Tandem type capsule grouting device and method

By designing a splicable series capsule grouting device, the problem that the existing technology cannot achieve series splicing and pressure adjustment is solved, the flexible control of soil deformation and material saving is achieved, and the application flexibility of grouting device is improved. and reliability.

CN118997161APending Publication Date: 2024-11-22CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411416235.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing single-point capsule grouting device cannot realize series splicing, irregular grouting, adjustable pressure pressurized grouting, reuse and standardized design of grouting outer sleeve casing, which is difficult to meet the complexity of soil deformation in underground space development. need.

Method used

A tandem capsule grouting device is designed, including a splicable grouting rod and grouting capsule, adopts a one-way sealing structure and a high-strength rubber capsule body, and the grouting pressure is achieved through the conical grouting head and boss. Adjustment and sealing, supporting assembly of grouting bodies of different lengths and shapes, allowing reuse of grouting hoses.

Benefits of technology

It realizes rapid and flexible assembly of grouting bodies, supports soil deformation of different depths and shapes, improves equipment application flexibility and reliability, saves material consumption, and ensures the stability of grouting pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997161A_ABST
    Figure CN118997161A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of foundation and foundation engineering construction, in particular to a tandem type capsule grouting device and method. Comprising a grouting rod, a grouting bag is arranged at the bottom of the grouting rod, the grouting bag comprises a grouting body, the grouting body comprises a grouting pipe, an inner cavity of the grouting pipe is communicated with an inner cavity of the grouting rod, external threads are arranged at the upper end of the grouting pipe, internal threads are arranged at the lower end of the grouting pipe, and a plug is arranged below the grouting bag; a bag body is arranged on the outer side of the grouting pipe, a grouting hole is formed in the grouting pipe, a connecting pipe is arranged in the grouting hole, a grouting hose is arranged in the grouting pipe, a conical grouting head is arranged at the lower end of the grouting hose, a boss is arranged in an inner cavity of the grouting pipe, and a one-way sealing structure is arranged below the boss. According to the invention, grouting bodies can be quickly connected in series and spliced, and grouting bags with different grouting lengths and different expansion shapes can be quickly and flexibly assembled, so that grouting of the grouting bags can be combined with engineering practice, different depth and different deformation control requirements are met, and the application flexibility of equipment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation and basic engineering construction, and in particular to a series capsule grouting device and method. Background Art

[0002] At present, the national economy is developing rapidly, urbanization is advancing, and the urban population is increasing. The development of underground space has become increasingly important. In order to solve the problems of insufficient urban space and traffic congestion, various large and medium-sized cities have built new high-rise buildings and developed underground space. The foundation pit construction for the construction of new high-rise buildings and the development of underground space will inevitably cause deformation of the surrounding underground tunnels and existing buildings.

[0003] Chinese utility model patent CN208235526U discloses a single-point bladder grouting device for controlling soil deformation, including a grouting core tube and an outer sleeve, a grouting bladder is provided at the bottom of the outer sleeve, and a bladder sleeve is provided on the outside of the grouting bladder. The grouting bladder is closedly connected to the lower end of the outer sleeve, and the bladder sleeve is composed of two thin rubber sheets adhered to the lower end of the outer sleeve and located on the outside of the grouting bladder. When grouting is performed using the utility model, a grouting gun is used to quantitatively inject slurry into the outer sleeve to a designed depth through a grouting pipe, and the grouting bladder filled with slurry enters the corresponding soil after the bladder sleeve is flushed open.

[0004] The above patent can achieve expansion of a predetermined volume at a predetermined depth of the soil, but there are some problems: 1. It cannot achieve serial splicing, and grouting bags of different lengths cannot be spliced ​​according to actual engineering needs; 2. It cannot achieve irregular grouting; 3. It cannot achieve pressure-adjustable pressurized grouting; 4. It cannot achieve the reuse of the grouting outer casing; 5. It cannot achieve standardized design, production and promotion of grouting bags. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a series capsule grouting device and method for accurately, efficiently and safely causing soil to produce expected deformation.

