Construction method of finalization steel die retaining wall bottom plate concrete accurate leveling device

Through the precise leveling device for the concrete of the base plate of the fixed steel form retaining wall, the problem of precise forming of slope concrete casting in the building is solved, efficient and precise construction is achieved, cost and labor intensity is reduced, and the quality forming of the base plate of the retaining wall foundation is ensured.

CN118979501AInactive Publication Date: 2024-11-19CHINA MCC17 GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411242215.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the field of construction, the cantilever retaining wall toe and wall heel plate foundation panels are inclined, which makes it difficult to accurately form the slope during concrete pouring. The traditional manual leveling method is time-consuming and labor-intensive and cannot guarantee the slope, which affects construction efficiency and molding quality. .

Method used

The concrete leveling device for the base plate of the fixed steel mold retaining wall is adopted, including operating handrails, connecting rods, angle regulators, vibrators, vibrator switches, vibrator bases, leveling scrapers, limit plates, combined fixed steel moldings and The chute is designed to accurately lay lines, install formwork, pour concrete, and use vibrators and limit panels to achieve accurate leveling.

Benefits of technology

It greatly saves construction time, reduces costs, ensures accurate slope forming of the base plate of the retaining wall foundation, improves construction speed and quality, and the formwork can be reused, clean and environmentally friendly, reducing labor intensity and waste materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979501A_ABST
    Figure CN118979501A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a finalization steel die retaining wall bottom plate concrete accurate leveling device, and relates to the technical field of building construction. The construction method of the finalization steel mould retaining wall bottom plate concrete accurate leveling device comprises the finalization steel mould retaining wall bottom plate concrete accurate leveling device and a retaining wall foundation template. The finalization steel mold retaining wall bottom plate concrete accurate leveling device comprises an operation handrail, a connecting rod piece, an angle adjuster, a vibrator, a vibrator switch, a vibrator base, a leveling scraping bar, a limiting plate, a combined finalization steel mold plate and a sliding groove. According to the finalization steel die retaining wall bottom plate concrete accurate leveling device, the traditional mode that multiple persons conduct leveling repeatedly through trowels is abandoned, a traditional technology is replaced with machinery, the time for surface finding construction is greatly saved, and meanwhile the construction cost is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a construction method of a standardized steel formwork retaining wall bottom plate concrete precise leveling device. Background Art

[0002] At present, the retaining wall base plate in the construction field is an inclined surface with a certain slope, for example: the base plate surface of the toe plate and the heel plate of the cantilever retaining wall is an inclined surface; when pouring concrete on the base slope, it is difficult to accurately shape the slope. The traditional manual leveling method with a trowel is labor-intensive and time-consuming. Limited by the technical level of the operators, the slope gradient cannot be guaranteed. After construction, the slope of the retaining wall base plate is poorly formed, which has great limitations in terms of construction efficiency and forming quality.

[0003] With the popularization of the information technology industry and the rise of building industrialization, digitalization has begun to drive the entire business process of production, logistics, and construction. The rapid development of engineering construction and the pressure of technological needs have further promoted the development trend of domestic steel formwork product solutions to show a deep combination of standardization and customization, industrialization and informatization. Intelligence, greenness, and prefabrication of some components have become important development directions for high-quality engineering construction. At the same time, personalized product solutions will replace single product structures, the phenomenon of homogeneous competition among enterprises will be effectively curbed, the added value of product technology will be improved, and the technical upgrading potential of steel formwork products is huge. Summary of the invention

[0004] 1. Technical issues to be solved

[0005] In view of the deficiencies in the prior art, the present invention provides a construction method for a standardized steel formwork retaining wall bottom slab concrete precise leveling device, which solves the problems existing in the prior art.

[0006] (II) Technical solution

[0007] To achieve the above purpose, the present invention is implemented through the following technical solutions: a construction method of a standardized steel formwork retaining wall bottom plate concrete precise leveling device, including a standardized steel formwork retaining wall bottom plate concrete precise leveling device and a retaining wall foundation template, the standardized steel formwork retaining wall bottom plate concrete precise leveling device includes: an operating handrail, a connecting rod, an angle adjuster, a vibrator, a vibrator switch, a vibrator base, a leveling scraper bar, a limit plate, a combined standardized steel template, and a slide groove;

[0008] The retaining wall foundation template includes: a standardized steel template, a vertical stiffening rib, and the retaining wall template is a cast-in-place building box steel template composed of a standardized steel template using a 4mm thick steel plate and a 40mm*60mm*3mm square tube shell rib frame structure welded together, including a box-type retaining wall outer template, a box-type retaining wall inner template, etc.; an 8# channel steel is installed at the bottom of the retaining wall template to form a track;

[0009] The specific construction method is as follows:

[0010] S1: Lay out the lines on the cushion layer according to the design requirements of the drawings. After the lines are qualified, install the retaining wall foundation formwork.

