Sample car trial-manufacture digital management method and device and computer readable storage medium

By designing a digital management method for trial production in the automotive industry, using the interfaces of PLM and trial production systems to obtain and maintain BOM, and achieving synchronous management of trial production planning and status information, the problem of inflexible management during the trial production of the prototype car is solved, and the problem of inflexible management is improved. Production efficiency and product quality.

CN118982181APending Publication Date: 2024-11-19ZHEJIANG GEELY HLDG GRP CO LTD +2
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411015645.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The automotive industry lacks systematic management during the trial production process of prototypes, which leads to the inability to cover all scenarios and the need for diverse models and special scenarios, resulting in insufficient flexibility and efficiency in production management.

Method used

A digital management method for trial production of prototype cars was designed. Through the interface between PLM and trial production system, the basic BOM is obtained and maintained, the engineering BOM is generated, the trial production planning and status information are realized, and the digital system group is formed, information islands are eliminated, and information is realized. Sharing and collaboration.

Benefits of technology

The production efficiency and product quality of the prototype vehicle trial production have been improved, the adaptability and business coverage of the system have been enhanced, and the flexibility and accuracy of the trial production process have been improved through information technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982181A_ABST
    Figure CN118982181A_ABST
Patent Text Reader

Abstract

The invention provides a sample car trial-manufacture digital management method and device and a computer readable storage medium, and the sample car trial-manufacture digital management method is applied to a sample car trial-manufacture digital system group. A product life cycle management system PLM, a research and development data management platform and trial-manufacture systems for realizing the trial-manufacture process are developed and developed in a customized manner in a sample car trial-manufacture digital system group according to trial-manufacture business scenes, and a plurality of interfaces for connecting the PLM system and the trial-manufacture systems are designed on the research and development data management platform to form the digital system group. Information islands of all systems are eliminated, and information sharing and service collaboration of all service roles on the whole trial-production service chain are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of prototype vehicle trial production, and in particular to a digital management method, device and computer-readable storage medium for prototype vehicle trial production. Background Art

[0002] In the context of intelligent manufacturing and engineering, major automakers pay more attention to the informatization and digitization of mass production line management, and have not yet formed a systematic system for the digital construction of the prototype trial production management process during product development. At present, there are great differences between the various links of the trial production business in the automotive industry and the mass production business. The mass production information system cannot cover all trial production scenarios, has poor applicability in the trial production process of prototype vehicles, and has not formed a systematic management of the trial production process of prototype vehicles. In addition, in order to seize the market, major automakers have a wide variety of trial models with large differences and many special scenarios. It is urgent to develop a digital system group for trial production of prototype vehicles that can meet the actual business needs of trial production. Summary of the invention

[0003] In order to overcome the problems existing in the related art, this manual provides a digital management method, equipment and computer-readable storage medium for trial production of a prototype vehicle.

[0004] According to a first aspect of an embodiment of the present specification, a digital management method for prototype vehicle trial production is provided, the management method being applied to a research and development data management platform in a digital system group for prototype vehicle trial production, the system group comprising a product lifecycle management system PLM and a trial production system connected to multiple interfaces of the research and development data management platform; the management method comprising:

[0005] Acquire the basic BOM built by the PLM based on the design information of the target prototype through the first interface, maintain the basic BOM based on the requirements of the target prototype in the trial production stage, and generate the engineering BOM for trial production of the target prototype;

[0006] The engineering BOM and the trial production task are transmitted to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, performs trial production of a prototype vehicle according to the trial production plan, and feeds back trial production status information of the trial production process to the R&D data management platform through the second interface;

[0007] Receive the trial production status information fed back by the trial production system, synchronously update the trial production information in the research and development data management platform, and monitor the prototype vehicle trial production process in real time through the trial production status information.

[0008] According to a digital management method for prototype vehicle trial production provided by the present application, the basic BOM constructed by the PLM based on the design information of the target prototype vehicle is obtained through the first interface, including:

[0009] A basic BOM built by the PLM based on design information of the target prototype vehicle is obtained through the first interface. The basic BOM is automatically generated by selecting a target configuration option of the target prototype vehicle based on configuration requirements of all prototype vehicles in the PLM, applicable configurations corresponding to all BOM lines, and an association between the configuration options and the BOM lines.

[0010] According to a digital management method for trial production of a prototype vehicle provided in this application, the trial production BOM includes the engineering BOM and the procurement BOM;

[0011] The method further comprises:

[0012] When the basic BOM is maintained based on the requirements of the target prototype vehicle in the trial production stage and the engineering BOM for trial production of the target prototype vehicle is generated, the procurement information corresponding to the trial production of the target prototype vehicle is maintained to generate the procurement BOM;

[0013] The transmitting the engineering BOM and the trial production task to the trial production system through the second interface so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, includes:

[0014] The trial production BOM and the trial production task are transmitted to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the trial production BOM when receiving the trial production task.

[0015] According to a digital management method for prototype vehicle trial production provided by the present application, the trial production system includes an enterprise management solution system SAP, and the second interface includes a first data interface connecting the R&D data management platform and the SAP.

[0016] The maintaining of the purchase information corresponding to the trial production of the target sample vehicle and generating the purchase BOM includes:

[0017] Calling the procurement view information corresponding to the engineering BOM in the SAP through the first data interface;

[0018] The procurement information corresponding to the trial production of the target sample vehicle is maintained through the procurement view information to generate the procurement BOM.

[0019] According to a digital management method for prototype vehicle trial production provided by the present application, the trial production system also includes a supplier relationship management system SRM and a logistics execution system LES;

[0020] The transmitting of the engineering BOM and the trial production task to the trial production system through the second interface includes:

[0021] The trial production BOM and trial production tasks are transmitted to the SAP through the first data interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, determines the material procurement requirement list according to the trial production plan, and sends the material procurement requirement list to the SRM to initiate the procurement approval process; when the LES is warehousing materials, it retrieves the material procurement requirement list of the SRM, and if the materials to be warehousing are in the material procurement requirement list, executes the warehousing operation; after the materials are warehousing and approved, the prototype vehicle is trial-produced according to the trial production plan, and the trial production status information of the trial production process is fed back to the R&D data management platform through the second interface.

