Steel rail butt joint device for railway track construction

By designing a combination device of the transfer rail trolley and the rail-taking and rail-taking and rail-removing mechanism, the problems of inconvenience and low efficiency of rail installation in the existing technology are solved, stable and convenient installation and efficient transportation of the two rails are achieved, and the efficiency of railway construction is improved and Docking accuracy.

CN118996926AActive Publication Date: 2024-11-22CHINA RAILWAY FIRST GROUP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411234997.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-22
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

In the prior art, the installation of rails is inconvenient and low efficiency, and it is impossible to transport and install two rails at the same time, resulting in low railway construction efficiency.

Method used

A rail docking device including a transfer rail trolley and a rail-taking and rail-taking and rail-removing mechanism is designed. Through the combination of sliding frame components, rail support components, bracket components and rail support components, stable transportation, docking and installation of the two rails is achieved. The bracket components of the device can be automatically deployed to increase the support area, and the buffer is used for clamping and limiting, ensuring the stability and precise installation of the rails.

Benefits of technology

It realizes stable and convenient transportation, docking and installation of two rails at the same time, improves the accuracy of rail docking and railway construction efficiency, and reduces the footprint of the docking device and facilitates movement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118996926A_ABST
    Figure CN118996926A_ABST
Patent Text Reader

Abstract

The invention provides a steel rail butt joint device for railway track construction, which comprises a steel rail transfer trolley for loading and transferring steel rails and a rail taking and falling mechanism for grabbing rails on the steel rail transfer trolley and placing the steel rails at preset positions; the rail taking and falling mechanism comprises a sliding frame component, a steel rail clamping component, a support component and a steel rail supporting component, the sliding frame component is installed on the transfer steel rail trolley in a sliding mode, the steel rail clamping component is installed on the sliding frame component, the steel rail supporting component is installed on the support component, and the steel rail supporting component is used for bearing a to-be-laid steel rail. And the to-be-laid steel rail is placed on a sleeper at a preset position by moving downwards along the bracket component. Two steel rails can be stably, conveniently and simultaneously transported, butted, mounted and fixed, the overall occupied area of the butting device can be reduced, the butting device can be conveniently moved, and the accuracy of butting mounting of the steel rails is improved while the railway construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of railway track construction, and in particular to a rail butt joint device and method for railway track construction. Background Art

[0002] Railway track construction is an important part of railway construction. The laying process mainly uses special equipment such as sleeper laying machines and long rail transport vehicles. The sleeper laying machines are responsible for laying sleepers, and the long rail transport vehicles are responsible for transporting rails. When laying butt rails, the sleepers are first transported by the sleeper laying machine through the conveyor belt on the sleeper laying machine, and then the moved sleepers are placed one by one at equal intervals on the ballast laid in advance, and then the rails are butt-jointed and installed on the laid and fixed sleepers, and then the rails are fixed on the sleepers to complete the butt-jointed installation of the rails.

[0003] After searching, the Chinese patent application number CN202310990434.X discloses a rail laying construction device for rail transit and a construction method thereof, including a bracket and a lifting plate that slides with the bracket, and a first pull rope is fixedly installed on both sides of the bottom surface of the lifting plate. The end of the first pull rope away from the lifting plate is connected to a hook. However, the above technical solution can only transport one rail at a time and cannot transport and install two rails at the same time. Therefore, there is still a problem that two rails cannot be transported and installed at the same time, resulting in low railway construction efficiency. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the above-mentioned prior art and to provide a rail docking device and method for railway track construction to solve the problems of inconvenient rail installation and low efficiency in the prior art.

[0005] In order to solve the above problems, the present invention provides a rail docking device for railway track construction, characterized in that it includes a transfer rail trolley for loading and transferring rails and a rail taking and rail dropping mechanism, the rail taking and rail dropping mechanism is connected to the transfer rail trolley and is used to grab the rails on the transfer rail trolley and place the rails in a predetermined position; the rail taking and rail dropping mechanism includes a sliding frame component, a rail holding component, a bracket component and a rail supporting component, the sliding frame component is slidably installed on the transfer rail trolley, and can slide along the transfer rail trolley in the direction of rail laying. The rail holding component is installed at the lower part of the sliding frame component away from one end of the transfer rail trolley, and the rail holding component is used to hold one end of the rail to be laid, and driven by the sliding frame component to drive the rail to be laid to move in the direction of rail laying. The bracket component is located at the front end of the laying direction of the transfer rail trolley, and the bracket component is connected to the transfer rail trolley. The rail supporting component is installed on the bracket component, and the rail supporting component is used to support the rail to be laid, and move downward along the bracket component to place the rail to be laid on the sleeper at a preset position.

[0006] The above-mentioned rail docking device for railway track construction is characterized in that: the transfer rail trolley includes a transfer rail trolley body and a sliding frame guide rail, and the sliding frame guide rail is fixedly arranged on the transfer rail trolley body along the length direction of the transfer rail trolley body; the sliding frame component includes a sliding frame body, a sliding frame rack, a sliding frame gear and a sliding frame drive, the sliding frame body is slidably installed on the sliding frame guide rail, the sliding frame rack is installed on the sliding frame body along the direction of the sliding frame guide rail, the sliding frame gear is meshed with the sliding frame rack, and the sliding frame gear is used to push the sliding frame rack to drive the sliding frame body to slide along the sliding frame guide rail, the sliding frame drive is connected to the sliding frame gear, and the sliding frame drive is used to drive the sliding frame gear to rotate.

[0007] The above-mentioned rail docking device for railway track construction is characterized in that: the bracket component includes a first bracket, a second bracket, a third bracket and a bracket connecting structure, the first bracket, the second bracket and the third bracket are arranged in sequence along the length direction of the transfer rail trolley, and the bracket connecting structure is connected to the first bracket, the second bracket and the third bracket respectively; the second bracket includes a second bracket body and a guide plate, the guide plate is fixedly mounted on the second bracket body, and the guiding direction of the guide plate is perpendicular to the length direction of the transfer rail trolley; the bracket connecting structure includes a first connecting member, a second connecting member and a sliding block, the sliding block is slidably mounted on the guide plate, one end of the first connecting member is hinged to one side of the sliding block, the other end of the first connecting member is hinged to the first bracket, one end of the second connecting member is hinged to the other side of the sliding block, the other end of the second connecting member is hinged to the third bracket, and the first connecting member and the second connecting member are symmetrically arranged along the second bracket.

