Method for controlling optimized operation of water chilling unit system and related equipment

By collecting operation information of chiller units and water pumps, adjusting their on-off status, and optimizing the operation of chiller system, the problem of energy waste in chiller system is solved, and the state with the lowest energy consumption and the satisfaction of refrigeration needs is achieved.

CN118980213APending Publication Date: 2024-11-19XINAO SHUNENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411315258.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The chiller system is prone to energy waste during operation, mainly because the regulation depends on the experience of on-site operation and maintenance personnel and the lack of automated and efficient adjustment methods.

Method used

By collecting operation information of the chiller unit and water pump, determine whether it is necessary to adjust the number of start-ups and the opening status, switch according to energy efficiency and efficiency, optimize the operation of the chiller unit system, including determining the working conditions on the refrigeration and cooling sides, and adjusting the chiller unit and water pump The power-on and shutdown state is optimized for the number of cooling towers.

Benefits of technology

The chiller system can meet the refrigeration needs with the lowest energy consumption, avoid blindly increasing the energy consumption of the boot equipment, and improve the system's operating efficiency and energy utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980213A_ABST
    Figure CN118980213A_ABST
Patent Text Reader

Abstract

The invention discloses a method for controlling optimized operation of a water chilling unit system and related equipment, and relates to the field of energy simulation, and the method comprises the steps: collecting first operation information of started water chilling units, determining whether the starting number of the water chilling units needs to be adjusted or not according to the first operation information, if yes, determining at least one target water chilling unit needing to be switched to be in a startup and shutdown state, the starting number of the water chilling units is adjusted; and collecting second operation information of the started water pumps, determining whether the starting number of each water pump needs to be adjusted according to the second operation information, if so, determining at least one target water pump for switching the on-off state so as to adjust the starting number of the water pumps, and determining the total flow of the cooling water pumps according to the adjusted starting number of the cooling water pumps in each water pump, and the starting number of the cooling towers is adjusted. According to the application, an operation strategy from local (each part) to the whole system is formulated, so that each part and the whole of the water chilling unit system can meet the refrigeration requirement while achieving the state of lowest energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy simulation technology, and in particular to a method for controlling the optimized operation of a chiller system and related equipment. Background Art

[0002] The chiller system is a complex and efficient refrigeration system widely used in commercial buildings, industrial buildings and public transportation to meet cooling needs. The chiller system can consist of multiple chillers and also includes some auxiliary equipment such as pump sets (cooling pumps and freezing pumps) and cooling towers.

[0003] Since the chiller system involves the operation of multiple devices, and the operation (on or off) of multiple devices in the chiller system usually depends on the experience of on-site operation and maintenance personnel, energy waste is prone to occur. Therefore, how to adjust the chiller system is a technical problem that needs to be solved urgently. Summary of the invention

[0004] In view of the above problems, the present application provides a method and related equipment for controlling the optimal operation of a chiller system to achieve the purpose of regulating the chiller system. The specific scheme is as follows:

[0005] The first aspect of the present application provides a method for controlling the optimal operation of a chiller system, wherein the chiller system comprises: a plurality of chillers, a plurality of water pumps and a plurality of cooling towers, and the method for controlling the optimal operation of the chiller system comprises:

[0006] Collecting first operation information of the chillers that have been turned on among the chillers, and determining whether it is necessary to adjust the number of chillers turned on based on the first operation information; if it is necessary to adjust the number of chillers turned on, determining at least one target chiller that needs to switch the on / off state based on the energy efficiency of the chillers that have been turned on, and controlling the target chillers to switch the on / off state to adjust the number of chillers turned on;

[0007] Collecting second operation information of the water pumps that have been turned on among the water pumps, and determining whether it is necessary to adjust the number of water pumps turned on according to the second operation information, if it is necessary to adjust the number of water pumps turned on, determining at least one target water pump for switching the switch state according to the efficiency of the water pumps that have been turned on, and controlling the target water pump to switch the switch state to adjust the number of water pumps turned on, wherein each water pump includes a plurality of cooling water pumps and a plurality of freezing water pumps;

[0008] Determine the total flow rate of the cooling water pumps according to the number of cooling water pumps that are turned on among the adjusted water pumps;

[0009] The number of cooling towers opened is adjusted according to the total flow of the cooling water pump.

[0010] In a possible implementation, collecting first operation information of the started chillers among the chillers, and determining whether to adjust the start-up quantity of the chillers according to the first operation information, includes:

[0011] Obtain the chilled water return temperature, chilled water supply temperature and operating current percentage of each of the chilled water units that have been turned on, and calculate the average chilled water return temperature, average chilled water supply temperature and average operating current percentage of the chilled water units that have been turned on;

[0012] Determine the current operating condition of the started chiller according to the average return water temperature of the refrigeration side, the average supply water temperature of the refrigeration side and the average percentage of the operating current, wherein the operating condition includes: a first target operating condition, a second target operating condition and a third target operating condition, wherein the third target operating condition is other operating conditions except the first target operating condition and the second target operating condition;

[0013] If the duration of the started chillers in the first target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be increased;

[0014] If the duration of the started chillers being in the second target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be reduced;

[0015] If the started-up chillers continue to be in the third target operating condition, or the time for which the started-up chillers continue to be in the first target operating condition is not greater than the preset duration, or the time for which the started-up chillers continue to be in the second target operating condition is not greater than the preset duration, it is determined that there is no need to adjust the number of started-up chillers.

[0016] In a possible implementation, the first target operating condition is: the average percentage of the operating current is greater than a first preset value, the average water supply temperature on the freezing side is greater than a second preset value, and the difference between the average water supply temperature on the freezing side and the second preset value is greater than a third preset value;

[0017] The second target operating condition is: the current calculation value is less than the fourth preset value and the average return water temperature on the refrigeration side is less than the fifth preset value and the difference between the fifth preset value and the average return water temperature on the refrigeration side is greater than the sixth preset value, and the current calculation value is: the sum of the operating current percentages divided by the calculated value of the target value, and the target value is the calculated value after subtracting 1 from the number of the operating current percentages.

[0018] In a possible implementation, determining at least one target chiller that needs to switch on / off states according to the energy efficiency of the chillers that have been turned on includes:

[0019] If the duration of the started chiller being in the first target operating condition is longer than the preset duration, determining the target chiller to be the chiller with the highest energy efficiency among the chillers that are not started;

[0020] If the duration of the started chiller in the second target operating condition is greater than the preset duration, the target chiller is determined to be the chiller with the lowest energy efficiency among the started chillers.

[0021] In a possible implementation, collecting the second operation information of the turned-on water pumps among the water pumps, and determining whether to adjust the turned-on quantity of each water pump according to the second operation information, includes:

[0022] Collect the return water temperature and supply water temperature of each turned-on water pump to obtain the average return water temperature and average supply water temperature of the turned-on water pumps;

[0023] Determine the average supply and return water temperature difference of the pumps that have been turned on;

[0024] The average supply and return water temperature difference and the preset supply and return water temperature difference are input into the PID algorithm to calculate the average frequency of the turned-on water pump;

[0025] Determine the current operating condition of the turned-on water pump according to the average supply and return water temperature difference and the average frequency, wherein the operating condition includes a fourth target operating condition, a fifth target operating condition and a sixth target operating condition, and the sixth target operating condition is an operating condition other than the fourth target operating condition and the fifth target operating condition;

[0026] If the duration of the turned-on water pumps being in the fourth target operating condition is longer than a preset duration, it is determined that the number of turned-on water pumps needs to be increased;

[0027] If the duration of the turned-on water pumps being in the fifth target operating condition is longer than the preset duration, it is determined that the number of turned-on water pumps needs to be reduced;

[0028] If the turned-on water pump continues to be in the sixth target operating condition, or the time length that the turned-on water pump continues to be in the fourth target operating condition is not greater than the preset duration, or the time length that the turned-on water pump continues to be in the fifth target operating condition is not greater than the preset duration, it is determined that there is no need to adjust the number of water pumps turned on.

