Structure for reducing floating of existing tunnel below caused by river excavation and protection method

By setting up a combined structure of precast concrete anti-buoyancy plates and fixing components above the tunnel, combined with soil reinforcement using lightweight mixing piles and segmented excavation methods, the problem of tunnel uplift caused by river excavation was solved, achieving improved tunnel stability, simplified construction, and environmental protection.

CN118979525AInactive Publication Date: 2024-11-19NINGBO ELECTROMECHANICAL IND RES & DESIGN INST CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411333327.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing technologies for protecting existing tunnels from uplift caused by river excavation are not very effective, are complex to implement, have long construction cycles, and make it difficult to consider the protection of the tunnel and the surrounding environment after construction is completed.

Method used

The project employs a combination structure of precast concrete anti-buoyancy plates and fixing components. This involves setting up precast concrete anti-buoyancy plates above the tunnel, with pre-drilled holes and fixing components such as anchors or piles on them. The soil is reinforced using a lightweight mixing pile machine. The tunnel is excavated in sections, and grouting is injected at the pre-drilled holes to lock the fixing components and provide temporary load-bearing support, adapting to the shape of the river channel and the length of the construction section.

Benefits of technology

It effectively controls tunnel uplift, improves soil stability, simplifies construction, shortens the construction period, reduces environmental impact, ensures construction quality and safety, adapts to different river channels and tunnel locations, and extends the life of fixed components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979525A_ABST
    Figure CN118979525A_ABST
Patent Text Reader

Abstract

The invention provides a structure for reducing floating of an existing tunnel below caused by river excavation. The structure comprises a prefabricated concrete anti-floating plate arranged above the existing tunnel. One end of the fixing assembly is connected with the prefabricated concrete anti-floating plate, and the other end of the fixing assembly extends towards the tunnel hole and extends into the soil body. The invention further discloses a protection method for reducing floating of the existing tunnel below caused by river excavation. The protection method comprises the steps that S1, soil body reinforcement is conducted on part of the soil layer below the river; s2, a fixing assembly is arranged below the pre-excavated river channel in a driving mode; s3, the river channel is divided into a plurality of construction sections in the length direction of the existing tunnel; s4, the construction section is subjected to sectional stripping excavation; s5, a fixing assembly which is arranged in advance penetrates through a preformed hole in the prefabricated concrete anti-floating plate; step S6; a temporary load is placed on the prefabricated concrete anti-floating plate; step S7; and the next construction section soil body is excavated in a jump excavation mode, and the step S5 and the step S6 are repeated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel protection, and in particular to a structure and a protection method for reducing the floating of an existing tunnel below caused by river excavation. Background Art

[0002] Cities need to carry out river excavation operations to improve river water quality, increase flood control functions, or carry out waterway construction. With the formation of urban underground rail transit networks, many river excavation projects above existing tunnels have emerged. When excavating a river, the unloading of the river excavation will disturb the surrounding soil, and at the same time cause stress release and deformation of the soil under the river. The unloading and deformation of the soil will cause the existing tunnel under the soil to respond. At the least, the existing tunnel will produce a large longitudinal deformation, and there will be diseases such as seepage and cracks; at the worst, it will affect the use of the existing tunnel, limit the speed of trains, and even cause the existing tunnel to be out of service, causing public hazards.

[0003] However, the current protection technology that can reduce the floating of existing tunnels caused by river excavation is very limited. The common protection method for controlling the floating of existing tunnels is mainly to install a mixing pile gantry type reinforcement in the soil around the tunnel or to cast concrete in the area where construction has already begun. However, the construction process of the gantry type reinforcement method is relatively complicated, with many construction steps and a relatively long construction period. Under special geological conditions, such as soft soil layers and strata with high water content, the construction effect of the mixing pile gantry type reinforcement method is not good and the expected reinforcement effect is not achieved. Casting concrete in the area where construction has already begun is likely to affect the construction progress, and it is necessary to wait for a long time before construction can continue, resulting in an extension of the construction period, and it may affect the surrounding environment, making it difficult to ensure the quality of the concrete, affecting the quality of the construction period. In addition, the protection methods for reducing the floating of existing tunnels caused by river excavation in the existing technology are mostly reflected in the river excavation construction stage, and it is not easy to consider the tunnel and surrounding environmental protection work after the construction is completed.