[0006] The technical solution adopted by the present invention to solve its technical problems is a series capsule grouting device, comprising a grouting rod, a grouting bag is arranged at the bottom of the grouting rod, the grouting bag comprises at least one grouting body, each of the grouting bodies comprises a grouting pipe, the inner cavity of the grouting pipe is connected with the inner cavity of the grouting rod, the upper end of the grouting pipe is arranged with an external thread, the lower end of the grouting pipe is arranged with an internal thread used in conjunction with the external thread, and a plug matched with the internal thread is arranged below the grouting bag; a capsule body is arranged on the outer side of the grouting pipe, a grouting hole is arranged on the grouting pipe, a connecting pipe connecting the inner cavity of the capsule body and the inner cavity of the grouting pipe is arranged in the grouting hole, a grouting hose is arranged in the grouting pipe, one end of the grouting hose is located outside the grouting rod, the other end is located in the inner cavity of the grouting pipe and is provided with a conical grouting head, a boss used in conjunction with the conical grouting head is arranged in the inner cavity of the grouting pipe, and a one-way sealing structure is arranged below the boss.

[0007] Furthermore, the one-way sealing structure includes a hinge seat arranged on the lower surface of the boss, and a sealing plate is hinged on the hinge seat.

[0008] Furthermore, a floating body is provided on the lower surface of the sealing plate, and a sealing ring is provided on the upper surface of the sealing plate.

[0009] Furthermore, the boss is provided with a conical sealing surface which cooperates with the conical grouting head.

[0010] Furthermore, the material of the capsule is high-strength and high-elasticity rubber.

[0011] Furthermore, a plastic film is provided at the grouting hole.

[0012] A serial capsule grouting method, using a serial capsule grouting device, comprises the following steps: S1: Determine the hole layout location: According to the specific needs of controlling soil deformation at the project site, the location of the holes, the depth of each hole, and the specifications of the serial capsule grouting device required for each hole are determined through theoretical calculation, numerical simulation, and in-situ testing; S2: Equipment transportation: transport the serial capsule grouting equipment and grouting equipment of determined specifications from the manufacturing site to the project site, and store them safely and reasonably until they are assembled and used; S3: On-site drilling: According to the calibrated hole position and hole depth, a reasonable drilling sequence is formulated, the hole diameter is determined according to the serial capsule grouting device, and the drilling machine is used for drilling; S4: Splicing of serial capsule grouting devices: according to the specifications of serial capsule grouting devices required for each hole, the grouting bodies are spliced ​​and assembled in series to form a grouting bag, and then a grouting rod is arranged on the grouting bag, and the inner cavity of the grouting rod is communicated with the inner cavity of the grouting pipe, and the grouting hose is inserted from the bottom of the lowest grouting body, so that the conical grouting head on the grouting hose is located in the grouting pipe of the lowest grouting body, and the other end of the grouting hose passes through the inner cavity of the grouting rod and is arranged outside the grouting rod, and finally the lowest grouting body is closed with a plug; S5: Install the serial capsule grouting device: vertically place the assembled serial capsule grouting device into the drill hole to ensure that the serial capsule grouting device sinks to the bottom of the hole. Then, fine sand can be used to fill the gap between the grouting rod, the grouting body and the hole to ensure that the gap is densely filled. After filling, the hole is closed; S6: connect the grouting equipment with the grouting hose, inject the slurry into the grouting pipe through the grouting hose, and slowly lift the grouting hose during the grouting process until the grouting pipe is full of slurry, continue to lift the grouting hose to make the conical grouting head fit tightly with the boss, increase the grouting pressure, and the slurry enters the bladder through the grouting hole. During the process, the grouting speed is controlled to ensure that the bladder expands at a uniform speed, thereby squeezing the surrounding soil to deform. After the grouting of the current grouting body is completed, lift the grouting hose upward with a specified force to compress the conical grouting head and separate it from the boss, and enter the upper grouting pipe. Then the slurry provides upward pressure to push the one-way sealing structure to seal the grouting body; S7: Repeat step S6 until the grouting of all grouting bodies is completed; S8: Complete grouting and seal: After the grouting of the uppermost grouting body is completed, slowly lift the grouting hose into the grouting rod, rotate the grouting rod to separate it from the uppermost grouting body, then slowly lift the grouting rod and the grouting hose upwards, and grout slowly and simultaneously to avoid the collapse of the borehole. The grouting is completed after the grouting rod and the grouting hose leave the borehole, and finally seal it.