[0029] In a possible implementation, the fourth target operating condition is: the average supply and return water temperature difference is greater than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than a seventh preset value, and the average frequency is not less than a loading frequency setting value;

[0030] The fifth target operating condition is: the average supply and return water temperature difference is less than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than the eighth preset value, and the average frequency is not greater than the load reduction frequency setting value.

[0031] In a possible implementation, determining at least one target water pump for switching a switch state according to the efficiency of the turned-on water pump includes:

[0032] If the duration of the turned-on water pump being in the fourth target operating condition is longer than the preset duration, determining that the target water pump is the water pump with the highest efficiency among the unturned water pumps;

[0033] If the duration of the turned-on water pump being in the fifth target operating condition is longer than the preset duration, the target water pump is determined to be the water pump with the lowest efficiency among the turned-on water pumps:

[0034] A second aspect of the present application provides a device for controlling the operation of a chiller system, wherein the chiller system comprises: a plurality of chillers, a plurality of water pumps and a plurality of cooling towers, and the device for controlling the operation of the chiller system comprises:

[0035] A first processing unit is used to collect first operating information of the chillers that have been turned on among the chillers, and determine whether the number of chillers turned on needs to be adjusted according to the first operating information; if the number of chillers turned on needs to be adjusted, at least one target chiller that needs to switch the on / off state is determined according to the energy efficiency of the chillers that have been turned on, and the target chillers are controlled to switch the on / off state to adjust the number of chillers turned on;

[0036] a second processing unit, for collecting second operation information of the water pumps that have been turned on among the water pumps, and determining whether it is necessary to adjust the number of water pumps turned on according to the second operation information; if it is necessary to adjust the number of water pumps turned on, determining at least one target water pump for switching the switch state according to the efficiency of the water pumps that have been turned on, and controlling the target water pump to switch the switch state to adjust the number of water pumps turned on, wherein each water pump includes a plurality of cooling water pumps and a plurality of freezing water pumps;

[0037] The third processing unit is used to determine the total flow of the cooling water pumps according to the adjusted number of cooling water pumps that are turned on among the water pumps, and adjust the number of cooling towers that are turned on according to the total flow of the cooling water pumps.

[0038] A third aspect of the present application provides an electronic device, comprising at least one processor and a memory connected to the processor, wherein:

[0039] The memory is used to store computer programs;

[0040] The processor is used to execute the computer program so that the electronic device can implement the method for controlling the optimized operation of the chiller system according to the first aspect or any implementation method of the first aspect.

[0041] A fourth aspect of the present application provides a computer program product, comprising computer-readable instructions, which, when executed on an electronic device, enables the electronic device to implement the method for controlling the optimized operation of a chiller system according to the first aspect or any implementation of the first aspect.

[0042] By means of the above technical scheme, the present application provides a method for controlling the optimized operation of a chiller system and related equipment. The method first determines whether it is necessary to adjust the number of chillers to be turned on based on the first operation information of the multiple chillers that have been turned on, and then determines whether it is necessary to adjust the number of pumps to be turned on based on the second operation information of the multiple pumps that have been turned on, and finally determines the number of cooling towers to be turned on based on the total flow of the cooling water pumps in the turned-on pumps. The method determines the on / off status of each part of the chiller system according to the operation information of the turned-on equipment, and does not blindly increase the turned-on equipment to increase energy consumption. The method adopts the formulation of operation strategies from local (each part) to the whole system, so that each part and the whole of the chiller system can meet the cooling demand while achieving the lowest energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and the originals and elements are not necessarily drawn to scale.

[0044] Figure 1 A structural schematic diagram of a chiller system is provided for an embodiment of the present application;

[0045] Figure 2 A flow chart of a method for controlling the optimal operation of a chiller system provided in an embodiment of the present application;

[0046] Figure 3 A schematic diagram of the structure of a device for controlling the optimized operation of a chiller system provided in an embodiment of the present application;

[0047] Figure 4 A hardware structure block diagram of an electronic device provided in this application. DETAILED DESCRIPTION

[0048] The following describes the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. The terms used in the implementation method section of the present application are only used to explain the specific embodiments of the present application, and are not intended to limit the present application.

[0049] The embodiments of the present application are described below in conjunction with the accompanying drawings. Those skilled in the art will appreciate that, with the development of technology and the emergence of new scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.

[0050] The terms "first", "second" etc. in the specification of the application and the above-mentioned drawings are used to distinguish similar objects, and need not be used to describe a specific order or sequential order. It should be understood that the terms used in this way can be interchangeable in appropriate circumstances, and this is only to describe the distinction mode adopted by the objects of the same attributes when describing in the embodiments of the application. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, so that the process, method, system, product or equipment comprising a series of units need not be limited to those units, but may include other units that are not clearly listed or inherent to these processes, methods, products or equipment.

[0051] The chiller system is a complex refrigeration system, which is mainly composed of the chiller body and a series of auxiliary equipment, which together realize the functions of refrigeration, cooling and water supply. It is widely used in commercial buildings, industrial buildings and public transportation to provide users with refrigeration needs. The chiller, also known as a freezer, refrigeration unit, ice water unit, etc., is a multifunctional cooling device that integrates refrigeration, cooling and water supply. A series of auxiliary equipment can include water tanks, water pumps, cooling towers, etc., which are used to support the operation of the chiller and can improve the reliability and stability of the chiller.

[0052] The management of chiller systems often relies on the experience of on-site operation and maintenance personnel. However, due to the lack of experience or improper operation of on-site operation and maintenance personnel, it is difficult for the chiller system to maintain efficient operation and energy waste is prone to occur. Furthermore, the labor cost of hiring professional operation and maintenance personnel is high.

[0053] In order to solve the above problems, the embodiment of the present application provides a method for controlling the optimized operation of a chiller system. The method can determine whether it is necessary to adjust the number of startups of each chiller according to the first operation information of the chiller, and then determine whether it is necessary to adjust the number of startups of each water pump according to the second operation information of multiple water pumps that have been turned on, and finally determine the number of startups of the cooling tower according to the total flow of the cooling water pumps in the turned-on water pumps, and adopt the operation strategy formulation from the local (each part) to the whole system, so that each part and the whole of the chiller system can meet the cooling demand while achieving the lowest energy consumption state.

[0054] like Figure 1The embodiment of the present application shown provides a structural schematic diagram of a chiller system. The chiller may include a compressor, an evaporator, a condenser and a throttle valve. The refrigerant exists in a low-pressure, low-temperature liquid form in the evaporator.

[0055] The low-temperature chilled water is transported from the evaporator to the water distributor for distribution and is used by the user side to achieve a balanced cooling effect. The low-temperature chilled water exchanges heat with the user side and the temperature of the low-temperature chilled water rises.

[0056] The water collector collects the heated chilled water, and the chilled water pump sends the heated chilled water from the water collector to the evaporator. The heated chilled water exchanges heat with the liquid refrigerant in the evaporator and becomes low-temperature chilled water again. The liquid refrigerant absorbs the heat of the chilled water, is compressed by the compressor and becomes a high-temperature and high-pressure gaseous refrigerant, and is sent to the condenser.

