flange surface 34 is provided, and a spherical groove is formed inwardly by the flange surface 34. A limit plate 35 is provided in conjunction with the flange surface 34, and a limit groove is provided on the limit plate 35. The end of the auxiliary boom 22 is fixedly connected to a spherical support block 221 that cooperates with the spherical groove. The spherical groove is less than or equal to 1 / 2 sphere, so that the spherical support block 221 can enter normally. Preferably, the limit plate 35 is formed by two pieces abutting to form a whole plate. After the spherical support block 221 extends into the spherical groove, the limit plate 35 is assembled on both sides of the bottom of the spherical support block 221 and fixed to the flange surface 34 by bolts.

[0023] Further, as attached Figure 4 As shown, the flange surface 34 forms an angle of 30° to 50° with the plane, which is used to bear the auxiliary boom 22 in a positive direction and at the same time allow the spherical support block 221 to have a larger rotation margin.

[0024] Further, as attached Figure 5 As shown, the main crane 1 and the support vehicle 2 are both crawler cranes; the auxiliary boom 22 is a telescopic boom, and the main vehicle body 11 and the auxiliary vehicle body 21 are fixedly connected by a truss 4. Preferably, the two trusses 4 are further fixedly connected by a transverse truss 4.

[0025] The advantage of a crawler crane is that it can use the control method of the prior art in which the two crawlers rotate in opposite directions at the same speed, while keeping the upper body rotating relative to the lower body but stationary relative to the ground, to cope with the working condition of multiple vehicles in the present invention where they are fixed and interfere with each other's movements, and can also move as a whole under this condition.

[0026] The above truss 4 structure is preferably as shown in the attached Figure 5 , 10 As shown, two groups of left and right hinge seats are arranged on the sides of the upper car bodies of the main car body 11 and the auxiliary car body 21, and each group of hinge seats includes two upper and lower parallel hinge seats, a through hole is arranged in the middle of the hinge seats, and two limit rods are fixed at the ends of the truss 4, and each limit rod passes through the through holes of the upper and lower hinge seats in one group, and the diameter of the limit rod is smaller than the diameter of the through hole, leaving a control error and a margin for activity. This is because the function of the truss 4 itself is suitable for pulling each other between the car bodies to be more stable, rather than fixing the car bodies.

[0027] Furthermore, the main crane 1 and the support vehicle 2 are both provided with sub-controllers, which control the operation of the entire vehicle. All sub-controllers are wirelessly connected to the main controller, and the main controller sends instructions to the sub-controllers to control the operation of the main crane 1 and / or the support vehicle 2. The technology of separately controlling multiple devices through the main controller belongs to the existing technology and will not be repeated here.

[0028] A method for constructing wind power generation equipment, the method comprising: comprising a main crane 1, the main crane 1 supporting a main boom 12 of the main crane 1 through at least one supporting vehicle 2, the main crane 1 and the supporting vehicle 2 being connected to form a vehicle group, the vehicle group synchronously moves to a position of a component to be hoisted for hoisting, and the vehicle group synchronously moves to an installation position for assembling the component.

