Air down-the-hole hammer drilling auxiliary device for middle-deep layer geothermal hot spring well and construction method
By designing the air submerged hammer drilling auxiliary device and construction method of medium-deep geothermal hot spring wells, the problems of low efficiency and safety hazards in traditional hot spring wells are solved, and an efficient and stable drilling process is achieved, reducing construction difficulty and environmental pollution are achieved. .
Patent Information
- Application Number
- CN202411185702.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-19
AI Technical Summary
In the drilling construction of traditional hot spring wells, there are problems such as insufficient drilling speed and drilling depth capability, slow drilling speed of hard rock formations and complex formations, easy collapse of hole walls, poor verticality, low construction efficiency, and safety hazards during casing lifting.
A medium-deep geothermal hot spring well air submerged hammer drilling auxiliary device is designed, including construction platform, legs, fence, casing slope plate and arcuate frame. Through the cooperation of the first draw rope and the second draw rope, it avoids the The swaying of the casing during lifting and the construction is carried out using an air submersible hammer to control the drilling pressure and air pressure, and combined with the use of air pipes and foam pumps, a stable and efficient drilling is achieved.
It improves drilling efficiency, reduces construction difficulty and safety risks, reduces hole wall rock collapse and environmental pollution, and ensures the perpendicularity of the orifices and project quality.
Smart Images

Figure CN118979694A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a drilling construction method, in particular to an air down-the-hole hammer drilling auxiliary device and a construction method for a medium-deep geothermal hot spring well, belonging to the technical field of geothermal drilling. Background Art
[0002] Geothermal water resources have multiple attributes such as physical therapy, health preservation, and leisure. They can be well integrated with many industries and are easy to create marketing concept highlights in various industries. Therefore, they are favored by many industries. Through investigation, it is found that traditional hot spring well drilling mainly relies on surface water or groundwater as the circulation medium. Due to the complexity of the formation and hydrological conditions, its drilling speed and drilling depth capabilities are relatively limited, and the drilling speed is slow for hard rock formations and complex formations, which makes the rock of the hole wall easy to collapse, the verticality of the hole wall is poor, the construction efficiency is low, and the construction is difficult. Moreover, when hoisting the casing, the casing will swing greatly, and there are certain safety hazards. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art and provide an air down-the-hole hammer drilling auxiliary device and a construction method for a medium-deep geothermal hot spring well, reduce the construction difficulty, avoid large swings during casing hoisting, facilitate workers to quickly carry out drilling construction, improve work efficiency, and reduce construction difficulty.
[0004] The technical solution adopted by the present invention to solve the technical problem is: An air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well comprises a construction platform, legs, a fence and a casing slope. A casing slope is arranged in the middle of the right side of the construction platform, and legs are arranged at the bottom of the construction platform and the casing slope. Fences are arranged on both sides of the top of the construction platform and the casing slope, respectively. A base is arranged on the construction platform, a roller is arranged at the bottom of the base, an arc frame is rotatably connected to the top of the base, and a handle is arranged on the outer wall of the arc frame.
[0005] Support plates are respectively arranged at both ends of the arc-shaped frame, pillars are arranged outside the support plates, and a first pull rope and a second pull rope are arranged on the pillars.
[0006] The end of the first pull rope is provided with a ring, and the ring is sleeved on a pole on one side of the fence.
[0007] An annular track is dug on the top of the base, and the arc frame is slidably connected with the annular track.
[0008] The bottom of the base is provided with rollers.