[0057] At the same time, the cooling water pump draws cooling water from the cooling tower and transports it to the condenser. The cooling water condenses the gaseous refrigerant into liquid refrigerant. The liquid refrigerant returns to the evaporator after being cooled and reduced in pressure by the throttling device to continue cooling the heated chilled water. The cooling water returns to the cooling tower for cooling treatment.

[0058] A pressure gauge can be set in the pipeline to measure the water pressure, a thermometer can be set to measure the water temperature, and a flow meter can be set to measure the water flow.

[0059] The following is a detailed description of the method for controlling the optimal operation of the chiller system in accordance with an embodiment of the present application in conjunction with the accompanying drawings.

[0060] Reference Figure 2 , Figure 2 A flow chart of a method for controlling the optimal operation of a chiller system provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, an embodiment of the present application provides a method for controlling the optimal operation of a chiller system, the chiller system comprising: a plurality of chillers, a plurality of water pumps and a plurality of cooling towers, the method for controlling the optimal operation of the chiller system may include steps S10 to S13, and these steps are described in detail below.

[0061] S10. Collect the first operating information of the chillers that have been turned on among the chillers, and determine whether it is necessary to adjust the number of turned-on chillers based on the first operating information. If it is necessary to adjust the number of turned-on chillers, determine at least one target chiller that needs to switch the on / off state based on the energy efficiency of the turned-on chillers, and control the target chiller to switch the on / off state to adjust the number of turned-on chillers.

[0062] Among them, the first operation information is the values ​​of various parameters involved in the operation of the chillers that have been turned on among the multiple chillers, and optionally includes the return water temperature of the refrigeration side of the chillers that have been turned on, the supply water temperature of the refrigeration side of the chillers that have been turned on, and the operating current percentage of each of the chillers that have been turned on. In this embodiment, the operating status of the currently turned-on chillers can be determined through the first operation information to determine whether the currently turned-on chillers are close to the load limit or are in a low-load operation state, and determine whether the number of chillers turned on needs to be adjusted according to the state of the turned-on chillers. The specific process can be as follows:

[0063] Obtaining the chilled water return temperature, chilled water supply temperature and operating current percentage of each of the chilled water units that have been turned on, and calculating the average chilled water return temperature, average chilled water supply temperature and average operating current percentage of the chilled water units that have been turned on; determining the current operating condition of the chilled water units that have been turned on according to the average chilled water return temperature, average chilled water supply temperature and average operating current percentage, the operating conditions including: a first target operating condition, a second target operating condition and a third target operating condition, the third target operating condition being other operating conditions except the first target operating condition and the second target operating condition;

[0064] If the duration of the started chillers in the first target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be increased; if the duration of the started chillers in the second target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be reduced;

[0065] If the started chillers continue to be in the third target operating condition, or the time for which the started chillers continue to be in the first target operating condition is not greater than the preset duration, or the time for which the started chillers continue to be in the second target operating condition is not greater than the preset duration, it is determined that there is no need to adjust the number of started chillers.

[0066] Among them, the operating current percentage is a term used to describe the ratio of the current intensity of a device or circuit in actual operation to its rated current intensity. This ratio can be expressed in the form of a percentage, reflecting the load condition of the device or circuit under working conditions. The higher the percentage value, the closer the current carried by the device or circuit is to its design limit; the lower the percentage value, the lighter the workload of the device or circuit is, and there is more margin to cope with sudden high load conditions or improve performance. The freezing side water supply temperature can be the water supply temperature of the chiller, such as Figure 1 The water temperature in the connecting pipe between the evaporator and the water distributor of the chiller shown in FIG. 1 and the return water temperature on the refrigeration side can be the water temperature of the chiller after the heat exchange of the chilled water. Figure 1The water temperature in the connecting pipe between the water collector and the evaporator of the chiller is shown. The refrigeration side water supply temperature and the refrigeration side return water temperature can be obtained by a thermometer set in the refrigeration side pipeline. The preset duration is the preset working condition duration. In this embodiment, the specific value of the preset duration can be 15 minutes.

[0067] The first target operating condition can be: the average percentage of the operating current is greater than the first preset value, the average water supply temperature on the freezing side is greater than the second preset value, and the difference between the average water supply temperature on the freezing side and the second preset value is greater than the third preset value. It means that under the first target operating condition, the multiple chillers that are currently turned on are close to the load limit, and the multiple chillers that are turned on need to continue to maintain a state close to the load limit so that the water supply temperature on the freezing side can meet the refrigeration requirements. At this time, in order to balance the load pressure of each chiller that has been turned on, you can choose to turn on other chillers that have not been turned on to reduce the load pressure of the chillers that have been turned on, and meet the refrigeration needs at the same time. Therefore, under the first target operating condition, the target chiller for switching the on / off state is determined to be the chiller with the highest energy efficiency among the chillers that have not been turned on, so as to quickly balance the load pressure of the chillers that have been turned on.

[0068] The second target operating condition may be: the current calculation value is less than the fourth preset value and the average return water temperature on the freezing side is less than the fifth preset value and the difference between the fifth preset value and the average return water temperature on the freezing side is greater than the sixth preset value, and the current calculation value is: the sum of the operating current percentages divided by the calculated value of the target value, and the target value is the calculated value after the number of operating current percentages is subtracted from 1. It means that under the second target operating condition, the multiple chillers currently turned on are in a low-load operation state, and after the chilled water completes the heat exchange, its return water temperature is still low, indicating that the water supply temperature on the freezing side can meet the cooling demand under the low-load operation state. Therefore, the multiple chillers turned on can already meet the cooling demand under the low-load operation state, then at this time, at least one chiller can be selected from the multiple chillers turned on to be turned off, and when the multiple chillers turned on meet the cooling demand, the load of the chillers turned on can be appropriately increased and energy can be saved at the same time. Therefore, under the second target operating condition, the target chiller for switching the on / off state is determined to be the chiller with the lowest energy efficiency among the chillers that have been turned on. The chiller with the lowest energy efficiency contributes the least to the cooling effect and the chillers that are currently turned on are all in low-load operation. Shutting down the chiller with the lowest energy efficiency can appropriately improve the operating efficiency of other chillers that have been turned on. While saving energy, the chillers that have been turned on can still meet the cooling demand.

[0069] Among them, the energy efficiency of the chiller is an important indicator to measure its energy utilization efficiency, which mainly involves the ability to effectively utilize energy and reduce energy consumption during the refrigeration or cooling process. The energy efficiency of the chiller can be obtained by fitting the historical operation data of the chiller or the factory data of the chiller. The specific calculation formula can be as follows:

[0070]

[0071] in, Energy efficiency of chillers; is the operating current percentage of the chiller; It is the water supply temperature on the freezing side; is the return water temperature on the cooling side; is the rated energy efficiency of the chiller; , , , , and All of them are fitting coefficients, which can be obtained by fitting the historical data of the chiller.

[0072] This embodiment can obtain the operating current percentage of the chiller from historical data, and obtain the freezing side supply water temperature and the cooling side return water temperature under the operating current percentage, and obtain the rated energy efficiency of the unit from the exit data of the chiller, so as to obtain the energy efficiency of each chiller according to the above calculation formula.

[0073] In the third target operating condition, the average percentage of the operating current and the average water supply temperature on the freezing side do not simultaneously meet the numerical requirements of the average percentage of the operating current and the average water supply temperature on the freezing side in the first target operating condition, or the calculated current value and the average return water temperature on the freezing side do not simultaneously meet the numerical requirements of the calculated current value and the average return water temperature on the freezing side in the second target operating condition. For example, when the average percentage of the operating current is greater than the first preset value, but the average water supply temperature on the freezing side is not greater than the second preset value, the operating condition can be the third target operating condition. Under the third target operating condition, the load of the chillers that have been turned on is normal, and they are neither close to the load limit nor running at low load, so there is no need to adjust the number of chillers turned on. Furthermore, when the time that the turned-on chiller is continuously in the first target operating condition is not greater than the preset duration, or the time that the turned-on chiller is continuously in the second target operating condition is not greater than the preset duration, it means that the turned-on chiller is only briefly in the first target operating condition or the second target operating condition, rather than continuously in the first target operating condition or the second target operating condition. At this time, there is no need to adjust the number of chillers turned on.