[0013] Further, in step S6, a plastic film is provided at the grouting hole. As the grouting pressure increases, the plastic film will be broken, so that the slurry in the grouting pipe can enter the capsule through the grouting hole.

[0014] The beneficial effects of the present invention are: 1. The present invention can realize the rapid serial splicing of grouting bodies, and quickly and flexibly assemble grouting bags with different grouting lengths, so that the grouting of grouting bags can be combined with engineering practice, meet the deformation control requirements of different soil depth ranges, and improve the flexibility of equipment application; 2. The present invention can connect grouting bodies of different expansion sizes in series to achieve expansion effects of different shapes such as cylindrical, right conical, and inverted conical, control the deformation of the soil in different directions, and expand the scope of application; 3. The present invention can effectively ensure the expansion effect of the grouting body. According to the actual grouting situation, high-strength grouting hoses with different inner diameters are selected to effectively improve the grouting pressure and grouting reliability. For hard soil, a small-sized grouting body can be selected to ensure the expansion effect of the grouting body in various soils. 4. The present invention provides a one-way sealing structure. After the grouting is completed, the one-way sealing structure can seal the grouting body. When the slurry in the grouting body is not solidified, the slurry can be prevented from overflowing from the grouting body, thereby ensuring the internal pressure of the grouting body is stable. 5. The present invention can realize the standardized design, production and popularization and application of grouting bodies, grouting rods, grouting hoses, etc., and can especially realize the standard definition of the size specifications of grouting bodies, so as to facilitate the application in various soil layers; 6. In the actual project of the present invention, only the grouting body is left in the soil after the grouting is completed, and the grouting rod and the grouting hose can be reused, which effectively controls the material consumption and saves the project investment. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 is a schematic diagram of the grouting body; Figure 3 is a schematic diagram of a grouting hose; Figure 4 yes Figure 2 The enlarged view of point A in the middle; Figure 5 yes Figure 2 Enlarged view of point B in the middle.

[0016] Figure markings: 1-grouting rod; 2-grouting bag; 3-grouting body; 4-grouting pipe; 401-external thread; 402-internal thread; 403-grouting hole; 404-plastic film; 5-plug; 6-bag body; 7-connecting pipe; 8-grouting hose; 801-conical grouting head; 9-boss; 901-sealing surface; 10-one-way sealing structure; 101-hinged seat; 102-sealing plate; 103-floating body; 104-sealing ring. DETAILED DESCRIPTION

[0017] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0018] like Figure 1-Figure 5As shown, the present invention is a serial capsule grouting device, comprising a grouting rod 1, a grouting bag 2 is arranged at the bottom of the grouting rod 1, the grouting bag 2 comprises at least one grouting body 3, each of the grouting bodies 3 comprises a grouting pipe 4, the inner cavity of the grouting pipe 4 is communicated with the inner cavity of the grouting rod 1, the upper end of the grouting pipe 4 is provided with an external thread 401, the lower end of the grouting pipe 4 is provided with an internal thread 402 used in conjunction with the external thread 401, and a plug 5 matched with the internal thread 402 is arranged below the grouting bag 2; the grouting A bladder 6 is arranged on the outside of the grouting pipe 4, a grouting hole 403 is arranged on the grouting pipe 4, a connecting pipe 7 connecting the inner cavity of the bladder 6 and the inner cavity of the grouting pipe 4 is arranged in the grouting hole 403, a grouting hose 8 is arranged in the grouting pipe 4, one end of the grouting hose 8 is located outside the grouting rod 1, and the other end is located in the inner cavity of the grouting pipe 4 and is provided with a conical grouting head 801, a boss 9 used in conjunction with the conical grouting head 801 is arranged in the inner cavity of the grouting pipe 4, and a one-way sealing structure 10 is arranged below the boss 9.