[0022] According to a digital management method for prototype vehicle trial production provided in the present application, when the SRM issues a purchase order based on the material procurement requirement list, verification is performed based on the procurement BOM. If the verification is inconsistent, feedback is given to the SAP system and an error is reported.

[0023] According to a digital management method for prototype vehicle trial production provided by the present application, the trial production system further includes a manufacturing execution system MES, and the R&D data management platform is configured with a second data interface for connecting to and transmitting data with the MES;

[0024] The method further comprises:

[0025] The trial production BOM and the trial production task are transmitted to the SAP through the first data interface, so that when the SAP receives the trial production task, it determines the trial production plan corresponding to the engineering BOM according to the preset association mechanism, and determines the production order according to the trial production plan, and sends the production order to the MES, so that the MES can conduct trial production of the prototype vehicle based on the trial production plan after the materials are put into storage and approved, and feed back the trial production status information of the trial production process to the R&D data management platform through the second data interface.

[0026] According to a digital management method for trial production of a prototype vehicle provided by the present application, after the basic BOM is maintained based on the requirements of the target prototype vehicle in the trial production stage and an engineering BOM for trial production of the target prototype vehicle is generated, the method further includes:

[0027] The components with multiple technical status and the same material number in the engineering BOM are marked, and the technical status and corresponding sample vehicle number information of the marked components are transmitted to each system in the trial production system through the second interface, so as to synchronize the information of each system; wherein, the second interface includes a third data interface for connecting the R&D data management platform with the SRM and transmitting data, and a fourth data interface for connecting the R&D data management platform with the LES and transmitting data.

[0028] According to a digital management method for prototype vehicle trial production provided in this application, the R&D data management platform includes a visual operation interface;

[0029] The receiving the trial production status information fed back by the trial production system, synchronously updating the trial production information in the R&D data management platform, and monitoring the trial production process of the prototype vehicle in real time through the trial production status information, includes:

[0030] The trial production status information is displayed through the visual operation interface.

[0031] The present application also provides a digital management device for prototype vehicle trial production, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the digital management method for prototype vehicle trial production as described above is implemented.

[0032] The present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the above-mentioned methods for digital management of prototype vehicle trial production.

[0033] In the embodiments of this specification, the digital management method, device and computer-readable storage medium for the trial production of prototype vehicles are applied to the digital system group for trial production of prototype vehicles. In the digital system group for trial production of prototype vehicles, the product lifecycle management system PLM, the R&D data management platform and the various trial production systems for implementing the trial production process are customized and developed according to the trial production business scenario, and an interface for docking with the PLM system and the trial production system is designed on the R&D data management platform to form a digital system group, eliminate information islands of each system, and realize information sharing and business collaboration of each business role in the entire trial production business chain. In addition, the basic BOM built by PLM based on the design information of the target prototype vehicle is obtained through the first interface, and the basic BOM is maintained based on the needs of the target prototype vehicle in the trial production stage, so as to realize the differentiated construction and modification of the BOM, generate the engineering BOM for trial production of the target prototype vehicle, meet the actual business needs of the trial production, and improve the adaptability of the system group. At the same time, it receives the trial production status information fed back by the trial production system, synchronously updates the trial production information in the R&D data management platform, realizes information synchronization, and monitors the prototype vehicle trial production process in real time through the trial production status information, adds system verification and reminder functions, improves the business coverage rate of the prototype vehicle trial production digital system group, and improves the trial production efficiency and the quality of trial products through information technology.

[0034] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present specification. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the specification and, together with the description, serve to explain the principles of the specification.

[0036] Figure 1 This specification is a prototype vehicle trial production digital system group according to an exemplary embodiment;

[0037] Figure 2 is a flow chart of a digital management method for trial production of a prototype vehicle according to an exemplary embodiment of the present specification;

[0038] Figure 3 is a business flow chart of a digital management method for trial production of a prototype vehicle according to an exemplary embodiment of the present specification;

[0039] Figure 4 is a schematic diagram of a digital management device for trial production of a prototype vehicle according to an exemplary embodiment of the present specification;

[0040] Figure 5 It is a schematic block diagram of a digital management device for trial production of a prototype vehicle according to an exemplary embodiment of the present specification. DETAILED DESCRIPTION

[0041] Here, the technical solutions in the embodiments (or "implementations") of the present application will be described clearly and completely in conjunction with the accompanying drawings. When the following description refers to the drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements.

[0042] If there are terms involving directional indications or positional relationships in the embodiments of the present application (such as up, down, left, right, front, back, inside, outside, top, bottom, center, vertical, horizontal, longitudinal, transverse, length, width, counterclockwise, clockwise, axial, radial, circumferential, etc.), such terms are only used to explain the relative positional relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings); if the specific posture changes, the directional indication or positional relationship will also change accordingly. In addition, the terms "first", "second", etc. involved in the embodiments of the present application are only used for the purpose of convenience of description and cannot be understood as indicating or implying relative importance.

[0043] The present application provides a digital management method, device and computer-readable storage medium for trial production of a prototype vehicle. The present application is described in detail below in conjunction with the accompanying drawings. The features of the following embodiments and implementations can be combined with each other without conflict.

[0044] The prototype vehicle described in this article generally refers to a vehicle manufactured for testing and verification during the development of a new product, and this process is the prototype trial production process.

[0045] With the development and changes of the market, automobile companies have gradually realized that the efficiency and high quality of the trial production process play an important role in the successful launch of new products and the company's continuous innovation capabilities. However, due to the frequent changes in requirements and the large variety and differences of trial production models during the trial production stage, the information and digital systems need to be flexible enough to adapt to these changes, which greatly increases the difficulty of system design and maintenance. As a result, the current automobile industry has not formed a systematic management of the prototype trial production process.