[0008] The above-mentioned rail docking device for railway track construction is characterized in that: the first bracket includes a left side leg of the first bracket, a left side bottom plate of the first bracket, a left side universal wheel of the first bracket, a right side leg of the first bracket, a right side bottom plate of the first bracket, a right side universal wheel of the first bracket and a first bracket connecting beam, the left side leg of the first bracket and the right side leg of the first bracket are vertically spaced, the first bracket connecting beam is located between the left side leg of the first bracket and the right side leg of the first bracket, and one end of the first bracket connecting beam is fixedly connected to the top end of the left side leg of the first bracket, the other end of the first bracket connecting beam is fixedly connected to the top end of the right side leg of the first bracket, the left side bottom plate of the first bracket is located below the left side leg of the first bracket and is fixedly connected to the left side leg of the first bracket, the left side universal wheel of the first bracket is located below the left side bottom plate of the first bracket and is fixedly connected to the left side bottom plate of the first bracket, the right side bottom plate of the first bracket is located below the right side leg of the first bracket and is fixedly connected to the right side leg of the first bracket, and the right side universal wheel of the first bracket is located at the The cam is located between the left and right legs of the second bracket and the right and left legs of the second bracket are connected with each other, and one end of the cam is connected with the top end of the right leg of the second bracket and the other end of the cam is connected with the top end of the right leg of the second bracket.

[0009] The above-mentioned rail docking device for railway track construction is characterized in that: the rail support component includes a lifting structure, a left rail support part and a right rail support part, the lifting structure is installed on the second bracket, the left rail support part is arranged on the left side of the forward direction of rail laying, and is used to place the left rail to a predetermined position, the right rail support part is arranged on the right side of the forward direction of rail laying, and is used to place the right rail to a predetermined position, the lifting structure is respectively connected to the left rail support part and the right rail support part, and is used to simultaneously control the lifting and lowering of the left rail support part and the right rail support part, so that the left rail and the right rail are placed at the predetermined positions.

[0010] The above-mentioned rail docking device for railway track construction is characterized in that: a first bracket leg slide groove is opened on the left leg of the first bracket in the vertical direction, and a second bracket leg slide groove is opened on the left leg of the second bracket in the vertical direction; the left rail support part includes a first rail support, a second rail support, a third rail support and a sliding connecting rod, the first rail support is connected to the left leg of the first bracket, the second rail support is connected to the left leg of the second bracket, and the third rail support is connected to the left leg of the third bracket, the first rail support includes a first support body, a first support shaft and a first buffer, the first support body is slidably connected to the first bracket leg slide groove, and one end of the first support body is located at the left leg of the first bracket. The first support body is located on a side close to the right leg of the first bracket, and the other end of the first support body is located on a side of the left leg of the first bracket away from the right leg of the first bracket. The first support shaft is horizontally penetrated on the first support body, and the first support shaft is located on a side of the left leg of the first bracket close to the right leg of the first bracket. The first buffer is connected to one end of the first support body close to the right leg of the first bracket, and the first buffer is located below the first support shaft. The sliding connecting rod is arranged along the length direction of the transfer rail trolley, and the sliding connecting rod is located on a side of the left leg of the first bracket away from the right leg of the first bracket. The first support body is located on one end of the left leg of the first bracket away from the right leg of the first bracket and is fixedly connected to one end of the sliding connecting rod.

[0011] The above-mentioned rail docking device for railway track construction is characterized in that: the second track support includes a second support body, a second support shaft and a second buffer, the second support body is slidably connected to the second bracket leg slide groove, and one end of the second support body is located on the side of the left side leg of the second bracket close to the right side leg of the second bracket, and the other end of the second support body is located on the side of the left side leg of the second bracket away from the right side leg of the second bracket, the second support shaft is horizontally penetrated on the second support body, and the second support shaft is located on the side of the left side leg of the second bracket close to the right side leg of the second bracket, the second buffer is connected to one end of the second support body close to the right side leg of the second bracket, and the second buffer is located below the second support shaft, and the second support body is located on the end of the left side leg of the first bracket away from the right side leg of the first bracket. A sliding hole is opened, and the sliding connecting rod is slidably connected to the second support body through the sliding hole.

[0012] The above-mentioned rail docking device for railway track construction is characterized in that: the first buffer includes a buffer mounting seat, a front buffer cylinder, a front buffer plate, a rear buffer cylinder, a rear buffer plate and a buffer airbag, the buffer mounting seat is fixedly connected to the first support body, the buffer airbag is arranged below the buffer mounting seat, the front buffer cylinder is arranged along the direction of rail laying and is located at the front side of the buffer mounting seat, one end of the front buffer cylinder is fixedly connected to the buffer mounting seat, and the other end of the front buffer cylinder is fixedly connected to the front buffer plate, the rear buffer cylinder is also arranged along the direction of rail laying and is located at the rear side of the buffer mounting seat, one end of the rear buffer cylinder is fixedly connected to the buffer mounting seat, and the other end of the rear buffer cylinder is fixedly connected to the rear buffer plate, and the buffer airbag is respectively connected to the front buffer cylinder and the rear buffer cylinder.

[0013] The above-mentioned rail docking device for railway track construction is characterized in that: the rail docking device for railway track construction also includes an expansion airbag, which is installed on the rail transfer trolley body, the first connecting member and the second connecting member are both cylinders, and the expansion airbag is connected to the first connecting member and the second connecting member through a pipeline, and a compression plate is provided on the sliding frame body, and when the sliding frame body slides forward, the compression plate can compress the expansion airbag; the sliding frame component also includes an extension rod and a magnet plug block, the extension rod is arranged on the front side of the inside of the sliding frame body along the sliding direction of the sliding frame body, and the front end of the extension rod is fixedly connected to the sliding frame body, and the magnet plug block is arranged on the upper part of the rear end of the extension rod, and when the sliding frame body slides forward, the extension rod drives the first bracket to move forward through the magnet plug block.

[0014] The above-mentioned rail docking device for railway track construction is characterized in that the transfer rail trolley also includes multiple load-bearing shafts, which are arranged on the transfer rail trolley body along the width direction of the transfer rail trolley body, and the load-bearing shafts are used to carry the tracks to be laid.

[0015] Compared with the prior art, the present invention has the following advantages:

[0016] 1. The present invention can transport, dock and install and fix two rails stably and conveniently at the same time, and can allow the first bracket, the second bracket and the third bracket for hoisting the two rails, which are located at the front of the transfer rail trolley and are used to automatically open when the rails are installed, thereby increasing the supporting area of ​​the first bracket, the second bracket and the third bracket for the rails to be installed, so that the rails can be stably hoisted on the sleepers. At the same time, the buffer not only plays a buffering role but also can clamp and limit the first bracket, the second bracket and the third bracket as a whole on both sides of the sleeper, thereby avoiding the first bracket, the second bracket and the third bracket from shaking when the rails are docked, thereby improving the docking accuracy of the rails. After the rails are installed and fixed on the sleepers, the first bracket, the second bracket and the third bracket as a whole can be automatically stacked again at the front end of the transfer rail trolley, thereby reducing the overall footprint of the docking device, facilitating the movement of the docking device, and improving the accuracy of rail docking installation while improving the efficiency of railway construction.

[0017] 2. When the track support in the present invention drives the rail to move downward, the buffer airbag located at the bottom of the buffer mounting seat will first contact the ground. At this time, the buffer airbag will be squeezed and the internal gas will be filled into the buffer cylinder, so that the buffer cylinder pushes the buffer plate forward, so that the movable frame as a whole can be clamped between the two sleepers, and the first bracket, the second bracket and the third bracket as a whole are clamped and limited.