[0009] The construction method of the air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well comprises the following steps: S1. Construction preparation Prepare the drilling tools required for drilling, including: XSL600 drilling rigs for the first and second openings, XSL1000 drilling rigs for the third and fourth openings, 405-400-395mm drill bits for the first opening, equipped with a 12-inch impactor; 320-315-310-305mm drill bits for the second opening, equipped with a 10-inch impactor; 220-216-213mm drill bits for the third opening, equipped with an 8-inch impactor; 156-152mm drill bits for the third opening, equipped with a 6-inch impactor; at the same time, 3 high-power air compressors, 1 high-power booster, 1 gas lift reverse circulation special booster and supporting drilling tools are equipped; S2. Installation and connection of air manifold The air supply interface of the air compressor adopts a flexible connection with a rubber hose, and the air supply interface of the booster adopts a hard connection with a steel pipe; after the three air compressors are uniformly connected to the low-pressure gas manifold to collect the gas, the gas is uniformly distributed to a booster as the intake through the gas collecting pipe, and the exhaust of the booster is connected to the high-pressure gas manifold, and then the gas pipeline is connected to the drilling rig; after the collection, a high-pressure valve is installed on the gas main pipe to the drilling rig. When injecting foam, the foam pump can switch between the air compressor and the booster, or the air manifold can be pressure tested before drilling. S3. Control of drilling pressure and air pressure ①. Control of drilling pressure: The suitable drilling pressure for a one-opening drill bit is about 2.5T, the suitable drilling pressure for a two-opening drill bit is 2.0-2.5T, the suitable drilling pressure for a three-opening drill bit is 1.5-2.0T, and the drilling pressure for a four-opening drill bit is 1.0-1.5T; ②. Control of wind pressure: a. Use air compressor for construction at the beginning, and control the maximum air pressure within 3MPa. After drilling 2m, lift the drill 30-50cm to release pressure and discharge slag; b. Air compressors and boosters are used for construction in the second opening and below. The maximum air pressure is controlled within 5.5MPa. Every time the drilling depth is about 2m, the drill is lifted 30-50cm to release the pressure and discharge the slag; S4, single root connection and slag removal ① Before each single connection, cover the drilling tools in the well with a cover bucket, use a sledgehammer to hammer the rust or other debris attached to the inner wall of the drill pipe to shake off, and finally use high-pressure gas to blow and flush. After the single connection is completed, close the wellhead rotary blower cover, and then turn on the air compressor to supply air for drilling; ② When drilling, inject foam into the well through a foam pump; when there is too much sediment at the bottom of the well to connect single roots, first concentrate on foaming to clean the bottom, and then connect single roots; every 4-5 single roots, pour a small amount of impactor lubricating oil into the drill bit, and before stopping the gas for each single root connection, lift the drill bit 4-5 meters away from the bottom of the well to prevent drilling blockage; S5. Tripping ①. After each drilling, the outer diameter of the drill bit should be measured to observe the wear of the alloy on the drill bit. The diameter of the new drill bit should match the old drill bit. ② Before drilling each time, the impactor must be disassembled, cleaned, reassembled and filled with lubricating oil; before drilling, a vibration test must be conducted at the wellhead, and drilling can only be conducted after the impactor vibrates normally; S6, casing lowering ① Place the hammer drilling auxiliary device on the construction platform, and put the loop of the first pull rope on the pole of the fence; ② Rotate the arc frame so that the opening of the arc frame faces the casing slope plate; arrange a worker on each side of the hammer drilling auxiliary device, and the two workers hold the ends of the second pull rope respectively, so that the second pull rope is stretched and distributed in a cross shape; ③. Place the casing on the casing ramp, lift the casing with a sling, and move it to the second tension rope in a tightened state, then slowly loosen the tightened second tension rope to make the casing stand vertically in the arc frame, and wrap the second tension rope around the outside of the right side of the casing; ④. Use the rollers at the bottom of the base to move the hammer drilling auxiliary device and rotate the arc frame so that the opening of the arc frame faces the left side of the construction platform; ⑤. Release the second pull rope, use the lifting device to move the casing to the top of the wellhead and lower it; S7, cementing ① During the cementing process, before the casing is lowered to the bottom, circulate the mud and observe the cement slurry performance every 5 minutes; cementing can only be carried out after the cement slurry performance is stable; ② After cementing is completed, clean water circulation is used to ventilate the annulus before the next operation can be carried out; in the cementing preparation work, a circulating pressure test is required. During the pressure test, the circulating fluid should not be lost and the pressure should not be blocked. After the pressure test is qualified, formal cementing can be carried out; ③、φ340mm, φ245mm well pipe section cementing a. Use a mud pump to cement the well. Calculate the amount