[0074] Among them, the first preset value is the set loading current percentage, and the loading current percentage is the percentage of the current load current under the maximum current (i.e., rated current) that the device or system can withstand. In this embodiment, the specific value of the first preset value can be 0.9. The second preset value is the set freezing side water supply temperature. In this embodiment, the specific value of the second preset value can be 7°C. The third preset value is the difference between the actual freezing side water supply temperature and the set freezing side water supply temperature. In this embodiment, the specific value of the third preset value can be 0.5°C. The fourth preset value can be the set load reduction current percentage, and the load reduction current percentage is the percentage between the current after the equipment is reduced and the rated current. In this embodiment, the specific value of the fourth preset value can be 0.3. The fifth preset value is the set freezing side return water temperature. In this embodiment, the specific value of the fifth preset value can be 12°C. The sixth preset value is the difference between the actual freezing side return water temperature and the set freezing side return water temperature. In this embodiment, the specific value of the sixth preset value can be 0.5°C. Furthermore, the first preset value, the second preset value, the third preset value, the fourth preset value, the fifth preset value and the sixth preset value can all be set according to actual conditions.

[0075] In the first target operating condition, the average value of the operating current percentages of each turned-on chiller is compared with the first preset value, while in the second target operating condition, the current calculation value compared with the fourth preset value is not the average value of the operating current percentages of each turned-on chiller, but the value obtained by first subtracting 1 from the number of operating current percentages (the number of turned-on chillers) and then calculating the value as the divisor of multiple operating current percentages.

[0076] The overall formulation process of the chiller operation strategy can be shown as steps 1 to 8, wherein (set1) is the loading current percentage (first preset value), (set2) is the load reduction current percentage (fourth preset value), Tgset is the set refrigeration side water supply temperature (second preset value), Thset is the set refrigeration side return water temperature (fifth preset value), t_state is the preset duration, Hold_time1 is the duration of the first target operating condition, and Hold_time2 is the duration of the second target operating condition:

[0077] Step 1: Collect the operating current percentage (PLR) of each chiller, and obtain the chilled side supply water temperature (Tg) and the cooling side return water temperature (Th) under the operating current percentage, and calculate the average chilled side return water temperature (Th1), the average chilled side supply water temperature (Tg1) and the average operating current percentage (sum (PLR) / num) of the chillers that have been turned on;

[0078] Step 2: Determine (sum (PLR) / num) and (set1). If (sum (PLR) / num) > (set1), go to step 3; if (sum (PLR) / num) ≤ (set1), go to step 4.

[0079] Step 3: Determine (Tg1) and (Tgset+0.5). If (Tg1)>(Tgset+0.5), proceed to step 5; if (Tg1)≤(Tgset+0.5), proceed to step 6;

[0080] Step 4: Determine (sum (PLR) / (num-1)) and (set2). If (sum (PLR) / (num-1)) < (set2), then execute step 7; if (sum (PLR) / (num-1)) ≥ (set2), then execute step 6;

[0081] Step 5: Determine Hold_time1 and t_state. If Hold_time1>t_state, determine that the number of chillers to be started needs to be increased, and determine that the target chiller for switching the on / off state is the chiller with the highest energy efficiency among the chillers that are not started; if Hold_time1≤t_state, execute step 6;

[0082] Step 6: Do not adjust the number of chillers on.

[0083] Step 7: Determine (Th1) and (Thset). If (Th1) < (Thset-0.5), proceed to step 8; if (Th1) ≥ (Thset-0.5), proceed to step 6;

[0084] Step 8: Determine Hold_time2 and t_state. If Hold_time2>t_state, determine that the number of chillers to be started needs to be reduced, and determine that the target chiller for switching the on / off state is the chiller with the lowest energy efficiency among the chillers that have been started; if Hold_time2≤t_state, execute step 6.

[0085] S11. Collect the second operating information of the water pumps that have been turned on among the water pumps, and determine whether it is necessary to adjust the number of water pumps that are turned on based on the second operating information. If it is necessary to adjust the number of water pumps that are turned on, determine at least one target water pump for switching the switch state based on the efficiency of the water pumps that have been turned on, and control the target water pump to switch the switch state to adjust the number of water pumps that are turned on. Each water pump includes multiple cooling water pumps and multiple freezing water pumps.

[0086] The second operation information may be various parameter values ​​related to the operation of the water pump, and may optionally be the return water temperature and the supply water temperature of the water pump. In this embodiment, the water pump may be divided into a cooling water pump and a refrigeration water pump, and the second operation information of the cooling water pump may be the cooling side outlet water temperature and the cooling side return water temperature, such as Figure 1 The water temperature in the cooling water outlet pipe and the water temperature in the cooling water return pipe are shown, wherein the cooling water supply in this embodiment can be used to represent Figure 1 The second operation information of the chilled water pump may be the chilled water supply temperature and the chilled water return temperature. Figure 1 The water temperature in the chilled water supply pipe and the water temperature in the chilled water return pipe are shown. In this embodiment, when adjusting the number of water pumps to be turned on, the chilled water pump can be adjusted first, and then the cooling water pump can be adjusted. In this embodiment, it can be determined whether the number of water pumps to be turned on needs to be adjusted based on the return water temperature and supply water temperature of the currently turned-on water pump, and the specific process can be as follows:

[0087] Collect the return water temperature and supply water temperature of each turned-on water pump, obtain the average return water temperature and average supply water temperature of the turned-on water pump, determine the average supply and return water temperature difference of the turned-on water pump, input the average supply and return water temperature difference and the preset supply and return water temperature difference into the PID algorithm, and calculate the average frequency of the turned-on water pump;

[0088] According to the average supply and return water temperature difference and the average frequency, the current working condition of the turned-on water pump is determined, and the working conditions include the fourth target working condition, the fifth target working condition and the sixth target working condition. The sixth target working condition is other working conditions except the fourth target working condition and the fifth target working condition.

[0089] If the duration of the turned-on water pump in the fourth target operating condition is longer than the preset duration, it is determined that the number of turned-on water pumps needs to be increased; if the duration of the turned-on water pump in the fifth target operating condition is longer than the preset duration, it is determined that the number of turned-on water pumps needs to be reduced;

[0090] If the turned-on water pump continues to be in the sixth target operating condition, or the turned-on water pump continues to be in the fourth target operating condition for a period not greater than the preset duration, or the turned-on water pump continues to be in the fifth target operating condition for a period not greater than the preset duration, it is determined that there is no need to adjust the number of water pumps turned on.

[0091] Among them, in this embodiment, the return water temperature and supply water temperature of the water pump can be determined by a thermometer set in the pipeline. The preset supply and return water temperature difference is the difference between the set supply water temperature and the return water temperature, and the difference is the calculation result of subtracting the return water temperature from the supply water temperature. In this embodiment, the value of the preset supply and return water temperature difference can be 5°C. In this embodiment, the average supply and return water temperature difference and the preset supply and return water temperature difference can be input into the PID algorithm. After multiple iterative calculations, the average frequency of the water pump that has been turned on is obtained when the average supply and return water temperature difference is infinitely close to the preset supply and return water temperature difference.