[0029] The method comprises the following steps: S1. Use the main crane 1 to complete the material transportation, positioning and setting out, excavation, cushion concrete pouring, pre-embedded foundation ring support steel plate, setting out, installation of foundation ring 5 anchor bolt support, installation of foundation ring, steel bar binding, pre-embedded power cable pipe, formwork, foundation concrete pouring, formwork removal, earth backfilling, and use the main crane 1 to hoist the tower bottom equipment (including but not limited to the inverter and tower bottom control cabinet) to the top of the foundation ring 5, and perform installation, commissioning and wiring, etc.; S2. The hub 7 and blades are hoisted and installed in the wind turbine at a position far away from the foundation ring 5 by the main crane 1. The reason for "far away" is that in this solution, the hub 7 and blades need to be pre-installed before the multi-trailer assembly, and the installation process of the hub 7 and blades is delayed, so they are pre-assembled far away; S3. Install the fixed support member 3 on the main boom 12 of the main crane 1, drive the two support vehicles 2 to the two sides of the main boom 12 respectively, extend the spherical support block 221 of the auxiliary boom 22 to the corresponding height of the support member 3, let the spherical support block 221 extend into the spherical groove, fix the limit plate 35 and the flange surface 34, and complete the installation. The installation process can be completed manually with the ladder. The ladder uses the ladder device used in the construction of wind power equipment in the prior art and is preferably used with the main crane 1 for lifting and stability; S4, installing a truss 4 between the main crane 1 and the support vehicle 2 to form a crane assembly; S5, as attached Figure 5 As shown, the two crawlers of the lower body of the main crane 1 and / or the support vehicle 2 rotate in opposite directions at the same speed, while the upper body rotates relative to the lower body but remains stationary relative to the ground, and the crawlers of the main crane 1 and the support vehicle 2 are adjusted to be parallel, and move to the position shown in the figure. Figure 6 In the state shown, the crane assembly moves forward and backward along the crawler direction; S6, as attached Figure 7As shown, the two crawlers of the lower body of the main crane 1 and / or the support vehicle 2 rotate in opposite directions at the same speed, while the upper body is kept rotating relative to the lower body but stationary relative to the ground, and the crawlers of the support vehicle 2 are adjusted to be tangent to the arc with the rotation axis of the upper body of the main crane 1 as the center, and the crawlers of the main crane 1 are parallel to the main boom 12; the two crawlers of the support vehicle 2 run at a differential speed, and the upper body of the main crane 1 rotates at the same time, so that the crane assembly can rotate as a whole along the rotation axis of the upper body of the main crane 1; S7, adjusting the main boom 12 toward the component to be hoisted through S6, and moving the hoisting device on the main boom 12 to above the component to be hoisted through S5, and performing hoisting operations such as installing a traction rope; S8, through S6, adjust the main boom 12 toward the foundation ring 5, through S5, so that the lifting device on the main boom 12 is moved above the foundation ring 5 to perform the lifting operation; S9, repeat S7-S8, and sequentially hoist the multi-section tower 6 and the wind power equipment cabin 8; S10, through S6, adjust the main boom 12 toward the hub 7 of the wind power equipment, through S5, make the hoisting device on the main boom 12 move to the top of the hub 7, perform the lifting operation, and complete the hub 7 and the blade from the horizontal to the vertical posture conversion during the lifting process; through S6, adjust the main boom 12 toward the nacelle 8, so that the hub 7 and the nacelle 8 are aligned and installed in coordination; it should be noted that "the posture conversion from the horizontal to the vertical" belongs to the prior art, and is realized by the special equipment recorded in the application number CN202310613984X filed by the applicant on May 29, 2023, and the name is "A wind turbine construction impeller lifting mechanism and wind turbine construction method"; S11, dismantle the truss 4 and the limit plate 35 in sequence, disengage the support vehicle 2, dismantle the support member 3, retract the main boom 12, and clear the site.

[0030] Furthermore, the differential operation in S6 means that the rotation speed of the vehicle body on the main crane 1 is n, and the running speed of one track of the support vehicle 2 is 2πRxn, Rx is the radius of the arc tangent to the track and the rotation axis of the vehicle body on the main crane 1 as the center; the running speed of the other track is 2πRyn, Ry is the radius of the arc tangent to the track and the rotation axis of the vehicle body on the main crane 1 as the center; the two tracks form a running speed difference of |2πRxn-2πRyn|.

[0031] The above is only a preferred embodiment of the present invention. It should be pointed out that for those skilled in the art, several changes and improvements can be made without departing from the overall concept of the present invention, which should also be regarded as the scope of protection of the present invention.

Claims

1. A wind power construction method using multiple cranes, characterized in that: The method comprises a main crane (1), wherein the main crane (1) supports a main boom (12) of the main crane (1) via at least one supporting vehicle (2), the main crane (1) and the supporting vehicle (2) are connected to form a vehicle group, the vehicle group moves synchronously to a position of a component to be lifted for lifting, and the vehicle group moves synchronously to an installation position for assembling the component.