[0019] Among them, the grouting rod 1 is a hollow steel pipe, and the grouting bag 2 is composed of at least one grouting body 3. The number of grouting bodies 3 is determined according to the actual project, and the length of a single grouting body 3 can be arbitrarily selected according to the design; the grouting pipe 4 is coaxial with the grouting rod 1, and the inner cavity of the grouting pipe 4 is connected with the inner cavity of the grouting rod 1, so that the grouting hose 8 can pass through the grouting rod 1 and the grouting pipe 4 to grout the inner cavity of the grouting pipe 4; the upper end of the grouting pipe 4 is provided with an external thread 401, and the lower end of the grouting pipe 4 is provided with an internal thread 402 used in conjunction with the external thread 401, so that multiple grouting bodies 3 can be connected in sequence through threads, and a connecting thread used in conjunction with the external thread 401 can be provided at the bottom end of the grouting rod, which can make the connection more convenient The grouting pipe 4 and the grouting rod 1; the plug 5 is used to close the grouting body 3 at the bottom, and the plug 5 is provided with a thread, which is connected to the internal thread 402 at the lower end of the grouting pipe 4; the bladder 6 is made of high-strength and high-elasticity rubber. When grouting is not performed, the bladder 6 is in a contracted state and is tightly tied to the grouting pipe 4 with a cloth strip. The cloth strip breaks during the grouting expansion process of the bladder 6. When the number of grouting bodies 3 is more than two, the expansion size of the bladder 6 of each grouting body 3 can be the same or different, which needs to be determined according to the actual engineering conditions; the grouting holes 403 are evenly arranged along the circumference of the grouting pipe 4, and a connecting pipe 7 connecting the inner cavity of the bladder 6 and the inner cavity of the grouting pipe 4 is provided in the grouting hole 403. The connecting pipe 7 can be rubber The rubber hose is bonded to the inner wall of the grouting hole 403 with AB glue, and the connecting pipe 7 can be integrally formed with the bladder 6. In order to achieve rapid grouting, the grouting hole 403 can be provided with multiple layers; the grouting hose 8 can adopt a high-strength rubber hose with built-in steel wire, and the conical grouting head 801 is integrally formed with the grouting hose 8. The diameter of the end of the conical grouting head 801 close to the grouting hose 8 is smaller than the diameter of the end away from the grouting hose 8. When in use, the grouting is penetrated into the grouting hose 8 from the bottom of the lowest grouting body 3, so that the conical grouting head 801 on the grouting hose 8 is located in the grouting pipe 4 of the lowest grouting body 3, and the other end of the grouting hose 8 passes through the inner cavity of the grouting rod 1 and is arranged outside the grouting rod 1, so as to be conveniently connected with the external grouting equipment; the grouting hose The inner diameter of the upper part of the grouting pipe 4 is R1, and the inner diameter of the lower part is R2, R1 is smaller than R2, and a boss 9 is formed at the position where the diameters of the upper part and the lower part change, and the grouting hole 403 is located below the boss 9. The inner diameter of the upper part of the grouting pipe 4 is slightly larger than the diameter of the grouting hose 8, and the inner diameter of the upper part of the grouting pipe 4 is smaller than the diameter of the end of the conical grouting head 801 away from the grouting hose 8, so that the conical grouting head 801 can be stuck at the position of the boss 9. Since the conical grouting head 801 and the grouting hose 8 are both made of rubber, after completing the grouting of a grouting body 3, the grouting hose 8 is pulled upward, which can compress and deform the conical grouting head 801, so that the conical grouting head 801 can smoothly pass through the upper part of the grouting pipe 4 and then enter the inner cavity of the upper-level grouting body 3;The one-way sealing structure 10 can adopt a one-way valve, and the one-way valve is arranged below the boss 9, so that after the slurry is injected into the grouting body 3, the one-way sealing structure 10 can seal the grouting body 3, and when the slurry in the grouting body 3 is not solidified, the slurry can be prevented from overflowing from the grouting body 3, thereby ensuring that the internal pressure of the grouting body 3 remains stable. ;

[0020] See also Figure 4 The one-way sealing structure 10 includes an articulated seat 101 disposed on the lower surface of the boss 9, and a sealing plate 102 is hinged on the articulated seat 101. The articulated seat 101 is fixedly connected to the lower surface of the boss 9, and the sealing plate 102 is a circular plate made of lightweight plastic. The diameter of the sealing plate 102 is larger than the inner diameter of the upper part of the grouting pipe 4 and smaller than the inner diameter of the lower part of the grouting pipe 4. As the slurry level in the grouting pipe 4 rises, the sealing plate 102 will be driven to rotate until the upper surface of the sealing plate 102 is tightly attached to the lower surface of the boss 9, so that a grouting body 3 can be closed by a sealing component.

