Device and method for vacuum upper injection of multiple steel ingots

Through vacuum injection technology of sealing mold cavity and diverting runner, steel temperature control problems and equipment complexity problems are solved, and high-quality small and medium-sized multi-submarine ingots are efficiently produced, improving the yield and internal tissue density.

CN118989299APending Publication Date: 2024-11-22UNIV OF SCI & TECH LIAONING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411285089.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the process of injecting multiple steel ingots into vacuum, there is a problem that the steel temperature drops rapidly and the casting temperature of each steel ingot is difficult to control. In addition, traditional methods require huge and complex vacuum devices, and it is impossible to efficiently produce small and medium-sized multi-steel ingots.

Method used

Vacuum casting is carried out by sealing mold cavity and split runner. The vacuum injection of multiple small and medium-sized steel ingots is realized through the splitter and split runner, controlling the inflow sequence and flow of the steel, ensuring sufficient solidification of the core, reducing the gas content and Inadequate solidification.

Benefits of technology

It improves production efficiency and material yield, reduces the gas content of the steel liquid, reduces production costs, reduces defects such as loose core, shrinkage and segregation, and improves the internal quality of the steel ingot.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118989299A_ABST
    Figure CN118989299A_ABST
Patent Text Reader

Abstract

The device comprises a steel ladle, a sealing seat ring, a casting platform, a flow divider, a flow dividing pouring gate and an ingot mold device, the steel ladle is connected with the sealing seat ring in a sealed mode, the sealing seat ring is connected to the casting platform in a sealed mode, a flow guiding sand groove is formed in the sealing seat ring, and a vacuumizing pipe is arranged on the side wall of the sealing seat ring; a flow divider is arranged on the casting platform below the steel ladle, the flow divider is opposite to a steel outlet of the steel ladle, the flow divider is connected with a plurality of flow dividing pouring gates, the flow dividing pouring gates are connected with the ingot mould device in a sealed mode, an inner cavity of the sealing seat ring is communicated with the ingot mould device through an air guide pipe, and the ingot mould device is arranged on the base plate. According to the invention, vacuum casting of a plurality of small and medium-sized steel ingots is realized by adopting a mode of sealing the die cavity and the shunting pouring gates, and under the condition of giving play to the advantages of top casting, the production efficiency is improved, the comprehensive yield is improved, and a plurality of metal ingots with compact internal tissues can be cast at one time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of metal ingot preparation, and in particular to a device and method for vacuum pouring multiple steel ingots. Background Art

[0002] At present, mold casting is still the main molding method for some special steel ingots, among which most of the small and medium-sized special steel ingots are mainly cast by pouring. The main feature of pouring is that multiple ingots can be cast at one time through the center pouring pipe. Compared with a single large ingot, it improves the casting efficiency, is conducive to the floating of slag inclusions, and also improves the surface quality. However, during the pouring process, the center of the ingot is always at the highest temperature from bottom to top. It will not solidify until the pouring is completed from bottom to top, which will easily lead to a large shrinkage in the center of the ingot, insufficient center shrinkage compensation, and coarse core structure, severe segregation, looseness, and excessive shrinkage. On the contrary, during the pouring process, since the molten steel is injected from the top, the lower part of the ingot has begun to solidify during the pouring process, and the high temperature zone only appears in the center of the upper part of the ingot. When the pouring is completed, the lower and middle parts of the ingot have solidified, and only the upper part has not yet solidified. Therefore, the required molten steel shrinkage compensation is small, and the looseness, shrinkage and segregation are relatively light. Especially for slender ingots with a relatively large height-to-diameter ratio, the amount of molten steel shrinkage is smaller, the riser is small, the yield rate is high, and the internal quality is good. However, during pouring, the molten steel flow is scattered, the slag is not easy to float up, and the surface quality is poor. In order to give full play to their respective advantages and improve the quality of ingots, patent document 201420845836.7 proposes a vacuum casting device for steel ingots with multiple ingots in one bag, with a tundish and a stopper as intermediate equipment, directly pouring the molten steel into multiple ingot molds arranged in the vacuum chamber, abandoning the shortcomings of pouring, and realizing the multiple ingot pouring process. Patent document 200710156115.X proposes a device and process for casting multiple ingots by a molten steel vacuum overflow method, which produces multiple ingots by casting a single ingot into a vacuum chamber and then overflowing into other ingot molds, with the advantages of high production efficiency and good internal quality. Patent document 200720106748.5 proposes an integrated method and device for vacuum ladle degassing and vacuum casting of multiple steel ingots, in which the LF furnace and multiple ingot molds are placed in a vacuum chamber, and after smelting is completed, the pouring order is changed by rotating the ingot plate to achieve sequential casting of multiple steel ingots, making full use of the advantages of pouring, and at the same time, improving the pouring efficiency. However, the above methods all require large and complex vacuum devices, and the sequential casting of multiple steel ingots also has problems such as rapid drop in steel temperature and difficulty in controlling the casting temperature of the front and rear ingots. JP201339588A provides a method for vacuum pouring steel ingots, in which the tundish is placed outside the vacuum chamber, the ingot mold is placed in the vacuum chamber, and a sealing valve body and a stopper rod are used between the two to control the vacuum degree, but this method can only be used to cast a single large steel ingot, and cannot cast multiple small and medium-sized steel ingots. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a device for vacuum pouring multiple steel ingots, which can greatly improve the internal quality of the steel ingots, increase the steel ingot yield rate and reduce production costs.