of cement slurry and the amount of slurry replacement before cementing. When cementing, connect the drill pipe to the casing through a reducer; b. Before injecting cement slurry, firstly perform cyclic punching with a large pump volume to remove the rock powder in the annulus and make the cementing gap unblocked, and then press the cement slurry into the well through the mud pump; after the cement slurry is injected, the cement slurry in the casing and manifold is discharged according to the replacement slurry volume, and at the same time, pay attention to the outflow of cement slurry at the wellhead; after the cement solidifies, remove the drill pipe and wait for the cement to solidify; ④、φ178mm well pipe section cementing a. Use the shoe-cap method to cement the well. The casing string is connected to the drill pipe with a positive and negative thread joint and lowered to the bottom of the well. A flow-blocking ring should be set at the bottom of the casing string. b. Before cementing, calculate the cement slurry consumption and replacement volume according to the cement slurry return height, ensure that the cement slurry return volume outside the bottom shoe pipe is accurately controlled at 50m, and leave more than 10m of cement plug in the pipe; after waiting for 24 hours for shoe cementing, perform capping operation at the top of the three-open casing; S8. Pumping test a. Carry out two steady flow pumping tests with standard drawdown, first with a large drawdown and then with a small drawdown; the stabilization time of the water level drawdown shall be no less than 24 hours; b. Before and after the formal pumping, observe the static water level and the recovery water level; the dynamic water level and water output observation time shall be measured once every 5, 10, 15, 20, 25 and 30 minutes after the start of pumping, and then every 60 minutes until the water level stabilizes; the water temperature and air temperature observation shall be measured synchronously every 2-4 hours; S9. Well Completion After the well is completed, the surface casing female coupling is level with the ground, and the area around the surface casing is filled with soil to keep it flat; after the well is handed over, the outer edge of the 5mm steel plate is spot welded to protect the wellhead.
[0010] During the drilling process, the drill bit needs to be lowered to the bottom of the hole and the air circulation volume needs to be increased to wash away the sand at the bottom of the hole and bring it to the surface. After 10 minutes of circulation, the circulation is stopped and the thickness of the sand at the bottom of the hole is determined. If it is less than the value specified in the specification, a round hole can be made or a pipe can be lowered. When a round hole is determined to be required, if it is determined that the lowering of the round hole device encounters resistance, the hole needs to be swept, and after the hole sweeping is completed, the round hole device is lowered to the bottom of the hole to ensure that the casing can be lowered smoothly in the wellbore.
[0011] The positive beneficial effects of the present invention are: 1. The present invention avoids large swinging when the casing is hoisted by arranging the first pull rope and the second pull rope, thereby ensuring the safety of the construction.
[0012] 2. The present invention is connected with an arc frame rotatably on the base and used in conjunction with a sling, which makes it easy for workers to stably move the casing and is conducive to the rapid and accurate lowering of the casing.
[0013] 3. The present invention adopts air down-the-hole hammer for construction, which greatly improves the drilling efficiency and ensures the quality of the project; at the same time, it adopts circulating dry operation, and air is used as both power and slag removal medium, and no waste such as mud is generated, so the impact on the environment is relatively small.
[0014] 4. The present invention adopts an air down-the-hole hammer for construction, which can reduce the influence of hole inclination on rocks or inclined strata, improve the verticality of the borehole, and also reduce the collapse of rock on the hole wall, thereby reducing environmental pollution and having good social practical value. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The construction flow chart of the present invention is Figure 2 This is a diagram showing the use status of the drilling auxiliary device of the present invention; Figure 3 It is a structural schematic diagram of the drilling auxiliary device of the present invention; Among them: 1-construction platform, 2-support legs, 3-fence, 4-duct slope, 5-base, 6-annular track, 7-arc frame, 8-handle, 9-support plate, 10-pillar, 11-first pull rope, 12-ring, 13-second pull rope, 14-roller. DETAILED DESCRIPTION
[0016] The present invention will be further explained and illustrated below in conjunction with the accompanying drawings: Example 1, see Figure 1-Figure 3 A mid-deep geothermal hot spring well air down-the-hole hammer drilling auxiliary device comprises a construction platform 1, a leg 2, a fence 3 and a casing slope 4. The casing slope 4 is arranged in the middle of the right side of the construction platform 1, and the leg 2 is arranged at the bottom of the construction platform 1 and the casing slope 4. The fence 3 is arranged on both sides of the top of the construction platform 1 and the casing slope 4 respectively. A base 5 is arranged on the construction platform 1, and a roller 14 is arranged at the bottom of the base 5. An arc frame 8 is rotatably connected above the base 5, and a handle 8 is arranged on the outer wall of the arc frame 8.