2. A wind power construction method using multiple cranes as claimed in claim 1, characterized in that: The method comprises the following steps: S1. The main crane (1) is used to complete the foundation construction and hoist and install the foundation ring (5). The main crane (1) is used to hoist the tower bottom equipment to the top of the foundation ring (5), and installation and commissioning are performed; S2. At a location far from the foundation ring (5), the main crane (1) is used to complete the hoisting and installation operation of the hub (7) and the blades in the wind power equipment; S3, installing a fixed support member (3) on the main boom (12) of the main crane (1), driving two support vehicles (2) to the two sides of the main boom (12), extending the auxiliary boom (22) to the corresponding height of the support member (3), allowing the spherical support block (221) to extend into the spherical groove, fixing the limit plate (35) and the flange surface (34), and completing the installation; S4, installing a truss (4) between the main crane (1) and the support vehicle (2) to form a crane assembly; S5, adjusting so that the crawler tracks of the main crane (1) and the support vehicle (2) are parallel, and the crane assembly moves forward and backward along the crawler track direction; S6, adjusting so that the crawler tracks of the support vehicle (2) are tangent to the arc with the rotation axis of the upper vehicle body of the main crane (1) as the center; the two crawler tracks of the support vehicle (2) run at a differential speed, and at the same time the upper vehicle body of the main crane (1) rotates, so that the crane assembly rotates as a whole along the rotation axis of the upper vehicle body of the main crane (1); S7, adjusting the main boom (12) toward the component to be hoisted through S6, and moving the hoisting device on the main boom (12) to above the component to be hoisted through S5, and performing the hoisting operation; S8, adjusting the main boom (12) toward the base ring (5) through S6, and moving the lifting device on the main boom (12) to above the base ring (5) through S5 to perform the lifting operation; S9, repeat S7-S8, and sequentially hoist the multiple tower sections (6) and the wind power equipment cabin (8); S10, adjusting the main boom (12) toward the hub (7) of the wind turbine through S6, and moving the hoisting device on the main boom (12) to the top of the hub (7) through S5 to perform a lifting operation, during which the hub (7) and the blades are transformed from a horizontal to a vertical posture; adjusting the main boom (12) toward the nacelle (8) through S6, so that the hub (7) and the nacelle (8) are aligned and installed in coordination; S11, dismantle the truss (4) and the limit plate (35) in sequence, disengage the support vehicle (2), dismantle the support member (3), retract the main boom (12), and clear the site.

3. A wind power construction method using multiple cranes as claimed in claim 2, characterized in that: The main crane (1) and the support vehicle (2) are both provided with sub-controllers, which control the operation of the entire vehicle. All sub-controllers are wirelessly connected to the main controller, and the main controller sends instructions to the sub-controllers to control the operation of the main crane (1) and / or the support vehicle (2).

4. A wind power construction method using multiple cranes as claimed in claim 2, characterized in that: The method for adjusting the direction of the crawler tracks of S5 is as follows: the two crawler tracks of the lower body of the main crane (1) and / or the support vehicle (2) rotate in opposite directions at the same speed, while the upper body is kept rotating relative to the lower body but stationary relative to the ground, and the crawler tracks of the main crane (1) and the support vehicle (2) are adjusted to be parallel.

5. The method for wind power construction by multiple cranes as claimed in claim 2, characterized in that: The method for adjusting the direction of the crawler tracks of S6 is as follows: the two crawler tracks of the lower body of the main crane (1) and / or the support vehicle (2) rotate in opposite directions at the same speed, while the upper body is kept rotating relative to the lower body but stationary relative to the ground, and the crawler tracks of the support vehicle (2) are adjusted to be tangent to an arc with the rotation axis of the upper body of the main crane (1) as the center.

6. A wind power construction method using multiple cranes as claimed in claim 2, characterized in that: The differential operation means that the rotation speed of the vehicle body on the main crane (1) is n, and the running speed of one track of the support vehicle (2) is 2πRxn, where Rx is the radius of the arc tangent to the track and the rotation axis of the vehicle body on the main crane (1) as the center; the running speed of the other track is 2πRyn, where Ry is the radius of the arc tangent to the track and the rotation axis of the vehicle body on the main crane (1) as the center; the two tracks form a running speed difference of |2πRxn-2πRyn|.

Citation Information

Patent Citations

  • Stable hoisting equipment for expressway steel box girder and hoisting construction method of stable hoisting equipment

    CN113788413A

  • Impeller lifting mechanism for wind power construction and wind power construction method

    CN116605766A

  • Control method and device for cooperative operation of double cranes and double-crane system

    CN117185140A

  • Hoisting equipment

    CN220845228U

Cited By

  • Combined crane structure and wind power generation equipment construction method

    CN118954327A