[0011] S2: Tie up the retaining wall foundation slab and retaining wall reinforcement according to the design requirements of the drawings.

[0012] S3: After the steel bars are accepted, install the guide wall formwork of the retaining wall.

[0013] S4: After the guide wall formwork reinforcement of the retaining wall is accepted, start pouring the foundation slab of the retaining wall and the concrete of the guide wall.

[0014] S5: After pouring and vibrating to the designed elevation, start finishing the surface with the bottom slab concrete precision leveling device.

[0015] S6: Place the limit plate and sliding square tube on the top of the foundation template and in the slide groove to ensure the sliding of the precise leveling device.

[0016] S7: The worker adjusts the angle adjuster and turns on the vibrator to ensure that the device is in good condition and can be used.

[0017] S8: The precise leveling device for the bottom slab concrete moves along the track, and then a plastic film is laid for maintenance.

[0018] S9: After the demoulding strength of the foundation slab is reached, the retaining wall slab is leveled once and completed.

[0019] Preferably, the leveling scraper bar is composed of two front and rear 60&60mm horizontal square steels welded by two vertical 50&50mm square steels.

[0020] Preferably, a worker of the retaining wall bottom slab concrete precise leveling device holds the operating handrail tightly, one end slides on the upper opening of the retaining wall template through a limit plate, and the other end slides on the bottom slide groove of the retaining wall through a 40&60mm square tube.

[0021] (III) Beneficial effects

[0022] The present invention provides a construction method for a standardized steel formwork retaining wall bottom plate concrete precise leveling device. It has the following beneficial effects:

[0023] 1. The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device abandons the traditional method of multiple people using trowels to repeatedly level the surface, greatly saving the time used for surface leveling construction and greatly reducing construction costs.

[0024] 2. The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device can accurately level the slope designed in the drawing at one time, is no longer limited by the technical level of the operators, and effectively ensures the molding quality of the retaining wall foundation bottom plate.

[0025] 3. The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device adopts the standardized steel formwork itself which has the advantages of high strength, large combined rigidity, high plate production precision, tight joints, and not easy to deform. The formwork has good integrity and can make the pool wall retaining wall in the industrial wastewater pool meet the standards of fair water concrete, which can effectively ensure the quality.

[0026] 4. The construction method of the standardized steel formwork retaining wall bottom slab concrete precise leveling device is simple to operate and easy to implement. The standardized steel formwork with good self-stability and integrity is processed in advance and hoisted and dismantled by lifting machinery. The bolt holes on the side panels are used to connect and disassemble the various sections of the formwork. It is simple and efficient, reducing the workload of disassembly and assembly of the formwork support system. The mechanized operation degree is high, the labor intensity is reduced, the use of carpentry can be reduced, the construction speed of the mold is greatly improved, and the mechanization of the formwork construction is realized.

[0027] 5. The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device is that the standardized detachable formwork can be reused, while the traditional wooden formwork will generate a large amount of waste materials after being used twice. The standardized steel formwork does not generate garbage or waste during the construction process, and the construction site is clean and tidy, which has a very good effect on civilized construction on site; at the same time, it is non-toxic and harmless, will not cause fire, and has outstanding advantages in saving resources and protecting the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0029] Figure 2 It is a detailed diagram of the leveling device of the present invention.

[0030] In the figure: 1. operating handrail; 2. vibrator switch; 3. connecting rod; 4. vibrator; 5. vibrator support; 6. limit plate; 7. leveling scraper bar; 8. angle adjuster; 9. sliding square tube; 10. foundation template; 11. guide wall template; 12. slide groove. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] See also Figure 1-2 The present invention provides a technical solution: a construction method of a standardized steel formwork retaining wall bottom plate concrete precise leveling device, comprising a standardized steel formwork retaining wall bottom plate concrete precise leveling device and a retaining wall foundation template, wherein the standardized steel formwork retaining wall bottom plate concrete precise leveling device comprises: an operating handrail, a connecting rod, an angle adjuster, a vibrator, a vibrator switch, a vibrator base, a leveling scraper bar, a limit plate, a combined standardized steel template, and a slide groove;

[0033] The retaining wall foundation template includes: a standardized steel template, a vertical stiffening rib, and the retaining wall template is a cast-in-place building box steel template composed of a standardized steel template using a 4mm thick steel plate and a 40mm*60mm*3mm square tube shell rib frame structure welded together, including a box-type retaining wall outer template, a box-type retaining wall inner template, etc.; an 8# channel steel is installed at the bottom of the retaining wall template to form a track;

[0034] The specific construction method is as follows:

[0035] S1: Lay out the lines on the cushion layer according to the design requirements of the drawings. After the lines are qualified, install the retaining wall foundation formwork.