[0017] Support plates 9 are respectively provided at both ends of the arc frame 8 , and pillars 10 are provided outside the support plates 9 . A first pull rope 11 and a second pull rope 13 are provided on the pillars 10 .
[0018] A ring 12 is provided at the end of the first pull rope 11, and the ring 12 is sleeved on a pole at one side of the fence.
[0019] An annular track 6 is dug on the top of the base 5 , and an arc frame 7 is slidably connected to the annular track 6 .
[0020] A roller 14 is provided at the bottom of the base 5 .
[0021] In the above description, the size of the collar matches the size of the fence post.
[0022] In the above description, the port cross-section of the arc-shaped frame is distributed in a semicircular shape.
[0023] In the above description, three rollers are evenly arranged on the bottom of the base to facilitate the movement of the base.
[0024] In the above description, by arranging pillars on the support plates at both ends of the arc-shaped frame, the distance between the ends of the two pillars is made greater than the distance between the two poles of the fence.
[0025] In the above description, a gap is provided in the middle of the right end of the fence, and a pole is provided at the position of the gap.
[0026] Embodiment 2, the construction method of the above-mentioned air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well, comprises the following steps: S1. Construction preparation Prepare the drilling tools required for drilling, including: XSL600 drilling rigs for the first and second openings, XSL1000 drilling rigs for the third and fourth openings, 405-400-395mm drill bits for the first opening, equipped with a 12-inch impactor; 320-315-310-305mm drill bits for the second opening, equipped with a 10-inch impactor; 220-216-213mm drill bits for the third opening, equipped with an 8-inch impactor; 156-152mm drill bits for the third opening, equipped with a 6-inch impactor; at the same time, 3 high-power air compressors, 1 high-power booster, 1 gas lift reverse circulation special booster and supporting drilling tools are equipped; S2. Installation and connection of air manifold The air supply interface of the air compressor adopts a flexible connection with a rubber hose, and the air supply interface of the booster adopts a hard connection with a steel pipe; after the three air compressors are uniformly connected to the low-pressure gas manifold to collect the gas, the gas is uniformly distributed to a booster as the intake through the gas collecting pipe, and the exhaust of the booster is connected to the high-pressure gas manifold, and then the gas pipeline is connected to the drilling rig; after the collection, a high-pressure valve is installed on the gas main pipe to the drilling rig. When injecting foam, the foam pump can switch between the air compressor and the booster, or the air manifold can be pressure tested before drilling. S3. Control of drilling pressure and air pressure ①. Control of drilling pressure: The suitable drilling pressure for a one-opening drill bit is about 2.5T, the suitable drilling pressure for a two-opening drill bit is 2.0-2.5T, the suitable drilling pressure for a three-opening drill bit is 1.5-2.0T, and the drilling pressure for a four-opening drill bit is 1.0-1.5T; ②. Control of wind pressure: a. Use air compressor for construction at the beginning, and control the maximum air pressure within 3MPa. After drilling 2m, lift the drill 30-50cm to release pressure and discharge slag; b. Air compressors and boosters are used for construction in the second opening and below. The maximum air pressure is controlled within 5.5MPa. Every time the drilling depth is about 2m, the drill is lifted 30-50cm to release the pressure and discharge the slag; S4, single root connection and slag removal ① Before each single connection, cover the drilling tools in the well with a cover bucket, use a sledgehammer to hammer the rust or other debris attached to the inner wall of the drill pipe to shake off, and finally use high-pressure gas to blow and flush. After the single connection is completed, close the wellhead rotary blower cover, and then turn on the air compressor to supply air for drilling; ② When drilling, inject foam into the well through a foam pump; when there is too much sediment at the bottom of the well to connect single roots, first concentrate on foaming to clean the bottom, and then connect single roots; every 4-5 single roots, pour a small amount of impactor lubricating oil into the drill bit, and before stopping the gas for each single root connection, lift the drill bit 4-5 meters away from the bottom of the well to prevent