[0004] It can be seen that after the excavation of the river channel, the stress distribution of the soil above the existing tunnel is prone to change, which is easy to affect the existing tunnel structure and cause damage to the existing tunnel structure. In addition, the construction quality and the effect of controlling the deformation of the existing tunnel are poor.

[0005] Therefore, there is room for further improvement in the existing protection method for reducing the floating of the existing tunnel below caused by river excavation. Summary of the invention

[0006] The purpose of the present application is to provide a structure and a protection method to reduce the floating of an existing tunnel below caused by river excavation, so as to solve the problem raised in the background technology that the stress distribution of the soil above the existing tunnel is likely to change after the river excavation, which is likely to affect the existing tunnel structure and cause damage to the existing tunnel structure.

[0007] To achieve the above-mentioned purpose, the present application provides a structure for reducing the floating of an existing tunnel below caused by river excavation, including a prefabricated concrete anti-floating plate arranged above the existing tunnel;

[0008] It also includes a fixing assembly, one end of which is connected to the precast concrete anti-floating plate, and the other end of which extends toward the tunnel hole and into the soil;

[0009] The fixing assembly comprises a rod body, a locking piece and a grouting body; one end of the rod body close to the precast concrete anti-floating plate is connected to the locking piece, and the other end is connected to the grouting body;

[0010] Wherein, it also includes a gasket and a nut, the locking member passes through the gasket and is connected to the rod body, and the gasket is located above the precast concrete anti-floating plate;

[0011] The nut is connected to the locking piece, and the nut is used to fix the locking piece.

[0012] Furthermore, the precast concrete anti-floating plate is provided with a reserved hole corresponding to the fixing component, and a plurality of the reserved holes are evenly arranged, and the reserved holes are used to fix the fixing component.

[0013] Further, the fixing component is an anchor rod;

[0014] or,

[0015] The fixing component is a pile.

[0016] Furthermore, an anti-corrosion paint layer is applied on the top of the fixing component.

[0017] The present application also provides a protection method for reducing the floating of an existing tunnel below caused by river excavation, comprising the following steps:

[0018] Step S1: Before excavating the river channel, the soil layer above the existing tunnel and below the river channel is reinforced;

[0019] Step S2: installing a fixing assembly below the pre-excavated river channel;

[0020] Step S3: Divide the river channel into multiple construction sections along the length direction of the existing tunnel;

[0021] Step S4: According to the width of the river channel and the lifting weight limit, excavation is carried out in sections according to a preset sequence, and each construction section is excavated in sections;

[0022] Step S5: After the construction section is excavated to the riverbed elevation, the precast concrete anti-floating plate is hoisted to the base of each excavated construction section, and the pre-installed fixing components are passed through the reserved holes on the precast concrete anti-floating plate;

[0023] Step S6: Grouting the fixing assembly at the reserved hole, locking the fixing assembly with the precast concrete anti-floating plate, adjusting the tensile stress of the fixing assembly at the locking position, and placing a temporary load with the same weight of excavated soil on the precast concrete anti-floating plate;

[0024] Step S7: Skip excavation to start excavating the next construction section of soil, and repeat steps S5 and S6.

[0025] In the protection method for reducing the floating of the existing tunnel below caused by river excavation provided in the embodiment of the present application, in step S1, soil reinforcement is constructed using a light-duty mixing pile driver.

[0026] In the protection method for reducing the floating of an existing tunnel below caused by river channel excavation provided in an embodiment of the present application, the shape of the precast concrete anti-floating plate is determined according to the shape of the river channel.

[0027] In the protection method for reducing the floating of an existing tunnel below caused by river excavation provided in an embodiment of the present application, the length of the construction section is determined according to the size of the precast concrete anti-floating plate.

[0028] In the protection method for reducing the floating of the existing tunnel below caused by river excavation provided in the embodiment of the present application, during the construction process, the precast concrete anti-floating plate is constructed separately for the construction section corresponding to the section excavation of the river.