[0018] 3. In the present invention, when the sliding frame is driven to push the sliding frame body forward through the sliding frame gear, the compression plate on one side of the sliding frame body squeezes the deployment airbag. After the deployment airbag is squeezed, the internal gas is filled into the corresponding first connecting member and the second connecting member, so that the first connecting member and the second connecting member push the output shaft to move outward, increase the overall length of the first connecting member and the second connecting member, increase the spacing between the first bracket, the second bracket and the third bracket, and further increase the support area of ​​the first bracket, the second bracket and the third bracket for the rail body.

[0019] 4. The staff of the present invention can lift the rails into the temporary rail trolley through the lifting equipment. When the rail body inside the transfer rail trolley leaves the transfer rail trolley under the push of the sliding frame, the load-bearing shaft inside the transfer rail trolley will rotate under the friction force at the bottom of the rail body, thereby driving the transmission rod to rotate through the load-bearing shaft. When the transmission rod rotates, it will drive the load-bearing shaft inside the temporary rail car to rotate in the same direction, thereby driving the rails temporarily stored in the rail car to move forward through the friction force between the load-bearing shaft and the bottom of the rail body, and quickly adding new rails to the front of the transfer rail trolley, so that the docking device can continuously dock and install the rails, thereby improving the transportation and docking installation efficiency of the rail body.

[0020] The invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the rail transfer trolley traveling to the laying site in an embodiment of the present invention.

[0022] Figure 2 It is a schematic structural diagram of a first viewing angle when the first bracket, the second bracket and the third bracket are unfolded in an embodiment of the present invention.

[0023] Figure 3 Schematic diagram of the structure of the first bracket, the second bracket and the third bracket in the embodiment of the present invention when they are unfolded at a second viewing angle.

[0024] Figure 4 It is a schematic diagram of the partial structure at a first viewing angle when the first bracket, the second bracket and the third bracket are put together in an embodiment of the present invention.

[0025] Figure 5 Schematic diagram of the structure of the first bracket, the second bracket and the third bracket in the embodiment of the present invention when they are close together at a second viewing angle.

[0026] Figure 6 It is a schematic diagram of the top view of the structure when the first bracket, the second bracket and the third bracket are unfolded in an embodiment of the present invention.

[0027] Figure 7 It is a schematic diagram of the three-dimensional structure of the second track support in an embodiment of the present invention.

[0028] Figure 8 It is a schematic diagram of the three-dimensional structure of the first track support in an embodiment of the present invention.

[0029] Description of reference numerals:

[0030] 1—transfer rail trolley; 11—transfer rail trolley body; 12—sliding frame guide rail;

[0031] 13—bearing shaft; 14—reserved through slot; 2—rail taking and dropping mechanism; 21—sliding frame component;

[0032] 211 - sliding frame body; 212 - sliding frame rack; 213 - sliding frame gear;

[0033] 214—sliding frame drive; 215—compression plate; 216—extension rod; 217—magnet insert;

[0034] 22—rail support component; 23—bracket component; 231—first bracket;

[0035] 2311 — left leg of the first bracket; 2312 — left bottom plate of the first bracket;

[0036] 2313—universal wheel on the left side of the first bracket; 2314—support leg on the right side of the first bracket;

[0037] 2315—right bottom plate of the first bracket; 2316—right universal wheel of the first bracket;

[0038] 2317—first bracket connecting crossbeam; 2318—first bracket leg slide slot;

[0039] 232—second bracket; 2321—second bracket body; 2322—guide plate;

[0040] 2323—left side leg of the second bracket; 2324—left side bottom plate of the second bracket;

[0041] 2325—universal wheel on the left side of the second bracket; 2326—support leg on the right side of the second bracket;

[0042] 2327—right bottom plate of the second bracket; 2328—right universal wheel of the second bracket;

[0043] 2329—second bracket leg slide slot; 233—third bracket; 234—bracket connection structure;

[0044] 235—first connecting member; 236—second connecting member; 237—sliding block;

[0045] 24—rail support component; 241—lifting structure; 2411—traction motor; 2412—rotating rod;

[0046] 2413—reel; 242—left rail support; 2421—first rail support;

[0047] 2422—second track support; 24221—second support body; 24222—second support shaft;

[0048] 24223—second buffer; 24224—sliding hole; 24225—guide sleeve;

[0049] 24226—traction head; 2423—third track support; 2424—sliding connecting rod;

[0050] 2425—first supporting body; 2426—first supporting shaft; 2427—first buffer;

[0051] 24271—Buffer mounting seat; 24272—Front buffer cylinder;

[0052] 24273—front side buffer plate; 24274—rear side buffer cylinder; 24275—rear side buffer plate;

[0053] 24276—cushion airbag; 2428—limit stopper; 243—right rail support;

[0054] 3—Deploy the airbag. DETAILED DESCRIPTION

[0055] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0056] like Figures 1 to 3 As shown, the present invention discloses a rail docking device for railway track construction, which includes a transfer rail trolley 1 for loading and transferring rails and a rail taking and rail dropping mechanism 2, wherein the rail taking and rail dropping mechanism 2 is connected to the transfer rail trolley 1 and is used to grab the rails on the transfer rail trolley 1 and place the rails at a predetermined position; the rail taking and rail dropping mechanism 2 includes a sliding frame component 21, a rail holding component 22, a bracket component 23 and a rail supporting component 24, wherein the sliding frame component 21 is slidably mounted on the transfer rail trolley 1 and can slide along the transfer rail trolley 1 in the direction of rail laying, and the rail holding component 22 is used to hold the rails on the transfer rail trolley 1. Component 22 is installed at the lower part of the sliding frame component 21 away from one end of the transfer rail trolley 1, and the rail holding component 22 is used to hold one end of the rail to be laid, and driven by the sliding frame component 21 to drive the rail to be laid to move in the direction of rail laying. The bracket component 23 is located at the front end of the laying direction of the transfer rail trolley 1, and the bracket component 23 is connected to the transfer rail trolley 1. The rail supporting component 24 is installed on the bracket component 23, and the rail supporting component 24 is used to support the rail to be laid, and move downward along the bracket component 23 to place the rail to be laid on the sleeper at a preset position.

[0057] In this embodiment, after the rail transfer trolley 1 is loaded with the rails to be laid, it carries the rail taking and rail dropping mechanism 2 installed in front of it and the loaded rails to be laid, and runs along the laid track to the location to be laid, the rail holding component 22 on the rail taking and rail dropping mechanism 2 holds the front end of the rail to be laid on the rail transfer trolley 1, the sliding frame component 21 slides forward, driving the rail holding component 22 to move forward, and the rail holding component 22 drives the held rail to move forward until the rail to be laid is transferred from the rail transfer trolley 1 to the rail supporting component 24, and the rail supporting component 24 moves downward along the bracket component 23 to place the rail to be laid on the rail supporting component 24 on the sleeper.