drilling blockage; S5. Tripping ①. After each drilling, the outer diameter of the drill bit should be measured to observe the wear of the alloy on the drill bit. The diameter of the new drill bit should match the old drill bit. ② Before drilling each time, the impactor must be disassembled, cleaned, reassembled and filled with lubricating oil; before drilling, a vibration test must be conducted at the wellhead, and drilling can only be conducted after the impactor vibrates normally; S6, casing lowering ①, place the hammer drilling auxiliary device on the construction platform 1, and sleeve the ring 12 of the first pull rope 11 on the pole of the fence; ②, rotating the arc frame 7 so that the opening of the arc frame 7 faces the casing ramp 4; arranging a worker on both sides of the hammer drilling auxiliary device, and the two workers respectively hold the ends of the second pull rope 13, so that the second pull rope 13 is stretched and distributed in a cross shape; ③. Place the casing on the casing ramp 4, lift the casing with a sling, and move it to the second draw rope 13 in a tightened state, then slowly loosen the tightened second draw rope 13, so that the casing stands vertically in the arc-shaped frame 7, and wrap the second draw rope 13 around the outside of the right side of the casing; ④. Use the roller at the bottom of the base 5 to move the hammer drilling auxiliary device and rotate the arc frame 7 so that the opening of the arc frame 7 faces the left side of the construction platform 1; ⑤. Loosen the second pull rope 13, use the lifting device to move the casing to the top of the wellhead, and lower it; S7, cementing ① During the cementing process, before the casing is lowered to the bottom, circulate the mud and observe the cement slurry performance every 5 minutes; cementing can only be carried out after the cement slurry performance is stable; ② After cementing is completed, clean water circulation is used to ventilate the annulus before the next operation can be carried out; in the cementing preparation work, a circulating pressure test is required. During the pressure test, the circulating fluid should not be lost and the pressure should not be blocked. After the pressure test is qualified, formal cementing can be carried out; ③、φ340mm, φ245mm well pipe section cementing a. Use a mud pump to cement the well. Calculate the amount of cement slurry and the amount of slurry replacement before cementing. When cementing, connect the drill pipe to the casing through a reducer; b. Before injecting cement slurry, firstly perform cyclic punching with a large pump volume to remove the rock powder in the annulus and make the cementing gap unblocked, and then press the cement slurry into the well through the mud pump; after the cement slurry is injected, the cement slurry in the casing and manifold is discharged according to the replacement slurry volume, and at the same time, pay attention to the outflow of cement slurry at the wellhead; after the cement solidifies, remove the drill pipe and wait for the cement to solidify; ④、φ178mm well pipe section cementing a. Use the shoe-cap method to cement the well. The casing string is connected to the drill pipe with a positive and negative thread joint and lowered to the bottom of the well. A flow-blocking ring should be set at the bottom of the casing string. b. Before cementing, calculate the cement slurry consumption and replacement volume according to the cement slurry return height, ensure that the cement slurry return volume outside the bottom shoe pipe is accurately controlled at 50m, and leave more than 10m of cement plug in the pipe; after waiting for 24 hours for shoe cementing, perform capping operation at the top of the three-open casing; S8. Pumping test a. Carry out two steady flow pumping tests with standard drawdown, first with a large drawdown and then with a small drawdown; the stabilization time of the water level drawdown shall be no less than 24 hours; b. Before and after the formal pumping, observe the static water level and the recovery water level; the dynamic water level and water output observation time shall be measured once every 5, 10, 15, 20, 25 and 30 minutes after the start of pumping, and then every 60 minutes until the water level stabilizes; the water temperature and air temperature observation shall be measured synchronously every 2-4 hours; S9. Well Completion After the well is completed, the surface casing female coupling is level with the ground, and the area around the surface casing is filled with soil to keep it flat; after the well is handed over, the outer edge of the 5mm steel plate is spot welded to protect the wellhead.