[0092] The fourth target operating condition is: the average supply and return water temperature difference is greater than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than the seventh preset value, and the average frequency is not less than the loading frequency setting value, wherein the loading frequency setting value is a frequency threshold, when the average frequency of the turned-on water pump is not less than the loading frequency setting value, it means that the water pump can be loaded (other water pumps are turned on), in this embodiment, the specific value can be 50. In the fourth target operating condition, the average supply and return water temperature difference is higher than the preset supply and return water temperature difference, which can indicate that the heat exchange of the medium that needs to be heat exchanged at this time is large, but the turned-on water pump is close to the load limit (the average frequency is not less than the loading frequency setting value), then in order to balance the load pressure of the turned-on water pump, other unturned water pumps can be selected to be turned on to reduce the load pressure of the turned-on water pump and meet the heat exchange. Therefore, the target water pump that determines the switching state under the fourth target operating condition can be the most efficient water pump among the unturned water pumps, so as to quickly meet the demand for a large heat exchange and quickly balance the load pressure of other turned-on water pumps.

[0093] The fifth target operating condition is: the average supply and return water temperature difference is less than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than the eighth preset value, and the average frequency is not greater than the load shedding frequency setting value, wherein the load shedding frequency setting value is a frequency threshold, when the average frequency of the turned-on water pump is not greater than the load shedding frequency setting value, it means that the water pump can be unloaded (turn off other water pumps), in this embodiment, the specific value can be 30. In the fifth target operating condition, the average supply and return water temperature difference is not greater than the preset supply and return water temperature difference, indicating that the heat exchange amount of the medium that needs to be heat exchanged at this time is small, and the turned-on water pump is in a low-load operation state (the average frequency is not greater than the load shedding frequency setting value), then at this time, at least one water pump can be selected from the turned-on water pumps to turn off, and energy can be saved while meeting the heat requirement. Therefore, the target water pump that determines the switching state under the fifth target operating condition can be the water pump with the lowest efficiency among the turned-on water pumps. The least efficient water pump contributes the least to the heat exchange and the currently turned on water pumps are all in a low-load state. Therefore, when the least efficient water pump is turned off, the operating efficiency of other turned on water pumps can be appropriately improved to improve energy utilization efficiency, thereby saving energy and minimizing the impact on the heat exchange.

[0094] Among them, the seventh preset value is the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference when the average supply and return water temperature difference is greater than the preset supply and return water temperature difference, and the eighth preset value is the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference when the average supply and return water temperature difference is not greater than the preset supply and return water temperature difference. In this embodiment, the seventh preset value and the eighth preset value can both be 0.5°C. Of course, the seventh preset value and the eighth preset value can be set according to actual conditions.

[0095] The efficiency of a water pump refers to the useful work actually done by the water pump on the liquid, reflecting the effectiveness of the water pump's energy conversion. This embodiment can determine the efficiency of the water pump based on the historical data of the water pump. Specifically, this embodiment can fit the flow-efficiency characteristic curve of each water pump based on the historical data of the water pump. The curve can be used to determine the efficiency of each water pump at the same flow rate, so as to facilitate the selection of the most efficient water pump or the least efficient water pump. The fitting formula of the flow-efficiency characteristic curve can be expressed as:

[0096]

[0097] in, It can be the efficiency of the water pump; It can be the rated efficiency of the pump; It can be the flow rate of the water pump; It can be the rated flow rate of the pump; , and They are all fitting coefficients, and the fitting coefficients can be determined by fitting multiple sets of historical data of the water pump.

[0098] In the sixth target operating condition, the average supply and return water temperature difference and the average frequency do not meet the numerical requirements in the fourth target operating condition at the same time, or do not meet the numerical requirements in the fifth target operating condition at the same time. For example, when the average supply and return water temperature difference is less than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than the eighth preset value, the operating condition in which the average frequency is greater than the load shedding frequency setting value can be the sixth target operating condition. Under the sixth target operating condition, the load of the turned-on water pump is normal, and it will neither approach the load limit nor run at low load, so there is no need to adjust the number of water pumps turned on. Furthermore, the duration of the turned-on water pump being in the fourth target operating condition is not greater than the preset duration, or the duration of the turned-on water pump being in the fifth target operating condition is not greater than the preset duration, indicating that the turned-on water pump is only temporarily in the fourth target operating condition or the fifth target operating condition, rather than being continuously in the fourth target operating condition or the fifth target operating condition, then there is no need to adjust the number of water pumps turned on at this time.

[0099] The overall formulation process of the operation strategy of the water pump can be as shown in Steps Nine to Seventeen. Among them, y1 is the set value of the loading frequency, y2 is the set value of the unloading frequency, t_state is the preset duration, Hold_time4 is the duration of the fourth target working condition, and Hold_time5 is the duration of the fifth target working condition.

[0100] Step Nine: Collect the return water temperature and supply water temperature of each started water pump, obtain the average return water temperature and average supply water temperature of the started water pumps, and calculate the average temperature difference between the supply water and return water (Tw) of the started water pumps.

[0101] Step Ten: Input the average temperature difference between the supply water and return water and the preset temperature difference between the supply water and return water (Tset) into the PID algorithm to calculate the average frequency (y) of the started water pumps.

[0102] Step Eleven: Judge Tw and (Tset + 0.5). If (Tw) > (Tset + 0.5), then execute Step Twelve; if (Tw) ≤ (Tset + 0.5), then execute Step Thirteen.

[0103] Step Twelve: Judge y and y1. If y ≥ y1, then execute Step Fourteen; if y < y1, then execute Step Fifteen.

[0104] Step Thirteen: Judge Tw and (Tset - 0.5). If (Tw) < (Tset - 0.5), then execute Step Sixteen; if (Tw) ≥ (Tset - 0.5), then execute Step Fifteen.

[0105] Step Fourteen: Judge Hold_time4 and t_state. If Hold_time4 > t_state, then determine that the number of started water pumps needs to be increased, and the target water pump for determining the switching switch state can be the water pump with the highest efficiency among the unstarted water pumps; if Hold_time4 ≤ t_state, then execute Step Fifteen.

[0106] Step Fifteen: There is no need to adjust the number of started water pumps.

[0107] Step Sixteen: Judge y and y2. If y ≤ y2, then execute Step Seventeen; if y > y2, then execute Step Fifteen.

[0108] Step Seventeen: Judge Hold_time5 and t_state. If Hold_time5 > t_state, then determine that the number of started water pumps needs to be decreased, and the target water pump for determining the switching switch state can be the water pump with the lowest efficiency among the started water pumps; if Hold_time5 ≤ t_state, then execute Step Fifteen.

[0109] S12, determining the total flow rate of the cooling water pumps according to the adjusted number of cooling water pumps opened among the water pumps;

[0110] S13. Adjust the number of cooling towers opened according to the total flow of the cooling water pump.

[0111] Among them, since the cooling tower and the cooling water pump are located on the cooling side of the chiller, and the cooling water pump draws cooling water from the cooling tower to cool the refrigerant in the condenser, the number of cooling towers that are opened is related to the flow rate of the cooling water pump. When the number of cooling water pumps that are opened is adjusted, the flow rate of the cooling water pump is also changed. In order to balance the flow rate of the cooling water pump and the flow rate of the cooling tower and prevent the cooling tower from being overloaded, the number of cooling towers that are opened needs to be adjusted. For example, if the flow rate of the cooling water pump is higher than the flow rate of the cooling tower, the water flow rate drawn by the cooling water pump is higher than the flow rate of the cooling tower, too much cooling water enters the cooling tower and the cooling tower has limited heat dissipation capacity, which may cause the cooling tower to be overloaded. This embodiment can determine the number of cooling towers that are opened based on the total flow rate of the cooling water pumps that are turned on, and its specific processing process can be as follows:

[0112] If the total flow of the cooling water pump is not less than the minimum value of the total flow of the cooling tower under the first quantity and is not greater than the minimum value of the total flow of the cooling tower under the second quantity, the number of cooling towers opened is adjusted to the first quantity, the second quantity is greater than the first quantity, and the difference between the first quantity and the second quantity is 1;

[0113] If the total flow of the cooling water pump is not less than the lowest value of the total flow of all cooling towers, all unopened cooling towers will be opened.