[0058] like Figure 1 , Figures 3 to 6As shown, the transfer rail trolley 1 includes a transfer rail trolley body 11 and a sliding frame guide rail 12, and the sliding frame guide rail 12 is fixedly arranged on the transfer rail trolley body 11 along the length direction of the transfer rail trolley body 11; the sliding frame component 21 includes a sliding frame body 211, a sliding frame rack 212, a sliding frame gear 213 and a sliding frame drive 214, the sliding frame body 211 is slidably installed on the sliding frame guide rail 12, the sliding frame rack 212 is installed on the sliding frame body 211 along the direction of the sliding frame guide rail 12, the sliding frame gear 213 is meshed with the sliding frame rack 212, and the sliding frame gear 213 is used to push the sliding frame rack 212 to drive the sliding frame body 211 to slide along the sliding frame guide rail 12, the sliding frame drive 214 is connected to the sliding frame gear 213, and the sliding frame drive 214 is used to drive the sliding frame gear 213 to rotate.

[0059] In this embodiment, the sliding frame body 211 is a frame structure, and there are two sliding frame racks 212, which are respectively arranged on two sides of the frame structure parallel to the length direction of the transfer rail trolley body 11, and there are two sliding frame gears 213, which are respectively meshed with the corresponding sliding frame racks 212. The sliding frame drive 214 includes a driving motor and a transmission shaft. The driving motor is installed on the transfer rail trolley body 11, and its output shaft is connected to the transmission shaft. Both sliding frame gears 213 are installed on the transmission shaft. The driving motor can be a servo motor, or a device that can be easily obtained in the working environment such as a motor driven by a pressure source to convert other forms of energy into torque.

[0060] In this embodiment, the sliding frame component 21 also includes an extension rod 216 and a magnet block 217. The extension rod 216 is arranged on the front side of the sliding frame body 211 along the sliding direction of the sliding frame body 211, and the front end of the extension rod 216 is fixedly connected to the sliding frame body 211. The magnet block 217 is arranged on the upper part of the rear end of the extension rod 216. When the sliding frame body 211 slides forward, the extension rod 216 drives the first bracket 231 to move forward through the magnet block 217, and the first bracket 231, the second bracket 232 and the third bracket 233 are unfolded.

[0061] like Figure 5As shown, the sliding frame component 21 also includes a connecting plate 218, a pushing frame 219 and a limit block 2191. The connecting plate 218 is arranged along the width direction of the transfer rail trolley body 11. The connecting plate 218 is located at the end of the sliding frame component 21 close to one end of the transfer rail trolley body 11 and is fixedly connected to the sliding frame body 211. The pushing frame 219 is arranged below the connecting plate 218 and is fixedly connected to the connecting plate 218, and is used to cooperate with the rail holding component 22 to transfer the rails to be laid. The limit block 2191 is arranged on the pushing frame 219, and is used to limit the rails placed on the transfer rail trolley body 11.

[0062] In this embodiment, the rail holding component 22 includes two left and right clamps and a clamp drive. The left and right clamps are installed below the front end of the sliding frame body 211. The clamp drive is connected to the left and right clamps to control the holding and release of the left and right clamps. The clamp drive can be an electrically driven device that converts electrical energy into a clamping force, such as a mechanism composed of a motor, a reducer, a lead screw, etc. The clamp drive can be a device driven by a pressure source, such as a pneumatic cylinder, an oil cylinder, etc.

[0063] like Figure 1 As shown, the bracket component 23 includes a first bracket 231, a second bracket 232, a third bracket 233 and a bracket connecting structure 234. The first bracket 231, the second bracket 232 and the third bracket 233 are arranged in sequence along the length direction of the transfer rail trolley 1, and the bracket connecting structure 234 is connected to the first bracket 231, the second bracket 232 and the third bracket 233 respectively; the second bracket 232 includes a second bracket body 2321 and a guide plate 2322, and the guide plate 2322 is fixedly mounted on the second bracket body 2321, and the guiding direction of the guide plate 2322 is aligned with the transfer rail The length direction of the trolley 1 is vertical; the bracket connecting structure 234 includes a first connecting member 235, a second connecting member 236 and a sliding block 237, the sliding block 237 is slidably installed on the guide plate 2322, one end of the first connecting member 235 is hinged to one side of the sliding block 237, the other end of the first connecting member 235 is hinged to the first bracket 231, one end of the second connecting member 236 is hinged to the other side of the sliding block 237, the other end of the second connecting member 236 is hinged to the third bracket 233, and the first connecting member 235 and the second connecting member 236 are symmetrically arranged along the second bracket 232.

[0064] In this embodiment, the first bracket 231, the second bracket 232 and the third bracket 233 can adjust the spacing and expand each other, thereby increasing the supporting area of ​​the first bracket 231, the second bracket 232 and the third bracket 233 for laying the rails, so that the rails can be stably placed on the sleepers.

[0065] like Figure 1 As shown, the first bracket 231 includes a first bracket left leg 2311, a first bracket left bottom plate 2312, a first bracket left universal wheel 2313, a first bracket right leg 2314, a first bracket right bottom plate 2315, a first bracket right universal wheel 2316 and a first bracket connecting beam 2317. The first bracket left leg 2311 and the first bracket right leg 2314 are vertically spaced apart, the first bracket connecting beam 2317 is located between the first bracket left leg 2311 and the first bracket right leg 2314, and one end of the first bracket connecting beam 2317 is fixedly connected to the top of the first bracket left leg 2311, and the first bracket connecting beam 2317 is fixedly connected to the top of the first bracket left leg 2311. The other end of the crossbeam 2317 is fixedly connected to the top of the right leg 2314 of the first bracket, the left bottom plate 2312 of the first bracket is located below the left leg 2311 of the first bracket and is fixedly connected to the left leg 2311 of the first bracket, the left universal wheel 2313 of the first bracket is located below the left bottom plate 2312 of the first bracket and is fixedly connected to the left bottom plate 2312 of the first bracket, the right bottom plate 2315 of the first bracket is located below the right leg 2314 of the first bracket and is fixedly connected to the right leg 2314 of the first bracket, and the right universal wheel 2316 of the first bracket is located below the right bottom plate 2315 of the first bracket and is fixedly connected to the right bottom plate 2315 of the first bracket.

[0066] The second bracket body 2321 includes a second bracket left leg 2323, a second bracket left bottom plate 2324, a second bracket left universal wheel 2325, a second bracket right leg 2326, a second bracket right bottom plate 2327 and a second bracket right universal wheel 2328, the second bracket left leg 2323 and the second bracket right leg 2326 are vertically spaced apart, the guide plate 2322 is located between the second bracket left leg 2323 and the second bracket right leg 2326, and one end of the guide plate 2322 is fixedly connected to the top of the second bracket left leg 2323, and the other end of the guide plate 2322 is fixedly connected to the second bracket left leg 2323. The second bracket is fixedly connected to the top of the right leg 2326 of the bracket, the left bottom plate 2324 of the second bracket is located below the left leg 2323 of the second bracket and is fixedly connected to the left leg 2323 of the second bracket, the left universal wheel 2325 of the second bracket is located below the left bottom plate 2324 of the second bracket and is fixedly connected to the left bottom plate 2324 of the second bracket, the right bottom plate 2327 of the second bracket is located below the right leg 2326 of the second bracket and is fixedly connected to the right leg 2326 of the second bracket, and the right universal wheel 2328 of the second bracket is located below the right bottom plate 2327 of the second bracket and is fixedly connected to the right bottom plate 2327 of the second bracket.