[0027] During the drilling process, the drill bit needs to be lowered to the bottom of the hole and the air circulation volume needs to be increased so that the sand at the bottom of the hole can be washed clean and brought to the surface. After 10 minutes of circulation, the circulation is stopped and the thickness of the sand at the bottom of the hole is determined. If it is less than the value specified in the specification, a round hole can be made or a pipe can be lowered. When a round hole is determined to be required, if it is determined that the lowering of the round hole device encounters resistance, the hole needs to be swept, and after the hole sweeping is completed, the round hole device is lowered to the bottom of the hole to ensure that the casing can be lowered smoothly in the wellbore.
[0028] During construction, a clean water source must be provided on site for foam preparation and circulation of clean water drilling fluid in the borehole in case of emergency, as well as for clearing the drilling tool channel each time the well depth exceeds 1000m. A foam mixing tank with a volume of 2-3 cubic meters must be equipped and directly connected to the foam pump for normal foam drilling and centralized bottom cleaning. A high-pressure valve is installed on the manifold from the foam pump to the drilling rig to control the switching between the foam pump and the compressor when controlling the frequency of foaming.
[0029] In the above description, before cementing, a large pump volume should be circulated to remove the rock powder and mud in the annular gap of the well pipe, so that the cementing annular gap is unobstructed, the cement slurry is prevented from channeling, and the cementing quality is ensured; the surface casing is large in size, easy to be wrongly threaded, and the time for connecting a single pipe is long, so it is necessary to prevent sticking and resistance. When lowering the casing, it is strictly prevented from being wrongly threaded, and the thread must reach the specified torque value; after finding a wrong thread, it is removed and the thread is carefully checked. The thread can be re-threaded if it is intact, and the thread must be replaced if it is damaged. If the thread is not in place, electric welding shall not be used for welding treatment, and the casing must be replaced; the drill pipe thread must be sealed, and the joint must be locked to prevent the drill pipe from vibrating under high pressure and high flow rate during cementing, and the loose thread falls into the well; a flow blocking ring must be installed on the top of the swirl pipe of each layer of casing to prevent the cement slurry from flowing back when the drill pipe is returned after cementing; the cement setting time after cementing shall not be less than 48 hours.
[0030] In the above description, the underbalanced drilling process is adopted, and air is used as the cuttings carrying medium and rock crushing power, which does not pollute the reservoir, so it can protect the geothermal reservoir very well; during the drilling process, the drill bit is subjected to the dual effects of high temperature and impact, which is easy to wear and fail. The air down-the-hole hammer can introduce cold air into the drill bit through the cold air circulation system to cool the drill bit, so that the drill bit can maintain a good working condition at high temperature, reduce wear and improve drilling efficiency In the above description, during the drilling process of the traditional roller bit, the scouring effect of the high-pressure water column can easily cause the well wall to collapse and the wellbore to expand, which brings difficulties to the subsequent exploitation of hot spring water and sealing of the well. The air down-the-hole hammer uses air as a medium for drilling, avoiding the well wall collapse and wellbore expansion problems that may be caused by water medium, and effectively protecting the stability of the well wall and the well environment.
[0031] The present invention adopts air down-the-hole hammer for construction, which greatly improves drilling efficiency and ensures project quality; it adopts circulating dry operation, in which air is used as both power and slag removal medium, and waste such as mud will not be generated, thus reducing pollution to the environment, improving work efficiency, reducing construction difficulty, and being easy to promote.
Claims
1. An air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well, comprising a construction platform (1), legs (2), a fence (3) and a casing ramp (4), characterized in that: A casing slope (4) is provided in the middle of the right side of the construction platform (1), and legs (2) are provided at the bottom of the construction platform (1) and the casing slope (4). Fences (3) are provided on both sides of the top of the construction platform (1) and the casing slope (4), respectively. A base (5) is provided on the construction platform (1), and a roller (14) is provided at the bottom of the base (5). An arc frame (8) is rotatably connected to the top of the base (5), and a handle (8) is provided on the outer wall of the arc frame (8).