[0029] In the protection method for reducing the floating of the existing tunnel below caused by river excavation provided in the embodiment of the present application, in step S7, the soil of the next construction section is excavated by skipping, and after repeating steps S5 and S6, it specifically includes removing the counterweight and allowing water to flow to the river after the entire river excavation is completed.

[0030] The structure and protection method of the present application for reducing the floating of the existing tunnel below caused by river excavation have at least the following technical effects:

[0031] 1. By reinforcing part of the soil under the river channel, the soil reinforcement adopts the construction method of light mixing pile machine. The light mixing pile machine can form a three-dimensional reinforcement body in the soil. On the one hand, it can effectively improve the density and strength of the soil. After construction, the tunnel will produce a certain pre-settlement, which can be used to compensate for the floating amount caused by subsequent river channel excavation, improve the stability of the soil, provide stability of the excavation surface, prevent over-excavation, and help reduce the stress release of the soil. On the other hand, it can effectively control the floating of the existing tunnel, and the construction is relatively simple, effectively shortening the construction period.

[0032] 2. The segmented excavation method can reduce the surge in the existing tunnel's floating volume caused by one-time large-scale excavation and unloading, control the excavation progress and reduce the risk of the excavation project.

[0033] 3. By setting multiple reserved holes at intervals on the precast concrete anti-floating plate, on the one hand, the reserved holes are densely packed, so that the perforation construction between the fixed components and the precast concrete anti-floating plate can be completed in a variety of different river channels and tunnel locations, which can improve work efficiency and avoid construction problems caused by inappropriate position or insufficient depth of a single reserved hole, thereby improving safety during construction; on the other hand, more reserved holes can reserve working channels for subsequent reinforcement measures, which is conducive to reducing the dead weight of the precast concrete anti-floating plate, facilitating maintenance, and will not affect the infiltration of the soil layer after the river is irrigated, and will play a certain positive role in the local ecological environment.

[0034] 4. By setting the shape of the precast concrete anti-floating plate, the shape of the precast concrete anti-floating plate is determined according to the shape of the river channel. Its main function is to adapt to the shape of the river bend and ensure the comprehensive coverage of the river bottom by the precast concrete anti-floating plate. The construction is simple and the construction efficiency can be improved.

[0035] 5. The length of the construction section is set according to the size of the precast concrete anti-floating plate. The main purpose is to reduce the area of ​​single excavation, thereby reducing the stress release of local soil. It can ensure that the size and quality of each construction section meet the requirements, improve the quality and stability of the overall project, reduce the risk of size mismatch or adjustment difficulties during construction, and improve construction efficiency.

[0036] 6. By applying an anti-corrosion paint layer on the top of the fixed component, the top of the fixed component can be effectively prevented from being affected by oxidation, corrosion and rust, and the service life of the fixed component can be extended. Compared with the traditional technology of setting a waterproof device on the top of the fixed component, the construction of the waterproof device is complicated, and the application of an anti-corrosion paint layer can speed up the construction, reduce the construction process, speed up the formation of the pre-tensioning force of the fixed component, and reduce the stress release of the lower soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the arrangement of a structure and a protection method for reducing the floating of an existing tunnel below caused by river excavation provided in one embodiment of the present application;

[0038] Figure 2 This is a schematic diagram of a structure and a protection method for reducing the floating of an existing tunnel below caused by river excavation provided in an embodiment of the present application. Figure 1 ;

[0039] Figure 3It is a schematic diagram of a fixed component structure of a structure and a protection method for reducing floating of an existing tunnel below caused by river excavation provided in an embodiment of the present application;

[0040] Figure 4 This is a schematic diagram of a structure and a protection method for reducing the floating of an existing tunnel below caused by river excavation provided in an embodiment of the present application. Figure 2 ;

[0041] Figure 5 It is the spatial relationship diagram of the load for river excavation;

[0042] Figure 6 The structure of the precast concrete anti-floating plate in the structure and protection method for reducing the floating of the existing tunnel below caused by river excavation provided in one embodiment of the present application is schematically shown. Figure 1 ;