[0004] To achieve the above object, the present invention adopts the following technical solutions:

[0005] A device for vacuum pouring multiple steel ingots comprises a ladle, a sealing seat ring, a casting platform, a diverter, a diverter runner, and an ingot mold device. The ladle is sealedly connected to the sealing seat ring, the sealing seat ring is sealedly connected to the casting platform, a drainage sand trough is arranged inside the sealing seat ring, a vacuum pipe is arranged on the side wall of the sealing seat ring, a diverter is arranged on the casting platform below the ladle, the diverter is opposite to the steel outlet of the ladle, a plurality of diverter runners are connected to the diverter, the diverter runners are sealedly connected to the ingot mold device, the inner cavity of the sealing seat ring and the ingot mold device are connected through an air guide pipe, and the ingot mold device is placed on a chassis.

[0006] The steel outlet is provided with a sliding water outlet.

[0007] The drainage sand trough is connected to the slag receiving hydraulic cylinder outside the sealing seat ring.

[0008] A sealing rubber pad is used to seal between the ladle and the sealing seat ring.

[0009] The diverter is placed at the center of the sealing seat ring and connected with the casting platform by bolts. The inner lining of the diverter is diverter bricks.

[0010] The diverter runner comprises an inclined runner and a straight runner. The inner linings of the inclined runner and the straight runner are runner bricks. The runner bricks are butted with the diverter bricks in the diverter by a male-female joint.

[0011] The ingot mold device comprises an ingot mold body and a sealing cover plate, the ingot mold body and the sealing cover plate are connected by a hook device, the sealing cover plate is connected to a slag pot, the slag pot is filled with protective slag, a discharge switch is provided on the discharge port of the slag pot, an insulating plate is provided on the inner side of the mold opening of the ingot mold body, and the outside of the ingot mold body is connected to mold ears.

[0012] A casting method of a device for vacuum casting multiple steel ingots comprises the following steps:

[0013] 1) Vacuuming: Place the ladle on the sealing seat ring, and form a sealed cavity between the bottom of the ladle, the sealing seat ring, the casting platform, the diverter, the diverter runner, the sealing cover plate and the mold cavity of the ingot mold; turn off the electric switch at the bottom of the slag pot, add protective slag into the slag pot, and use a vacuum pump to evacuate the entire cavity through the vacuum pipe, and the vacuum degree reaches 10 -2 ~20.0Pa;