[0021] In order to enable the sealing plate 102 to float better on the slurry surface and improve the sealing effect, further, see Figure 4 , a floating body 103 is provided on the lower surface of the sealing plate 102, and a sealing ring 104 is provided on the upper surface of the sealing plate 102. The floating body 103 can be an air bag, which is connected to the lower surface of the sealing plate 102 by bonding, and the sealing ring 104 can be a rubber ring. It should be noted here that when grouting is performed, the inner cavity of the grouting pipe 4 is filled first. At this time, the slurry has not yet entered the bladder body 6. The conical grouting head 801 is stuck on the boss 9, so that the bladder body 6 is in a closed state. The sealing plate 102 will also close the grouting pipe 4, increase the grouting pressure, and the slurry will flush the sealing plate 102, so that the slurry continues to enter the grouting pipe 4. At this time, the slurry can enter the bladder body 6. After the slurry pressure in the bladder body 6 is sufficient, the grouting is stopped. The sealing plate 102 will rotate rapidly around the hinge seat 101 under the action of the buoyancy of the slurry due to the floating body 103 until the slurry is sealed. The sealing ring 104 on the sealing plate 102 abuts against the lower surface of the boss 9 to achieve sealing of the grouting body 3. It should be noted here that in the initial state, the sealing plate 102 will rotate around the hinge seat under the action of gravity until the floating body 103 abuts against the inner wall of the grouting pipe 4. At the same time, the upper surface of the sealing plate 102 is in an inclined state, and the distance between the end of the sealing plate 102 close to the hinge seat and the inner wall of the grouting pipe 4 is smaller than the distance between the end of the sealing plate 102 away from the hinge seat and the inner wall of the grouting pipe 4. This ensures that the floating body 103 will drive the sealing plate to rotate toward the boss 9 under the action of the buoyancy of the slurry.

[0022] In order to make the boss 9 and the conical grouting head 801 fit more closely, further, see Figure 4The boss 9 is provided with a conical sealing surface 901 which cooperates with the conical grouting head 801.

[0023] In order to prevent air from entering the bladder 6 when the grouting pipe 4 is filled, a plastic film 404 is further provided at the grouting hole 403 as shown in the figure. The plastic film 404 can be a common polyethylene film. When in use, the slurry is injected into the grouting pipe 4 through the grouting hose 8, and the grouting hose 8 is slowly lifted until the grouting pipe 4 is filled with slurry. The grouting hose 8 is further lifted to make the conical grouting head 801 fit tightly with the boss 9 to increase the grouting pressure. When the pressure reaches a certain level, the slurry will break through the plastic film 404 and enter the bladder 6.