[0046] In view of the above situation, the present application provides a prototype vehicle trial production digital system group, which is a collection of a series of interrelated and collaborative digital systems. It is professionally customized according to the current mainstream business flows and scenarios of trial production, and connects the trial production links of R&D data, project trial production plans, material procurement, material warehousing management and pulling, trial production process production, and quality control, aiming to improve the trial production efficiency and the quality of trial products through information technology.

[0047] This system group may include PLM (Product Lifecycle Management), SAP (Systems Applications, and Products in Data Processing), MES (Manufacturing Execution System), SRM (Supplier Relationship Management), and LES (Logistics Execution System).

[0048] In some embodiments, Figure 1 As shown, Figure 1 This is a digital system group for prototype vehicle trial production shown in this specification according to an exemplary embodiment. According to the trial production business scenario, the data management platform, SAP system, MES production process execution system and LES logistics execution system are customized and developed, and interfaces are designed with existing SRM, BPM and other peripheral systems and the corresponding interface information is modified to form a digital system group, eliminate information islands of each system, and run through the entire trial production backbone business process.

[0049] Specifically, the R&D data management platform is designed with multiple interfaces, and the multiple interfaces enable the R&D data management platform to be connected to the PLM and trial production systems for data transmission, wherein the trial production system refers to any one or more of the SAP system, SRM system, MES system and LES system customized according to the trial production business scenario.

[0050] like Figure 2 As shown, Figure 2 This is a flow chart of a digital management method for prototype vehicle trial production according to an exemplary embodiment of the present specification, comprising the following steps:

[0051] In step 101, a basic BOM built by the PLM based on the design information of the target prototype is obtained through a first interface, the basic BOM is maintained based on the requirements of the target prototype in the trial production stage, and an engineering BOM for trial production of the target prototype is generated;

[0052] In step 102, the engineering BOM and the trial production task are transmitted to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, performs trial production of a prototype vehicle according to the trial production plan, and feeds back trial production status information of the trial production process to the R&D data management platform through the second interface;

[0053] In step 103, the trial production status information fed back by the trial production system is received, the trial production information in the R&D data management platform is synchronously updated, and the trial production process of the prototype vehicle is monitored in real time through the trial production status information.

[0054] In step 101, the first interface described in this article is an interface designed by the R&D data management platform for connecting to the PLM system. The basic BOM (Bill of Materials) built by the PLM system based on the design information of the target prototype vehicle is received through the first interface. The basic BOM can be a BOM of master data (main data of major structural parts and key components, etc.), which provides a basic material framework for trial production so as to quickly understand the main composition of the product.

[0055] In order to solve the problems of frequent changes in requirements and a wide variety of trial models with large differences during the trial production stage, the R&D data management platform can realize the differentiated construction and modification of the trial production BOM to improve the flexibility of the information and digital system. Among them, the trial production BOM includes EBOM (Engineering BOM). The trial production BOM described in this article is adjusted and supplemented on the basis of EBOM in combination with the specific needs and characteristics of the trial production. The trial production BOM may be modified according to the actual problems encountered during the trial production process, such as special process requirements, temporary replacement parts, etc., to better adapt to the actual operation of the trial production stage. In other words, the trial production BOM may contain some special information or adjustment content related to the trial production that is not reflected in the EBOM. For example, during the trial production process, it may be necessary to add some parts for testing or debugging, or to make temporary changes to the specifications of some parts. These changes will be reflected in the trial production BOM and may not be completely consistent with the EBOM.

[0056] In one embodiment, without affecting the PLM system and the mass production system, the R&D data management platform supports maintenance of the basic BOM based on the actual use of the prototype vehicle, test use, assessment items, etc., so as to build a trial production EBOM, ensure one BOM for one vehicle, and adapt to the business status of the R&D stage.

[0057] Specifically, after the basic BOM is built in the PLM system, it is pushed to the R&D data management platform through the first interface, and then the BOM information is manually deleted, modified, and added according to the verification requirements of different vehicles in the trial production stage to generate the EBOM required for the trial production of the target vehicle.

[0058] In another embodiment, without affecting the PLM system and the mass production system, the basic BOM can be automatically generated by configuring the marking in the PLM system.

[0059] Specifically, in step 101, obtaining the basic BOM built by the PLM based on the design information of the target prototype vehicle through the first interface includes:

[0060] A basic BOM built by the PLM based on design information of the target prototype vehicle is obtained through the first interface. The basic BOM is automatically generated by selecting a target configuration option of the target prototype vehicle based on configuration requirements of all prototype vehicles in the PLM, applicable configurations corresponding to all BOM lines, and an association between the configuration options and the BOM lines.

[0061] In the PLM system, the configuration requirements are first set for each specific prototype vehicle, various possible configuration options are defined, and the specific settings of the prototype vehicle in terms of various characteristics, functions, component types, etc. are clarified.

[0062] Then, the BOM maintains the applicable configurations corresponding to all BOM lines. For each BOM line, its applicability under different configuration options is clarified, and detailed annotations and associations are performed.

[0063] Create configuration templates or rules in the PLM system to associate these configuration options with the corresponding BOM lines.

[0064] When it is necessary to generate the configuration of a specific prototype, select the corresponding configuration option combination in the system. The system automatically screens and combines the BOM lines applicable to the configuration based on the selected configuration and the pre-established association relationship, and then quickly and accurately generates the corresponding BOM, i.e., the basic BOM. In this embodiment, the efficiency and accuracy of configuration management are greatly improved, and the management and tracking of prototypes with different configurations are convenient, while also avoiding the errors and omissions that may be caused by manually selecting and combining parts one by one.