[0114] Among them, when determining the number of cooling towers to be opened, this embodiment mainly determines it by the minimum flow of the cooling tower and the total flow of the cooling water pumps that have been opened. Specifically, the total flow of the cooling water pump is L, the water flow of a single cooling tower is I, and the minimum flow rate that can meet the operation of the cooling tower is 0.3I. When L≥K×0.3I, K is the total number of cooling towers, indicating that the total flow of the cooling water pump can meet the minimum flow rate of all cooling towers at this time, and all cooling towers can be opened; when X×0.3I≤L≤(X+1)×0.3I, X is the number of cooling towers to be opened, indicating that the total flow of the cooling water pump can only meet the minimum flow rate of X (first number) cooling towers, but cannot meet the minimum flow rate of X+1 (second number) cooling towers, and the number of cooling towers to be opened can be adjusted to X.

[0115] This embodiment uses the Modelica simulation model. On the basis of the developed Modelica simulation model, the strategy is formulated in the order of energy consumption from large to small (cooling unit-water pump-cooling tower). The strategy operation of the chiller system from local to overall is simulated by simulating the Modelica model. The specific process can be shown in steps 18 to 25:

[0116] Step 18: collecting first operation information of the chillers that have been turned on among the chillers, determining whether it is necessary to adjust the number of chillers turned on according to the first operation information, and if it is necessary to adjust the number of chillers turned on, determining at least one target chiller that needs to switch the on / off state according to the energy efficiency of the chillers that have been turned on, and controlling the target chillers to switch the on / off state to adjust the number of chillers turned on;

[0117] Step 19: Collect the first end information of the started chiller, the first end information includes the water temperature of the water supply end, the water pressure of the water supply end, the water temperature of the return water end and the water pressure of the return water end of the started chiller; if at least one of the first end information is abnormal, return to step 18; if none of the first end information is abnormal, then execute step 20;

[0118] Step 20: collecting the second operation information of the turned-on chilled water pump, and determining whether the number of chilled water pumps turned on needs to be adjusted according to the second operation information of the chilled water pump; if the number of chilled water pumps turned on needs to be adjusted, determining at least one target chilled water pump for switching the switch state according to the efficiency of the turned-on chilled water pump, and controlling the target chilled water pump to switch the switch state to adjust the number of chilled water pumps turned on;

[0119] Step 21: collecting the second end information of the turned-on chilled water pump, the second end information including the water temperature at the water supply end, the water pressure at the water supply end, the water temperature at the return water end, and the water pressure at the return water end of the turned-on chilled water pump; if at least one of the second end information is abnormal, returning to step 20; if none of the second end information is abnormal, executing step 22;

[0120] Step 22: collecting the second operation information of the turned-on cooling water pump, and determining whether it is necessary to adjust the number of cooling water pumps turned on according to the second operation information of the cooling water pump; if it is necessary to adjust the number of cooling water pumps turned on, determining at least one target cooling water pump for switching the switch state according to the efficiency of the turned-on cooling water pump, and controlling the target cooling water pump to switch the switch state to adjust the number of cooling water pumps turned on;

[0121] Step 23: collecting the second end information of the turned-on cooling water pump, the second end information includes the water temperature of the water supply end, the water pressure of the water supply end, the water temperature of the return water end, and the water pressure of the return water end of the turned-on cooling water pump; if at least one of the second end information is abnormal, return to step 22; if none of the second end information is abnormal, then execute step 24;

[0122] Step 24: determining the total flow of the cooling water pumps according to the adjusted number of cooling water pumps opened among the water pumps, and adjusting the number of cooling towers opened according to the total flow of the cooling water pumps;

[0123] Step 25: Determine whether the temperature of the space where the chiller system is cooling is within the set temperature range. If not, return to step 18. If within the set temperature range, end the strategy formulation process.

[0124] The water temperature at the water supply end and the water temperature at the water return end can be obtained by a thermometer arranged in the pipeline, the water pressure at the water supply end and the water pressure at the water return end can be obtained by a pressure gauge arranged in the pipeline, and the water flow rate can be obtained by a flow meter arranged in the pipeline. The set temperature range is the temperature range of the perceived temperature in the set space. In this embodiment, the perceived temperature in the set space in summer is 26°C, then the set temperature range can be [25, 27], and the perceived temperature in the set space in winter is 20°C, then the set temperature range can be [19, 21]. Of course, it can also be set according to actual conditions.

[0125] The embodiment of the present application provides a method for controlling the optimized operation of a chiller system. The method first determines whether it is necessary to adjust the number of chillers to be turned on based on the first operation information of multiple chillers that have been turned on, and then determines whether it is necessary to adjust the number of pumps to be turned on based on the second operation information of multiple pumps that have been turned on, and finally determines the number of cooling towers to be turned on based on the total flow of cooling water pumps in the turned-on pumps. The method determines the on / off status of each part of the chiller system according to the operation information of the turned-on equipment, does not blindly increase the turned-on equipment to increase energy consumption, and the method adopts the formulation of operation strategies from local (each part) to the whole system, so that each part and the whole of the chiller system can meet the cooling demand while achieving the lowest energy consumption.

[0126] The above describes a method for controlling the optimal operation of a chiller system provided by an embodiment of the present application. The following describes a device for executing the method for controlling the optimal operation of a chiller system. Figure 3 , Figure 3 A schematic diagram of a device for controlling the optimal operation of a chiller system provided in an embodiment of the present application. The chiller system includes: a plurality of chillers, a plurality of water pumps and a plurality of cooling towers, such as Figure 3As shown, the device for controlling the optimal operation of the chiller system includes:

[0127] The first processing unit 100 is used to collect first operating information of the chillers that have been turned on among the chillers, and determine whether the number of chillers turned on needs to be adjusted according to the first operating information. If the number of chillers turned on needs to be adjusted, at least one target chiller that needs to switch the on / off state is determined according to the energy efficiency of the chillers that have been turned on, and the target chiller is controlled to switch the on / off state to adjust the number of chillers turned on;

[0128] The second processing unit 110 is used to collect second operation information of the water pumps that have been turned on among the water pumps, and determine whether the number of water pumps turned on needs to be adjusted according to the second operation information. If the number of water pumps turned on needs to be adjusted, at least one target water pump whose switch state is switched is determined according to the efficiency of the water pumps that have been turned on, and the target water pump is controlled to switch the switch state to adjust the number of water pumps turned on, wherein each water pump includes a plurality of cooling water pumps and a plurality of freezing water pumps;

[0129] The third processing unit 120 is used to determine the total flow of the cooling water pumps according to the adjusted number of cooling water pumps that are turned on among the water pumps, and adjust the number of cooling towers that are turned on according to the total flow of the cooling water pumps.