2. The air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well according to claim 1, characterized in that: Support plates (9) are respectively provided at both ends of the arc-shaped frame (8), pillars (10) are provided outside the support plates (9), and a first pull rope (11) and a second pull rope (13) are provided on the pillars (10).
3. The air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well according to claim 1, characterized in that: A ring (12) is provided at the end of the first pull rope (11), and the ring (12) is sleeved on a pole on one side of the fence.
4. The air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well according to claim 1, characterized in that: An annular track (6) is excavated on the top of the base (5), and the arc-shaped frame (7) is slidably connected to the annular track (6).
5. The air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well according to claim 1, characterized in that: A roller (14) is provided at the bottom of the base (5).
6. The construction method of the air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well according to any one of claims 1 to 5, characterized in that: The steps include: S1. Construction preparation Prepare the drilling tools required for drilling, including: XSL600 drilling rigs for the first and second openings, XSL1000 drilling rigs for the third and fourth openings, 405-400-395mm drill bits for the first opening, equipped with a 12-inch impactor; 320-315-310-305mm drill bits for the second opening, equipped with a 10-inch impactor; 220-216-213mm drill bits for the third opening, equipped with an 8-inch impactor; 156-152mm drill bits for the third opening, equipped with a 6-inch impactor; at the same time, 3 high-power air compressors, 1 high-power booster, 1 gas lift reverse circulation special booster and supporting drilling tools are equipped; S2. Air manifold installation and connection The air supply interface of the air compressor adopts a flexible connection with a rubber hose, and the air supply interface of the booster adopts a hard connection with a steel pipe; after the three air compressors are uniformly connected to the low-pressure gas manifold to collect the gas, the gas is uniformly distributed to a booster as the intake through the gas collecting pipe, and the exhaust of the booster is connected to the high-pressure gas manifold, and then the gas pipeline is connected to the drilling rig; after the collection, a high-pressure valve is installed on the gas main pipe to the drilling rig. When injecting foam, the foam pump can switch between the air compressor and the booster, or the air manifold can be pressure tested before drilling. S3. Control of drilling pressure and air pressure ①. Control of drilling pressure: The suitable drilling pressure for a one-opening drill bit is about 2.5T, the suitable drilling pressure for a two-opening drill bit is 2.0-2.5T, the suitable drilling pressure for a three-opening drill bit is 1.5-2.0T, and the drilling pressure for a four-opening drill bit is 1.0-1.5T; ②. Control of wind pressure: a. Use air compressor for construction at the beginning, and control the maximum air pressure within 3MPa. After drilling 2m, lift the drill 30-50cm to release pressure and discharge slag; b. Air compressors and boosters are used for construction in the second opening and below. The maximum air pressure is controlled within 5.5MPa. Every time the drilling depth is about 2m, the drill is lifted 30-50cm to release the pressure and discharge the slag; S4, single root connection and slag removal ① Before each single connection, cover the drilling tools in the well with a cover bucket, use a sledgehammer to hammer the rust or other debris attached to the inner wall of the drill pipe to shake off, and finally use high-pressure gas to blow and flush. After the single connection is completed, close the wellhead rotary blower cover, and then turn on the air compressor to supply air for drilling; ② When drilling, inject foam into the well through a foam pump; when there is too much sediment at the bottom of the well to connect single roots, first concentrate on foaming to clean the bottom, and then connect single roots; every 4-5 single roots, pour a small amount of impactor lubricating oil into the drill bit, and before stopping the gas for each single root connection, lift the drill bit 4-5 meters away from the bottom of the well to prevent drilling blockage; S5. Tripping ①. Each time after drilling, the outer diameter of the drill bit should be measured to observe the wear of the alloy on the drill bit. The diameter of the new drill bit should match the old drill bit. ② Before drilling each time, the impactor must be disassembled, cleaned, reassembled and filled with lubricating oil; before drilling, a vibration test must be conducted at the wellhead, and drilling can only be conducted after the impactor vibrates normally; S6, casing lowering ①, placing the hammer drilling auxiliary device on the construction platform (1), and sleeve the ring (12) of the first pull rope (11) on