[0065] It should be noted that, if necessary, the configuration and BOM can be adjusted and optimized according to the actual situation to adapt to new needs or problems found. Finally, the finalized configuration and BOM are applied to the production of the prototype and related business processes. In other words, the basic BOM can be created based on the basic and main data in the prototype trial production process, and its R&D data management platform (or the BOM system of the R&D data management platform) is maintained to form an EBOM. It can also be formed in the PLM system according to the configuration mark. In this case, the basic BOM is the same as the EBOM.

[0066] In the above embodiment, the R&D data management platform realizes the coordination of R&D EBOM and PLM design data, realizes the systematic transmission of R&D information, improves the accuracy and timeliness of transmission, and improves the transmission efficiency.

[0067] In step 102, the trial production BOM includes the engineering BOM and the procurement BOM;

[0068] The digital management method for prototype vehicle trial production also includes:

[0069] Step 201, when the basic BOM is maintained based on the requirements of the target prototype vehicle in the trial production stage and the engineering BOM for trial production of the target prototype vehicle is generated, the procurement information corresponding to the trial production of the target prototype vehicle is maintained to generate the procurement BOM.

[0070] The trial production BOM is designed with two parts: the design information and procurement information of the target prototype. EBOM and procurement BOM are generated accordingly. The procurement BOM and EBOM as a whole are finally maintained as a trial production BOM suitable for this prototype vehicle, so as to facilitate the subsequent determination of the trial production plan corresponding to the trial production BOM and determine the material procurement requirement list.

[0071] The process of building a procurement BOM is as follows:

[0072] After building the PLM data, R&D personnel can directly push the BOM data to the R&D data management platform or the trial production BOM system of the R&D data management platform through the first interface, maintain sample-related procurement information (such as adding procurement-related information) in the trial production BOM system, and generate a procurement BOM.

[0073] It should be noted that procurement information is required to be maintained when EBOM is built on the R&D data management platform. The information of suppliers that have been designated can be directly synchronized and filled through systems such as SAP. For materials that have not been designated this time, the supplier information must be manually maintained in a timely manner to avoid this error when issuing a purchase order.

[0074] As an example, maintaining the purchase information corresponding to the trial production of the target sample vehicle and generating the purchase BOM includes:

[0075] Step 301: calling the procurement view information corresponding to the engineering BOM in the SAP through the first data interface;

[0076] Step 302: Maintain the procurement information corresponding to the trial production of the target prototype vehicle through the procurement view information to generate the procurement BOM.

[0077] In the SAP system, a purchasing view is maintained for all mass-produced parts. The purchasing view is an important part of the material master data, which is used to record and manage information related to purchasing. As an example, the purchasing view contains information such as suppliers, purchase prices, purchasing units, and purchase orders, which are crucial for the smooth progress of the purchasing process.

[0078] By adding a first data interface between the SAP system and the R&D data management platform, when the EBOM is pushed from the PLM system to the R&D data management platform or when the R&D data management platform builds the EBOM, the procurement view information corresponding to the target sample vehicle is requested from the SAP system to fill in and maintain the procurement information and generate the procurement BOM. The procurement view information of SAP can be called manually or automatically by the design-control program from the first data interface. When the purchased sample is a newly developed part and cannot be filled, the procurement information needs to be maintained manually.

[0079] Therefore, if there is an error in the maintenance of procurement information, when the SAP system issues a purchase order through the SRM system, it will be verified according to the procurement BOM. If the verification is inconsistent (that is, the master data of the procurement view is inconsistent), the procurement information will be fed back through the first data interface between the SAP system and the R&D data management platform to avoid this error. In other words, through the data transmission between the digital system group of the prototype trial production, the system verification and reminder functions are added to the system, the validity of the data is increased, and repeated manual inspections are eliminated.

[0080] Based on the above, in some embodiments, the step 102 of transmitting the engineering BOM and the trial production task to the trial production system through the second interface so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task includes:

[0081] Step 202: transmitting the trial production BOM and the trial production task to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the trial production BOM when receiving the trial production task.

[0082] The second interface described herein is an interface designed by the R&D data management platform for connecting with the trial production system. It can be understood that for the system in the trial production system required for the actual trial production business, the second interface includes at least one data interface for each system in the trial production system to transmit data with the R&D data management platform. For example, the second interface includes the first data interface for connecting the R&D data management platform with the SAP.

[0083] The R&D data management platform sends the R&D data such as the trial production BOM and the trial production tasks to the generation system, so that the trial production system can determine the trial production plan corresponding to the trial production BOM when receiving the trial production task. The trial production plan described in this article refers to a series of planning and arrangement work for the trial production of the prototype before the prototype is officially put into mass production. As an example, the trial production plan includes basic information such as prototype information, project information, test purpose, trial production plan, referenced BOM information, production order type, prototype color, etc.

[0084] During the trial production of the prototype vehicle, after the SAP system receives the trial production BOM, it links the trial production BOM with the trial production plan through a specific association mechanism to ensure the close integration of material requirements and trial production plans, so that procurement personnel can accurately prepare materials according to actual trial production requirements. By automatically generating a target planning version of the material procurement requirements list, the efficiency and accuracy of procurement are greatly improved, and the possibility of human error is reduced. At the same time, the system has a certain degree of configurability, and can quickly adjust parameters according to different needs.

[0085] As an example, a specific association mechanism may be: setting key identifiers or codes for the trial production BOM and the trial production plan, and establishing association by matching these identifiers. For example, the BOM of a specific trial production project and the corresponding trial production plan are given the same project number or version number, and the system can identify these key information and match them.

[0086] The specific association mechanism can also be: using data mapping to match the component information, quantity, etc. in the trial production BOM with the material requirements involved in the trial production planning one by one, thereby establishing an association.

[0087] The specific association mechanism can also be: by setting specific processes or rules, when the trial production BOM enters the system, the association operation is triggered, and it is automatically matched with the corresponding trial production plan according to the preset logic.