[0036] S2: Tie up the retaining wall foundation slab and retaining wall reinforcement according to the design requirements of the drawings.

[0037] S3: After the steel bars are accepted, install the guide wall formwork of the retaining wall.

[0038] S4: After the guide wall formwork reinforcement of the retaining wall is accepted, start pouring the foundation slab of the retaining wall and the concrete of the guide wall.

[0039] S5: After pouring and vibrating to the designed elevation, start finishing the surface with the bottom slab concrete precision leveling device.

[0040] S6: Place the limit plate and sliding square tube on the top of the foundation template and in the slide groove to ensure the sliding of the precise leveling device.

[0041] S7: The worker adjusts the angle adjuster and turns on the vibrator to ensure that the device is in good condition and can be used.

[0042] S8: The precise leveling device for the bottom slab concrete moves along the track, and then a plastic film is laid for maintenance.

[0043] S9: After the demoulding strength of the foundation slab is reached, the retaining wall slab is leveled once and completed.

[0044] The leveling scraper bar is composed of two 60&60mm horizontal square steels at the front and rear, welded by two 50&50mm vertical square steels.

[0045] The worker of the retaining wall bottom plate concrete precise leveling device holds the operating handrail tightly, one end slides on the upper mouth of the retaining wall template through the limit plate, and the other end slides on the bottom slide groove of the retaining wall through the 40&60mm square tube.

[0046] Example:

[0047] See also Figure 1 , Figure 2 In the embodiment of the present invention, a device for accurately leveling concrete of a standardized steel mold retaining wall bottom plate is provided, and the device comprises: an operating handrail 1, a vibrator switch 2, a connecting rod 3, a vibrator 4, a vibrator support 5, a limit plate 6, a leveling scraper 7, an angle adjuster 8, a sliding square tube 9, a base template 10, a guide wall 11, and a slide 12. The limit plate 6 is located at the upper mouth of the base template 10, and the sliding square tube 9 is specially designed to be connected with the slide 12 set in the guide wall template 10. Through the sliding of the limit plate 6 and the sliding square tube 9, the leveling scraper 7 can slide slowly along the same angle smoothly, so that the inclined concrete molding effect is good. The leveling scraper 7 is located below the vibrator 4 and connected to the vibrator support 5, which can conduct the vibration of the vibrator to achieve the slurry leveling of the concrete surface. The angle adjuster 8 is a connector at the junction of the connecting rod 3 and the leveling scraper 7. Through the angle control of the angle adjuster 8, workers can choose the most comfortable angle to use the operating handrail, which is faster and more convenient.

[0048] In the specific implementation, after the retaining wall reinforcement is installed, the foundation formwork 10 and the guide wall formwork 11 are installed. The guide wall formwork 11 is composed of a 4mm thick steel plate and a 40mm*60mm*3mm square tube rib frame structure welded together. After the concrete is poured to the elevation, the standardized steel mold retaining wall bottom plate concrete precise leveling device is used to place the limit plate 6 and the sliding square tube 9 on the top of the foundation formwork 10 and the slide 12 respectively. The worker holds the operating handrail 1 tightly, uses the angle adjuster 8 to adjust to a suitable angle, turns on the vibrator switch 2, and starts to slide slowly.

[0049] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0050] S1: Lay out the lines on the cushion layer according to the design requirements of the drawings. After the lines are qualified, install the retaining wall foundation formwork 10.

[0051] S2: Tie up the retaining wall foundation slab and retaining wall reinforcement according to the design requirements of the drawings.

[0052] S3: After the steel bars are accepted, the guide wall formwork 11 of the retaining wall is installed.

[0053] S4: After the reinforcement and acceptance of the guide wall formwork 11 of the retaining wall is qualified, the concrete of the foundation slab of the retaining wall and the guide wall is poured.

[0054] S5: After pouring and vibrating to the designed elevation, start finishing the surface with the bottom slab concrete precision leveling device.

[0055] S6: Place the limit plate 6 and the sliding square tube 9 on the upper opening of the base template 10 and in the slide groove 12 to ensure the sliding of the precise leveling device.

[0056] S7: The worker adjusts the angle adjuster 8 and turns on the vibration machine switch 2 to ensure that the device is intact and can be used.

[0057] S8: The precise leveling device for the bottom slab concrete moves along the track, and then a plastic film is laid for maintenance.

[0058] S9: After the demoulding strength of the foundation slab is reached, the retaining wall slab is leveled once and completed.

[0059] In summary, the construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device abandons the traditional method of multiple people using a trowel to repeatedly level the surface, greatly saves the time used for surface leveling construction, and greatly reduces the construction cost.