[0024] A serial capsule grouting method, using a serial capsule grouting device, comprises the following steps: S1: Determine the hole layout location: According to the specific needs of controlling soil deformation at the project site, the location of the holes, the depth of each hole, and the specifications of the serial capsule grouting device required for each hole are determined through theoretical calculation, numerical simulation, and in-situ testing; S2: Equipment transportation: transport the serial capsule grouting equipment and grouting equipment of determined specifications from the manufacturing site to the project site, and store them safely and reasonably until they are assembled and used; S3: On-site drilling: According to the calibrated hole position and hole depth, a reasonable drilling sequence is formulated, the hole diameter is determined according to the serial capsule grouting device, and the drilling machine is used for drilling; S4: splicing of serial capsule grouting devices: according to the specifications of the serial capsule grouting devices required for each hole, the grouting bodies 3 are spliced ​​and assembled in series to form a grouting bag 2, and then a grouting rod 1 is arranged on the grouting bag 2, and the inner cavity of the grouting rod 1 is communicated with the inner cavity of the grouting pipe 4, and the grouting hose 8 is inserted from the bottom of the lowest grouting body 3, so that the conical grouting head 801 on the grouting hose 8 is located in the grouting pipe 4 of the lowest grouting body 3, and the other end of the grouting hose 8 passes through the inner cavity of the grouting rod 1 and is arranged outside the grouting rod 1, and finally the lowest grouting body 3 is closed with a plug 5; S5: Installing the serial capsule grouting device: vertically place the assembled serial capsule grouting device into the drill hole to ensure that the serial capsule grouting device sinks to the bottom of the hole, and then use fine sand to fill the gap between the grouting rod 1, the grouting body 3 and the hole to ensure that the gap is densely filled, and close the hole after filling; S6: connect the grouting equipment with the grouting hose 8, inject the slurry into the grouting pipe 4 through the grouting hose 8, and slowly lift the grouting hose 8 during the grouting process until the grouting pipe 4 is filled with slurry, continue to lift the grouting hose 8, make the conical grouting head 801 fit tightly with the boss 9, increase the grouting pressure, and the slurry enters the bladder 6 through the grouting hole 403. During the process, the grouting speed is controlled to ensure that the bladder 6 expands at a uniform speed, thereby squeezing the surrounding soil to deform. After the grouting of the current grouting body 3 is completed, lift the grouting hose 8 upward with a specified force, so that the conical grouting head 801 is compressed and separated from the boss 9, and enters the upper grouting pipe 4. Then the slurry provides upward pressure to push the one-way sealing structure 10 to seal the grouting body 3; S7: repeat step S6 until the grouting of all grouting bodies 3 is completed; S8: Complete grouting and seal: After the grouting of the uppermost grouting body 3 is completed, slowly lift the grouting hose 8 into the grouting rod 1, rotate the grouting rod 1 to separate it from the uppermost grouting body 3, and then slowly lift the grouting rod 1 and the grouting hose 8 upwards, and grout slowly and synchronously to avoid the collapse of the borehole. The grouting is completed after the grouting rod 1 and the grouting hose 8 leave the borehole, and finally seal it.

[0025] Further, in step S6 , a plastic film 404 is provided at the grouting hole 403 . As the grouting pressure increases, the plastic film 404 will be broken, so that the slurry in the grouting pipe 4 can enter the capsule 6 through the grouting hole 403 .

[0026] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A serial capsule grouting device, comprising a grouting rod (1), a grouting bag (2) being arranged at the bottom of the grouting rod (1), characterized in that: The grouting bag (2) comprises at least one grouting body (3), each of the grouting bodies (3) comprises a grouting pipe (4), the inner cavity of the grouting pipe (4) is communicated with the inner cavity of the grouting rod (1), the upper end of the grouting pipe (4) is provided with an external thread (401), the lower end of the grouting pipe (4) is provided with an internal thread (402) used in conjunction with the external thread (401), and a plug (5) is provided below the grouting bag (2) and is used in conjunction with the internal thread (402); a bag body (6) is provided on the outer side of the grouting pipe (4), and a plug (5) is provided on the upper side of the grouting pipe (4) to prevent the plug (5) from being damaged. A grouting hole (403) is provided, wherein a connecting pipe (7) is provided in the grouting hole (403) for connecting the inner cavity of the bladder (6) and the inner cavity of the grouting pipe (4), wherein a grouting hose (8) is provided in the grouting pipe (4), wherein one end of the grouting hose (8) is located outside the grouting rod (1), and the other end is located in the inner cavity of the grouting pipe (4) and is provided with a conical grouting head (801), wherein a boss (9) for use with the conical grouting head (801) is provided in the inner cavity of the grouting pipe (4), and a one-way sealing structure (10) is provided below the boss (9).

2. A serial capsule grouting device as claimed in claim 1, characterized in that: The one-way sealing structure (10) comprises a hinge seat (101) arranged on the lower surface of the boss (9), and a sealing plate (102) is hingedly connected to the hinge seat (101).

3. A serial capsule grouting device as claimed in claim 2, characterized in that: A floating body (103) is provided on the lower surface of the sealing plate (102), and a sealing ring (104) is provided on the upper surface of the sealing plate (102).