[0043] Figure 7 The structure of the precast concrete anti-floating plate in the structure and protection method for reducing the floating of the existing tunnel below caused by river excavation provided in one embodiment of the present application is schematically shown. Figure 2 ;

[0044] Figure 8 It is a schematic diagram of the overlapping structure of two adjacent prefabricated concrete anti-floating plates of a structure and a protection method for reducing the floating of an existing tunnel below caused by river excavation provided in one embodiment of the present application;

[0045] Fig. 9 It is a schematic diagram of a precast concrete anti-floating plate structure at a river channel bend, which provides a structure and a protection method for reducing the floating of an existing tunnel below caused by river channel excavation, according to an embodiment of the present application.

[0046] Reference numerals:

[0047] 1. Existing tunnel; 2. Precast concrete anti-floating plate; 3. Fixed components; 4. Reserved holes; 5. Counterweight; 6. Soil reinforcement; 7. Construction section;

[0048] 31. Rod body; 32. Locking piece; 33. Grouting body; 34. Gasket; 35. Nut. DETAILED DESCRIPTION

[0049] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, the present disclosure is described in detail, clearly and completely in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present disclosure and are not used to limit the present disclosure.

[0050] In the description of this application, if there is a description of first or second, it is only for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0051] Those skilled in the art should understand that, in the disclosure of the present application, the orientation or positional relationship indicated by terms such as "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", and "outside" are based on the orientation or positional relationship shown in the accompanying drawings, which are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present application.

[0052] The present application is further described in detail below in conjunction with the accompanying drawings. Figures 1 to 9 illustrate.

[0053] The structure and protection method provided in this embodiment to reduce the floating of the existing tunnel below caused by river excavation are applied in river excavation projects, such as Figures 1 to 9As shown, this embodiment provides a structure for reducing the floating of the existing tunnel below caused by river excavation, including a precast concrete anti-floating plate 2 and a fixing assembly 3. The precast concrete anti-floating plate 2 is arranged above the existing tunnel 1. The precast concrete anti-floating plate 2 is a prefabricated concrete anti-floating plate, which is convenient for on-site installation and use. It is made by arranging steel bars and then pouring concrete. The precast concrete anti-floating plate 2 can effectively maintain the stability of the existing tunnel 1 through its own weight and structural design, and can also distribute the load to reduce the possibility of load concentration in local areas; wherein, during the river excavation process, the length of the construction section 7 is determined according to the size of the precast concrete anti-floating plate 2, and its main function is to reduce the area of ​​a single excavation, thereby reducing the stress release of the local soil, and can ensure that the size and quality of each construction section 7 meet the requirements, improve the quality and stability of the overall project, reduce the risk of size mismatch or adjustment difficulty during construction, and improve construction efficiency. One end of the fixing component 3 is connected to the precast concrete anti-floating plate 2, and the other end extends toward the tunnel hole and extends into the soil. The anchoring components are arranged on both sides of the tunnel hole. The anchoring components are inclined or extended vertically. The fixing component 3 is an anchor rod or a pile. The fixing component 3 can be adopted according to the actual situation of the construction site. The fixing component 3 has high flexibility and is not easy to squeeze the soil out. The disturbance to the soil is small and the impact on the existing tunnel 1 is small. The fixing component 3 increases the anti-floating ability of the foundation through the friction with the surrounding soil, and prevents the floating phenomenon under the action of external load of the foundation. The fixing component 3 can improve the overall stability of the structure and prevent the structure from tilting or displacing under the action of external load, thereby ensuring the safe operation of the structure, making the construction process simpler and maintenance more convenient.