the pole of the fence; ②, rotating the arc frame (7) so that the opening of the arc frame (7) faces the casing ramp (4); arranging a worker on both sides of the hammer drilling auxiliary device, and the two workers respectively hold the ends of the second pull rope (13) so that the second pull rope (13) is stretched and distributed in a taut cross shape; ③. Place the casing on the casing ramp (4), lift the casing with a lifting device, and move it to the position where the second draw rope (13) is in a tensioned state, then slowly loosen the tensioned second draw rope (13) to make the casing stand vertically in the arc-shaped frame (7), and wrap the second draw rope (13) around the outside of the right side of the casing; ④. Using the roller at the bottom of the base (5), move the hammer drilling auxiliary device and rotate the arc frame (7) so that the opening of the arc frame (7) faces the left side of the construction platform (1); ⑤. Loosen the second pull rope (13), use the lifting device to move the casing to the top of the wellhead, and lower it; S7, cementing ① During the cementing process, before the casing is lowered to the bottom, circulate the mud and observe the cement slurry performance every 5 minutes; cementing can only be carried out after the cement slurry performance is stable; ② After cementing is completed, clean water circulation is used to ventilate the annulus before the next operation can be carried out; in the cementing preparation work, a circulating pressure test is required. During the pressure test, the circulating fluid should not be lost and the pressure should not be blocked. After the pressure test is qualified, formal cementing can be carried out; ③、φ340mm, φ245mm well pipe section cementing a. Use a mud pump to cement the well. Calculate the amount of cement slurry and the amount of slurry replacement before cementing. When cementing, connect the drill pipe to the casing through a reducer; b. Before injecting cement slurry, firstly perform cyclic punching with a large pump volume to remove the rock powder in the annulus and make the cementing gap unblocked, and then press the cement slurry into the well through the mud pump; after the cement slurry is injected, the cement slurry in the casing and manifold is discharged according to the replacement slurry volume, and at the same time, pay attention to the outflow of cement slurry at the wellhead; after the cement solidifies, remove the drill pipe and wait for the cement to solidify; ④、φ178mm well pipe section cementing a. Use the shoe-cap method to cement the well. The casing string is connected to the drill pipe with a positive and negative thread joint and lowered to the bottom of the well. A flow-blocking ring should be set at the bottom of the casing string. b. Before cementing, calculate the cement slurry consumption and replacement volume according to the cement slurry return height, ensure that the cement slurry return volume outside the bottom shoe pipe is accurately controlled at 50m, and leave more than 10m of cement plug in the pipe; after waiting for 24 hours for shoe cementing, perform capping operation at the top of the three-open casing; S8. Pumping test a. Carry out two steady flow pumping tests with standard drawdown, first with a large drawdown and then with a small drawdown; the stabilization time of the water level drawdown shall be no less than 24 hours; b. Before and after the formal pumping, observe the static water level and the recovery water level; the dynamic water level and water output observation time shall be measured once every 5, 10, 15, 20, 25 and 30 minutes after the start of pumping, and then every 60 minutes until the water level stabilizes; the water temperature and air temperature observation shall be measured synchronously every 2-4 hours; S9. Well Completion After the well is completed, the surface casing female coupling is level with the ground, and the area around the surface casing is filled with soil to keep it flat; after the well is handed over, the outer edge of the 5mm steel plate is spot welded to protect the wellhead.
7. The construction method of the air down-the-hole hammer drilling auxiliary device for a medium-deep geothermal hot spring well according to claim 6 is characterized in that: During the drilling process, the drill bit needs to be lowered to the bottom of the hole and the air circulation volume needs to be increased to wash away the sand at the bottom of the hole and bring it to the surface. After 10 minutes of circulation, the circulation is stopped and the thickness of the sand at the bottom of the hole is determined. If it is less than the value specified in the specification, a round hole can be made or a pipe can be lowered. When a round hole is determined to be required, if it is determined that the lowering of the round hole device encounters resistance, the hole needs to be swept, and after the hole sweeping is completed, the round hole device is lowered to the bottom of the hole to ensure that the casing can be lowered smoothly in the wellbore.