[0067] In this embodiment, the third bracket 233 includes a left leg of the third bracket, a left bottom plate of the third bracket, a left universal wheel of the third bracket, a right leg of the third bracket, a right bottom plate of the third bracket, a right universal wheel of the third bracket and a third bracket connecting beam. The left leg of the third bracket and the right leg of the third bracket are vertically spaced apart. The third bracket connecting beam is located between the left leg of the third bracket and the right leg of the third bracket, and one end of the third bracket connecting beam is fixedly connected to the top end of the left leg of the third bracket, and the other end of the third bracket connecting beam is fixedly connected to the top end of the right leg of the third bracket. The left bottom plate of the third bracket is located below the left leg of the third bracket and is fixedly connected to the left leg of the third bracket. The left universal wheel of the third bracket is located below the left bottom plate of the third bracket and is fixedly connected to the left bottom plate of the third bracket. The right bottom plate of the third bracket is located below the right leg of the third bracket and is fixedly connected to the right leg of the third bracket. The right universal wheel of the third bracket is located below the right bottom plate of the third bracket and is fixedly connected to the right bottom plate of the third bracket.

[0068] like Figure 3 , Figure 4 and Figure 5 As shown, the rail support component 24 includes a lifting structure 241, a left rail support part 242 and a right rail support part 243. The lifting structure 241 is installed on the second bracket 232. The left rail support part 242 is arranged on the left side of the forward direction of rail laying, and is used to place the left rail to a predetermined position. The right rail support part 243 is arranged on the right side of the forward direction of rail laying, and is used to place the right rail to a predetermined position. The lifting structure 241 is respectively connected to the left rail support part 242 and the right rail support part 243, and is used to simultaneously control the lifting and lowering of the left rail support part 242 and the right rail support part 243, so that the left rail and the right rail are placed at the predetermined positions.

[0069] In this embodiment, by providing the left rail support part 242 and the right rail support part 243, the rail docking device for railway track construction can stably and conveniently grasp, dock and install and fix two rails at the same time, and when the rails are installed, the first bracket 231, the second bracket 232 and the third bracket 233 located in the front of the transfer rail trolley 1 can be automatically unfolded, thereby increasing the support area of ​​the first bracket 231, the second bracket 232 and the third bracket 233 for the laid rails, so that the rails can be stably hoisted on the sleepers.

[0070] In this embodiment, the lifting structure 241 includes a traction motor 2411, a rotating rod 2412, a winding drum 2413 and a traction rope. The traction motor 2411 is installed on a leg of the second bracket 232, one end of the rotating rod 2412 is rotatably connected to the second bracket left leg 2323 of the second bracket 232, and the other end of the rotating rod 2412 is rotatably connected to the second bracket right leg 2326, and the winding drum 2413 is fixedly installed on the rotating rod 2412. The output shaft of the traction motor 2411 is connected to the rotating rod 2412 to drive the rotating rod 2412 to rotate. One end of the traction rope is wound around the winding drum 2413, and the other end is connected to the rail support component 24, driving the rail support component 24 to move up and down along the bracket component 23.

[0071] In this embodiment, a traction head 24226 is provided on the upper part of the second track support 2422, and the other end of the traction rope is fixedly connected to the traction head 24226. The staff only needs to control the traction motor 2411 to drive the rotating rod 2412 to rotate forward and reversely, and the traction rope connected to the traction head 24226 can be reeled and released through the reel 2413, so as to pull the second track support 2422 up and down as a whole, and the second track support 2422 drives the first track support 2421 and the third track support 2423 to move together through the sliding connecting rod 2424. The sliding connecting rod 2424 is a rectangular square tube. Of course, the lifting structure 241 can adopt a structure that is the same as or similar to the hoisting device in the prior art.

[0072] like Figure 1 As shown, a first bracket leg slide groove 2318 is opened on the left side leg 2311 of the first bracket along the vertical direction, and a second bracket leg slide groove 2329 is opened on the left side leg 2323 of the second bracket along the vertical direction; the left side rail support part 242 includes a first rail support 2421, a second rail support 2422, a third rail support 2423 and a sliding connecting rod 2424, the first rail support 2421 is connected to the left side leg 2311 of the first bracket, the second rail support 2422 is connected to the left side leg 2323 of the second bracket, and the third rail support 2423 is connected to the left side leg 2423 of the third bracket.

[0073] The first track support 2421 includes a first support body 2425, a first support shaft 2426 and a first buffer 2427. The first support body 2425 is slidably connected to the first bracket leg slide groove 2318, and one end of the first support body 2425 is located on the side of the first bracket left leg 2311 close to the first bracket right leg 2314, and the other end of the first support body 2425 is located on the side of the first bracket left leg 2311 away from the first bracket right leg 2314, and the first support shaft 2426 is horizontally penetrated on the first support body 2425, and the first support shaft 2426 is located on the first bracket left leg 2311. 11 is close to the side of the right leg 2314 of the first bracket, the first buffer 2427 is connected to one end of the first support body 2425 close to the side of the right leg 2314 of the first bracket, and the first buffer 2427 is located below the first support shaft 2426, the sliding connecting rod 2424 is arranged along the length direction of the transfer rail trolley 1, and the sliding connecting rod 2424 is located on the side of the left leg 2311 of the first bracket away from the right leg 2314 of the first bracket, and the first support body 2425 is located on one end of the left leg 2311 of the first bracket away from the side of the right leg 2314 of the first bracket and is fixedly connected to one end of the sliding connecting rod 2424.

[0074] like Figure 2 As shown, a limit stopper 2428 is provided at the other end of the sliding connecting rod 2424 to prevent the second supporting body 24221 and the third supporting body from sliding off the sliding connecting rod 2424 .

[0075] like Figure 7As shown, the second rail support 2422 includes a second support body 24221, a second support shaft 24222 and a second buffer 24223, the second support body 24221 is slidably connected to the second bracket leg slide groove 2329, and one end of the second support body 24221 is located on the side of the second bracket left leg 2323 close to the second bracket right leg 2326, the other end of the second support body 24221 is located on the side of the second bracket left leg 2323 away from the second bracket right leg 2326, the second support shaft 24222 is horizontally penetrated on the second support body 24221, and the The second support shaft 24222 is located on the side of the left side leg 2323 of the second bracket close to the right side leg 2326 of the second bracket, the second buffer 24223 is connected to one end of the second support body 24221 close to the right side leg 2326 of the second bracket, and the second buffer 24223 is located below the second support shaft 24222, and the second support body 24221 is located on the side of the left side leg 2311 of the first bracket away from the right side leg 2314 of the first bracket. A sliding hole 24224 is provided at one end, and the sliding connecting rod 2424 is slidably connected to the second support body 24221 through the sliding hole 24224.