[0060] The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device can accurately level the slope designed in the drawing in one go, is no longer limited by the technical level of the operators, and effectively ensures the molding quality of the retaining wall foundation bottom plate.

[0061] The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device adopts a standardized steel formwork which has the advantages of high strength, large combined rigidity, high plate production precision, tight joints, and not easy to deform. The formwork has good integrity and can make the pool wall retaining wall in the industrial wastewater pool meet the standards of clear water concrete, which can effectively ensure the quality.

[0062] The construction method of the standardized steel formwork retaining wall bottom slab concrete precise leveling device is simple to operate and easy to implement. The standardized steel formwork with good self-stability and integrity is processed in advance and hoisted and dismantled by lifting machinery. The various sections of the formwork are connected and disassembled by bolts through the bolt holes on the side panels. The method is simple and efficient, reduces the workload of disassembly and assembly of the formwork support system, has a high degree of mechanized operation, reduces labor intensity, can reduce the use of carpentry, greatly improves the construction speed of the mold, and realizes the mechanization of formwork construction.

[0063] The construction method of the standardized steel formwork retaining wall bottom plate concrete precise leveling device is that the standardized detachable formwork can be reused, and the traditional wooden formwork will generate a large amount of waste materials after being used twice. The standardized steel formwork does not generate garbage and waste during the construction process, and the construction site is clean and tidy, which has a very good effect on civilized construction on site; at the same time, it is non-toxic and harmless, will not cause fire, and has outstanding advantages in saving resources and protecting the environment.

[0064] The invention provides a standardized steel formwork retaining wall bottom plate concrete precise leveling device, which abandons the traditional method of repeated leveling by multiple people with a trowel, and uses machinery to replace the traditional process, which greatly saves the time used for surface construction and greatly reduces the construction cost. It can also accurately level the slope designed in the drawing once, no longer limited by the technical level of the operators, effectively ensure the molding quality of the retaining wall foundation bottom plate, and provide more abundant and reference devices and construction experience for the construction in the future steel formwork casting process.

[0065] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0066] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction method for a standardized steel formwork retaining wall bottom plate concrete precise leveling device, Features: It includes a standardized steel formwork retaining wall bottom plate concrete precise leveling device and a retaining wall foundation template, and the standardized steel formwork retaining wall bottom plate concrete precise leveling device includes: an operating handrail, a connecting rod, an angle adjuster, a vibrator, a vibrator switch, a vibrator base, a leveling scraper bar, a limit plate, a combined standardized steel template, and a slide groove; The retaining wall foundation template includes: a standardized steel template, a vertical stiffening rib, and the retaining wall template is a cast-in-place building box steel template composed of a standardized steel template using a 4mm thick steel plate and a 40mm*60mm*3mm square tube shell rib frame structure welded together, including a box-type retaining wall outer template, a box-type retaining wall inner template, etc.; an 8# channel steel is installed at the bottom of the retaining wall template to form a track; The specific construction method is as follows: S1: Lay out the lines on the cushion layer according to the design requirements of the drawings. After the lines are qualified, install the retaining wall foundation formwork. S2: Tie up the retaining wall foundation slab and retaining wall reinforcement according to the design requirements of the drawings. S3: After the steel bars are accepted, install the guide wall formwork of the retaining wall. S4: After the guide wall formwork reinforcement of the retaining wall is accepted, start pouring the foundation slab of the retaining wall and the concrete of the guide wall. S5: After pouring and vibrating to the designed elevation, start finishing the surface with the bottom slab concrete precision leveling device. S6: Place the limit plate and sliding square tube on the top of the foundation template and in the slide groove to ensure the sliding of the precise leveling device. S7: The worker adjusts the angle adjuster and turns on the vibrator to ensure that the device is in good condition and can be used. S8: The precise leveling device for the bottom slab concrete moves along the track, and then a plastic film is laid for maintenance. S9: After the demoulding strength of the foundation slab is reached, the retaining wall slab is leveled once and completed.

2. The construction method of a standardized steel formwork retaining wall bottom slab concrete precise leveling device according to claim 1, Features: The leveling scraper bar is composed of two 60&60mm horizontal square steels at the front and rear, welded by two 50&50mm vertical square steels.

3. The construction method of a standardized steel formwork retaining wall bottom slab concrete precise leveling device according to claim 1, Features: The worker of the retaining wall bottom plate concrete precise leveling device holds the operating handrail tightly, one end slides on the upper mouth of the retaining wall template through the limit plate, and the other end slides on the bottom slide groove of the retaining wall through the 40&60mm square tube.

Citation Information

Patent Citations

  • Simple slope terrace leveling and vibrating integrated device and construction method thereof

    CN110878507A