[0088] The above-mentioned association mechanism linking BOM with trial production planning can be adaptively used according to actual design requirements and is not specifically limited here.

[0089] After the trial production plan is determined according to the trial production BOM, the approval process (including the procurement approval process, etc.) is initiated. After approval, the prototype vehicle is trial-produced according to the trial production plan, and the trial production status information of the trial production process is fed back to the R&D data management platform through the second interface. It should be noted that during the trial production process, the trial production status information of each trial production system is fed back through the interface between it and the R&D data management platform to achieve information synchronization and business collaboration.

[0090] In step 103, the R&D data management platform can obtain the trial production status information fed back by each trial production system in real time through the added interface, such as trial production project planning, R&D data management platform, sample procurement, trial production process management, production operation management, quality management, warehouse management, and the mutual coordination and early warning between its various businesses, so as to realize closed-loop management; the planning information, BOM information, material information, production process problems and other information in the trial production process are shared by all employees in real time. Use information tools to monitor the trial production status information in the trial production process in real time, such as key trial production indicators and data, to detect abnormalities in time and issue early warnings to indicate possible changes in demand. At the same time, it also provides a decision-making basis for project managers to correct relevant information of the trial production process in time.

[0091] In this embodiment, the prototype car trial production digital system group is a complete information system group with high business coverage. Through the prototype car trial production digital system group, information sharing and business collaboration of various business roles in the entire trial production business chain can be realized. In addition, other system integration interfaces are reserved in the R&D data management platform to improve the data reuse in the trial production process, with high flexibility, which can adapt to the changing needs in the prototype car trial production process.

[0092] Based on the above embodiments, a digital management method for prototype vehicle trial production at the business level is proposed.

[0093] like Figure 3 As shown, in some embodiments, the trial production system also includes a supplier relationship management system SRM and a logistics execution system LES; the prototype vehicle trial production digital system group includes a PLM system, a R&D data management platform, SRM and LES systems.

[0094] The transmitting of the engineering BOM and the trial production task to the trial production system through the second interface includes:

[0095] The trial production BOM and trial production tasks are transmitted to the SAP through the first data interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, determines the material procurement requirement list according to the trial production plan, and sends the material procurement requirement list to the SRM to initiate the procurement approval process; when the LES is warehousing materials, it retrieves the material procurement requirement list of the SRM, and if the materials to be warehousing are in the material procurement requirement list, executes the warehousing operation; after the materials are warehousing and approved, the prototype vehicle is trial-produced according to the trial production plan, and the trial production status information of the trial production process is fed back to the R&D data management platform through the second interface.

[0096] After receiving the trial production BOM, the SAP system is associated with the trial production plan, and the material purchase list corresponding to the target trial production plan version can be automatically generated in the SAP system. The material purchase list is sent to the SRM system or remote BPM system through the interface between the SAP system and the SRM system, and then the procurement approval process is initiated and sent to the supplier.

[0097] After the materials arrive, they can be put into storage and put on the shelves through the LES system, and the LES system can be used to realize material warehouse management.

[0098] Regarding the procurement and warehousing process, this prototype vehicle trial production digital system group can realize multiple ways of warehousing: receiving and warehousing according to purchase orders and / or purchase requirements (corresponding to the material purchase requirement list), creatively adding a purchase requirement receipt and warehousing method. Compared with the existing warehousing method (the current conventional warehousing process is that the LES system receives the purchase order information (such as project, material number, quantity, WBS number, special parts information, etc.) in SAP for warehousing, the parts to be entered into the warehouse cannot be entered into the warehouse if they do not exist in the purchase order. However, since most of the parts in the trial production stage are newly developed parts, the price and other approval processes are complicated, and the purchase order is generated late, there is a problem that the actual parts have arrived but cannot be entered into the warehouse), by adding purchase requirements, the LES system can pull the purchase requirement information of the SRM system when entering the warehouse, and the parts within the purchase requirements can also be entered / exited from the LES system, that is, by verifying that if the parts to be entered into the warehouse exist in the material purchase requirement list, they can be entered / exited from the LES system, greatly improving the warehousing efficiency and trial production efficiency.

[0099] In the above process, unnecessary approval levels are reduced so that key decisions can be made quickly.

[0100] like Figure 3As shown, in other embodiments, the trial production system also includes a manufacturing execution system MES; the prototype vehicle trial production digital system group includes a PLM system, a R&D data management platform, an SRM system, a LES system and an MES system; the R&D data management platform is configured with a second data interface for connecting to and transmitting data with the MES.

[0101] The method further comprises:

[0102] The trial production BOM and the trial production task are transmitted to the SAP through the first data interface, so that when the SAP receives the trial production task, it determines the trial production plan corresponding to the engineering BOM according to the preset association mechanism, and determines the production order according to the trial production plan, and sends the production order to the MES, so that the MES can conduct trial production of the prototype vehicle based on the trial production plan after the materials are put into storage and approved, and feed back the trial production status information of the trial production process to the R&D data management platform through the second data interface.

[0103] The trial production plan corresponding to the trial production BOM is determined according to the preset association mechanism. After the trial production plan is imported into SAP, production order splitting, daily planning and scheduling, work island allocation, capacity verification, and complete set verification can be carried out, and the production order can be issued to the MES system.

[0104] The MES system receives the production orders and master data issued by SAP, and can maintain basic information such as process routes, transfer orders, execute production processes, and pull material requirements. It also transmits these demand information to the LES system.

[0105] The LES system can receive the material pull demand from the MES system, analyze and process it, generate specific distribution tasks, including the type, quantity, delivery time and location of the material, and transmit the distribution information back to the MES system. That is, the LES system arranges relevant personnel or equipment to perform the distribution task, and records the distribution status and other information in real time during the distribution process. Once the distribution is completed, the LES system will transmit the detailed information of the distribution, such as the actual delivery time, the receiving personnel, etc. back to the MES system. This allows the MES system to be aware of the material distribution situation in a timely manner, so as to better coordinate and monitor the production process and ensure the continuity and efficiency of production.