[0130] In a possible implementation, the first processing unit 100 collects first operation information of the started chillers among the chillers, and determines whether the start-up quantity of the chillers needs to be adjusted according to the first operation information. Specifically, the configuration may be as follows:

[0131] Obtain the chilled water return temperature, chilled water supply temperature and operating current percentage of each of the chilled water units that have been turned on, and calculate the average chilled water return temperature, average chilled water supply temperature and average operating current percentage of the chilled water units that have been turned on;

[0132] According to the average return water temperature of the freezing side, the average supply water temperature of the freezing side and the average percentage of the operating current, the current operating condition of the started chiller is determined, and the operating conditions include: the first target operating condition, the second target operating condition and the third target operating condition, and the third target operating condition is other operating conditions except the first target operating condition and the second target operating condition;

[0133] If the duration of the started chillers in the first target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be increased;

[0134] If the duration of the started chillers in the second target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be reduced;

[0135] If the started chillers continue to be in the third target operating condition, or the time for which the started chillers continue to be in the first target operating condition is not greater than the preset duration, or the time for which the started chillers continue to be in the second target operating condition is not greater than the preset duration, it is determined that there is no need to adjust the number of started chillers.

[0136] In a possible implementation, the first target operating condition is specifically configured as follows: the average percentage of the operating current is greater than a first preset value, the average supply water temperature on the freezing side is greater than a second preset value, and the difference between the average supply water temperature on the freezing side and the second preset value is greater than a third preset value;

[0137] The second target operating condition is: the calculated current value is less than the fourth preset value and the average return water temperature on the refrigeration side is less than the fifth preset value and the difference between the fifth preset value and the average return water temperature on the refrigeration side is greater than the sixth preset value. The calculated current value is: the sum of the operating current percentages divided by the calculated value of the target value. The target value is the calculated value after subtracting 1 from the number of operating current percentages.

[0138] In a possible implementation, the first processing unit 100 determines at least one target chiller that needs to switch on / off states according to the energy efficiency of the chillers that have been turned on, which can be specifically configured as follows:

[0139] If the duration of the started chiller being in the first target operating condition is longer than the preset duration, the target chiller is determined to be the chiller with the highest energy efficiency among the chillers that are not started;

[0140] If the duration of the started chiller in the second target operating condition is greater than the preset duration, the target chiller is determined to be the chiller with the lowest energy efficiency among the started chillers.

[0141] In a possible implementation, the second processing unit 110 collects the second operation information of the water pumps that have been turned on among the water pumps, and determines whether to adjust the number of water pumps turned on according to the second operation information. Specifically, the configuration may be as follows:

[0142] Collect the return water temperature and supply water temperature of each turned-on water pump to obtain the average return water temperature and average supply water temperature of the turned-on water pumps;

[0143] Determine the average supply and return water temperature difference of the pumps that have been turned on;

[0144] The average supply and return water temperature difference and the preset supply and return water temperature difference are input into the PID algorithm to calculate the average frequency of the turned-on water pump;

[0145] According to the average supply and return water temperature difference and the average frequency, the current working condition of the turned-on water pump is determined, and the working conditions include the fourth target working condition, the fifth target working condition and the sixth target working condition. The sixth target working condition is other working conditions except the fourth target working condition and the fifth target working condition.

[0146] If the duration of the turned-on water pumps being in the fourth target operating condition is longer than the preset duration, it is determined that the number of turned-on water pumps needs to be increased;

[0147] If the duration of the turned-on water pumps being in the fifth target operating condition is longer than the preset duration, it is determined that the number of turned-on water pumps needs to be reduced;

[0148] If the turned-on water pump continues to be in the sixth target operating condition, or the turned-on water pump continues to be in the fourth target operating condition for a period not greater than the preset duration, or the turned-on water pump continues to be in the fifth target operating condition for a period not greater than the preset duration, it is determined that there is no need to adjust the number of water pumps turned on.

[0149] In a possible implementation, the fourth target operating condition is specifically configured as follows: the average supply and return water temperature difference is greater than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than a seventh preset value, and the average frequency is not less than the loading frequency setting value;

[0150] The specific configuration of the fifth target operating condition is: the average supply and return water temperature difference is less than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than the eighth preset value, and the average frequency is not greater than the load reduction frequency setting value.

[0151] In a possible implementation, the second processing unit 110 determines at least one target water pump to switch the switch state according to the efficiency of the turned-on water pump, which can be specifically configured as follows:

[0152] If the duration of the turned-on water pump being in the fourth target operating condition is longer than the preset duration, the target water pump is determined to be the water pump with the highest efficiency among the unturned water pumps;

[0153] If the duration of the activated water pump being in the fifth target operating condition is longer than the preset duration, the target water pump is determined to be the water pump with the lowest efficiency among the activated water pumps.

[0154] The present application also provides an electronic device in an embodiment. Figure 4 As shown, it shows a schematic diagram of the structure of an electronic device suitable for implementing the embodiment of the present application. The electronic device in the embodiment of the present application may include but is not limited to fixed terminals such as mobile phones, laptops, PDAs (personal digital assistants), PADs (tablet computers), desktop computers, etc. Figure 4 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0155] like Figure 4As shown, the electronic device may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 401, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 402 or a program loaded from a storage device 408 to a random access memory (RAM) 403. When the electronic device is powered on, various programs and data required for the operation of the electronic device are also stored in the RAM 403. The processing device 401, the ROM 402, and the RAM 403 are connected to each other via a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.

[0156] Typically, the following devices may be connected to the I / O interface 405: an input device 406 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 407 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 408 including, for example, a memory card, a hard disk, etc.; and a communication device 409. The communication device 409 may allow the electronic device to communicate with other devices wirelessly or by wire to exchange data. Although Figure 4 An electronic device having various devices is shown, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0157] An embodiment of the present application also provides a computer program product including computer-readable instructions. When the computer-readable instructions are executed on an electronic device, the electronic device implements any method for controlling the optimized operation of a chiller system provided in the embodiment of the present application.

[0158] A computer-readable storage medium is also provided in an embodiment of the present application. The storage medium carries one or more computer programs. When one or more computer programs are executed by an electronic device, the electronic device can implement any method for controlling the optimized operation of a chiller system provided in an embodiment of the present application.

[0159] It should also be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed over multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the drawings of the device embodiments provided by the present application, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines.

[0160] Through the description of the above implementation mode, the technicians in the field can clearly understand that the present application can be implemented by means of software plus necessary general hardware, and of course, it can also be implemented by special hardware including special integrated circuits, special CPUs, special memories, special components, etc. In general, all functions completed by computer programs can be easily implemented by corresponding hardware, and the specific hardware structure used to implement the same function can also be various, such as analog circuits, digital circuits or special circuits. However, for the present application, software program implementation is a better implementation mode in more cases. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a readable storage medium, such as a computer floppy disk, a U disk, a mobile hard disk, a ROM, a RAM, a disk or an optical disk, etc., including a number of instructions to enable a computer device (which can be a personal computer, a training device, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0161] In the above embodiments, all or part of the embodiments may be implemented by software, hardware, firmware or any combination thereof. When implemented by software, all or part of the embodiments may be implemented in the form of a computer program product.

[0162] The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website site, a computer, a training device, or a data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, training device, or data center. The computer-readable storage medium may be any available medium that a computer can store or a data storage device such as a training device, a data center, etc. that includes one or more available media integrations. The available medium may be a magnetic medium, (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state drive (SSD)), etc.

[0163] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0164] It is understandable that before using the technical solutions disclosed in the embodiments of the present disclosure, the types, scope of use, usage scenarios, etc. of the personal information involved in the present disclosure should be informed to the user and the user's authorization should be obtained in an appropriate manner in accordance with relevant laws and regulations.