[0014] 2) Pouring: Open the slag receiving hydraulic cylinder, push the drainage sand trough to the bottom of the steel outlet, open the sliding water outlet, flush the drainage sand into the drainage sand trough, and return the drainage sand trough after the molten steel is clean. The molten steel flows into the ingot mold body through the diverter and the diverter runner. When the pouring is completed, stop vacuuming, turn on the electric switch, spray protective slag onto the surface of the molten steel, turn off the electric switch after the slag spraying is completed, and continue to vacuum the vacuum tube until the ingot solidifies;

[0015] 3) Demolding: After the molten steel inside the ingot mold body is completely solidified, stop vacuuming, remove the diversion runner, casting platform, and sealing cover plate, and perform demolding operations.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] The present invention adopts a sealed mold cavity and a diversion runner to realize vacuum casting of multiple small and medium-sized steel ingots, which improves production efficiency and comprehensive yield rate while giving full play to the advantages of upper pouring, and can cast multiple metal ingots with dense internal structure at one time. The specific advantages are:

[0018] 1) The present invention adopts a sealed mold cavity, a diverter and a diverter runner to realize vacuum pouring of multiple small and medium-sized steel ingots, which can greatly reduce the gas in the steel, reduce the gas content in the steel, and improve the purity of the molten steel without reducing the production efficiency.

[0019] 2) The present invention replaces the lower pouring method with the upper pouring method, adopts the diverter and the diverter runner to replace the center pouring pipe, saves a large number of pouring pipe bricks, saves the solidified molten steel in the center pouring pipe and the runner during the lower pouring, and thus greatly improves the utilization rate of the molten steel.

[0020] 3) The present invention adopts the top pouring method to pour molten steel, and can control the flow rate of the ingot body and the riser by controlling the sliding water gate, which can greatly improve the solidification rate of the core of the ingot and realize sequential solidification from bottom to top, thereby reducing defects such as looseness, shrinkage, segregation and coarse grains in the core, and greatly reducing the volume of the riser, thereby improving the yield rate of the ingot. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the structure of the present invention.

[0022] Figure 2 It is a top view of the present invention.

[0023] Figure 3 It is a partial schematic diagram of the present invention.

[0024] In the figure: ladle 1, drainage sand trough 2, diverter 3, slag receiving hydraulic cylinder 4, diverter brick 5, diverter runner 6, inclined runner 7, straight runner 8, runner brick 9, sealing cover plate 10, insulation board 11, ingot mold body 12, chassis 13, hook device 14, unloading switch 15, slag pot 16, protective slag 17, casting platform 18, air guide pipe 19, vacuum tube 20, sealing seat ring 21, sealing rubber pad 22, sliding water nozzle 23, mold ear 24. DETAILED DESCRIPTION

[0025] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0026] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means more than two.

[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0028] like Figure 1-Figure 3A device for vacuum pouring multiple steel ingots, comprising a ladle 1, a sealing seat ring 21, a casting platform 18, a diverter 3, a diverter runner 6, an ingot mold device, the ladle 1 is sealed and connected to the sealing seat ring 21, the sealing seat ring 21 is sealed and connected to the casting platform 18, a drainage sand trough 2 is provided inside the sealing seat ring 21, a vacuum pipe 20 is provided on the side wall of the sealing seat ring 21, a diverter 3 is provided on the casting platform 18 below the ladle 1, the diverter 3 is opposite to the steel outlet of the ladle 1, a plurality of diverter runners are connected to the diverter 3, the diverter runner 6 is sealed and connected to the ingot mold device, the inner cavity of the sealing seat ring 21 and the ingot mold device are connected through an air guide pipe, and the ingot mold device is placed on the chassis 13.

[0029] The steel outlet is provided with a sliding water nozzle 23 .

[0030] The drainage sand trough 2 is connected to the slag receiving hydraulic cylinder 4 outside the sealing seat ring 21. Through the control of the slag receiving hydraulic cylinder 4, it can move forward to the bottom of the ladle outlet, receive the drainage sand when pouring, and then retreat to prevent the drainage sand from entering the ingot mold body 12.

[0031] The ladle 1 and the sealing seat ring 21 are sealed by a sealing rubber gasket 22 .