[0106] At the same time, after receiving the goods, the LES system will automatically synchronize the incoming inventory information with the SRM system to achieve information synchronization, and will also send the incoming inventory information back to the SAP system to facilitate subsequent supplier settlement.

[0107] After the materials are put into storage and approved, MES will carry out trial production of the prototype vehicle based on the trial production plan. After the work order is completed, it will automatically send the actual material collection information back to the SAP system, calculate the manufacturing cost of the prototype vehicle, and synchronize the loading information with the SAP system.

[0108] Afterwards, the LES system will transmit the outbound information back to the SAP system to realize cost collection and synchronize the outbound information with the SAP system.

[0109] During the trial production process, the trial production status information including loading progress in the MES system is fed back to the R&D data management platform through the second data interface to achieve synchronization of loading information.

[0110] Furthermore, after the parts are put into storage through LES, the material barcode information, storage batch, special status of the sample and other information will be automatically synchronized to the MES system as the master data of the MES system. During the actual scanning and assembly process of MES, only the barcode information in the master data can be assembled, and other barcodes are prohibited from being assembled, which plays a role in error prevention.

[0111] In some embodiments, during the trial production of prototype vehicles, a combination of the trial production BOM system and the LES system in the R&D data management platform is adopted. The trial production BOM system clearly defines the materials required for the trial production, and the LES system accurately generates distribution tasks based on its information to ensure that the required materials arrive at the trial production site in a timely and accurate manner, avoiding material missing or errors.

[0112] Specifically, the R&D data management platform is equipped with a fourth data interface for connecting to and transmitting data with LES to ensure real-time interaction between the two systems. The trial production BOM system clearly defines the materials required for assembly and transmits them to the SAP system. The process views such as the process route are maintained in the SAP system and then sent to the MES system; the MES system issues material distribution tasks to the LES system based on production orders and production tasks. In the trial production BOM system, a detailed BOM is generated according to the design requirements of the new product. The LES system generates specific distribution tasks based on the material requirements in the trial production BOM system through the SAP system and the MES system, and ensures that the required materials are delivered to the trial production workshop on time and accurately through collaboration with suppliers. The trial production workshop conducts trial production of new products according to the process routes and work instructions in the trial production BOM system.

[0113] By combining the trial production BOM system, SAP system, MES system and LES system, the efficiency and quality of new product trial production have been improved, the product development cycle has been shortened, and the trial production cost has been reduced. At the same time, the precise distribution and visual management of materials have also improved the company's supply chain coordination capabilities and production management level.

[0114] In this embodiment, trial production and R&D data collaboration, production planning and scheduling, purchase order generation and issuance, material pulling, material warehousing and system settlement are all performed online without the need for manual offline transmission, repeated summarization and comparison, thereby achieving high data collaboration, accuracy, timeliness and consistency.

[0115] In some other embodiments, the prototype vehicle trial production digital system group includes the management of special parts in the research and development stage. The special parts described in this article refer to parts with multiple technical states under the same material number. In the research and development stage, in order to shorten the cycle, design engineers will simultaneously develop multiple states of parts for prototype vehicles with different purposes for synchronous verification. If data collaboration cannot be achieved, it is bound to cause the mixing of materials from different vehicles, and the effect cannot be verified at the beginning.

[0116] In view of the above problems, the R&D data management platform determines whether the trial production BOM of each prototype vehicle is a special part, the requirements of the special part, the corresponding prototype vehicle number information, etc., and develops interfaces between the R&D data management platform and the system in the trial production system group to maintain the special part information on the EBOM side of the R&D data management platform and bind it to the target prototype vehicle. The special part information will be coordinated with the trial production system group during the issuance of purchase orders, the warehousing of parts, the traction of trial production materials, and the outbound delivery of materials, so as to achieve 100% control of special parts.

[0117] As an example, after maintaining the basic BOM based on the requirements of the target prototype vehicle in the trial production stage and generating an engineering BOM for trial production of the target prototype vehicle, the method further includes:

[0118] Parts with multiple technical statuses and the same material number in the engineering BOM are marked as special parts. The technical status of the marked parts and the corresponding sample vehicle number information are transmitted to each system in the trial production system through the second interface to synchronize the information of each system; wherein the second interface includes a third data interface for connecting the R&D data management platform with the SRM and transmitting data, and a fourth data interface for connecting the R&D data management platform with the LES and transmitting data. Special parts are reflected in the SAP, SRM, and LES systems in the procurement, arrival, and warehousing links, and are displayed and specially marked as reminders.

[0119] The above special parts related information will also be transmitted in the production plan and process. It can be reflected in SAP, MES, and LES, so that the special parts requirements of a certain vehicle and the special requirements of assembly materials can be known.

[0120] Production information can be exchanged through the material distribution interface of MES and LES, ensuring the smooth handshake between the special material information transmission link and the production plan and process links.

[0121] The special parts function can accurately identify specific parts of a vehicle, enabling refined management and better meeting business needs during the trial production and testing phase.

[0122] In this embodiment, trial production project planning, R&D data management platform, sample procurement, trial production process management, production operation management, quality management, warehouse management, and the mutual coordination and early warning between various businesses are all managed in a closed loop; the planning information, BOM information, material information, production process problems and other information in the trial production process are shared in real time by all employees, eliminating information islands in each system, and improving the trial production efficiency and the quality of trial products through information technology.

[0123] In some embodiments, the R&D data management platform includes a visual operation interface;

[0124] The receiving the trial production status information fed back by the trial production system, synchronously updating the trial production information in the R&D data management platform, and monitoring the trial production process of the prototype vehicle in real time through the trial production status information, includes:

[0125] The trial production status information is displayed through the visual operation interface.