[0076] like Figure 7 As shown, the second support shaft 24222 is installed on the second support body 24221 through a guide sleeve 24225. When placing the rail, the second support shaft 24222 can be pulled out from the guide sleeve 24225.

[0077] When it is necessary to dock and install a rail body with a certain curvature at a curve, the staff can adjust the corresponding positions of the second bracket 232 and the third bracket 233 by pushing them left and right according to the curvature of the rail. Since a larger gap is reserved when the sliding connecting rod 2424 cooperates with the sliding hole 24224 in the width direction, the first bracket 231, the second bracket 232 and the third bracket 233 can be arranged in a certain curvature to place the curved rail on the corresponding sleeper, complete the docking installation of the rail at the curve, and improve the applicability of the docking device.

[0078] like Figure 1As shown, the first buffer 2427 includes a buffer mounting seat 24271, a front buffer cylinder 24272, a front buffer plate 24273, a rear buffer cylinder 24274, a rear buffer plate 24275 and a buffer airbag 24276. The buffer mounting seat 24271 is fixedly connected to the first support body 2425, and the buffer airbag 24276 is arranged below the buffer mounting seat 24271. The front buffer cylinder 24272 is arranged along the direction of laying the rail and is located at the front side of the buffer mounting seat 24271. One end of the front buffer cylinder 24272 is connected to the first support body 2425. The buffer mounting seat 24271 is fixedly connected, the other end of the front buffer cylinder 24272 is fixedly connected to the front buffer plate 24273, the rear buffer cylinder 24274 is also arranged along the direction of rail laying, and is located on the rear side of the buffer mounting seat 24271, one end of the rear buffer cylinder 24274 is fixedly connected to the buffer mounting seat 24271, the other end of the rear buffer cylinder 24274 is fixedly connected to the rear buffer plate 24275, and the buffer airbag 24276 is respectively connected to the front buffer cylinder 24272 and the rear buffer cylinder 24274.

[0079] In this embodiment, the structure of the first buffer 2427 is the same as the structure of the second buffer 24223 .

[0080] In this embodiment, the structure of the second rail support 2422 is the same as the structure of the third rail support 2423 .

[0081] In this embodiment, the left rail support portion 242 and the right rail support portion 243 have the same structure.

[0082] like Figure 1 , Figure 2 and Figure 5 As shown, the rail docking device for railway track construction also includes a deployment airbag 3, which is installed on the transfer rail trolley body 11, the first connecting member 235 and the second connecting member 236 are both cylinders, and the deployment airbag 3 is connected to the first connecting member 235 and the second connecting member 236 through a pipeline, and a compression plate 215 is provided on the sliding frame body 211, when the sliding frame body 211 slides forward, the compression plate 215 can compress the deployment airbag 3; the sliding frame component 21 also includes an extension rod 216 and a magnet plug block 217, the extension rod 216 is arranged on the front side of the inside of the sliding frame body 211 along the sliding direction of the sliding frame body 211, and the front end of the extension rod 216 is fixedly connected to the sliding frame body 211, and the magnet plug block 217 is arranged on the upper part of the rear end of the extension rod 216, when the sliding frame body 211 slides forward, the extension rod 216 drives the first bracket 231 to move forward through the magnet plug block 217.

[0083] like Figure 1 As shown, the transfer rail trolley 1 further includes a plurality of bearing shafts 13, which are arranged on the transfer rail trolley body 11 along the width direction of the transfer rail trolley body 11 and are used to carry the rails to be laid. The bearing shafts 13 are connected by a transmission chain or a transmission rod.

[0084] like Figure 5 As shown, a reserved through slot 14 is provided on the side wall of the rail transfer trolley body 11 near one end of the first bracket 231 , and the staff can conveniently clamp the clamp on one end of the rail through the reserved through slot 14 .

[0085] When in use, the staff first lifts the rails to be laid into the transfer rail trolley 1, and then pushes the transfer rail trolley 1 as a whole to move on the laid rails through the corresponding trolley that can run on the track, and stops the transfer rail trolley 1 after pushing the transfer rail trolley 1 to the position where the rails need to be docked and installed. When the transfer rail trolley 1 moves forward, it will push the first bracket 231, the second bracket 232 and the third bracket 233 that are close to each other in front to move forward as a whole under the support of universal wheels. After the transfer rail trolley 1 stops, the first bracket 231, the second bracket 232 and the third bracket 233 located at the front of the transfer rail trolley 1 will move as a whole to the top of multiple sleepers where no rails are laid.

[0086] The staff first uses the rail holding component 22 to clamp the rail placed on the transfer rail trolley 1. The specific structure of the rail holding component 22 can be two clamps fixed under the sliding frame component 21. The two clamps respectively hold one end of the left and right rails. At this time, the left and right rails are still placed on the through-bearing shaft 13 inside the transfer rail trolley 1. Then, the sliding frame drive 214 is started to drive the two sliding frame gears 213 to rotate. When the sliding frame gear 213 rotates, it will push the sliding frame component 21 as a whole to slide forward on the top of the transfer rail trolley 1 through the sliding frame rack 212 engaged therewith, thereby pushing the sliding frame body 211 as a whole to pass through the first bracket 231 and the second bracket 232 and continue to move forward. After the magnet block 217 on one side of the extension rod 216 moves to the side of the third bracket 233, the magnet block 217 is adsorbed and abutted on the outer wall of the third bracket 233, thereby pushing the third bracket 233 to move forward as a whole. When the third bracket 233 moves forward, the first connecting member 235 connected by rotation of the outer wall will pull the first bracket 231 and the second bracket 232 on one side to move forward, so that the first bracket 231, the second bracket 232 and the third bracket 233 are opened as a whole under the guidance of the first connecting member 235 and the sliding block 237, and the first support shaft 2426 connected to the inner walls of the first bracket 231, the second bracket 232 and the third bracket 233 is raised to support the track pulled out by the clamp.

[0087] When the rail is pulled out of the rail transfer trolley 1 as a whole by the sliding frame component 21, the staff controls the sliding frame drive 214 to stop rotating, and then releases the clamp on one end of the rail. Then the staff starts the traction mechanism arranged on the outer wall of the second bracket 232, and pulls the rail support component 24 slidingly connected to the inner walls of the first bracket 231, the second bracket 232 and the third bracket 233 to move downward at a uniform speed, and pulls the rail supported on the rail support component 24 downward at a uniform speed until the bottom of the rail is placed on the sleeper. During the downward movement of the rail support component 24, the front buffer cylinder 24272 and the rear buffer cylinder 24274 at the bottom will respectively push their corresponding buffer plates to unfold and support between the two sleepers, and support and limit the rail support component 24 moved between the two sleepers.

[0088] After the staff completes the docking installation of the rails and fixes the rails on the sleepers, the first support shaft 2426 slidably connected to the inner wall of the guide sleeve 24225 can be pulled out from both sides of the first bracket 231, the second bracket 232 and the third bracket 233, and then the traction mechanism is started to pull the rail support component 24 upward and reset it, and then the first support shaft 2426 is inserted back into the corresponding guide sleeve 24225; then the sliding frame drive 214 is controlled to rotate in the opposite direction, and the sliding frame component 21 moves back as a whole, thereby driving the sliding frame component 21 to move back as a whole. When the sliding frame component 21 moves back, the magnet plug block 217 connected to the outer wall of the third bracket 233 on one side of the extension rod 216 will pull the third bracket 233 to move back as a whole, thereby pushing the first bracket 231, the second bracket 232 and the third bracket 233 to be stacked as a whole on one side of the transfer rail trolley 1.