[0032] The diverter is placed at the center of the sealing seat ring 21 and connected to the casting platform 18 by bolts. The inner lining of the diverter 3 is the diverter brick 5.

[0033] The diverter runner 6 includes an inclined runner 7 and a straight runner 8. The inner lining of the inclined runner 7 and the straight runner 8 is a runner brick 9. The runner brick 9 is connected to the diverter brick 5 in the diverter 3 by a male-female joint.

[0034] The ingot mold device comprises an ingot mold body 12 and a sealing cover plate 10, wherein the ingot mold body 12 and the sealing cover plate 10 are connected by a hook device 14, so that the sealing cover plate 10 and the ingot mold 12 are sealed. The sealing cover plate 10 is connected to a slag pot 16, and the slag pot 16 contains protective slag 17. A discharge switch 15 is provided at the discharge port of the slag pot 16. An insulating plate 11 is provided inside the mold opening of the ingot mold body, and a mold ear 24 is connected to the outside of the ingot mold body.

[0035] A casting method of a device for vacuum casting multiple steel ingots comprises the following steps:

[0036] 1) Vacuuming: Place the ladle 1 on the sealing seat ring 21, and form a sealed cavity between the bottom of the ladle 1, the sealing seat ring 21, the casting platform 18, the diverter 3, the diverter runner 6, the sealing cover plate 10 and the mold cavity of the ingot mold 12; turn off the electric switch 15 at the bottom of the slag pot 16, add protective slag 17 into the slag pot 16, and use a vacuum pump to evacuate the entire cavity through the vacuum pipe 20, and the vacuum degree reaches 10 -2 ~20.0Pa;

[0037] 2) Pouring: Open the slag receiving hydraulic cylinder 4, push the drainage sand trough 2 to the bottom of the steel outlet, open the sliding water inlet 23, flush the drainage sand into the drainage sand trough 2, and return the drainage sand trough 2 after the molten steel is clean. The molten steel flows into the ingot mold body 12 through the diverter and the diverter runner. When the pouring is completed, stop vacuuming, turn on the electric switch 15, and spray protective slag 17 onto the surface of the molten steel. After the slag spraying is completed, turn off the electric switch 15, and the vacuum tube 20 continues to vacuum until the ingot solidifies;

[0038] 3) Demolding: After the molten steel inside the ingot mold body 12 is completely solidified, the vacuum pumping is stopped, the diverter runner 6, the casting platform 18, and the sealing cover plate 10 are removed, and the demolding operation is performed.

[0039] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, the technical solution of the present invention can be subjected to a variety of simple modifications, and these simple modifications all belong to the protection scope of the present invention. It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations. In addition, the various different embodiments of the present invention can also be arbitrarily combined, as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.

[0040] In order to make the purpose, technical scheme and technical effect of the present invention clearer, the technical scheme in the embodiment of the present invention is now clearly and completely described. However, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. In combination with the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] Example 1

[0042] A device for vacuum pouring multiple steel ingots, comprising a ladle 1, a sealing seat ring 21, a casting platform 18, a diverter 3, a diverter runner, and an ingot mold device. The ladle 1 is sealed and connected to the sealing seat ring 21, and a sealing rubber pad 22 is used to seal the ladle 1 and the sealing seat ring 21. The sealing seat ring 21 is sealed and connected to the casting platform 18, and a drainage sand trough 2 is provided inside the sealing seat ring 21, and the drainage sand trough 2 is connected to a slag receiving hydraulic cylinder 4 outside the sealing seat ring 21. A vacuum pipe 20 is provided on the side wall of the sealing seat ring 21, and a diverter 3 is provided on the casting platform 18 below the ladle 1. The diverter 3 is opposite to the steel outlet of the ladle 1, and a sliding water port 23 is provided on the steel outlet. The diverter 3 is connected to the casting platform 18 by bolts, and the inner lining of the diverter 3 is a diverter brick 5.