[0126] Use visualization tools on the R&D data management platform: such as the visual operation interface, to intuitively display information such as demand changes, trial production status information, and trial production task progress, so that all relevant personnel can quickly understand the situation.

[0127] The present application provides a digital management method, device and computer-readable storage medium for trial production of a prototype vehicle. The digital management method for trial production of a prototype vehicle is applied to a digital system group for trial production of a prototype vehicle. In the digital system group for trial production of a prototype vehicle, a product lifecycle management system PLM, a research and development data management platform and various trial production systems for implementing the trial production process are customized and developed according to the trial production business scenario. In addition, the research and development data management platform is designed with multiple interfaces for connecting the PLM system and the trial production system to form a digital system group, eliminate information islands of each system, and realize information sharing and business collaboration of various business roles in the entire trial production business chain. In addition, the basic BOM built by the PLM based on the design information of the target prototype vehicle is obtained through the first interface, and the basic BOM is maintained based on the needs of the target prototype vehicle in the trial production stage, so as to realize the differentiated construction and modification of the BOM, generate the engineering BOM for trial production of the target prototype vehicle, meet the actual business needs of the trial production, and improve the adaptability of the system group. At the same time, it receives the trial production status information fed back by the trial production system, synchronously updates the trial production information in the R&D data management platform, realizes information synchronization, and monitors the prototype vehicle trial production process in real time through the trial production status information, adds system verification and reminder functions, improves the business coverage rate of the prototype vehicle trial production digital system group, and improves the trial production efficiency and the quality of trial products through information technology.

[0128] Based on the same application concept as the above method, the present application embodiment also proposes a digital management device for prototype vehicle trial production, such as Figure 4The management device is applied to the R&D data management platform in the digital system group of prototype vehicle trial production, and the system group includes a product lifecycle management system PLM and a trial production system connected to multiple interfaces of the R&D data management platform;

[0129] The device comprises:

[0130] The first processing module 402 is used to obtain the basic BOM built by the PLM based on the design information of the target prototype through the first interface, maintain the basic BOM based on the requirements of the target prototype in the trial production stage, and generate the engineering BOM for trial production of the target prototype;

[0131] The second processing module 404 is used to transmit the engineering BOM and the trial production task to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, performs trial production of a prototype vehicle according to the trial production plan, and feeds back the trial production status information of the trial production process to the R&D data management platform through the second interface;

[0132] The monitoring module 406 is used for the first vehicle control module 404 to receive the trial production status information fed back by the trial production system, synchronously update the trial production information in the R&D data management platform, and monitor the trial production process of the prototype vehicle in real time through the trial production status information.

[0133] The implementation process of the functions and effects of each module / submodule / unit in the above-mentioned device is specifically described in the implementation process of the corresponding steps in the above-mentioned method, and the same technical effect can be achieved, so it will not be repeated here.

[0134] Figure 5 The following is an example of a physical structure diagram of a digital management device for a prototype vehicle trial production. Figure 5As shown, the prototype vehicle trial production digital management device may include: a processor (processor) 810, a communication interface (CommunicationsInterface) 820, a memory (memory) 830 and a communication bus 840, wherein the processor 810, the communication interface 820, and the memory 830 communicate with each other through the communication bus 840. The processor 810 can call the logic instructions in the memory 830 to execute the digital management method for trial production of a prototype vehicle, which method includes: obtaining the basic BOM built by the PLM based on the design information of the target prototype vehicle through the first interface, maintaining the basic BOM based on the needs of the target prototype vehicle in the trial production stage, and generating an engineering BOM for trial production of the target prototype vehicle; transmitting the engineering BOM and the trial production task to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, conducts trial production of the prototype vehicle according to the trial production plan, and feeds back the trial production status information of the trial production process to the R&D data management platform through the second interface; receiving the trial production status information fed back by the trial production system, synchronously updating the trial production information in the R&D data management platform, and monitoring the trial production process of the prototype vehicle in real time through the trial production status information.

[0135] In addition, the logic instructions in the above-mentioned memory 830 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art, and the computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk.

[0136] On the other hand, the present application also provides a computer program product, which includes a computer program, which can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the digital management method for trial production of a prototype vehicle provided by the above methods, the method including: obtaining a basic BOM built by the PLM based on the design information of the target prototype vehicle through a first interface, maintaining the basic BOM based on the needs of the target prototype vehicle in the trial production stage, and generating an engineering BOM for trial production of the target prototype vehicle; transmitting the engineering BOM and the trial production task to the trial production system through a second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, performs trial production of the prototype vehicle according to the trial production plan, and feeds back the trial production status information of the trial production process to the R&D data management platform through the second interface; receiving the trial production status information fed back by the trial production system, synchronously updating the trial production information in the R&D data management platform, and monitoring the trial production process of the prototype vehicle in real time through the trial production status information.

[0137] On the other hand, the present application also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the digital management method for trial production of a prototype vehicle provided by the above-mentioned methods, the method comprising: obtaining, through a first interface, a basic BOM built by the PLM based on the design information of the target prototype vehicle, maintaining the basic BOM based on the needs of the target prototype vehicle in the trial production stage, and generating an engineering BOM for trial production of the target prototype vehicle; transmitting the engineering BOM and the trial production task to the trial production system through a second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, performs trial production of the prototype vehicle according to the trial production plan, and feeds back the trial production status information of the trial production process to the R&D data management platform through the second interface; receiving the trial production status information fed back by the trial production system, synchronously updating the trial production information in the R&D data management platform, and monitoring the trial production process of the prototype vehicle in real time through the trial production status information.

[0138] It should be noted that the technical solutions or technical features described in the above embodiments can be combined or supplemented with each other without causing conflicts. The scope of protection of this application is not limited to the precise structures described in the above embodiments and shown in the drawings; all modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of this application should be included in the scope of protection of this application.