4. A serial capsule grouting device as claimed in claim 1, characterized in that: The boss (9) is provided with a conical sealing surface (901) that cooperates with the conical grouting head (801).

5. A serial capsule grouting device as claimed in claim 1, characterized in that: The material of the bladder (6) is high-strength and high-elasticity rubber.

6. A serial capsule grouting device as claimed in claim 1, characterized in that: A plastic film (404) is provided at the grouting hole (403).

7. A serial capsule grouting method, using a serial capsule grouting device as claimed in any one of claims 1 to 6, characterized in that: The following steps are included: S1: Determine the hole layout location: According to the specific needs of controlling soil deformation at the project site, determine the location of the holes, the depth of each hole, and the specifications of the serial capsule grouting device required for each hole through theoretical calculation, numerical simulation, and in-situ testing; S2: Equipment transportation: transport the serial capsule grouting equipment and grouting equipment of determined specifications from the manufacturing site to the project site, and store them safely and reasonably until they are assembled and used; S3: On-site drilling: According to the calibrated hole position and hole depth, a reasonable drilling sequence is formulated, the hole diameter is determined according to the serial capsule grouting device, and the drilling machine is used for drilling; S4: splicing of the serial capsule grouting device: according to the specifications of the serial capsule grouting device required for each hole, the grouting bodies (3) are spliced ​​and assembled end to end in series to form a grouting bag (2), and then a grouting rod (1) is arranged on the grouting bag (2), and the inner cavity of the grouting rod (1) is communicated with the inner cavity of the grouting pipe (4), and a grouting hose (8) is inserted from the bottom of the lowest grouting body (3) so that the conical grouting head (801) on the grouting hose (8) is located in the grouting pipe (4) of the lowest grouting body (3), and the other end of the grouting hose (8) passes through the inner cavity of the grouting rod (1) and is arranged outside the grouting rod (1), and finally the lowest grouting body (3) is closed with a plug (5); S5: Installing the serial capsule grouting device: vertically placing the assembled serial capsule grouting device into the drill hole, ensuring that the serial capsule grouting device sinks to the bottom of the hole, and then using fine sand to fill the gap between the grouting rod (1), the grouting body (3) and the hole, ensuring that the gap is densely filled, and closing the hole after filling; S6: connecting the grouting equipment to the grouting hose (8), injecting the slurry into the grouting pipe (4) through the grouting hose (8), and slowly lifting the grouting hose (8) during the grouting process until the grouting pipe (4) is filled with slurry, and continuing to lift the grouting hose (8) so that the conical grouting head (801) and the boss (9) are tightly fitted and sealed, increasing the grouting pressure, and the slurry enters the sac (6) through the grouting hole (403). During the process, the grouting speed is controlled to ensure that the sac (6) expands at a uniform speed, thereby squeezing the surrounding soil to deform. After the grouting of the current grouting body (3) is completed, the grouting hose (8) is lifted upward with a specified force, so that the conical grouting head (801) is compressed and separated from the boss (9) and enters the upper grouting pipe (4). Then, the slurry provides an upward pressure to push the one-way sealing structure (10) to seal the grouting body (3); S7: repeat step S6 until the grouting of all grouting bodies (3) is completed; S8: Complete grouting and seal: After the grouting of the uppermost grouting body (3) is completed, slowly lift the grouting hose (8) into the grouting rod (1), rotate the grouting rod (1) to separate it from the uppermost grouting body (3), then slowly lift the grouting rod (1) and the grouting hose (8) upward, and grouting is performed simultaneously and slowly to prevent the borehole from collapsing. After the grouting rod (1) and the grouting hose (8) leave the borehole, the grouting is completed, and finally the hole is sealed.

8. A serial capsule grouting method as claimed in claim 7, characterized in that: In step S6, a plastic film (404) is provided at the grouting hole (403). As the grouting pressure increases, the plastic film (404) will be broken, allowing the slurry in the grouting pipe (4) to enter the capsule (6) through the grouting hole (403).

Citation Information

Patent Citations

  • Control soil deformation's single -point bag formula slip casting device

    CN208235526U