[0043] Four diverter runners are connected to the diverter 3. The diverter runner 6 includes an inclined runner 7 and a straight runner 8. The inner lining of the inclined runner 7 and the straight runner 8 is a runner brick 9. The runner brick 9 is connected to the diverter brick 5 in the diverter 3 by a male-female joint. The diverter 3 and the diverter runner 6 are made of ordinary carbon steel, and the diverter brick 5 and the runner brick 9 are made of high-aluminum bricks.

[0044] The diverter runner 6 corresponds to the sealed connection ingot mold device, the inner cavity of the sealing seat ring 21 and the ingot mold device are connected through an air duct, the ingot mold device includes an ingot mold body 12 and a sealing cover plate 10, the ingot mold body 12 and the sealing cover plate 10 are connected by a hook device 14, the sealing cover plate 10 is connected to a slag pot 16, the slag pot 16 is filled with protective slag 17, a discharge port of the slag pot 16 is provided with a unloading switch 15, an insulating plate 11 is provided on the inner side of the mold opening of the ingot mold body, and the outside of the ingot mold body is connected to a mold ear 24.

[0045] The ingot mold device is placed on the bottom plate 13.

[0046] The pouring method of the device for vacuum pouring multiple steel ingots in this embodiment comprises the following steps:

[0047] 1) Arrange the mold: Place the chassis 13 flat on the floor, place the required ingot mold body 12 on the chassis 13 according to the casting process requirements, insert the insulation board 11 on the upper part of the mold mouth, then clean the mold mouth, lay the asbestos sealing pad on the upper edge of the mold mouth, and then hang the sealing cover plate 10 on the ingot mold body 12, hang the hydraulic hook 14 on the hanging ear of the ingot mold, and then tighten the sealing cover plate 10 through the hydraulic hook 14 to ensure that the ingot mold body 12 and the sealing cover plate 10 are pressed and sealed;

[0048] 2) Assembling the pouring channel: drive the casting car to the top of the ingot mold body 12, so that the diverter 3 at the center of the casting platform 18 is aligned with the middle position of the ladle; place the diverter brick 5 in the diverter 3, install the inclined pouring channel 7 outside the orifice of the diverter 3, and use asbestos to seal the inclined pouring channel 7 and the diverter 3, and use bolts to lock;

[0049] 3) Vacuuming: turn off the electric switch 15 at the bottom of the slag pot 16, add protective slag 17 into the slag pot 16, use the air guide pipe 19 to connect the sealing cover plate 10 and the casting platform 18, lay the sealing rubber pad 22 on the sealing seat ring 21, and then sit the ladle 1 on the sealing seat ring 21. At this time, a sealed cavity is formed between the bottom of the ladle 1, the sealing seat ring 21, the casting platform 18, the diverter 3, the inclined runner 7, the straight runner 8, the sealing cover plate 10 and the mold cavity of the ingot mold body 12; open the vacuum pipe 20, use a vacuum pump to evacuate the entire cavity, and exhaust the air in the cavity. When the vacuum degree reaches 5-10Pa, you can prepare to start pouring;

[0050] 4) Pouring: Open the slag receiving hydraulic cylinder 4, push the drainage sand trough 2 to the bottom of the steel outlet, open the sliding water inlet 23 at the bottom of the ladle 1, flush the drainage sand into the drainage sand trough 2, and after the molten steel is clean, return to the drainage sand trough 2, and the molten steel directly flows into the diverter 3, enters the inclined runner 7 and the straight runner 8 through the orifice of the diverter 3, and falls into the ingot mold 12. When the molten steel level reaches the half position of the ingot mold 12, the molten steel flow rate is reduced by controlling the sliding water inlet 23 at the bottom of the ladle 1 to increase the solidification rate of the lower part of the ingot. When the molten steel level reaches the riser part, the flow rate is further reduced, and the riser part is slowly filled with molten steel to improve the shrinkage compensation capacity of the core of the ingot; when the riser is filled, close the vacuum tube 20, stop vacuuming, turn on the electric switch 15, spray protective slag 17 onto the surface of the molten steel, close the electric switch 15 again after the slag spraying is completed, open the vacuum tube 20, and continue vacuuming until the ingot solidifies.