[0165] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for controlling the optimal operation of a chiller system, characterized in that: The chiller system comprises: a plurality of chillers, a plurality of water pumps and a plurality of cooling towers, and the method for controlling the optimal operation of the chiller system comprises: Collecting first operation information of the chillers that have been turned on among the chillers, and determining whether it is necessary to adjust the number of chillers turned on based on the first operation information; if it is necessary to adjust the number of chillers turned on, determining at least one target chiller that needs to switch the on / off state based on the energy efficiency of the chillers that have been turned on, and controlling the target chillers to switch the on / off state to adjust the number of chillers turned on; Collecting second operation information of the water pumps that have been turned on among the water pumps, and determining whether it is necessary to adjust the number of water pumps turned on according to the second operation information, if it is necessary to adjust the number of water pumps turned on, determining at least one target water pump for switching the switch state according to the efficiency of the water pumps that have been turned on, and controlling the target water pump to switch the switch state to adjust the number of water pumps turned on, wherein each water pump includes a plurality of cooling water pumps and a plurality of freezing water pumps; Determine the total flow rate of the cooling water pumps according to the number of cooling water pumps that are turned on among the adjusted water pumps; The number of cooling towers opened is adjusted according to the total flow of the cooling water pump.

2. The method for controlling the optimal operation of a chiller system according to claim 1, characterized in that: The collecting first operation information of the started chillers among the chillers, and determining whether the start-up quantity of the chillers needs to be adjusted according to the first operation information, includes: Obtain the chilled water return temperature, chilled water supply temperature and operating current percentage of each of the chilled water units that have been turned on, and calculate the average chilled water return temperature, average chilled water supply temperature and average operating current percentage of the chilled water units that have been turned on; Determine the current operating condition of the started chiller according to the average return water temperature of the refrigeration side, the average supply water temperature of the refrigeration side and the average percentage of the operating current, wherein the operating condition includes: a first target operating condition, a second target operating condition and a third target operating condition, wherein the third target operating condition is other operating conditions except the first target operating condition and the second target operating condition; If the duration of the started chillers in the first target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be increased; If the duration of the started chillers being in the second target operating condition is longer than the preset duration, it is determined that the number of started chillers needs to be reduced; If the started-up chillers continue to be in the third target operating condition, or the time for which the started-up chillers continue to be in the first target operating condition is not greater than the preset duration, or the time for which the started-up chillers continue to be in the second target operating condition is not greater than the preset duration, it is determined that there is no need to adjust the number of started-up chillers.

3. The method for controlling the optimal operation of a chiller system according to claim 2, characterized in that: The first target operating condition is: the average percentage of the operating current is greater than a first preset value, the average water supply temperature on the freezing side is greater than a second preset value, and the difference between the average water supply temperature on the freezing side and the second preset value is greater than a third preset value; The second target operating condition is: the current calculation value is less than the fourth preset value and the average return water temperature on the refrigeration side is less than the fifth preset value and the difference between the fifth preset value and the average return water temperature on the refrigeration side is greater than the sixth preset value, and the current calculation value is: the sum of the operating current percentages divided by the calculated value of the target value, and the target value is the calculated value after subtracting 1 from the number of the operating current percentages.

4. The method for controlling the optimal operation of a chiller system according to claim 2, characterized in that: The step of determining at least one target chiller that needs to switch on / off states according to the energy efficiency of the chillers that have been turned on includes: If the duration of the started chiller being in the first target operating condition is longer than the preset duration, determining the target chiller to be the chiller with the highest energy efficiency among the chillers that are not started; If the duration of the started chiller in the second target operating condition is greater than the preset duration, the target chiller is determined to be the chiller with the lowest energy efficiency among the started chillers.

5. The method for controlling the optimal operation of a chiller system according to claim 1, characterized in that: The collecting of second operation information of the turned-on water pumps among the water pumps, and determining whether to adjust the turned-on quantity of each water pump according to the second operation information, includes: Collect the return water temperature and supply water temperature of each turned-on water pump to obtain the average return water temperature and average supply water temperature of the turned-on water pumps; Determine the average supply and return water temperature difference of the pumps that have been turned on; The average supply and return water temperature difference and the preset supply and return water temperature difference are input into the PID algorithm to calculate the average frequency of the turned-on water pump; Determine the current operating condition of the turned-on water pump according to the average supply and return water temperature difference and the average frequency, wherein the operating condition includes a fourth target operating condition, a fifth target operating condition and a sixth target operating condition, and the sixth target operating condition is an operating condition other than the fourth target operating condition and the fifth target operating condition; If the duration of the turned-on water pumps being in the fourth target operating condition is longer than a preset duration, it is determined that the number of turned-on water pumps needs to be increased; If the duration of the turned-on water pumps being in the fifth target operating condition is longer than the preset duration, it is determined that the number of turned-on water pumps needs to be reduced; If the turned-on water pump continues to be in the sixth target operating condition, or the time length that the turned-on water pump continues to be in the fourth target operating condition is not greater than the preset duration, or the time length that the turned-on water pump continues to be in the fifth target operating condition is not greater than the preset duration, it is determined that there is no need to adjust the number of water pumps turned on.

6. The method for controlling the optimal operation of a chiller system according to claim 5, characterized in that: The fourth target operating condition is: the average supply and return water temperature difference is greater than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than a seventh preset value, and the average frequency is not less than a loading frequency setting value; The fifth target operating condition is: the average supply and return water temperature difference is less than the preset supply and return water temperature difference, and the difference between the average supply and return water temperature difference and the preset supply and return water temperature difference is greater than the eighth preset value, and the average frequency is not greater than the load reduction frequency setting value.

7. The method for controlling the optimal operation of a chiller system according to claim 5, characterized in that: The step of determining at least one target water pump for switching a switch state according to the efficiency of the turned-on water pump comprises: If the duration of the turned-on water pump being in the fourth target operating condition is longer than the preset duration, determining that the target water pump is the water pump with the highest efficiency among the unturned water pumps; If the duration for which the turned-on water pump is continuously in the fifth target operating condition is greater than the preset duration, the target water pump is determined to be the water pump with the lowest efficiency among the turned-on water pumps.

8. A device for controlling the operation of a chiller system, characterized in that: The chiller system comprises: a plurality of chillers, a plurality of water pumps and a plurality of cooling towers, and the device for controlling the operation of the chiller system comprises: A first processing unit is used to collect first operating information of the chillers that have been turned on among the chillers, and determine whether the number of chillers turned on needs to be adjusted according to the first operating information; if the number of chillers turned on needs to be adjusted, at least one target chiller that needs to switch the on / off state is determined according to the energy efficiency of the chillers that have been turned on, and the target chillers are controlled to switch the on / off state to adjust the number of chillers turned on; a second processing unit, for collecting second operation information of the water pumps that have been turned on among the water pumps, and determining whether it is necessary to adjust the number of water pumps turned on according to the second operation information; if it is necessary to adjust the number of water pumps turned on, determining at least one target water pump for switching the switch state according to the efficiency of the water pumps that have been turned on, and controlling the target water pump to switch the switch state to adjust the number of water pumps turned on, wherein each water pump includes a plurality of cooling water pumps and a plurality of freezing water pumps; The third processing unit is used to determine the total flow of the cooling water pumps according to the adjusted number of cooling water pumps that are turned on among the water pumps, and adjust the number of cooling towers that are turned on according to the total flow of the cooling water pumps.

9. An electronic device, characterized in that: The method comprises at least one processor and a memory connected to the processor, wherein: The memory is used to store computer programs; The processor is used to execute the computer program so that the electronic device can implement the method for controlling the optimized operation of the chiller system as described in any one of claims 1 to 7.

10. A computer program product, characterized in that It comprises computer-readable instructions, and when the computer-readable instructions are executed on an electronic device, the electronic device implements the method for controlling the optimized operation of a chiller system as claimed in any one of claims 1 to 7.