[0054] Specifically, Figure 6 to Figure 7 As shown, the precast concrete anti-floating plate 2 is provided with a temporary load and a plurality of reserved holes 4, the plurality of reserved holes 4 are evenly arranged, the reserved holes 4 are a circular structure or a square structure, the reserved holes 4 are used to fix the fixing components 3, on the one hand, the reserved holes 4 are densely packed, so that the perforation construction between the fixing components 3 and the precast concrete anti-floating plate 2 can be completed in the case of a variety of different river channels and tunnel positions, which can improve work efficiency and avoid construction problems caused by inappropriate position or insufficient depth of a single reserved hole 4, thereby improving safety during construction; on the other hand, there are more reserved holes 4, which can reserve an operating channel for subsequent reinforcement measures, which is beneficial to reducing the dead weight of the precast concrete anti-floating plate 2, facilitating maintenance, and will not affect the infiltration of the soil layer after the river channel is irrigated, and plays a certain positive role in the local ecological environment.

[0055] Further, such as Figure 8As shown, two adjacent precast concrete anti-floating plates 2 are overlapped with each other, and the edges of the precast concrete anti-floating plates 2 are designed to form a buckle. When the pull-out bearing capacity of the fixing component 3 is sufficient, piles can be driven only at the convex or concave precast concrete anti-floating plates 2, and the precast concrete anti-floating plates 2 in the middle position do not need to be piled, thereby reducing the use of the fixing component 3, saving construction costs, and reducing the impact of the fixing component 3 on the existing tunnel 1 during construction.

[0056] Further, such as Figure 3 As shown, the fixing assembly 3 includes a rod body 31, a locking member 32 and a grouting body 33. One end of the rod body 31 close to the precast concrete anti-floating plate 2 is connected to the locking member 32, and the other end of the rod body 31 is connected to the grouting body 33. There are two grouting bodies 33, which are symmetrically arranged on both sides of the lower end of the rod body 31, and the grouting body 33 is rectangular in shape. The grouting body 33 can increase the friction resistance between the fixing assembly 3 and the surrounding soil or rock, improve the anchoring force, and enhance the stability of the existing tunnel 1. The locking member 32 is a bolt, and the fixing assembly 3 also includes a nut 35 and a gasket 34. The locking member 32 at least partially passes through the gasket 34 to connect with the rod body 31. The gasket 34 is located above the precast concrete anti-floating plate 2. The gasket 34 can prevent the locking member 32 from loosening under vibration or force. The nut 35 is threadedly connected to the locking piece 32. The nut 35 is arranged above the gasket 34. The nut 35 is used to fix the locking piece 32. The nut 35 cooperates with the locking piece 32 to achieve the connection and fixation of the locking piece 32. The tightening force can also be adjusted to prevent the locking piece 32 from loosening under vibration or force, thereby maintaining the stability of the fixing component 3.

[0057] Further, such as Figure 2 As shown, applying an anti-corrosion paint layer on the top of the fixed component 3 can effectively prevent the top of the fixed component 3 from being affected by oxidation, corrosion and rust, increase the durability and protection of the fixed component 3, and extend the service life of the fixed component 3. Compared with the traditional technology of setting a waterproof device on the top of the fixed component 3, the waterproof device is complicated to construct, and applying an anti-corrosion paint layer can speed up the construction, reduce the construction process, speed up the formation of the pre-tensioning force of the fixed component 3, and reduce the stress release of the lower soil. Among them, a temporary load is provided on the precast concrete anti-floating plate 2, and the temporary load can be river water with the same weight as the lumps or excavated soil, which can improve the stability of the precast concrete anti-floating plate 2. On the one hand, the weight of the precast concrete anti-floating plate 2 is increased to improve the stability; on the other hand, during the construction process, the temporary load can provide support and stability, provide a safe working platform for construction personnel and equipment, and can also perform load tests to verify the bearing capacity and stability of the precast concrete anti-floating plate 2 to ensure that it meets the design requirements.