[0051] 5) Demolding: After the molten steel inside the ingot mold 12 body is completely solidified, stop vacuuming, open the vacuum tube 20, remove the inclined runner 7, move the casting car and the casting platform 18, lift the sealing cover plate 10, and lift the ingot mold body 12 in turn, and then demolding.

[0052] Embodiment 2:

[0053] The structure of the vacuum pouring device for multiple steel ingots in this embodiment is the same as that in embodiment 1, except that the inclined pouring channel 7 is composed of 6 sections, each section is connected by bolts and sealed with asbestos pads, each section is 200 cm long, the material of the diverter brick 5 is high-alumina brick, and the material of the pouring channel brick 9 is clay brick. The pouring method in this embodiment is the same as that in embodiment 1.

[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and basic spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A device for vacuum pouring multiple steel ingots, characterized in that: It includes a ladle, a sealing seat ring, a casting platform, a diverter, a diverter runner, and an ingot mold device. The ladle is sealed and connected to the sealing seat ring, which is sealed and connected to the casting platform. A drainage sand trough is provided inside the sealing seat ring, and a vacuum pipe is provided on the side wall of the sealing seat ring. A diverter is provided on the casting platform below the ladle, and the diverter is opposite to the steel outlet of the ladle. A plurality of diverter runners are connected to the diverter, and the diverter runners are sealed and connected to the ingot mold device. The inner cavity of the sealing seat ring and the ingot mold device are connected through an air guide pipe, and the ingot mold device is placed on a chassis.

2. The device for vacuum pouring multiple steel ingots according to claim 1, characterized in that: The drainage sand trough is connected to the slag receiving hydraulic cylinder outside the sealing seat ring.

3. The device for vacuum pouring multiple steel ingots according to claim 1, characterized in that: A sealing rubber pad is used to seal between the ladle and the sealing seat ring.

4. The device for vacuum pouring multiple steel ingots according to claim 1, characterized in that: The diverter is placed at the center of the sealing seat ring and connected with the casting platform by bolts. The inner lining of the diverter is diverter bricks.

5. The device for vacuum pouring multiple steel ingots according to claim 1, characterized in that: The diverter runner comprises an inclined runner and a straight runner. The inner linings of the inclined runner and the straight runner are runner bricks. The runner bricks are butted with the diverter bricks in the diverter by a male-female joint.

6. The device for vacuum pouring multiple steel ingots according to claim 1, characterized in that: The ingot mold device comprises an ingot mold body and a sealing cover plate, the ingot mold body and the sealing cover plate are connected by a hook device, the sealing cover plate is connected to a slag pot, the slag pot is filled with protective slag, a discharge switch is provided on the discharge port of the slag pot, an insulating plate is provided on the inner side of the mold opening of the ingot mold body, and the outside of the ingot mold body is connected to mold ears.

7. A casting method for the device for vacuum pouring multiple steel ingots according to claim 1, characterized in that: The steps include: 1) Vacuuming: Place the ladle on the sealing seat ring, and form a sealed cavity between the bottom of the ladle, the sealing seat ring, the casting platform, the diverter, the diverter runner, the sealing cover plate and the mold cavity of the ingot mold; turn off the electric switch at the bottom of the slag pot, add protective slag into the slag pot, and use a vacuum pump to evacuate the entire cavity through the vacuum pipe, and the vacuum degree reaches 10 -2 ~20.0Pa; 2) Pouring: Open the slag receiving hydraulic cylinder, push the drainage sand trough to the bottom of the steel outlet, open the sliding water outlet, flush the drainage sand into the drainage sand trough, and return the drainage sand trough after the molten steel is clean. The molten steel flows into the ingot mold body through the diverter and the diverter runner. When the pouring is completed, stop vacuuming, turn on the electric switch, spray protective slag onto the surface of the molten steel, turn off the electric switch after the slag spraying is completed, and continue to vacuum the vacuum tube until the ingot solidifies; 3) Demolding: After the molten steel inside the ingot mold body is completely solidified, stop vacuuming, remove the diversion runner, casting platform, and sealing cover plate, and perform demolding operations.