[0089] The present invention also discloses a method for butting rails for railway track construction, such as Figures 1 to 8 As shown, the following steps are included:

[0090] S1: hoisting the rails onto the load-bearing shaft 13 inside the transfer rail trolley 1 through the hoisting equipment, pushing the transfer rail trolley 1 as a whole on the laid rails through the trolley that can run on the track, and stopping after pushing the transfer rail trolley 1 to the position where the rails need to be docked and installed;

[0091] S2: Using the rail holding component 22 to clamp one end of the corresponding rail, start the sliding frame drive 214 to drive the sliding frame body 211 to move forward, and pull the rail inside the transfer rail trolley 1 into the unfolded first bracket 231, second bracket 232 and third bracket 233;

[0092] S3: Control the lifting structure 241 to pull the rail downward, place the rail on the sleeper for docking and installation, and after the rail is fixed on the sleeper, first pull out the support shaft, then control the lifting structure 241 to drive the rail support component 24 to move upward and reset, and then insert the support shaft back into the guide sleeve 24225;

[0093] S4: Control the sliding frame drive 214 to drive the sliding frame body 211 to move back and reset, and then continue to repeat the above installation process for the rails inside the transfer rail trolley 1, so that the rails can be continuously docked and installed.

[0094] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A rail docking device for railway track construction, It is characterized in that The invention comprises a steel rail transfer trolley (1) for loading and transferring steel rails and a rail taking and placing mechanism (2), wherein the rail taking and placing mechanism (2) is connected to the steel rail transfer trolley (1) and is used to grab the steel rails on the steel rail transfer trolley (1) and place the steel rails at a predetermined position; The rail removing and rail dropping mechanism (2) comprises a sliding frame component (21), a rail holding component (22), a bracket component (23) and a rail supporting component (24); the sliding frame component (21) is slidably mounted on the transfer rail trolley (1) and can slide along the transfer rail trolley (1) in the direction of rail laying; the rail holding component (22) is mounted at the lower part of the sliding frame component (21) away from one end of the transfer rail trolley (1), and the rail holding component (22) is used to hold one end of the rail to be laid. The support component (23) is located at the front end of the transfer rail trolley (1) in the laying direction, and the support component (23) is connected to the transfer rail trolley (1). The rail support component (24) is installed on the support component (23), and the rail support component (24) is used to support the rail to be laid, and moves downward along the support component (23) to place the rail to be laid on the sleeper at a preset position.

2. A rail docking device for railway track construction according to claim 1, Features: The transfer rail trolley (1) comprises a transfer rail trolley body (11) and a sliding frame guide rail (12), wherein the sliding frame guide rail (12) is fixedly arranged on the transfer rail trolley body (11) along the length direction of the transfer rail trolley body (11); The sliding frame component (21) comprises a sliding frame body (211), a sliding frame rack (212), a sliding frame gear (213) and a sliding frame drive (214); the sliding frame body (211) is slidably mounted on the sliding frame guide rail (12); the sliding frame rack (212) is mounted on the sliding frame body (211) along the direction of the sliding frame guide rail (12); the sliding frame gear (213) is meshed with the sliding frame rack (212), and the sliding frame gear (213) is used to push the sliding frame rack (212) to drive the sliding frame body (211) to slide along the sliding frame guide rail (12); the sliding frame drive (214) is connected to the sliding frame gear (213), and the sliding frame drive (214) is used to drive the sliding frame gear (213) to rotate.

3. A rail docking device for railway track construction according to claim 1 or 2, Features: The support component (23) comprises a first support (231), a second support (232), a third support (233) and a support connection structure (234); the first support (231), the second support (232) and the third support (233) are arranged in sequence along the length direction of the transfer rail trolley (1); and the support connection structure (234) is connected to the first support (231), the second support (232) and the third support (233) respectively; The second bracket (232) comprises a second bracket body (2321) and a guide plate (2322), wherein the guide plate (2322) is fixedly mounted on the second bracket body (2321), and the guiding direction of the guide plate (2322) is perpendicular to the length direction of the transfer rail trolley (1); The bracket connection structure (234) includes a first connection member (235), a second connection member (236) and a sliding block (237), wherein the sliding block (237) is slidably mounted on the guide plate (2322), one end of the first connection member (235) is hinged to one side of the sliding block (237), the other end of the first connection member (235) is hinged to the first bracket (231), one end of the second connection member (236) is hinged to the other side of the sliding block (237), the other end of the second connection member (236) is hinged to the third bracket (233), and the first connection member (235) and the second connection member (236) are symmetrically arranged along the second bracket (232).

4. A rail docking device for railway track construction according to claim 3, Features: The first bracket (231) comprises a first bracket left leg (2311), a first bracket left bottom plate (2312), a first bracket left universal wheel (2313), a first bracket right leg (2314), a first bracket right bottom plate (2315), a first bracket right universal wheel (2316) and a first bracket connecting crossbeam (2317), wherein the first bracket left leg (2311) and the first bracket right leg (2314) are vertically spaced apart, the first bracket connecting crossbeam (2317) is located between the first bracket left leg (2311) and the first bracket right leg (2314), and one end of the first bracket connecting crossbeam (2317) is fixedly connected to the top end of the first bracket left leg (2311), and the first bracket connecting crossbeam (2317) is fixedly connected to the top end of the first bracket left leg (2311). The other end of the beam (2317) is fixedly connected to the top of the right leg (2314) of the first bracket, the left bottom plate (2312) of the first bracket is located below the left leg (2311) of the first bracket and is fixedly connected to the left leg (2311) of the first bracket, the left universal wheel (2313) of the first bracket is located below the left bottom plate (2312) of the first bracket and is fixedly connected to the left bottom plate (2312) of the first bracket, the right bottom plate (2315) of the first bracket is located below the right leg (2314) of the first bracket and is fixedly connected to the right leg (2314) of the first bracket, and the right universal wheel (2316) of the first bracket is located below the right bottom plate (2315) of the first bracket and is fixedly connected to the right bottom plate (2315) of the first bracket; The second bracket body (2321) includes a second bracket left leg (2323), a second bracket left bottom plate (2324), a second bracket left universal wheel (2325), a second bracket right leg (2326), a second bracket right bottom plate (2327) and a second bracket right universal wheel (2328), the second bracket left leg (2323) and the second bracket right leg (2326) are vertically spaced apart, the guide plate (2322) is located between the second bracket left leg (2323) and the second bracket right leg (2326), and one end of the guide plate (2322) is fixedly connected to the top end of the second bracket left leg (2323), and the other end of the guide plate (2322) is fixedly connected to the second bracket left leg (2323). The top ends of the right legs (2326) of the second brackets are fixedly connected, the left bottom plate (2324) of the second bracket is located below the left leg (2323) of the second bracket and is fixedly connected to the left leg (2323) of the second bracket, the left universal wheel (2325) of the second bracket is located below the left bottom plate (2324) of the second bracket and is fixedly connected to the left bottom plate (2324) of the second bracket, the right bottom plate (2327) of the second bracket is located below the right leg (2326) of the second bracket and is fixedly connected to the right leg (2326) of the second bracket, and the right universal wheel (2328) of the second bracket is located below the right bottom plate (2327) of the second bracket and is fixedly connected to the right bottom plate (2327) of the second bracket.