[0058] This embodiment also provides a protection method for reducing the floating of an existing tunnel below caused by river excavation, including the following steps:

[0059] Step S1: Before excavating the river channel, the soil layer above the existing tunnel 1 and below the river channel is reinforced 6;

[0060] Step S2: installing a fixing assembly 3 below the pre-excavated river channel;

[0061] Step S3: Divide the river into a plurality of construction sections 7 along the length direction of the existing tunnel 1, and set the width of the river to be greater than the width of the existing tunnel 1;

[0062] Step S4: According to the width of the river channel and the lifting weight limit, excavation is carried out in sections according to a preset sequence, and each construction section 7 is excavated in sections;

[0063] Step S5: After the construction section 7 is excavated to the riverbed elevation, the precast concrete anti-floating plate 2 is hoisted to the base of each excavated construction section 7, and the pre-installed fixing assembly 3 is passed through the reserved hole 4 on the precast concrete anti-floating plate 2;

[0064] Step S6: Grouting the fixing assembly 3 at the reserved hole 4, locking the fixing assembly 3 with the precast concrete anti-floating plate 2, adjusting the tensile stress of the fixing assembly 3 at the locking position, and placing a temporary load of the same weight as the excavated soil on the precast concrete anti-floating plate 2;

[0065] Step S7: Skip excavation to start excavating the next construction section 7, and repeat steps S5 and S6.

[0066] Among them, refer to Figure 5 As shown, before the excavation of the river channel, the soil part above the existing tunnel 1 and below the river channel is reinforced first. The soil reinforcement 6 is constructed by a light mixing pile machine. The light mixing pile machine can form a three-dimensional reinforcement body in the soil. On the one hand, it can effectively improve the density and strength of the soil, improve the stability of the soil, reduce settlement and deformation, provide stability to ensure the excavation surface, prevent over-excavation, and help reduce the stress release of the soil. On the other hand, it can effectively control the floating of the existing tunnel 1, and the construction is relatively simple, effectively shortening the construction period.

[0067] Reference Figures 2 to 4 As shown, a fixing assembly 3 is set under the pre-excavated river channel. The fixing assembly 3 can be inclined or vertical. The fixing assembly 3 is set between two adjacent tunnels.

[0068] Reference Figure 1As shown, the river channel is divided into multiple construction sections 7 along the length direction of the existing tunnel 1, and the width of the river channel is set to be larger than the width of the existing tunnel 1. According to the width of the river channel and the lifting weight limit, segmented excavation is carried out in a preset order, and each construction section 7 is excavated in a compartment. This can avoid the floating of the existing tunnel 1 caused by one-time large-scale excavation and unloading, reduce the stress concentration of local soil, reduce surface settlement, control the excavation progress and reduce the risk of excavation projects.

[0069] Reference Figures 2 to 4 As shown, after the construction section 7 is excavated to the riverbed elevation, the precast concrete anti-floating plate 2 is hoisted to the base of each excavated construction section 7, and the pre-installed fixed component 3 is passed through the reserved hole 4 on the precast concrete anti-floating plate 2; grouting is performed at the reserved hole 4, and prestress is applied after the cement strength reaches the design requirements, and the fixed component 3 is locked with the precast concrete anti-floating plate 2, and the tension stress of the fixed component 3 is adjusted at the locking point, and a temporary load with the same weight of excavated soil is placed on the precast concrete anti-floating plate 2, and then the next construction section 7 soil is excavated, and the above steps are repeated until the riverbed excavation is completed, and the counterweight 5 is removed to allow water to flow through the riverbed. In addition, during the long-term operation of the tunnel, the fixed component 3 can be re-tensioned and locked according to the monitoring data of the tunnel floating; the plate hole area can apply or remove the load according to the tunnel monitoring data to achieve the effect of micro-adjustment. Thereby achieving the purpose of controlling the deformation of the tunnel in different regions, in real time, and throughout the process.

[0070] Reference Fig. 9 As shown, the shape of the precast concrete anti-floating plate 2 is set. The shape of the precast concrete anti-floating plate 2 is determined according to the shape of the river channel. Its main function is to adapt to the shape of the river channel bend and ensure the comprehensive coverage of the river channel bottom by the precast concrete anti-floating plate 2. The construction is simple and the construction efficiency can be improved.

[0071] The present application is described in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the present application and its core ideas. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the claims of the present application.