Claims

1. A digital management method for prototype vehicle trial production, characterized in that: The management method is applied to a research and development data management platform in a prototype vehicle trial production digital system group, wherein the system group includes a product lifecycle management system (PLM) and a trial production system connected to multiple interfaces of the research and development data management platform; The management method comprises: Acquire the basic BOM built by the PLM based on the design information of the target prototype through the first interface, maintain the basic BOM based on the requirements of the target prototype in the trial production stage, and generate the engineering BOM for trial production of the target prototype; The engineering BOM and the trial production task are transmitted to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, and after approval, performs trial production of a prototype vehicle according to the trial production plan, and feeds back trial production status information of the trial production process to the R&D data management platform through the second interface; Receive the trial production status information fed back by the trial production system, synchronously update the trial production information in the research and development data management platform, and monitor the prototype vehicle trial production process in real time through the trial production status information.

2. The digital management method for prototype vehicle production according to claim 1, characterized in that: The obtaining, through the first interface, a basic BOM constructed by the PLM based on the design information of the target prototype vehicle includes: A basic BOM built by the PLM based on design information of the target prototype vehicle is obtained through the first interface. The basic BOM is automatically generated by selecting a target configuration option of the target prototype vehicle based on configuration requirements of all prototype vehicles in the PLM, applicable configurations corresponding to all BOM lines, and an association between the configuration options and the BOM lines.

3. The digital management method for prototype vehicle trial production according to claim 1, characterized in that: The trial production BOM includes the engineering BOM and procurement BOM; The method further comprises: When the basic BOM is maintained based on the requirements of the target prototype vehicle in the trial production stage and the engineering BOM for trial production of the target prototype vehicle is generated, the procurement information corresponding to the trial production of the target prototype vehicle is maintained to generate the procurement BOM; The transmitting the engineering BOM and the trial production task to the trial production system through the second interface so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, includes: The trial production BOM and the trial production task are transmitted to the trial production system through the second interface, so that the trial production system determines the trial production plan corresponding to the trial production BOM when receiving the trial production task.

4. The digital management method for prototype vehicle trial production according to claim 3, characterized in that: The trial production system includes an enterprise management solution system SAP, and the second interface includes a first data interface connecting the R&D data management platform and the SAP. The maintaining of the purchase information corresponding to the trial production of the target sample vehicle and generating the purchase BOM includes: Calling the procurement view information corresponding to the engineering BOM in the SAP through the first data interface; The procurement information corresponding to the trial production of the target sample vehicle is maintained through the procurement view information to generate the procurement BOM.

5. The digital management method for prototype vehicle trial production according to claim 4, characterized in that: The trial system also includes a supplier relationship management system SRM and a logistics execution system LES; The transmitting of the engineering BOM and the trial production task to the trial production system through the second interface includes: The trial production BOM and trial production tasks are transmitted to the SAP through the first data interface, so that the trial production system determines the trial production plan corresponding to the engineering BOM when receiving the trial production task, determines the material procurement requirement list according to the trial production plan, and sends the material procurement requirement list to the SRM to initiate the procurement approval process; when the LES is warehousing materials, it retrieves the material procurement requirement list of the SRM, and if the materials to be warehousing are in the material procurement requirement list, executes the warehousing operation; after the materials are warehousing and approved, the prototype vehicle is trial-produced according to the trial production plan, and the trial production status information of the trial production process is fed back to the R&D data management platform through the second interface.

6. The digital management method for prototype vehicle trial production according to claim 5, characterized in that: When the SRM issues a purchase order based on the material purchase requirement list, verification is performed according to the purchase BOM. If the verification is inconsistent, feedback is given to the SAP system and an error is reported.

7. The digital management method for prototype vehicle trial production according to claim 4, characterized in that: The trial production system further includes a manufacturing execution system MES, and the R&D data management platform is configured with a second data interface for connecting to and transmitting data with the MES; The method further comprises: The trial production BOM and the trial production task are transmitted to the SAP through the first data interface, so that when the SAP receives the trial production task, it determines the trial production plan corresponding to the engineering BOM according to the preset association mechanism, and determines the production order according to the trial production plan, and sends the production order to the MES, so that the MES can conduct trial production of the prototype vehicle based on the trial production plan after the materials are put into storage and approved, and feed back the trial production status information of the trial production process to the R&D data management platform through the second data interface.

8. The digital management method for prototype vehicle trial production according to claim 5, characterized in that: After the basic BOM is maintained based on the requirements of the target prototype vehicle in the trial production stage and an engineering BOM for trial production of the target prototype vehicle is generated, the method further includes: The components with multiple technical status and the same material number in the engineering BOM are marked, and the technical status and corresponding sample vehicle number information of the marked components are transmitted to each system in the trial production system through the second interface, so as to synchronize the information of each system; wherein, the second interface includes a third data interface for connecting the R&D data management platform with the SRM and transmitting data, and a fourth data interface for connecting the R&D data management platform with the LES and transmitting data.

9. The digital management method for prototype vehicle trial production according to claim 1, characterized in that: The research and development data management platform includes a visual operation interface; The receiving the trial production status information fed back by the trial production system, synchronously updating the trial production information in the R&D data management platform, and monitoring the trial production process of the prototype vehicle in real time through the trial production status information, includes: The trial production status information is displayed through the visual operation interface.

10. A digital management device for prototype vehicle trial production, characterized in that: It includes a memory, a processor and a sample vehicle trial production digital management program stored in the memory and executable on the processor, and the processor implements the steps of the sample vehicle trial production digital management method as described in any one of claims 1-9 when executing the sample vehicle trial production digital management program.

11. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a sample vehicle trial production digital management program, which, when executed, implements the steps of the sample vehicle trial production digital management method according to any one of claims 1 to 9.

Citation Information

Cited By

  • Vehicle order production configuration method and device, equipment and storage medium

    CN119692847A

  • Test sample car sample piece state monitoring system and method

    CN119781385A

  • Tire project visualization view generation method and system based on data service bus

    CN121903560A