5. A rail docking device for railway track construction according to claim 1 or 4, Features: The rail support component (24) comprises a lifting structure (241), a left rail support part (242) and a right rail support part (243); the lifting structure (241) is mounted on the second bracket (232); the left rail support part (242) is arranged on the left side of the rail laying direction and is used to place the left rail at a predetermined position; the right rail support part (243) is arranged on the right side of the rail laying direction and is used to place the right rail at a predetermined position; the lifting structure (241) is respectively connected to the left rail support part (242) and the right rail support part (243) and is used to simultaneously control the lifting and lowering of the left rail support part (242) and the right rail support part (243) so as to place the left rail and the right rail at predetermined positions.

6. A rail docking device for railway track construction according to claim 5, Features: A first bracket leg sliding groove (2318) is provided on the left side leg (2311) of the first bracket in the vertical direction, and a second bracket leg sliding groove (2329) is provided on the left side leg (2323) of the second bracket in the vertical direction; The left rail support portion (242) includes a first rail support (2421), a second rail support (2422), a third rail support (2423) and a sliding connecting rod (2424), wherein the first rail support (2421) is connected to the left leg (2311) of the first bracket, the second rail support (2422) is connected to the left leg (2323) of the second bracket, and the third rail support (2423) is connected to the left leg (2423) of the third bracket, the first rail support (2421) includes a first support body (2425), a first support shaft (2426) and a first buffer (2427), the first support body (2425) is slidably connected to the first bracket leg slide groove (2318), and one end of the first support body (2425) is located on the side of the left leg (2311) of the first bracket close to the right leg (2314) of the first bracket, and the other end of the first support body (2425) is located on the left leg (2311) of the first bracket 1) away from the side of the right leg (2314) of the first bracket, the first support shaft (2426) is horizontally penetrated on the first support body (2425), and the first support shaft (2426) is located on the side of the left leg (2311) of the first bracket close to the right leg (2314) of the first bracket, the first buffer (2427) is connected to one end of the first support body (2425) close to the right leg (2314) of the first bracket, and the first buffer (2427) Located below the first support shaft (2426), the sliding connecting rod (2424) is arranged along the length direction of the transfer rail trolley (1), and the sliding connecting rod (2424) is located on the side of the left leg (2311) of the first bracket away from the right leg (2314) of the first bracket, and the first support body (2425) is located on the side of the left leg (2311) of the first bracket away from the right leg (2314) of the first bracket. One end is fixedly connected to one end of the sliding connecting rod (2424).

7. A rail docking device for railway track construction according to claim 6, Features: The second track support (2422) includes a second support body (24221), a second support shaft (24222) and a second buffer (24223), the second support body (24221) is slidably connected to the second bracket leg slide groove (2329), and one end of the second support body (24221) is located on the side of the second bracket left leg (2323) close to the second bracket right leg (2326), the other end of the second support body (24221) is located on the side of the second bracket left leg (2323) away from the second bracket right leg (2326), the second support shaft (24222) is horizontally penetrated on the second support body (24221), and the second The second support shaft (24222) is located on the side of the left leg (2323) of the second bracket close to the right leg (2326) of the second bracket, the second buffer (24223) is connected to one end of the second support body (24221) close to the right leg (2326) of the second bracket, and the second buffer (24223) is located below the second support shaft (24222), and the second support body (24221) is located on the side of the left leg (2311) of the first bracket away from the right leg (2314) of the first bracket. A sliding hole (24224) is provided at one end, and the sliding connecting rod (2424) is slidably connected to the second support body (24221) through the sliding hole (24224).

8. A rail docking device for railway track construction according to claim 6, Features: The first buffer (2427) includes a buffer mounting seat (24271), a front buffer cylinder (24272), a front buffer plate (24273), a rear buffer cylinder (24274), a rear buffer plate (24275) and a buffer airbag (24276); the buffer mounting seat (24271) is fixedly connected to the first support body (2425); the buffer airbag (24276) is arranged below the buffer mounting seat (24271); the front buffer cylinder (24272) is arranged along the direction of laying of the rail and is located at the front side of the buffer mounting seat (24271); one end of the front buffer cylinder (24272) The front buffer cylinder (24272) is fixedly connected to the buffer mounting seat (24271), the other end of the front buffer cylinder (24272) is fixedly connected to the front buffer plate (24273), the rear buffer cylinder (24274) is also arranged along the direction of rail laying and is located at the rear side of the buffer mounting seat (24271), one end of the rear buffer cylinder (24274) is fixedly connected to the buffer mounting seat (24271), the other end of the rear buffer cylinder (24274) is fixedly connected to the rear buffer plate (24275), and the buffer airbag (24276) is respectively connected to the front buffer cylinder (24272) and the rear buffer cylinder (24274).

9. A rail docking device for railway track construction according to claim 5, Features: The rail docking device for railway track construction also includes an expansion airbag (3), the expansion airbag (3) is installed on the rail transfer trolley body (11), the first connecting member (235) and the second connecting member (236) are both cylinders, the expansion airbag (3) is connected to the first connecting member (235) and the second connecting member (236) through a pipeline, and a compression plate (215) is provided on the sliding frame body (211), and when the sliding frame body (211) slides forward, the compression plate (215) can compress the expansion airbag (3); The sliding frame component (21) also includes an extension rod (216) and a magnet insert block (217); the extension rod (216) is arranged at the front side of the interior of the sliding frame body (211) along the sliding direction of the sliding frame body (211), and the front end of the extension rod (216) is fixedly connected to the sliding frame body (211); the magnet insert block (217) is arranged at the upper part of the rear end of the extension rod (216); when the sliding frame body (211) slides forward, the extension rod (216) drives the first bracket (231) to move forward through the magnet insert block (217).

10. A rail docking device for railway track construction according to claim 8, Features: The transfer rail trolley (1) further comprises a plurality of bearing shafts (13), wherein the bearing shafts (13) are arranged on the transfer rail trolley body (11) along the width direction of the transfer rail trolley body (11), and the bearing shafts (13) are used to bear the rails to be laid.

Citation Information

Patent Citations

  • Track laying machine and track construction method

    CN112281557A

  • Subway rail collecting and replacing equipment and method

    CN118048816A

  • Transfer device for laying steel rails on newly-built railway seamless tracks

    CN209907126U

  • Intelligent track laying method and intelligent track laying apparatus

    EP4273321A1

  • Intelligent track laying method and intelligent track laying apparatus

    WO2022142189A1