Claims

1. A structure that reduces the floating of the existing tunnel below caused by river excavation, characterized in that: It comprises a prefabricated concrete anti-floating plate (2) arranged above an existing tunnel (1); It also includes a fixing component (3), one end of which is connected to the prefabricated concrete anti-floating plate (2), and the other end of which extends toward the tunnel hole and extends into the soil; The fixing assembly (3) comprises a rod body (31), a locking piece (32) and a grouting body (33); one end of the rod body (31) close to the precast concrete anti-floating plate (2) is connected to the locking piece (32), and the other end is connected to the grouting body (33); It also includes a gasket (34) and a nut (35), the locking member (32) passes through the gasket (34) and is connected to the rod body (31), and the gasket (34) is located above the precast concrete anti-floating plate (2); The nut (35) is connected to the locking piece (32), and the nut (35) is used to fix the locking piece (32).

2. The structure for reducing the floating of the existing tunnel below caused by river excavation according to claim 1 is characterized in that: The precast concrete anti-floating plate (2) is provided with a reserved hole (4) corresponding to the fixing component (3), a plurality of the reserved holes (4) are evenly arranged, and the reserved holes (4) are used to fix the fixing component (3).

3. The structure for reducing the floating of the existing tunnel below caused by river excavation according to claim 1 is characterized in that: The fixing component (3) is an anchor rod; or, The fixing component (3) is a pile.

4. The structure for reducing the floating of the existing tunnel below caused by river excavation according to claim 1 is characterized in that: An anti-corrosion paint layer is applied on the top of the fixing component (3).

5. A protection method for reducing the floating of an existing tunnel below caused by river excavation, characterized in that: The method comprises the structure for reducing the floating of the existing tunnel below caused by river excavation as claimed in any one of claims 1 to 4, and the method comprises the following steps: Step S1: Before excavating the river channel, the soil layer above the existing tunnel and below the river channel is reinforced; Step S2: installing a fixing assembly below the pre-excavated river channel; Step S3: Divide the river into multiple construction sections along the length direction of the existing tunnel, and set the width of the river to be greater than the width of the existing tunnel; Step S4: According to the width of the river channel and the lifting weight limit, excavation is carried out in sections according to a preset sequence, and each construction section is excavated in sections; Step S5: After the construction section is excavated to the riverbed elevation, the precast concrete anti-floating plate is hoisted to the base of each excavated construction section, and the pre-installed fixing components are passed through the reserved holes on the precast concrete anti-floating plate; Step S6: Grouting the fixing assembly at the reserved hole, locking the fixing assembly with the precast concrete anti-floating plate, adjusting the tensile stress of the fixing assembly at the locking position, and placing a temporary load with the same weight of excavated soil on the precast concrete anti-floating plate; Step S7: Skip excavation to start excavating the next construction section of soil, and repeat steps S5 and S6.

6. The protection method for reducing the floating of an existing tunnel below caused by river excavation according to claim 5 is characterized in that: In step S1, soil reinforcement is carried out using a light mixing pile driver.

7. The protection method for reducing the floating of the existing tunnel below caused by river excavation according to claim 5 is characterized in that: The shape of the prefabricated concrete anti-floating plate is determined according to the shape of the river channel.

8. The protection method for reducing the floating of an existing tunnel below caused by river excavation according to claim 5 is characterized in that: The length of the construction section is determined according to the size of the precast concrete anti-floating slab.

9. The protection method for reducing the floating of an existing tunnel below caused by river excavation according to claim 5 is characterized in that: During the construction process, the precast concrete anti-floating slab is constructed separately for the construction section corresponding to the construction section according to the situation of the segmented excavation of the river channel.

10. The protection method for reducing the floating of an existing tunnel below caused by river excavation according to claim 5, characterized in that: In step S7, the soil of the next construction section is excavated by skipping, and steps S5 and S6 are repeated, specifically including removing the counterweight after the overall excavation of the river channel is completed, and allowing water to flow into the river channel.

Citation Information

Patent Citations

  • Mining anchor rod

    CN105201533A

  • Structure and method for avoiding upward floating of underlying tunnel caused by river excavation

    CN112695809A

  • Anti-floating construction structure for river channel above tunnel and construction method of anti-floating construction structure

    CN115710878A

  • Fixing structure for embedded channel

    CN209163052U

  • Structure for reducing floating of existing tunnel below caused by river excavation

    CN223281364U